100% found this document useful (1 vote)
370 views8 pages

DSAP MFG CC01 Create Change Master

This document provides steps to create an engineering change request in SAP. It describes creating a change master record, including entering a change number, description, valid from date and status. It also covers selecting object types and alternative dates to allow discrete changes with one change number.

Uploaded by

Deepak Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
370 views8 pages

DSAP MFG CC01 Create Change Master

This document provides steps to create an engineering change request in SAP. It describes creating a change master record, including entering a change number, description, valid from date and status. It also covers selecting object types and alternative dates to allow discrete changes with one change number.

Uploaded by

Deepak Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 8

Title: Create Change Master

SBU : DSAP (DuPont SAP)


Workstreams : Manufacturing (MFG)
DuPont - For internal use only

Create Change Master

CC01

Change History
Update the following table as necessary when this document is changed:
Date
03/02/2006

Name
Angel Perez

Change Description
DuPont SAP Standardization

Uncontrolled document when printed

File name: 281014352.doc


Reference Number:

Version: Rev1
Last Modified: 3/21/2014 12:07:00 PM

SAP Parent
Page 1 / 8

Purpose
Use this procedure to create an engineering change request.
Engineering Change Management is a function that can be used to change various
aspects of production basic data (for example, BOMs, task lists) with history.
A change with history has the following distinctive characteristics:
-

It takes effect under precisely defined conditions (precise date).

The changed object is saved twice: in its state before and after the changes.

Trigger
Perform this procedure when detailed information regarding changes to BOMs and recipes is
desired. Therefore an engineering change request will be required.
Prerequisites
None
Menu Path
Use the following menu path(s) to begin this transaction:

Select Logistics
Change Number

Production
Master Data
Engineering Change Management
Create to go to the Create Change Master: Initial screen.

Transaction Code
CC01
Helpful Hints

You may enter a change master profile on the initial screen when you create the Change
Master. The selected profile will default certain data and settings previously defined that
are always required when creating a change master. You may create a change master
from scratch or copy it from an existing change master record.

You can have the system assign a sequential number or you can assign your own number
that is either numeric, alpha or alphanumeric. If a standard is desired, the business will
need to decide what the standard will be.

Screen Flow
Create Change
Master: Initial
screen

-Change number
(Copy from)

Create Change
Master: Initial
screen

13. You have completed


this transaction.

Create Change -Change number


Master: Change description
-Valid from
header
-Change no. status

Create Change
Master: Object
types

Create Change -Alternative date


Master:
-Valid from
Alternative Date:
Overview

Procedure

1.

Start the transaction using the menu path Logistics


Production
Master Data
Engineering Change Management
Change Number
Create or transaction code CC01.

Create Change Master: Initial screen

2.

Select

3.

Select
to determine that the changes with reference to the change
master record are automatically released for the operative areas (costing, planning,
production).

4.

As required, complete/review the following field:

Field Name
Change number
(Copy from)

5.

Click

R/O/C
O

Description
Document number identifying the change record within the
engineering change management module.
Example:
794

to go to the Create Change Master: Change header screen.

Create Change Master: Change header

6.

As required, complete/review the following fields:


Field Name

R/O/C

Description

Change number
description

Description of the change record within the engineering


change management module.
Example:
Generated by EH&S Dangerous Goods

Valid from

Beginning date when specifying a range of dates.


Example:
02/13/2006

Change no. status

Indicates the status of a change master. Active or inactive.


Example:
1 - Active

7.

Click

8.

Click

to validate your entries.


to go to the Create Change Master: Object types screen.

Create Change Master: Object types

9.

Click
activate.

10.

Click
screen.

to select the check box for Actv, Object, MgtRec, and GenDial fields to

to go to the Create Change Master: Alternative Date: Overview

Create Change Master: Alternative Date: Overview

11.

As required, complete/review the following fields:


Field Name

12.

R/O/C

Description

Alternative date

Object-dependent valid-from date in a change master record.


This date replaces the valid-from date in the change master
header for the specified object, and allows you to make
discrete changes with one change number.
Example:
ALT CHANGE DATE

Valid from

Beginning date when specifying a range of dates.


Example:
11/09/2006

Click

to save the change master.

Create Change Master: Initial screen

The system displays the message, "Change number XXXX created."

13.

You have completed this transaction.

Result
You have created an engineering change request.