UPF PIPE SUPPORT INSPECTION RECORD
Work Package No.:
____________________________
Task No.: ________________
Page 1 of 2
DMC NO.:
DATE:
WORK PROCESS: PIPE SUPPORT
IR number:
PROJECT NUMBER:
QUALITY LEVEL:
PROJECT NAME:
Q
RS
CC
BLDG/AREA:
LOCATION:
LINE NUMBER:
ISO NUMBER:
PIPE SUPPORT NUMBER:
REV.:
SYSTEM NUMBER:
DESIGN DOCUMENTS:
1)
4)
2)
5)
3)
6)
RESPONSIBILITY
(* N/A, where Inspection Description is not applicable)
INSPECTION DESCRIPTION
FE Initial/Date *
(Pre-Inspection)
1
Verify Pipe Support identifying number matches design
documents
Pipe support and accessories protected from and free of any
damage
Pipe support configuration and spacing/location is within
nominal tolerance in accordance with design requirements
Materials in accordance with design requirements
Verify manufacturing parts/components are per the
manufacturers instructions. (Not different brand names
mismatched or sizes mismatched.
Welding and NDE complete and correct per design prior to
paint touchup.
Verify beam stiffeners are installed as required
Visually check anchor bolt installation for proper edge distance,
angularity and bolt tightness
Visually check bolted connections, ensure all plies are
thoroughly compacted, and any retaining pins, lock nuts are in
place and secure
10
Verify installed swing angles are equal to or less than five (5)
degrees for rod hangers on non-critical systems
11
Inspect hydraulic snubbers for integrity or leakage
12
Verify that hanger mark numbers as depicted on the spring
can(s) and hanger assemblies are correct .
13
Verify that the spring can(s) load/displacement scale is present
and oriented correctly.
14
Verify cold settings on spring cans and target is aligned with
cold setting
15
Inspect spring cans to ensure pins/travel stops are in place and
firmly secured prior to hydrostatic testing
16
Verify u-bolts are either loose-fit or snug in accordance with
design documents
CFN-1008, Y17-95-64-834 (07/12)
Accept/
Reject
(A or R)
QCE/PI/FE Initial/Date *
(Final Inspection)
UPF PIPE SUPPORT INSPECTION RECORD
Work Package No.:
____________________________
Task No.: ________________
Page 2 of 2
RRESPONSIBILITY
(* N/A, where Inspection Description is not applicable)
INSPECTION DESCRIPTION (continued)
FE Initial/Date *
(Pre-Inspection)
17
Verify that slide plate assemblies are present if specified,
installation offsets are maintained where applicable, and
specified slide material and/or lubricant has not been damaged
during installation.
18
Check integrity of slide plates and ensure plates are nominally
parallel and have not been distorted by welding or installation,
check bearing of slide plates to verify full contact between the
two plates/member or bearing contact as indicated by design
output
19
Verify dissimilar metal contact between process line and hanger
is in accordance with design output (Raw carbon steel surfaces
are not in contact with stainless steel pipe).
20
Verify clearances exist around the pipe for thermal movement
and growth, and that the location of the support does not
interfere with existing installed items.
21
Verify installed gaps and direction in the cold condition is within
nominal tolerance specified in design documents
22
Check pipe to support clearances per design drawing and record
as found dimensions;
Accept/
Reject
(A or R)
QCE/PI/FE Initial/Date *
(Final Inspection)
Direction: (+,-), +X is perpendicular to pipe left of flow direction,
+Y is vertical upward, and +Z is along the pipe axis in direction
of flow. Example; X= (+1/8, -0) or (+1/16, -1/16)
NOTE: Record as-found gaps at Final Inspection only.
X=
Y=
Z=
23
Verify clearance requirements for adjacent supports have not
been disturbed upon completion of step no. 17.
24
Verify that approved lubricants have been applied as required
by design output.
25
Verify that areas which are designated to be free of grease and
oil have been cleaned or wiped down if present.
26
Ensure pipe support components are not installed over
circumferential pipe weld.
27
If line balancing is required, at the design cold load, a general
process is delineated in Section 5.5.
YES
NO
Comments:
Print and Sign below
FE Inspection Performed by:
DATE:
QCE/PI Inspection Performed by:
DATE:
CFN-1008, Y17-95-64-834 (07/12)