0% found this document useful (0 votes)
305 views6 pages

PTC Codes

ASME has developed 48 Performance Test Codes (PTCs) over the past 100+ years to provide standardized testing procedures and calculations for power generation equipment and systems. The PTCs cover categories like power production, combustion, fluid handling, and emissions. They ensure accurate, precise, and reliable test results by all parties through consensus-based procedures. Joining a PTC development committee allows experts to contribute their knowledge to benefit public safety standards.

Uploaded by

kannan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
305 views6 pages

PTC Codes

ASME has developed 48 Performance Test Codes (PTCs) over the past 100+ years to provide standardized testing procedures and calculations for power generation equipment and systems. The PTCs cover categories like power production, combustion, fluid handling, and emissions. They ensure accurate, precise, and reliable test results by all parties through consensus-based procedures. Joining a PTC development committee allows experts to contribute their knowledge to benefit public safety standards.

Uploaded by

kannan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

5/27/2015

PerformanceTestCodesASME

ABOUTASME
> STANDARDSANDCERTIFICATION

Performance Test Codes

ASMEPerformanceTestCodes(PTCs):AWideRangeofApplications
Forover100years,ASMEhasbeenprovidingindustrywithacomprehensivecollectionofthebesttechnical
documentstoconducttestsofpowerplantequipmentandsystems.ASMEnowoffers48PerformanceTestCodes
(PTCs),coveringfourmaincategoriesofequipmentandsystemsPowerProduction,CombustionandHeat
Transfer,FluidHandling,andEmissions.Therearealso"general"documentsthatcoverAnalyticalTechniques,
MeasurementofProcessParametersandAssociatedPhenomenaandGuidingInformation.

https://www.asme.org/aboutasme/standards/performancetestcodes

1/6

5/27/2015

PerformanceTestCodesASME

ASMEPTCs:EnsuringAccuracy,Precision,andReliability.InstillingConfidence
Performancetestcodesprovidea"levelplayingfield"forbothmanufacturersandusersoftheequipmentor
systems.Bothpartiestothetestcanreferencetheparticulartestcode,confidentwiththeknowledgethatit
representsthehighestlevelofaccuracybasedoncurrentengineeringknowledge,takingintoaccounttestcostsand
thevalueofinformationobtainedfromtesting.Precisionandreliabilityoftestresultsmustalsounderlieall
considerationsinthedevelopmentofanASMEPTC,consistentwitheconomicconsiderationsasjudged
appropriatebyeachtechnicalcommitteeunderthejurisdictionoftheASMEBoardonStandardizationandTesting.

OrderanyofthePTCsbelow:
ASMEPTCsonPowerProduction
PTC6,SteamTurbines
PTC6S,ProceduresforRoutinePerformanceTest
ofSteamTurbines
PTC6.2,SteamTurbinesinCombinedCycles
PTC17,ReciprocatingInternalCombustionEngines
PTC18,HydraulicTurbinesandPumpTurbines
PTC22,GasTurbines
PTC29,SpeedGoverningSystemsforHydraulic
TurbineGeneratorUnits
PTC42,WindTurbines
PTC46,OverallPlantPerformance
PTC48,OverallPlantPerformancewithCarbon
Capture(underdevelopment)
PTC50,FuelCellPowerSystemsPerformance
PTC52,PerformanceTestCodeforConcentrating
SolarPowerPlants(underdevelopment)
PTC55,GasTurbineAircraftEngines
PTC70,RampRates
POM101,PerformanceRelatedOutageInspections
POM102,OperatingWalkdownsofPowerPlants
(underdevelopment)
PTCPM,PerformanceMonitoringGuidelinesfor
PowerPlants
https://www.asme.org/aboutasme/standards/performancetestcodes

2/6

5/27/2015

PerformanceTestCodesASME

ASMEPTCsonCombustionandHeatTransfer
PTC4,FiredSteamGenerators
PTC4.2,CoalPulverizers
PTC4.3,AirHeaters
PTC4.4,GasTurbineHeatRecoverySteam
Generators
PTC12.1,ClosedFeedwaterHeaters
PTC12.2,SteamSurfaceCondensers
PTC12.4,MoistureSeparatorReheaters
PTC12.5,SinglePhaseHeatExchangers
PTC23,AtmosphericWaterCoolingEquipment
PTC30,AirCooledHeatExchangers
PTC30.1,AirCooledSteamCondensers
PTC34,WasteCombustorswithEnergyRecovery
PTC51,GasTurbineCompressorInletAir
ConditioningEquipment

ASMEPTCsonFluidHandling
PTC8.2,CentrifugalPumps
PTC10,CompressorsandExhausters
PTC11,Fans
PTC12.3,Deaerators
PTC13,Blowers(underdevelopment)
PTC19.11,SteamandWaterSampling,
Conditioning,andAnalysisinthePowerCycle
PTC19.23,GuidanceManualforModelTesting
PTC24,Ejectors
https://www.asme.org/aboutasme/standards/performancetestcodes

3/6

5/27/2015

PerformanceTestCodesASME

PTC25,PressureReliefDevices
PTC31,HighPurityWaterTreatmentSystems
PTC39,SteamTraps

ASMEPTCsonEmissions
PTC19.10,FlueandExhaustGasAnalysis
PTC21,ParticulateMatterCollectionEquipment
PTC28,DeterminingthePropertiesofFine
ParticulateMatter
PTC40,FlueGasDesulfurizationUnits

ASMEGeneralDocumentonAnalytical
Techniques
PTC19.1,TestUncertainty

ASMEGeneralDocumentsonMeasurementof
ProcessParametersandAssociatedPhenomena
PTC19.2,PressureMeasurement
PTC19.3,TemperatureMeasurement
PTC19.5,FlowMeasurement
PTC19.6,ElectricalPowerMeasurement(under
development)
PTC19.7,MeasurementofShaftPower
PTC19.22,DataAcquisitionSystems
PTC36,MeasurementofIndustrialSound
B133.6,GasTurbineInstallationSoundEmissions

ASMEGeneralDocumentsonGuiding
Information

https://www.asme.org/aboutasme/standards/performancetestcodes

4/6

5/27/2015

PerformanceTestCodesASME

PTC1,GeneralInstructions
PTC2,DefinitionsandValues
PTC19.3TW,Thermowells

TheIndustrySpeaksAboutASMEPTCs
PTC4,onFiredSteamGenerators,istheultimatecomprehensivedocumentfordefining,calculatingandtestingfor
theefficiencyofFiredSteamGeneratorsbytheEnergyBalanceMethodaswellasothersignificantperformance
parameters.AmajorfeatureoftheCodeisthatitincludesthemethodologyforcorrectingtestconditionsto
guarantee/referenceconditionsbaseduponactualunitperformance.TheCodeiswritteninatutorialmannerwhich
enhancesuseasaninstructivemediumaswellasprovidingthemethodologyfordevelopingacomputercodeby
theuser.TheCodeincludesthemethodologyfordeterminingtheuncertaintyofboththetestandcorrectedresults.
THOMASC.HEIL,RETIREDBABCOCK&WILCOX

PTC6,onSteamTurbines,istheinternationalstandardforsteamturbineacceptancetesting.Itwascreatedand
recentlyrevisedbyaconsensusgroupofvendors,owners,andusers.Itprovidesastandard,consistent,method
fordeterminingexisting,retrofittedandnewsteamturbineperformancewithintheminimumpracticaluncertainty.It
coverslargefossilandnuclearfueledutilitygradesteamturbine/generators.
W.CARYCAMPBELL,PRINCIPALENGINEER,SOUTHERNCOMPANYSERVICES

PTC4.4,onHeatRecoverySteamGenerators,providesadetailedrigorouscalculationapproachfortestingof
HRSG's.Thetestapproachinvolvesthedeterminationofthegasturbineexhaustflowbytwodifferentmeansand
combiningtheresult.ThiswouldapplytomultipressureHRSG'sincludingunitswithauxiliaryductburners.It
includesguidanceoninstrumentationincludingmeasuringtemperatureofalargeexhaustflowstreamamethodfor
determiningtheHRSGtestuncertainty.
JOSEPHE.SCHROEDER,VICEPRESIDENTENGINEERING,NOOTERERIKSEN

PTC11,onFans,providesareliablemethodfortruetestingoffansintheasinstalledconditionwithoutany
questionableadjustmentstoperformance
PHILIPM.GERHART,PHD,DEAN,COLLEGEOFENGINEERING&COMPUTERSCIENCES,UNIVERSITY
OFEVANSVILLE

PTC19.1,TestUncertainty,providesguidelinestodeterminethequalityoftestdata,objectively.Thesemethods
meetnationalandinternationalstandardsforobjectivedataqualityassessment:measurementuncertainty.
RONALDH.DIECK,PRESIDENT,RONDIECKASSOCIATES,INC.

Over100YearsofASMEPTCs:EnsuringStateoftheArtQualityforStateoftheArt
Technology
In1884,theASMEpublishedRulesforConductingBoilerTests.OnApril13,1909,thePowerTestCommittee
https://www.asme.org/aboutasme/standards/performancetestcodes

5/6

5/27/2015

PerformanceTestCodesASME

wascharteredbytheCouncilofASMEtorevisethepresenttestingcodesoftheSocietyrelatingtoboilers,
pumpingengines,locomotives,steamengines,internalcombustionenginesetc.In1915,theRulesfor
ConductingPerformanceTestofPowerPlantApparatuswaspublished.Overtheyearsnumeroustestcodesand
supplementshavebeenpublished.Somehavebeenrevisedandotherswithdrawnasnewtechnologicaladvances
havenecessitatedtheissuanceofstateofthearttestcodes.Today,somethreedozentestcodesareavailablefor
testingpowerplantequipment,suchasfiredsteamgenerators,steamturbinesandgasturbinesaswellastesting
fuelcellsandcombinedcyclegasificationplants.ItisSocietypolicytorevieweachstandardeveryfiveyearsto
determinewhetherarevisionisnecessary.

ASMEPerformanceTestCodes(PTCs)provideuniformrulesandproceduresfortheplanning,preparation,
execution,andreportingofperformancetestresults.Theyprovideprotocolsforestablishingtestingparametersand
methodsofmeasurement.Theyprovidemathematicalexamplesoncomputingthetestresultsandstatistical
methodstodeterminethequalityofthetestsbycalculatingthetestuncertainty.

JoinanASMEPTCDevelopmentCommittee
Committeemembershipenablesyoutogivebacktoyourindustrycontributingyourtechnicalexpertiseforthe
benefitofpublicsafety.Committeemembersalsogainuniqueopportunitiestoexpandtheirprofessionalnetworks
andtechnicalresources.
Learnmoreaboutcommitteemembershipanddownloadanapplication.

https://www.asme.org/aboutasme/standards/performancetestcodes

6/6

You might also like