This document provides a quotation for repair and maintenance work on the vessel MV. JOCELINE. It includes 10 days of docking, external hull blasting and painting, steel renewal, piping replacement, sea valve maintenance, rudder work, and maintenance of propellers, valves, and other equipment. The total quoted price for all work is $67,829, excluding any unit rates or additional reservations listed. The document provides detailed line items and pricing for various repair and maintenance tasks needed to properly service the vessel.

Uploaded by

Rianto Aritonang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
121 views18 pages

G General Service

This document provides a quotation for repair and maintenance work on the vessel MV. JOCELINE. It includes 10 days of docking, external hull blasting and painting, steel renewal, piping replacement, sea valve maintenance, rudder work, and maintenance of propellers, valves, and other equipment. The total quoted price for all work is $67,829, excluding any unit rates or additional reservations listed. The document provides detailed line items and pricing for various repair and maintenance tasks needed to properly service the vessel.

Uploaded by

Rianto Aritonang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 18

Vessel Name : MV.

JOCELINE
Dimension : 114.0m x 17.5m x 9.3m ( GRT - 4902 Tons)
Duration : 10 Days Fine Weather Working Days All In Dock
Item

Description

General service

G1

Shore Power Supply


Provide portable generator based on 440V/3 Phase /60Hz and up to 200 AMP
Diesel consumption

G2

Fresh Water
Supply fresh water inclusive of connection and disconnection

G3

Provide rubbish bin including disposal.

G4

To dock and undock barge including 1st dock in dock.

G5

Subsequent day dock hire .

G6

Dock preparation.

G7

Wharfage.

G8

Riggers assistance for docking and undocking and departure only .

G9

Tugs hire for docking, undocking and departure only.

G10

Pilotage for arrival and departure to be arranged by Owner's local agent at


Owner's account.

G11

Provided of fire line per line per day. Connection disconnection included.

G12

Fire patrol only for day time and when hot-work activity is onboard during
normal working hours .

G13

Arrangement of cooling water per line per day. Allow for 2 lines( Aircon &
refigerator). Connection disconnection included. @ S$ 40 per line per day

Page 1 of 18

G14
G15

Gas free inspection by Shipyard personnel.

Cranage for ship's store/provision only, per hour or part thereof.

G16

Gang way at no charge.

G17

Remove and refit manhole covers .


Renew gaskets .
Renew broken studs/nuts .

G18

Remove and refit bottom plugs.

G19

Provide forced ventilation fan per tank/location per day. Connection


disconnection included.

H
H1a

External Hull Blasting and Painting


Bottom Area (1500 m2)
High pressure wash upto 3000 psi with fresh water
Hard scaraping , assume 70% of total area
Hosing of fresh water after grid blasting and prior painting
Washdown oil strains with owner'c chemical, minimum charge 200m2

H1b

Bottop Area (1000 m2)


High pressure wash upto 3000 psi with fresh water
Hard scaraping , assume 70% of total area
Hosing of fresh water after grid blasting and prior painting
Washdown oil strains with owner'c chemical, minimum charge 200m2

H1c

Top Side Area (700 m2)


High pressure wash upto 3000 psi with fresh water
Hard scaraping , assume 70% of total area
Hosing of fresh water after grid blasting and prior painting
Washdown oil strains with owner'c chemical, minimum charge 200m2
Grit blasting
SA 2.0
SA 1.5
SA 1.0

Page 2 of 18

Hull Painting
Touch up caot, per coat ( minimum charge 50% of full caot area)
Full Coat Paint , Assume 3 full coat.
General Notes for Hull Blasting and Painting
1. Owner to supply all paint and thinner.
2.Minimum charge for grit blasting 300m2
3. Exclude treatment of bottom hull in way of dock blocks.
H2a

Anchor (Included item no 3)


Range port and stbd anchor and coat with owner paint
HP washing if required will charge extra

H2b

Anchor Chain
- Lowering down anchor chain. Total 9 shackle port and stbd
- Cleaning and chipping (allow hosing down only)
- Measurement anchor chain and recort to class and owner

H2c

Chain Locker
- Removal and disposal of mud
- Cleaning and painting chain locker port and stbd

Crop and renew Owner's supply Zinc anodes (allow 400x120x50mm) 17 kg


welded type hull anodes. Exclude access works.

To repaint draft, plimsoll marks, barge name and POR only.


To protect hull anodes during painting, extra @S$ 3 each.

I
1a

Steel Work
Ultrasonic thickness measurement (Minimum 200 spots)

To crop and renew defective steel using preblasted and primed ABS Gr. A ship
plates and mild steel sectionals. Regardless of location and internals/profiles.
Price Per Kg.
General remarks for steel renewal work:
a) All new steel,allow for pre-blasted and primed ABS gradeAship plate or
equivalent and mild steel sectionals. For high tensile steel, surcharge 35%.
b) Quoted prices includes the following :

Page 3 of 18

i. Hose and vacuum testing of weldments


ii. Wire brushing and touch-up with one coat of Owner supply primer on new
weldments and disturbed steel. (Exclude drying time for the primer.)
iii. Forced ventilation and temporary working lights.

c)Ship yard reserves the right to substitute higher thickness steel available in the
market in case of non-availability of actual thickness.Any difference in weight
will be charged extra on prorated basis.
d) Steel workcalculation is based on max length x breadth x actual fitted
thickness x steeldensity of 8,000 kg/m3.
e) Tank air testing, if required extra @ S$900/tank/test.

f) Staging, removals in way for access to work,cleaning,special shoring,nondestructivetest and using of special electrodes are not included.
g) Surcharge for steel thickness less than 10 mm.
h) Minimum charge 150 kg per piece for insert plates and 15 kg per piece for
brackets and stiffeners.
i) Staging will be charged extra as follows:
Tower staging min. chargeable size @ 2.4m L x 2.4m L x Height .
Min. charge S$250/stage.
Hanging staging .
Min. charge S$300/stage
Build up welding on hull external. Min charge 2 m run per location. Exclude
access work.
1d

Forcastle Deck Windlass


Brake Lining port and stbd. Allow 2 sets

J1

Sea Chest Box and Sea Gratting


Remove gratings, clean grating and sea chest, apply one coat of Owner's paint
and refit ,per chest.

J2

Valves (29 Pcs)

To open up sea valves, clean for inspection, grind valve lids and seats (for globe
valve only) and repack gland in situ only:
Globe valves. Per inch bore.
Gate valves. Per inch bore.

Page 4 of 18

Butterfly valve. Per inch bore.


Note: Min. charge 2 inch bore per valve. Exclude repairs, renewals, machinging
and access work.
K
1

Controlled Pitch Propeller Tailshaft (1 Set Only)


Withdrawal CPP Tailshaft for survey

Overhaul CPP Tailshaft in workshop with owner specialist

Overhaul fwd and aft seal with owner specialist

Allow to check weight and balance propeller blade. @ S$ 900


per blade.
Allow for 4 blades

To clean and polish propeller

L1
L1a
L1b

Rudder
To check clearance of rudder including staging.
To remove/refit rudder blade .
Repack rudder gland (Owner Packing)

M1

Starting Air Receiver Safety Valve


Service and clean safety valve and test witness class and owner

M2

Piping in Engine Room - Allow to renew using sch 40 carbon


steel pipes
Sea Water AE Stbd Side
Sch 40 3.5" x 2400 x 1800 x 1320 x 1100 x 500 x 2100 x
1350 x 3 elbow x 11 flange
Sch 40 2" x 1400 x 350 x 2 elbow x 2 flange
Sch 40 2" x 1000 x 2 flange
Sch 40 3" x 1000 x 2 flange
Sch 40 3" x 1000 x 2 flange
Sch 40 4" x 1000 x 2 flange
Sch 40 2" x 1000 x 2 flange

Page 5 of 18

Sch 40 3" x 1000 x 2 flange


Sch 40 4" x 1000 x 2 flange
Sea Chest (Stbd)
Sch 40 13" x 1150 x 700 x 1660 x 550 x 5 elbow x 2 flange
Sch 40 8" x 500 x 300 x 600 x 3 elbow x 2 flange
Sch 40 4" x 1000 x 2 flange
Cooler Air Conditioner
Sch 40 2" x 1000 x 1800 x 3 elbow x 2 flange
Sea Water G/E
Sch 40 6" x 200 x 200 x 2 elbow x 2 flange
Sea Water M/E
Sch 40 8" x 1 elbow
Cooler M/E
Sch 40 5" x 750 x 300 x 450 x 2 elbow x 4 flange
Seachest Portside
Sch 40 13" x 940 x 600 x 470 x 5 elbow x 2 flange
Ballast Pump
Sch 40 10" x 200 x 350 x 1 elbow x 1 flange
Bilge Fire Ballast Pump
Sch 40 10" x 2460 x 150 x 1 flange
Sch 40 10" x 1 elbow x 1 flange
GS Pump
Sch 40 8" x 1 elbow x 2 flange
Compressor Cooler Out and AC Room
Sch 40 2" x 2040 x 1630 x 3 flange
Sch 40 1.5" x 1 elbow x 2 flange
Sytem Pipe LO Main Engine
Sch 40 4" x 400 x 1 elbow x 2 flange

Page 6 of 18

Reducer Sch 40 5" to 4" x 200


Sch 40 5" x 200 x 1 elbow x 1 flange
Sch 40 5" x 650 x 50 x 280 x 132 x 2 elbow x 3 flange
Note: Hot dip galvanizing of pipe surcharge 35%

Total for the above quoted works in Singapore Dollars. Exclude unit rates and reservations

Page 7 of 18

Qty

10

Marcopolo Shipyard Quotation


Singapore Dollars (S$)
Unit
Unit Rate
Total

days

160

1,600

per liter

1.20

UR

ton

10

UR

10

days

40

400

lot

1,750

1,750

days

389

3,501

lot

389

389

days

139

UR

moves

180

540

moves

4,050

8,100
-

10

days

40

400

10

days

40

400

10

day

80

800

Page 8 of 18

10

day

60

600

UR

hour

60

1500
1050
1500

1000
700
1000

700
490
700

each
each
each

45
35
10

UR
UR
UR

each

35

UR

each

35

UR

m2
m2
m2

0.7
1.2
0.25

m2

m2
m2
m2

0.7
1.2
0.25

m2

m2
m2
m2

0.7
1.2
0.25

m2

UR

m2
m2
m2

19
17
15

UR
UR
UR

1,050
1,260
375
UR

700
840
250
UR

490
588
175

Page 9 of 18

m2/coat

0.7

UR

m2/coat

0.7

UR

1,184

1,184

lot
inclusive
inclusive
lot

300

300

1
1

ton
lot

180
1,152

UR
1,152

59

each

22

1,298

lot
each

650
3

650
UR

spot

2.8

UR

kg

4.8

UR

Page 10 of 18

m3

UR

/m/plank.

14

UR

35

UR

sets

1,450

2,900

each

300

UR

inch
inch

36
38

UR
UR

Page 11 of 18

inch

54

7,796

UR

lot

7,796

lot

3,898

3,898

lot

1,536

1,536

blades

900

3,600

lot

450

450

1
1
1

unit
unit
unit

453
3,472
233

453
3,472
233

unit

600

UR

lot

1,532

1,532

lot

220

220

lot

124

124

lot

160

160

lot

160

160

lot

216

216

lot

104

104

Page 12 of 18

lot

160

160

lot

216

216

lot

2,929

2,929

lot

773

773

lot

216

216

lot

296

296

lot

428

428

lot

353

353

lot

561

561

lot

2,139

2,139

lot

614

614

1
1

lot
lot

950
614

950
614

lot

483

483

1
1

lot
lot

309
70

309
70

lot

282

282

Page 13 of 18

1
1
1

nit rates and reservations

lot
lot
lot

67
282
446

67
282
446

67,829

Page 14 of 18

Item

Description

Sea Valves
1

Location :Main Engine Room - Port Side


Globe valve 4 "
Globe valve 6 "
Globe valve 10 "
Globe valve 1/2 "
Globe valve 3 "
Globe valve 3 "
Location :Main Engine Room - Stbd Side
Globe valve 3 "
Globe valve 1/2 "
Globe valve 4 "
Globe valve 10 "
Globe valve 4 "
Globe valve 6 "

Location :Ro-Plant Room - Port Side


Globe valve 400mm
Globe valve 1 1/2 "
Globe valve 1/2 "
Location :Ro-Plant Room - Stbd Side
Globe valve 400mm
Globe valve 1 1/2 "
Globe valve 1/2 "
Globe valve 200mm

Page 15 of 18

Location : Pump Room


Globe valve 3 "
Globe valve 1 1/2 "
Globe valve 2 1/2 "
Globe valve 1/2 "
Globe valve 10 "
Globe valve 3 "
Globe valve 4 "
Globe valve 2 "
Globe valve 4 "
Globe valve 6 "
Globe valve 6 "
Globe valve 6 "
Total for the above quoted works in Singapore Dollars.

Page 16 of 18

Qty

Marcopolo Shipyard Quotation


Singapore Dollars (S$)
Unit
Unit Rate

Total

pc

168

168

pc

252

252

pc

420

420

pc

84

84

pc

126

126

pc

126

126

pc

126

126

pc

84

84

pc

168

168

pc

420

420

pc

168

168

pc

252

252

pc

168

168

pc

252

252

pc

420

420

pc

672

672

pc

84

84

pc

84

84

pc

336

336

Page 17 of 18

pc

168

168

pc

252

252

pc

420

420

pc

84

84

pc

126

126

pc

126

126

pc

168

168

pc

84

84

pc

168

168

pc

252

252

pc

252

252

pc

252

252
6,762