ALE Capabilities Brochure FV
ALE Capabilities Brochure FV
ALE Capabilities Brochure FV
www.ale-heavylift.Com
03
Contents
05
Introduction
SERVICES
06
26
Services: Transportation
MARKETS
30
08
Markets: Civil
34
Services: Skidding
10
38
Services: Jacking
12
Markets: Nuclear
40
Services: Weighing
14
Markets: Renewables
42
16
Markets: Shipyards
48
18
Markets: Ports
52
Services: Ballasting
20
54
Services: Logistics
22
Markets: Offshore
56
24
60
Services: Engineering
C;;=++-;;1;<0-:-;=4<7.
-5847A16/<0-*-;<8-784-16<0-
*=;16-;;)6,<:)1616/<0-5<7<0-
01/0-;<;<)6,):,;%0-84)6616/
-6/16--:16/)6,5)6)/-5-6<
<0)</7-;16<7->-:A8:72-+<1;
=6,-:<)3-6*A,-,1+)<-,8-:;766-4
?070)>-A-):;7.-@8-:1-6+-16
C;;8-+1)41;<F-4,
):3)::1-;Executive Director
Introduction
05
ALE combines exceptional project management with engineering intelligence to offer worldwide
heavy transportation and lifting services to all industry sectors. Founded in 1983, the company
has expanded steadily through a balanced strategy of organic growth and the acquisition of key
companies whose experience has enhanced our specialist capabilities.
And with the ability to get maximum value from our next-
07
663373
EMS532261
663298
FS26821
663298
SGI 6005514
Markets
Civil
ALE has a long and proud history working
closely with major civil engineering
companies all over the world. With
experience in high-prole infrastructure
projects such as the removal and
installation of innovative road, rail, river
and canal bridges, lock gates, stadium
roofs and airport architecture, we full
our role accurately, safely and with
minimal disruption.
We have an in-depth understanding of the
highly specialised equipment required for the
safe and accurate execution of such projects.
An appreciation of the control of loads and their
distribution, as well as a eet of Self-Propelled
Modular Transporters (SPMTs) and proven
expertise in lifting, skidding and jacking techniques
means were well equipped to move enormous
structures with minute precision. Our strategically
located equipment and full project management
service means we can meticulously plan and
execute complex projects despite the time-critical
nature of much of this work. If necessary, well
design purpose-built tools to ensure a project is
completed to the total satisfaction of our client.
Case study:
Services required:
4+J6<):))5$8)16
Background:
ALE was appointed to assist with the
construction of a viaduct on La Plata
highway over the Tajo River.
concrete pillars rising from the banks of the river and from
steel arches in the centre. ALEs responsibilities included
pushing the bridge sections into place, skidding the steel
arches over the bridge and lowering them into position,
tilting and closing the semi arches, skidding the semidecks
from both abutments and replacing the temporary
supports with the nal supports.
Markets
Power generation
The energy sector has been one of our core
businesses since our inception, and to date
weve worked on energy projects in more
than 100 countries. Consequently, were
world leaders in global power plant lifting
and transportation.
Case study:
$<)A<07:8-!7?-:$<)<176&
Background:
every stage.
Services required:
Four gas turbines, four generators
and four transformers each weighing
up to 370te were received using
SPMTs and stored prior to being
transported down the River Trent by
barge. ALEs Lift n Lock system was
used to trans-ship the cargo onto a
girder frame transporter for a 30-mile
road route. It was then trans-shipped
to SPMTs for transportation on public
roads using a second Lift n Lock
system. The nal leg of the journey to
site was undertaken using SPMTs for
installation onto foundations using
ALEs modular gantry system.
Markets
Nuclear
Nowhere does our reputation for safety,
precision and responsibility carry more
weight than in the nuclear power sector.
Our understanding of the health, safety and quality
standards of the industry has enabled us to develop
strong working relationships with key nuclear energy
providers over the last 20 years, supporting projects
ranging from the replacement of steam generators and
reactor heads to the design of systems for dismantling
turbines and electrical generators. From this platform
of experience, were well-equipped to support the
imminent increase in nuclear power generation.
ALE is accomplished at carrying out pre-engineering
works ahead of critical plant outages to ensure that the
minimum programme and operational impact is made.
To achieve this, we provide engineering resource early
in the planning process to produce the necessary HSE
and nuclear safety documentation.
Although we prioritise risk and safety, we also
champion innovative engineering. Manoeuvres can
combine lifting, tilting, skidding and hydraulic turning
and this demands careful planning and faultless
execution, with activity precisely scheduled to coincide
with planned stoppages of the plant for minimal
disruption and downtime.
Indeed such is our experience that we can design
bespoke lifting systems to t within existing station
designs a skill which has won us recognition for our
exibility and multiple project awards.
Case study:
#-84)+-5-6<6=+4-)::-)+<7:0-),)<
"=16;0)6!!016)
Background:
ALE was appointed to replace the nuclear reactor
head at the Quinshan Nuclear Power Plant in
China during the critical period of the shut down.
Services required:
The new reactor head was tilted from a vertical to
horizontal position in the turbine building using a
specially designed tilting frame driven by hydraulic
jacks. Once in the horizontal position, it was able
to exit the building onto a platform trailer for
transport to the containment building. The old
head was removed from the containment building
using a similar method and the new head was then
lifted, skidded into the building and tilted into its
nal vertical position. The whole operation was
completed in 36 hours.
):3-<;
Renewables
Case study:
:-)<-:)**):,&
1;84)A16/)>1<)4:74-16<0-:-6-?)*4-
-6-:/A;-+<7:=14,16/767=: A-):;C
-@8-:1-6+-16<0-87?-:;-+<7:?-0)>-
=;-,7=:367?4-,/-)6,-@8-:1-6+-<7
+:-)<-;5):<-:;74=<176;<7<0-+0)44-6/-;
+:-)<-,*A<0-16+:-);16/;1B-)6,?-1/0<7.
?16,<=:*16-;)6,);;7+1)<-,+75876-6<;
Background:
The Greater Gabbard wind farm, located in the
North Sea off the coast of Suffolk, will consist
of 142 wind turbines with a total capacity of
around 500MW when its completed.
Services required:
ALEs responsibilities included receiving and
15
Markets
Shipyards
ALE provides a number of services to the marine and shipbuilding industry, including the
lengthening of vessels and the enlargement or complete revamping of hulls.
Case study:
6+0)6<5-6<7.<0-$-);
<0--<0-:4)6,;
Background:
When ALEs client embarked on the
revitalisation of their luxury cruise
ships, they approached ALE to
assist with the lengthening of M/S
Enchantment of the Seas.
Services required:
Markets
Ports
ALE provides a range of services to
ports across the world including the
transportation, erection and vertical
extension of harbour cranes. We also have
the experience, the skills and the global
sourcing contacts to relocate heavy port
cranes and cargo handling equipment
worldwide and to jack-up heavy cranes
using state-of-the-art equipment so
theyre ready for new sections to be
added. Our schemes for recovering
cranes after collision or storm damage
are designed to address the unique
requirements of the circumstances.
As well as using our varied eet of trailers and
skidding capabilities to relocate cranes within ports,
we also deliver new cranes from suppliers and
ship cranes from port to port with all the marine
engineering, barging and sea-fastening that entails.
In fact, weve transported a variety of types of
crane on ve continents, with the result that both
global and local manufacturers use us repeatedly
to execute their projects quickly, efciently and
safely. Our continual investment in new design and
engineering methods enables us to maintain our
position as leaders in this eld.
Case study:
1-*0-::76<)16-::)6-;&
Background:
ALE was contracted to carry out the
land and marine transportation of two
Liebherr Container Cranes from Port
Khalid, Sharjah to Khorfakkan Port.
Services required:
With dimensions of 116 x 26 x 76
metres, the cranes required 96-axle
SPMTs. The centre of gravity from
the crane rails was 35 metres, so
extensive engineering was needed to
design safe and cost-effective seafastening and ballasting systems. The
two cranes were transported by sea
on a single barge (138 x 30 metres)
for 176 nautical miles.
):3-<;
Case study:
Background:
4+)6
@8)6;176!:72-+<'1-<6)5
Services required:
ALE loaded-in pre-assembled modules when they
arrived in Vietnam from Thailand, and positioned
them on top of pre-cast concrete bases using a ramp.
This created a SUPERPAM for shipping to Australia
that would be ready for load-out and installation on
arrival. The modules were moved using SPMTs and
are the heaviest to have been loaded-out in Vietnam
they were built with their foundations incorporated in
order to minimise the site work required.
21
Markets
Offshore
Our heritage in offshore structures extends
back many years, with some of our key
personnel having begun their careers
during the boom period in the 70s and
80s. Because of this, we are considered
the market leader in providing specialist
transportation services to the offshore
industry. Weve developed state-of-theart ballasting and weighing systems, and
loaded-out over 1,000 structures and
probably more tonnage than any other
company in the world.
Technical advances in offshore installation and
oatover capabilities have made the fabrication of
complete topsides weighing in excess of 30,000te
possible. In response, we have designed and
developed systems to safely load-out such structures
using integrated skid systems, SPMTs and high
capacity ballasting. Indeed ALE has succeeded
in staying ahead of the industry by developing
the mega-jack: a unique system capable of lifting
platforms weighing up to 40,000te to an elevation
of 30 metres. We are world leaders in oatover
installations, having the largest integrated ballasting
systems of over 60,000te capacity supported by a
dedicated marine engineering division with years
of experience.
Case study:
..;07:-$)30)416;4)6,#=;;1)
Background:
ALE was approached to assist with
the installation of a 21,800te oatover
topsides deck on the LUN-A Platform
Russias rst offshore gas platform in
the Lunskoye Field. The project set a
new record as the industrys heaviest
oatover deck installation.
Services required:
ALE was contracted to engineer,
design and perform the barge
ballasting for both the load-out and
offshore oatover installation. ALE
used computer modelling to design
a pumping system capable of
delivering sufciently high ow rates,
and fabricated non-standard pipework
as required. The purpose-built barge
transported the topsides 1,500 nautical
miles to the offshore installation
site, where ALE also performed all
the engineering associated with the
mating, including ballast and
mooring calculations.
Markets
Case study:
Services required:
;+:)>7;);<719=1,!:72-+<1/-:1)
Background:
ALE has been heavily involved in the EGTL Project,
ofoading, transporting and installing all items
onsite over 100te.
Services
Transportation
With years of experience and one of the largest
eets of heavy transportation axles and ancillary
equipment in the world, ALE is a globally
renowned authority in moving heavy loads. Our
substantial eet of latest-generation equipment
is operated by a team of highly trained personnel
who maintain it to the highest standards. All
trailers and ancillary equipment are strategically
located around the world for maximum
availability and to keep mobilisation costs to an
absolute minimum.
Case study:
Equipment used:
$)4)4)0-<0)674!4)6< 5)6
Background:
Over the course of six months, ALE received
30 heavy lifts from ten ships at Salalah Port in
the south of Oman.
$-:>1+-;
Transportation
Case study:
Equipment used:
!1)+-6B)<)4A
The images show the transportation of the rst gas turbine, which
weighed 310te. It was loaded onto a barge in Porto Marghera and
Background:
ALE was contracted to transport two
gas turbines and two generators
from Marghera to Piacenza in Italy.
Case study:
Equipment used:
$-8):)<7:<:)6;87:<-,76
+76>-6<176)4<:)14-:
Background:
ALE used a conventional trailer to
transport a 120te Separator for an
FPSO being tted out in Singapore.
Services
Case study:
Equipment used:
=BB):,1-4,->-4785-6<!:72-+<&
Background:
ALE successfully completed various site moves and
weighing operations which culminated with the
load-out operation of the QU Deck with a load-out
weight of 11,300te.
$-:>1+-;
Case study:
Equipment used:
$$0-4.B-:*)12)6
Background:
ALE was awarded the contract to supply and
operate an external barge ballast and de-ballast
system for six jackets as part of the ACG Full
Field Development in the Caspian Sea.
Case study:
Equipment used:
$!:72-+<)4)A;1)
Background:
ALE undertook the site move and load-out of a 1,700te
topside module for the ANGSI-D Project in Malaysia.
$-:>1+-;
Case study:
16)44)=6+016/7.<0-;<:-+07
,-!):-,-;>1),=+<$8)16
Background:
ALE completed the launch of the Estrecho de
Paredes viaduct, which bypasses the Estrecho
de Paredes gorge and is part of a new
highway in the province of Cuenca, Spain.
Equipment used:
The viaduct was made up of multiple sections
with a total length of 380 metres and a total
weight of 2,700te. ALE used strand jacks
for both pulling and restraining the bridge
sections. Finally, each section of the viaduct
was jacked down onto its permanent supports.
35
Skidding
ALE was the rst company to design, develop
and operate the hydraulic compensated skidshoe system. Skid systems are designed to
make safe and precise horizontal movements,
and as such are an effective means of moving
plant and structures in conned or restricted
environments. The movement equipment has
hydraulic skid-shoes with stainless steel bases
which move over low-friction blocks laid into
steel skid-tracks in an extend/retract sequence.
ALE operates 25, 50, 300, 500, 650 and 1,000te capacity
skid-shoe systems, with the option of combining a number
of skid-shoes to create the most suitable system for moving
complex loads. This has enabled us to load-out structures
weighing more than 20,000te. The integral hydraulic
cylinder of the skid-shoes can be interlinked to provide a
hydraulically compensated suspension system.
$-:>1+-;
Skidding
Case study:
&647),16/<:)6;87:<)<176)6,
16;<)44)<1767.<?7<:)6;.7:5-:;#=;;1)
Background:
ALE performed the unloading, transportation
and installation of two transformers on the two
400MW CCGT power plant in Surgut, Russia.
Equipment used:
Both transformers arrived on special railway
carriages which could hydraulically jack
themselves up in order to install ALEs climbing
jacks and load-spreading mats underneath. Using
a skid system the transformers were skidded
sideways onto a temporary storage area, jacked
up and positioned at the required height to allow
a four-le, six-axle SPMT to drive underneath. The
SPMT transported the transformers in front of
their foundations and positioned them on using
the climbing jacks and a skid system.
Case study:
Equipment used:
$31,,16/7.)<=66-4*7:16/5)+016-
):+-476)$8)16
Background:
ALE carried out the skidding of a tunnel
boring machine on a curve with a central radius
of 220 metres.
$-:>1+-;
Jacking
Case study:
$<-)5<=:*16-/-6-:)<7:")<):
>-:<0-A-):;0);78-:)<-,)6=5*-:7.
2)+316/;A;<-5;<7;=1<<0-?1,->):1-<A7.?7:3
?-,7%0-;-16+4=,-;<:)6,2)+3;?01+08:7>1,-
)+7;<-..-+<1>-41.<16/)6,8=4416/;74=<176.7:
<0-.)*:1+)<176)6,47),7=<7.7..;07:-2)+3-<;
84)<.7:5;)6,57,=4-; =::)6/-7.;<:)6,2)+3;
>):1-;.:75<-<7<-+)8)+1<A8-:2)+3
More recently, we developed the 40,000te capacity mega-jack
system which enables jacking of large structures from a low
elevation up to 30 metres. It was designed to assist with the
onshore fabrication of increasingly large and heavy topside
platforms for the offshore industry, although its versatility
means there is great potential for its use in other market
sectors as well.
The mega-jack has both heavy and light jacking modes,
and its modular set-up makes it suitable for a wide range of
applications. By adding jacking towers, the capacity can be
increased or the ground bearing loads per position reduced.
A key difference between it and traditional jacking systems
is that during normal jacking operations, the jacks remain at
Background:
ALE transported a steam turbine generator
weighing 230te and installed it at the
Mesaieed Power Station in Qatar.
ground level and the steel jacking beams rise by each jacking
step. This way all operations are performed at ground level
and working at height is kept to an absolute minimum. ALE
Equipment used:
Case study:
)+3=8)6,16;<)44)<1767.)*:1,/-
-:5)6A
Background:
ALE was contracted to jack-up and install a 560te
bridge in Berlin, Germany.
Equipment used:
Over the course of one day, the bridge was jacked
from its construction position to an elevation of 4.9
metres using four climbing jacks. The jacking timbers
had to be stabilised halfway due to the imposed
horizontal forces. The bridge was then transported to
its nal position and jacked down onto its bearings.
$-:>1+-;
Weighing
Case study:
%)3=4)?-1/016/78-:)<1767:-)
%0-)++=:)<-?-1/016/7.1<-5;1;
-;;-6<1)4.7:-;<)*41;016/<0)<41.<16/
)6,<:)6;87:<16/5-<07,;):-<7<)44A
)88:78:1)<-(-1/016/78-:)<176;0-48
=;<7-6;=:-<0)<?7:31;+)::1-,7=<
);-.F+1-6<4A)6,+7;<-..-+<1>-4A);
87;;1*4-(1<0<0-)*141<A<7?-1/0
;<:=+<=:-;.:75<-<7<-
8-:.7:5;?-1/016/78-:)<176;)447>-:
<0-?7:4,<716<-:6)<176)44A:-+7/61;-,
;<)6,):,;.)*:1+)<16/+=;<75
-9=185-6<);:-9=1:-,
Background:
ALE was required to perform the weighing of
onto a barge.
Equipment used:
Using 24 500s Weightor jacking units with
integrated load-cells, ALE weighed the structure
at 5649.28te. This weight result was 99.91%
accurate giving a calculated centre of gravity to
within 10mm.
Case study:
Equipment used:
%=:63-A78-:)<176;16%)581+7-@1+7
Background:
ALE has provided weighing services in central Mexico
for a total weight of 92,945te, and is now established
as the regions leading sub-contractor for load-out
and weighing work.
Services
Lifting systems
ALE offers a specialist lifting
service to all markets. With a
strong heritage in engineering and
innovation, we are perfectly placed
to undertake the most complex and
intricate lifting projects. Our team
of experienced multidisciplinary
engineers investigate and prepare
lifting schemes and tailor-make
solutions for complex lifting
operations. Our range of lifting
equipment includes bespoke gantry
systems, modular tower systems,
hydraulic lift systems and strand
jack systems.
We believe that technology, design and
ingenuity are essential requirements in
providing customer-focused solutions
that address the very specic challenges
each project brings. The exclusive lifting
equipment weve developed is the result
of many years experience and detailed
research carried out at our Research and
Development facility.
Case study:
&8:1/0<16/7.
+74=56;014-
Background:
ALE undertook the
uprighting of two columns
at the Mejillones Power
Plant in Antofagasta, Chile
Equipment
used:
Using two 45-metre,
self-stabilising A frame
gantries, ALE successfully
lifted and tailed two
columns into the vertical
position. Each gantry
was provided with a
200te lifting unit and an
auxiliary lifting unit for
stabilisation and retention.
The columns, measuring
85 metres long, were
both manoeuvred upright
and positioned on their
foundations within
ve hours.
$-:>1+-;
Lifting systems
Case study:
6;<)44)<1767.41>16/9=):<-:;
57,=4-:)B14
Background:
ALE performed the installation of the living
quarters module at San Roque shipyard in
Salvador de Bahia, Brazil.
Equipment used:
The 1,350te living quarters module was lifted a
total of 25 metres above the deck using two ALE
gantries. Using a fully computerised heavy lift
system developed by ALE, the lifting operation
was completed in ve hours. After the module
was lifted above the deck, the LQ module was
skidded 22 metres longitudinally across the deck
using 16 skid-shoes.
45
$-:>1+-;
Lifting systems
Case study:
(-;<=:<76%&
Background:
ALE successfully lifted and installed a Gas
Turbine Generator at West Burton B Station
in West Yorkshire.
Equipment used:
ALE lifted the 239te Gas Turbine Generator from
an SPMT to a height of ve metres and propelled
it 20 metres longitudinally before setting it down
on its foundations using a Lift n Lock. With
a capacity of 426te at 12.4m, the Lift n Lock
integrates with ALEs Teon-coated side shift to
allow transverse alignment. Each jack was tted
with an electronic monitoring system developed
specically by ALE to allow real-time feedback
to the operator, guaranteeing safe control of the
entire lifting operation.
47
Services
Case study:
4-F6;!4)6<$)=,1:)*1)
Background:
ALE was asked to complete major
lifts at a petrochemical plant in
Jubail in the Kingdom of Saudi
Arabia using the SK190 crane.
Equipment used:
ALE performed more than 100 lifts
on this project during a ve-month
period. The SK190 crane was used
to lift a depropaniser column and
a C3 splitter column into place,
working at 84 metres and 75.4
metres outreach respectively. The
ability to lift these loads at such
distances allowed onsite engineers
to complete foundation and pipe
racks in advance of installation.
$-:>1+-;
Case study:
!-<:7/)4876>-:;176
#-F6-:A!:72-+<$16-;
!7:<=/)4
Background:
ALE was contracted to perform
the land transportation, site
movements and erection of 26
columns and reactors for the new
Sines Renery Conversion Project.
Equipment used:
The scope of supply included up
to 96 axle lines of SPMTs, CC88001 1,650te, LR1750 750te and
CC2800-1 600te crawler cranes
as well as hydraulic cranes and
a tailing gantry device specially
designed for the erection of the
two main reactors. The heaviest
lift was the Hydrocraker Reactor
weighing 1,500te.
Case study:
!!4)6<)6)1
016)
Background:
ALE was contracted to
engineer and perform
the erection of 34 major
columns and towers
weighing up to 1,240te.
Equipment used:
ALE supplied a 3,000te
gantry system and two
crawler cranes of CC2800-1
600te and LR1800 800te.
A 1,400te capacity strand jack
system was used to lift the
process towers as the project
site was very compact with no
access for a large lifting crane.
$-:>1+-;
Ballasting
Case study:
! )4)A;1)
&;16/):)6/-7.0A,:)=41+;=*5-:;1*4-*)44);<
)6,,-*)44);<8=58;1;+)8)*4-7.
8-:.7:516/>-:A01/0+)8)+1<A*):/-*)44);<16/
78-:)<176;H16.)+<?-.:-9=-6<4A;=884A*)44);<
)6,,-*)44);<;A;<-5;+)8)*4-7.16-@+-;;7.
=50%0-;A;<-51;.=44A+758=<-:
5761<7:-,)6,+)6*-=;-,16+762=6+<176?1<0
7=:1667>)<1>-;31,,16/-9=185-6<<78-:.7:5
;7801;<1+)<-,47),7=<78-:)<176;
Background:
Control of the ALE barge ballasting system can be offered
Equipment used:
The operation was performed in three stages
using four 500-tonne capacity strand jacks.
The jacket was skidded 150 metres during
stage one, a further 70 metres to the quay
edge during stage two and then loaded-out
onto barge SLB1 for the nal stage. The
ballasting operation was performed using
ten submersible pumps with a total capacity
of 9,000 metres3 per hour. The pumps were
controlled from a single point using bespoke
software operating each pump individually
while monitoring the water level in each
tank. Finally the barge was ballasted to its
sea tow condition.
Case study:
Equipment used:
%78;1,-47),7=<72-7:-)
Background:
Services
Logistics
ALE offers a wide range of global logistical
solutions, particularly for the multi-modal
transportation of oversized and heavy cargos.
Our breadth of experience and enormous eet
of transporters and equipment gives us the
ability to meet all customer requirements, no
matter how challenging the project.
Case study:
Equipment used:
%:)6;87:<)<1767.0A,:7
<=:*16-:=66-:)6),)<7$?-,-6
Background:
ALE arranged the door-to-door transportation of
a hydro turbine runner from Montreal, Canada to
a hydro power station in Sweden.
$-:>1+-;
Case study:
%:)6;87:<)<176)6,*):/16/
7.->)87:)<7:;&
Background:
ALE undertook a full turnkey project to
transport, barge and install evaporators
weighing 2,000te from Hamriayah to
Fujairah in the UAE.
Equipment used:
ALEs team of naval architects and
engineering specialists carried out a range of
services including ballasting, sea-fastening,
barging, transportation from jetty and
positioning onto foundation. In addition to
76 SPMT axles, ALE used their own Londonregistered, fully ballastable 76-metre barge,
the ALE 250. The ALE 250 is equipped with
winches, ballast pumps, integral load-out
ramps and all machines and equipment
required for sea-fastening heavy lift cargo.
57
Turnkey projects
In recent years, major new projects have
grown both in size and in the demands
of the highest standards in performance.
Such projects require activities spanning
multiple disciplines such as sea transport,
land transport, lifting and installation as
well as signicant human resources in
HSQE, engineering, project management
and supervision.
In order to meet these requirements we formed a
dedicated projects team that has the human
resources necessary to address the demands and
challenges posed by major projects. The levels
of management and business processes that are
required in these projects are addressed in the
training of our staff.
Our highly developed project management skills
enable us to undertake high-value, long-term
transportation and installation contracts that require
multiple teams to work together to deliver optimum
value and efciency.
Services
Turnkey projects
Case study:
@8)6;1767.!=6<)):,K6
#-F6-:A'-6-B=-4)
Background:
ALE managed several operations
for the FCC renery of Punta Cardn
including the transportation of a new
reactor; the site movement of a new
domo; and the removal of the existing
stripper, absorber, reactor, regenerator,
fractionator and domo.
Equipment used:
The removal manoeuvres were
executed using a 70-metre, selfstabilising skidding gantry which
covered an area of 45 metres2 and
included two strand lifting units of
500te capacity each. Transporting
the 510te new reactor from the preassembling area to under the lifting
gantry required 28 SPMT lines with
a turning frame. Along the route, the
transport had to negotiate bends of 90
and pass under a pipe rack. For this,
ALE had to jack down the reactor along
the total length of the pipe rack using
four climbing jacks of 300te each and
four skid lines with SS-150 skidding
equipment. The new domo, weighing
420te, was moved using SPMTs.
Services
Engineering
With more than 100 highly qualied engineers,
a Research and Development facility capable
of designing record-breaking equipment, and
a pedigree in delivering innovative solutions
for some of the worlds largest organisations,
our engineering skills are proven. Ingenuity
is one of our core values, and a trait which is
evident in every scheme we design and every
problem we solve.
Case study:
Engineering required:
$=8-: #1/=44&
Background:
ALE carried out engineering works for the seafastening, ballasting, load-out and oat-off of the
Super M2 Rig Hull using a semi-submersible vessel.
Capabilities