Hilti-Fischer Anchor Bolt

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

SUPPLY AND INSTALLATION OF HILTI/FISCHER ANCHOR BOLTS:

Scope of supplier/applicator:
1. Calculations of no. of bolts & size for given load, edge clearances, bolt spacing,
torque value etc as data given.
2. Marking rebar location with help of rebar locator and marking on plate suitably.
3. Drilling of concrete, core-cutting of re-bars if required.
4. Suitable Drilling machine with different size of drill bits, electrical wiring and
torque wrench etc as required for successful completion of anchor bolt fixing.
5. Calculation of plate size with marking.
Scope of department:
1. Electrical supply single phase, 220V AC with extension board.
2. Compressed air supply with hose arrangement till job location.
3. Platform arrangements wherever required.
4. Fabrication of structural steel like mounting plate, bracket etc.
5. Plate Drilling as per size & sketch suggested/calculated by supplier/applicator.
6. Location and marking of drilling points.
7. safety equipments like waist belts and protective equipments
Note:
1. Total quantities, given in indent for estimation, may vary. However payment will
be based on no. of bolts and size of bolts.
2. If drill bits get broken while drilling, replacement of broken bolts is in scope of
applicator/supplier.
3. Total period of job execution is 45 days from date of call. Tentative time is from
Jan to Apr-2013.
4. Replacement of broken or failed anchor bolts or drill bit is in scope of
supplier/applicator with out any charges.
5. After successful completion of job, the total quantities and size of bolts will be
counted and payment will be done accordingly.
6. Job is to be executed inside operating island of our plant including inside reactor
building. Supplier/applicator shall comply with all safety measures and protective
measures in & out of operating island.

Item
FZA 14 X 80 M10
D/20
FZA 18 X 100 M12
D/20
FZA 22 X 125 M16
D/25

Art No.

FH II 12/25 B
FH II 15/25 B

MO
Q

0 60657

10

0 60684

10

0 60663

10

0 48774
0 48777

50
25

Rate
for
Supply

Rate for
fixing

Delivery
Period

FH II 18/25 B
FH II 24/25 B
FH II 28/30 B

0 48779
0 48886
0 47547

20
10
4

FAZ II 8/10
FAZ II 10/10

0 94871
0 94981

50
50

FAZ II 12/30

0 95421

20

174

FAZ II 16/25

0 95836

10

306

SlNo
1
2
3
4
5
6
7
8
9
10
11
12
13

Already
quotation
420 given
Already
quotation
690 given

Item Description
HILTI MAKE UNDERCUT ANCHOR HDA-T20 M10X
100/20
HILTI MAKE UNDERCUT ANCHOR HDA-T22 M12X25/30
HILTI MAKE UNDERCUT ANCHOR HDA-T30
M16X190X40
HILTI MAKE UNDERCUT ANCHOR HDA-T-37
M20X250X50
HILTI MAKE HEAVY-DUTY ANCHOR HSL-3-G M8/20
HILTI MAKE HEAVY-DUTY ANCHOR HSL-3-G M10/20
HILTI MAKE HEAVY-DUTY ANCHOR HSL-3-G M12/25
HILTI MAKE HEAVY-DUTY ANCHOR HSL-3-G M16/25
HILTI MAKE HEAVY-DUTY ANCHOR HSL-3-G M20/25
HILTI MAKE ANCHOR HST M8X75/10
HILTI MAKE ANCHOR HST M10X90/10
HILTI MAKE ANCHOR HST M12X115/20
HILTI MAKE ANCHOR HST M16X140/25

UOM

BOX
QTY.

BOX
BOX

12
8

BOX

BOX
BOX
BOX
BOX
BOX
BOX
BOX
BOX
BOX
BOX

2
40
20
20
10
6
100
50
25
12

22806
20277
17598
14222
9557
6176
8763
9212
9775
6154
4273
2638
3025

You might also like