Professional Practice Questionnaires
Professional Practice Questionnaires
Professional Practice Questionnaires
PD.1000
PD. 49
Acoustics
PD.344
Mural Paintings
Interior Design
Acoustics
All listed items
4. Under PD.1096 what should be the proportion of sidewalk width to that of the
road right-of-way?
a.
b.
c.
d.
1/3
1/6
5. What code holds the architect responsible for the building structure he
designed for a certain period of time?
a.
b.
c.
d.
People
Client
Contractor
Colleagues and Subordinates
a.
b.
c.
d.
7days
1month
2weeks
10days
8. What type of bond guarantees payment on all obligations arising from the
contract?
a.
b.
c.
d.
Performance
Payment
Guarantee
Proposal
Public
Manufacturers/Dealers
Contractor
Client
Performance
Payment
Guarantee
Proposal
11. Under the Civil Code, under what conditions can the Contractor be held liable
for damages within fifteen years after project completion?
a.
b.
c.
d.
12. Under the owner-architect agreement, which of the following is/are included
in project construction cost?
a.
b.
c.
d.
Fire-fighting equipment
Plumbing/Electrical Fixtures
Elevator/Escalator
All listed items
13. A well written set of specifications is important to at least four actors in the
building industry. Who of the following is able to check the character and
quality of materials and workmanship during construction?
a.
b.
c.
d.
Construction Superintendent
Fabricator
Estimator
Architect
14. Which of the following is NOT included in the set of contract documents
which forms an integral part of an owner-contractor agreement?
a.
b.
c.
d.
Labor force
Drawings, plans, elevations, etc.
Detailed/itemized drawings
General conditions
2.0%
1.0%
3.0%
2.5%
PD.223
PD.1098
PD.474
PD.1081
Quality of Materials
Aesthetics
Construction System
Use and Occupancy
18. Within what period should the owner release the retention after the date of
final payment?
a.
b.
c.
d.
4 months
3months
2months
5months
19. In the architects range of services under which services does cost, time and
quality control of work fall?
a. Comprehensive planning
b. Design Build
c. Construction
d. Specialized Allied
20. What legal mandate obliges owner to repair or demolish dangerous or ruinous
buildings?
a.
b.
c.
d.
21. Under PD 1185, what is the maximum width (meters) of a single door in a
doorway?
a.
b.
c.
d.
1.5m
0.9m
1.22m
1.4m
Movable Furniture
Five sets of contract documents
Income taxes on professional fees
Structural/electrical/sanitary engineering
23. How many copies of drawings specifications and other contract documents are
usually given to the owner by the architect?
a.
b.
c.
d.
10
5
7
6
d. Overcrowding
26. In the architects range of services, under which phase does site utilization and
land use fall? (PP001 & Architects National Code p.21)
a.
b.
c.
d.
Pre-Design services
Design services
Construction services
Specialized and allied services
27. What is the time frame for the release of the amount retained by the owner
after the date of final payment? (PP015 & CDEP handout)
a.
b.
c.
d.
15 days
120 days
60 days
3 months
28. You are hired as the architect for a 6-storey condominium project on a designbuild service with a guaranteed maximum cost of P 120 million. After
completion, the actual costs incurred for the project reached P 135 million.
Which of the following condition is TRUE: (PP007 & Architects National
Code p.73)
a. You pay for the P 15 million excess
b. You pay P 9 million while the Owner pays only P 6 million
c. Excess divided equally between you and owner (each pay P 7.5
million)
d. Owner pays P 15 million
29. What do you call the outline set of specifications enumerating the type / trade
names of materials? (PP009)
a.
b.
c.
d.
supplementary specifications
breakdown of work and corresponding value
schedule of materials and finishes
brand-name specifications
31. Which organization has the power to approve, issue, limit, or cancel permits
for foreign architects who will be practicing architecture in the Philippines?
(PP076/PP090)
a. 4
b. 1,2 and 4
c. 1,2,3 and 4
d. None of the Above
33. Unless extended for just cause, The Board of Architecture shall submit to the
PRC the ratings obtained by each examiner within how many days/months?
a. 120 days
b. 3 months
c. 30 days
d. 2 months
34. What is the correct order of the 16 Specifications Divisions: (PP063 & CDEP
p.I-22)
a. 1:General Requirements / 2:Site Works / 3:Concrete / 4:Masonry / 5:Metals /
6:Woods & Plastics / 7:Doors & Windows / 8:Thermal & Moisture Protection /
9:Finishes / 10:Specialties / 11:Equipment / 12:Furnishings / 13:Special
Construction / 14:Conveying Systems / 15:Mechanical / 16:Electrical
b. 1:General Requirements / 2:Site Works / 3:Concrete / 4:Masonry / 5:Metals /
6:Woods & Plastics / 7:Thermal & Moisture Protection / 8:Doors & Windows /
9:Finishes / 10:Special Construction / 11:Equipment / 12:Furnishings /
13:Specialties / 14:Conveying Systems / 15:Mechanical /16:Electrical
c. 1:General Requirements / 2:Site Works / 3:Concrete / 4:Masonry / 5:Metals /
6:Woods & Plastics / 7:Thermal & Moisture Protection / 8:Doors & Windows /
9:Finishes / 10:Specialties / 11:Equipment / 12:Furnishings /13:Special Construction /
14:Conveying Systems / 15:Mechanical / 16:Electrical
d. 1:General Requirements / 2:Site Works / 3:Concrete / 4:Masonry / 5:Metals /
6:Woods & Plastics / 7:Thermal & Moisture Protection / 8:Doors & Windows /
9:Finishes / 10:Specialties / 11:Furnishings / 12:Equipment / 13:Special
Construction / 14:Conveying Systems / 15:Mechanical / 16:Electrical
35. What type of bond guarantees payment on all obligations arising from the
contract?
a. Guarantee bond
b. Proposal bond
c. Performance bond
d. Payment bond
36. Which of the following limitations in the registration of a corporation is
correct as prescribed under RA9266 Section 37? (PP081/PP100)
a. Registered and licensed architects shall compose at least 75% of the
owners / Such corporation shall be registered with S.E.C.
b. Registered and licensed architects shall compose at least 70% of the
owners / Such corporation shall be registered with S.E.C. and the
Board
c. Registered and licensed architects shall compose at least 75% of the
owners / Such corporation shall be registered with S.E.C. and the
Board
d. Registered and licensed architects shall compose at least 70% of the
owners / Such corporation shall be registered with S.E.C.
37. What type of specifications specifies a number corresponding to a number in a
published specifications? (PP063 & CDEP p.I-28)
a. performance specifications
b. reference specifications
c. descriptive specifications
d. multi-product specifications
38. What is the condition for a bid to be automatically disqualified using the
Agency Approved Estimate (AAE) as basis?
a. 30% lower or 15% higher than AAE
b. 30% lower or 10% higher than AAE
c. 20% lower or 10% higher than AAE
d. 20% lower or 15% higher than AAE
39. What is the architects minimum basic fee for the design of an exhibition hall
with a project cost below P 50 million? (PP002-PP003)
a. 12% of project construction cost
b. 6% of project construction cost
c. 8% of project construction cost
d. 7% of project construction cost
40. Which of the following describes the lump sum or fixed fee method of
architects compensation?
a. generally used in government projects
b. all listed items
c. entails more paper work and processing of supplementary works
d. disadvantageous to both client and architect
41. How much should an architect charge if he is engaged by the owner to
perform full-time supervision as part of the architects construction services?
(PP005)
a. 1.5% to 3% of the project construction cost
b. 2% to 5% of the project construction cost
60. For interior design services, the architect shall be paid in the following
schedule with the corresponding percentage of the interior design fee:
(Architects National Code p.37, CDEP p.I-13 & PP004)
building maintenance
monitoring security and janitorial services
evaluates the actual use of the facility and the effectiveness of the plan
equipment maintenance
66. All permits/licenses pertinent to construction are paid by whom? (CDEP p.I19)
a.
b.
c.
d.
Architect
none of the listed items
contractor
project manager
67. What do you call the study which determines the viability of a project, such as
the cost of development which brings about a potential return to the owner?
(PP001)
a.
b.
c.
d.
68. The structures below are grouped accordingly with respect to their design
complexity. Which among the groupings have examples of
buildings/structures that DOES NOT belong to the corresponding group?
(PP002-PP003 & CDEP p.I-11 to I-12)
Group I (simple) bakeries, hangars, printing plants, public markets
Group II (moderate) art galleries, exhibition halls and display structures,
monasteries, motels, nursing homes, publishing plants, supermarkets
Group III (exceptional) auditoriums, breweries, cold storage facilities, convention
halls, hotels, mortuaries, theaters
a. Group I and Group III
b. Group II and Group III
c. Group I, Group II, and Group III
d. None (all buildings conform to their respective groups)
69. Condition(s) for an owner to terminate contract?
a. Contractor makes advance payments to subcontractors and suppliers
b. Bankruptcy declared by owner
c. Contractor provides unqualified superintendent and labor force
d. Architect failed to act on request for payment within 15 days
e. All of the above
70. What is a bid bulletin? (PP009)
a.
b.
c.
d.
71. No further retention shall be made on the balance of the Contract when ____
% of the Contract has been accomplished. (PP013 & PP056)
a. 98 %
b. 65 %
c. 50 %
d. 85 %
72. No payments shall be made on contracts in excess of ___ % of the Contract
Price, unless a sworn statement is submitted by the Contractor. (PP014)
a.
b.
c.
d.
50 %
98 %
85 %
65 %
73. Which of the following describes the percentage of project cost as a method of
compensation for the architects services? (PP007-PP008)
a.
b.
c.
d.
74. Which of the following describes architectural programming as part of the predesign services of the architect? (PP001)
a.
b.
c.
d.
75. Analyze the CPM scheduling of a simple project below. Which of the
following condition(s) is(are) TRUE: (PP030 & CDEP p.I-29)
b. 2, 4
c. 1, 5
d. 2, 3, 5
e. 6