Saudi Aramco Pre-Commissioning Form: Lighting
Saudi Aramco Pre-Commissioning Form: Lighting
Saudi Aramco Pre-Commissioning Form: Lighting
Sheet 1 of 2
User Reference:
Equipment Description:
Plant No. / Location:
Serial No:
No
Witness
Signature & Date
PDD
Inspection
Operation/Maintenance
Contractor
Sheet 2 of 2
LOCATION IN PLANT
Witness
Signature & Date
User Reference:
Equipment Description:
Plant No. / Location:
Serial No:
HEIGHT
PDD
DATA
PLANE (Specify
vertical (V) or
horizontal (H)
Inspection
ACTUAL
SAES-P-123
Requirement
Operation/Maintenance
Contractor