Jsa For Pmi Test at Shell PD

This job safety analysis summarizes the potential hazards and safety controls for performing a PMI test on offshore equipment. The key steps involve: 1) Obtaining the proper work permit and ensuring no conflicts with other work. 2) Inspecting the work site and identifying hazards like congested areas, uneven surfaces, and hot areas. 3) Performing the PMI test while wearing appropriate PPE and being aware of hazards like hot surfaces, noise, and falling objects. 4) Measuring findings carefully to avoid incorrect measurements. 5) Cleaning the work area upon completion. Precautions are outlined for each step to minimize risks and ensure the work is done safely.

Uploaded by

MohdHuzairiRusli
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views2 pages

Jsa For Pmi Test at Shell PD

This job safety analysis summarizes the potential hazards and safety controls for performing a PMI test on offshore equipment. The key steps involve: 1) Obtaining the proper work permit and ensuring no conflicts with other work. 2) Inspecting the work site and identifying hazards like congested areas, uneven surfaces, and hot areas. 3) Performing the PMI test while wearing appropriate PPE and being aware of hazards like hot surfaces, noise, and falling objects. 4) Measuring findings carefully to avoid incorrect measurements. 5) Cleaning the work area upon completion. Precautions are outlined for each step to minimize risks and ensure the work is done safely.

Uploaded by

MohdHuzairiRusli
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

JOB SAFETY ANALYSIS

JOB
WORK TEAM
NO
1

DATE :

TO PERFORM PMI TEST


NDT TECH

PERMIT TYPE (COLD/HOT/BURN):

COLD WORK PERMIT

BASIC JOB STEPS


Preparing of work permit

PERMIT NO :

POTENTIAL HAZARDS

CONTROLS

Conflict with other permit

Read the permit and brief the work scope during permit coordication

Miscommunication with other work group.

meeting.
Ensure the other group understand our work scope and location

Permit violation

where the jobs to be done.


Ensure the working permit is approved and signed by all respective
supervisors.

2 Work site inspection.

Congested area.

Familiarise working area such a blocking of escape route to


emergency assambly area.

Open deck floor/grating.

Locate the deck floor without cover/grating and do not try to walk
at this area.
Hot area.
Beware of hot air from generator turbine which blowing to riser area.
Uneven grating or floor.
Beware of uneven grating where can couse tripping hazzard.
High pressure area.
Keep away from any high high pressure equipment at cellar deck.
Do not touch any valves at the high pressure system.
WHAT TO CHECK AND NOT LIMITED TO WITH REFERENCE TO APPENDIX A & B OF THE OFFSHORE WORK PERMIT SYSTEM MANUAL:EXPERIENCE

YES NO

Have you done this job before?


Have you referred technical drawing/ Vendor procedure/SSP?

YES
YES

PPE

YES NO

YES NO

Hard Hat?

YES

Face shield?

Safety Glasses?

YES

Right type of gloves?

Safety Shoes?

YES

Safety harness?

YES NO
Are you knowledgeable with the job to be performed?

YES
NO

Is supervision/experienced assistance required?


YES NO

NO

Work Vest?

YES
YES

Apron?
Goggle?

YES NO

YES

Ear Plugs, double protection?


NO

Respiratory protection?

YES
NO

NO

POTENTIAL HAZARDS
O

Slippery floor?

Pinchh/Trap finger,hand?

Trap pressure?

High noise area?

Congested area?

Back injury hazard?

Pressurized equipment/vessel hazard?

Spark/Hot slag?

Tripping?

Swinging object?

Fire/Explosion hazards?

Burn (heat/chem)?

Overhead work?

Falling object?

Escape route?

Near radioactive materials/sources?

Working at height?

Others closeby?

Shock/Electricity/Static?

Environment spill?

Scaffolding?

Sharp object?

Breaker rack out?

Hose connection?

Secure ladder

Eye injury?

Valve isolation

Windy?

Heavy load?

Grating/deck opening?

Guard rotating equipment?

Dusty?

Hammer strike?

Blocked drains?

Power tools hazards?

1 of 2

JOB SAFETY ANALYSIS


JOB
TO PERFORM MPI TEST
WORK TEAM
NDT TECH
NO
BASIC JOB STEPS
3 PMI test

DATE :

PERMIT NO :

PERMIT TYPE (COLD/HOT/BURN):

POTENTIAL HAZARDS
Hot surface/piping.
High noise area.
Hand injury.
Hot area.
Tripping hazard.
Falling objects.
Over board.

COLD WORK PERMIT


CONTROLS
Wear a suitable hand glove for the protection from any hot surface
or object.
Wear a proper ear protection such a recommended ear plug or
ear mufler.
Wear a recommended hand glove. Beware of rotation equipment
such a pump fan and motor.
Minimise the duration at working area.
Beware of any protuding object during walking at deck floor or
grating.
Place all tool and equipment at suitable floor.
Wear a proper safety gear such a work vest and safety harness.
Safety harness should be hocked at strong structure such a s/fold
handrailing.

Radiation(Low)

Make sure there are no other person in front of the


equipment during the test was done.

Falling from ladder step

Ensure the step of ladder is free from grease or oil. To prevent from
slippery during stepping on the ladder step.

5 Measuring the finding

Wrong measurement.

Measure in detail area

6 House keeping.

Massive working place.

Clean up working area. Return the ladder to the place.