Purpose
Use this procedure to create an engineering change request.
Engineering Change Management is a function that can be used to change various
aspects of production basic data (for example, BOMs, task lists) with history.
A change with history has the following distinctive characteristics:
-
The changed object is saved twice: in its state before and after the changes.
Trigger
Perform this procedure when detailed information regarding changes to BOMs and recipes is
desired. Therefore an engineering change request will be required.
Prerequisites
None
Menu Path
Use the following menu path(s) to begin this transaction:
Select Logistics
Change Number
Production
Master Data
Engineering Change Management
Create to go to the Create Change Master: Initial screen.
Transaction Code
CC01
Helpful Hints
You may enter a change master profile on the initial screen when you create the Change
Master. The selected profile will default certain data and settings previously defined that
are always required when creating a change master. You may create a change master
from scratch or copy it from an existing change master record.
You can have the system assign a sequential number or you can assign your own number
that is either numeric, alpha or alphanumeric. If a standard is desired, the business will
need to decide what the standard will be.
Screen Flow
Create Change
Master: Initial
screen
-Change number
(Copy from)
Create Change
Master: Initial
screen
Create Change
Master: Object
types
Procedure
1.
2.
Select
3.
Select
to determine that the changes with reference to the change
master record are automatically released for the operative areas (costing, planning,
production).
4.
Field Name
Change number
(Copy from)
5.
Click
R/O/C
O
Description
Document number identifying the change record within the
engineering change management module.
Example:
794
6.
R/O/C
Description
Change number
description
Valid from
7.
Click
8.
Click
9.
Click
activate.
10.
Click
screen.
to select the check box for Actv, Object, MgtRec, and GenDial fields to
11.
12.
R/O/C
Description
Alternative date
Valid from
Click
13.
Result
You have created an engineering change request.