Responsibility Matrix D&B Rev 3 22 - Sep - 2014

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 10
At a glance
Powered by AI
The document outlines roles and responsibilities for project administration and communication for a design-build hospital project.

The document defines a responsibility matrix for various project tasks between the design-build contractor, engineer, supervision consultant, project and healthcare management consultant, and employer (Ministry of Health).

Roles like 'P' for direct responsibility, 'S' for supporting role, 'R' for review, and 'A' for approval are defined for each project task.

NEW AL SABAH HOSPITAL PROJECT

MATRIX FOR ADMINISTRATION & COMMUNICATION - DESIGN-BUILD-EQ


P
S
R
A
CC

Perform (Direct Responsibility for execution of works)


Supporting Role (within the Scope of Work)
Review / Comment
Approve
All Information (Copy)

No.

Description

Design-Build
Contractor

1
1.01
1..02

Notice to Commence Works


Issuing Notice to Commence Works
Possession of Site

2
2.01
2.02
2.03

Contractor's Bonds and Guarantees


Performance Bonds
Insurance Certificates
Advance Payment Bank Guarantee

P
P
P

3
3.01
3.02
3.03
3.04
3.05
3.06
3.07
3.08

Contractor's Design
Data Confirmation and Concept Design Refinement
Schematic Design
Design Development
Final Design
Design Change requested by Contractor
Design Change requested by Employer
Authorities Approval on Final Design
Building Permits

P
P
P
P
P
P
P
P

4
4.01
4.02
4.03
4.04

Project Control & Contract Management


Chair Kick-off Meeting
Mobilization Schedule
Key site personnel
Subcontractors Approval

P
P
P

Approval of sources & manufacturers not in specifications

4.06

Approval of sources & manufacturers listed in the specifications

4.07
4.08
4.09
4.10
4.11
4.12
4.13

Quality Assurance and Quality Control Plan


Contractor's Program/Schedule
Follow up on construction progress
Detailed Schedule
Management & Valuation of Variation Orders
Cost Loaded Schedule
Updated Schedule without time extension

P
P
S
P

4.14

Request for interpretation/Clarification of contract documents that does


entail any change in cost or time (contractually)

4.15

Request for interpretation/Clarification of contract documents that


doesn't entail any change in cost or time (technically)

4.16
4.17

Suspension of Work
Extension of Time

4.05

1 of 10

P
P

22-Sep-2014

NEW AL SABAH HOSPITAL PROJECT

MATRIX FOR ADMINISTRATION & COMMUNICATION - DESIGN-BUILD-EQ


P
S
R
A
CC

No.

5
5.01
5.02
5.03
5.04
5.05

Perform (Direct Responsibility for execution of works)


Supporting Role (within the Scope of Work)
Review / Comment
Approve
All Information (Copy)

Description

Site Logistics
Contractor's Plan for Site Facilities
Detailed Site Logistics Plan
On site and off site logistic
Security programme
Security Monitoring

Design-Build
Contractor

P
P
P
P
P

2 of 10

22-Sep-2014

NEW AL SABAH HOSPITAL PROJECT

MATRIX FOR ADMINISTRATION & COMMUNICATION - DESIGN-BUILD-EQ


P
S
R
A
CC

Perform (Direct Responsibility for execution of works)


Supporting Role (within the Scope of Work)
Review / Comment
Approve
All Information (Copy)

No.

Description

6
6.01
6.02

Site Safety
Health & Safety Program
Safety Monitoring

7
7.01
7.02
7.03
7.04
7.05

7.09

Submittals
Shop Drawings
Submittal Finishes Materials/Samples/Mockups
Submittal Other Materials/Samples/Mockups
Inspection and Testing of Plant and Materials
Request for Alternatives and Substitutes
Any deviation from the contract documents, that doesn't entail any
change in cost and time
Any deviation from the contract documents, that entails change in cost
and time
All correspondence which affects the terms and conditions of the
contract
Issues related to coordination among Stakeholders

7.10

Report on material procurement, shipment and delivery (E2)

8
8.01
8.02
8.03
8.04
8.05
8.06
8.07

8.09
8.10

Construction Supervision
Technical Supervision
Request for Inspection & Approval (RFIA)
Job Site Instructions (JSI)-without additional cost & time
Construction Methods
Defects/Deficiency Monitoring and Recording
Survey, Levels and Setting Out
Issue of Site Instruction
Execution of work in accordance with the contract drawings and
specifications (check list)
Quality Assurance and Control
Non Compliance Report

9
9.01
9.02
9.03
9.04
9.05

Contractor and Supplier Payments


Review/Verify Contractor Payment Schedules
Request for Proposal
Review variations
Approve Variations
Payment Certificates

10
10.01
10.02

Claims and Disputes'


Claims or disputes by Contractor
Approve Claims / Resolve Disputes

7.06
7.07
7.08

8.08

Design-Build
Contractor

P
P

P
P
P
P
P
P
P
P
P
P

P
P
S
P

P
P
CC

P
S

P
P

3 of 10

22-Sep-2014

NEW AL SABAH HOSPITAL PROJECT

MATRIX FOR ADMINISTRATION & COMMUNICATION - DESIGN-BUILD-EQ


P
S
R
A
CC

No.

Perform (Direct Responsibility for execution of works)


Supporting Role (within the Scope of Work)
Review / Comment
Approve
All Information (Copy)

Description

11
11.01

Coordination with Authorities


Coordinate with Services/Utilities Authorities

12
12.01
12.03
12.04
12.05

Hand Over Inspections


Testing and Commissioning
Prepare Snag List
Preliminary Hand Over Inspection
Final Hand Over Inspection

Design-Build
Contractor

P
S
S

4 of 10

22-Sep-2014

NEW AL SABAH HOSPITAL PROJECT

MATRIX FOR ADMINISTRATION & COMMUNICATION - DESIGN-BUILD-EQ


P
S
R
A
CC

No.

13
13.01
13.02
13.03
13.04
14

14.01

Perform (Direct Responsibility for execution of works)


Supporting Role (within the Scope of Work)
Review / Comment
Approve
All Information (Copy)

Description

Project Completion
Final As Built Drawings
Operation and Maintenance Manual
Warranties/Guaranties
Substantial Completion Certificates

Design-Build
Contractor

P
P
P
S

Clarification of the Documents Routing


Any submittal not in accordance with the Contract and not
approved may be actioned by the Supervision Consultant and
returned to the Contractor directly, after consultation with the
Project / Construction Manager

NOTE: In this MATRIX, wherever the Supervision Consultant has been authorized to approve (A) and the Project &
supporting role (S), the former shall closely coordinate with the latter before taking final action.

5 of 10

22-Sep-2014

ITAL PROJECT

NICATION - DESIGN-BUILD-EQUIP

Supervision
Consultant

Project & Health


Care Management The Engineer
Consultant

Employer
(MOH)

P
S

A
P

CC

R
R
R

A
A
A

CC
CC
CC

R
R
R
R
R
R
R
S

A
A
A
A
A
A
S
S

CC

R1

P
R
R
R2

S
A
A
A

R1

R2

A
A
P
A
P
A
R

S
S
S
S
R1
S
A

A
A
CC
CC
R2
CC
CC

R1

R2

R3

R1

R2

S
S

P
P

A
R

CC
A

6 of 10

22-Sep-2014

ITAL PROJECT

NICATION - DESIGN-BUILD-EQUIP

Supervision
Consultant

R1
R
R
R1
A

Project & Health


Care Management The Engineer
Consultant

R2
A
A
R2
CC

Employer
(MOH)

A
CC
CC
S
CC

7 of 10

22-Sep-2014

ITAL PROJECT

NICATION - DESIGN-BUILD-EQUIP

Supervision
Consultant

Project & Health


Care Management The Engineer
Consultant

A
A

S
CC

CC
CC

A
R1
A
A
R1

CC
R2
CC
S
R2

A
CC
S
A

R1

R2

R1

R2

R3

R1

R2

CC

CC

P/A
A
P/A
A
P
A
P

CC
CC
S
S
S
CC
S

CC
CC
CC
S
S
CC
S

CC

CC

S
R1

CC
CC

R1
P
P
P
R1

R2
R
R
R1
R2

A
A
S
R2
A

R1
S

R2
R1

R3
R2

A
A
P/A

Employer
(MOH)

A
A

8 of 10

22-Sep-2014

ITAL PROJECT

NICATION - DESIGN-BUILD-EQUIP

Supervision
Consultant

Project & Health


Care Management The Engineer
Consultant

A
P
P
P

S
S
S
R

CC
CC
CC
A

Employer
(MOH)

9 of 10

22-Sep-2014

ITAL PROJECT

NICATION - DESIGN-BUILD-EQUIP

Supervision
Consultant

Project & Health


Care Management The Engineer
Consultant

A
A
A
P

S
S
S
S

Employer
(MOH)

CC
A
A
A

o approve (A) and the Project & Healthcare Management Consultant has a
taking final action.

10 of 10

22-Sep-2014