Temporary Load Bearing Scaffold (Front)
Temporary Load Bearing Scaffold (Front)
Temporary Load Bearing Scaffold (Front)
Lateral support, diagonal bracings & hadrails accoding to MOM requirements to be provded and not shown to ease drawing reading
Clamps according to MOM requirements to be provided and not shown for ease reading.
Maximum load applied
for liftingisis1000kg
1000kg.
Notes:
1.
2.
3.
4.
applied is 1000kg
4m L x 3m W x 12m H
18-May-15
BY
SY
SY
CHKD.
RSL
RSL
APPD.
NG
JACOBS
S-KeroX Project
S-KeroX
PROJECT
DRAWING No.
REV
0
DATE
18-May-15
NOT TO SCALE
SCALE
TITLE :
FOR CONSTRUCTION
PRELIMINARY FOR INFORMATION
DESCRIPTION
CLIENT :
PLANT GENERAL
SERVICES
REV.
DATE
BUILDER :
0
A