Temporary Load Bearing Scaffold (Front)

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

This drawing is the design of tower & truss out scaffold for lifting rescue purpose.

Lateral support, diagonal bracings & hadrails accoding to MOM requirements to be provded and not shown to ease drawing reading
Clamps according to MOM requirements to be provided and not shown for ease reading.
Maximum load applied
for liftingisis1000kg
1000kg.

C:\Users\SongYuan.Chan\Desktop\PE Design\PE Design Drawing TemplatePE Design Drawing Template

Notes:
1.
2.
3.
4.

applied is 1000kg
4m L x 3m W x 12m H

18-May-15

BY

SY
SY

CHKD.

RSL
RSL

APPD.

NG
JACOBS

S-KeroX Project
S-KeroX

PROJECT
DRAWING No.

REV
0

DATE
18-May-15

NOT TO SCALE

SCALE

Temporary Load Bearing Scaffold @ Solvent Pipe Rack

TITLE :

FOR CONSTRUCTION
PRELIMINARY FOR INFORMATION
DESCRIPTION
CLIENT :

PLANT GENERAL
SERVICES

REV.
DATE
BUILDER :

0
A

Temporary Load Bearing Scaffold @ Solvent Pipe Rack

Page 1 of 1

You might also like