1 Introduction General
1 Introduction General
Field
Location
Field Layout
Facility
Layout
Equipment /
Piping Layout
2
Water depth
Other
environmenta
l issues
Existing Infra
Structure
Economy
Pipelines
Processing Facility Nearby
Heliport
Onshore Base Facilities
Supply boats
Site Contingency /
emergency response (EER, oil spill)
Sub sea
Field
Deveopment
Concept
Floating
FPSO
SPAR
Semisub
CAPEX
OPEX
Value of production
Fixed
Artificial island
MOPUSTOR
Jacket supported complex
Integrated platform (GBS or jacket)
Minimal wellhead (STAR or equal)
SELECTION OF LOCATION (Y / N)
Risk Assessments
Operation Philosophy
Main spacing
Special
Studies
Development Concept
Field / platform
orientation is also an issue
here
PLOT PLAN
Special Studies
EQUIPMENT LAYOUT
Plot plans
Conceptual
Design
FEED
Equipment
Layouts
Front End
Engineering
Design
Detailed
Design
Regulations
& Standards
Process
Design /
Layout
Operation /
Maintenance
Philosophy/strategy
Layout
Philosophy &
Strategy
Safety
Philosophy /
Strategy
Other
philosophies /
strategies
HYSYS
Block diagrams
PFD's
P&ID's
Line Lists
Equipment
List
Equipment
Sizing
Preliminary
Layout
Detailed
Layout
EQUIPMENT TYPES
(SPACE / ORIENTATION / LOCATION)
LOCATION
SPACE REQ. /
SPACING /
ACCESS REQ
SPACE REQUIREMENTS,
NON-PROCESS EQUIPMENT,
WORKING ENVIRONM / HUMAN FACTORS
WORK &
OPERATIONS
LAYOUT
Rooms, Workshops
Service facilities,
Non-process equipm.
10
11
OIL
LOGISTICS
Pipeline
Production
directly to
tanker
Production to
tank
Offloading
from tank
Submerged
Loading
System (SLS)
SPM
(Single Point
Mooring)
TANK
Tandem Hose
Offloading
Tank platform
FSO
Concrete
GBS
Steel tank
12
15
16
19
20
21
23
24
FES (Fire & Explosion Strategy) incl. design fire loads and blast
pressures
EERS (Escape, Evacuation and rescue strategy)
26
27
Product
Mix / storage
pump
Heating (heat
exch)
Filling point
28
29
JT
IP
HP
NGL
REC
FUEL
EXPORT GAS
FUEL
MULTIPHASE FLUID
FROM WELL(S)
LP2
LP1
FUEL
V1
SALE
V2
LIFT
V3
STABILIZED CRUDE OIL FOR EXPORT
PRODUCED WATER TO
TREATMENT
30
31
32
33
34
PHYSICAL LAYOUT
PLOT PLAN
Plot plans
shows the
entire level
in one
drawing.
Unit / main
equipment
level
35
PHYSICAL LAYOUT
EQUIPMENT LAYOUT
Equipment
layout is a
unit plot
plan, i.e.
the plot
plan is
divided
into units /
modules.
Other than
main
equipment
also shown
36
PHYSICAL LAYOUT
HAZARDOUS AREA CLASSIFICATION
One drwg
per deck
level +
overall view
37
PHYSICAL LAYOUT
HAZARDOUS AREA CLASSIFICATION
In addition
to plan
views side
views
(elevations)
required
from more
than one
side
38
PHYSICAL LAYOUT
F&G DETECTOR LAYOUT
39
PHYSICAL LAYOUT
FIRE & SAFETY PLAN
40
PHYSICAL LAYOUT
DELUGE AREA PROTECTION DRAWING
41
PHYSICAL LAYOUT
FRAMING PLAN
42
LISTS
EQUIPMENT LIST
All equipment shown in layouts/plot plans are shown in
equipment list
First input to equipment list is from PFD/P&ID
Size/Weight is shown in the equipment lists
For pre-conceptual and conceptual designs, sizes are based on
experience and estimates
On day 3 we will revert to methods for estimation of
sizes/weights.
43
LISTS
EQUIPMENT LIST
44
THANK YOU
45