Checlist Kelompok Pressure Vessel
Checlist Kelompok Pressure Vessel
Checlist Kelompok Pressure Vessel
PRESSURE VESSEL
MIGAS CERTIFICATION
OF
SKPP 7 UNITS PRESSURE VESSEL
(List Attched)
Location : Chevron Rajah Platform - Kaltim
Prepared by :
PT EXTERRAN INDONESIA
Reviewed by :
PT SUCOFINDO
Verified by :
MIGAS
Checklist:
Inspection and Test Plant Checklist for New Prssure Vessel
Work Area:
Contract Number:
Contract/Project Name:
Contractor:
Subcontractor:
Activities
1. Document
Items/activities to be verified
- QA/QC manual
- Approval of Drawings and Design Calculations
- Qualification/Approval of Welding Procedures
- Qualification/Approval of Welders and Welding Operators
- Approval of NDT Procedure including Personnel
- PWHT Procedure (if required)
- Hydrostatic Test Procedure
2. Materials
- Review of Mill/Test Certificates and Conformance Codes
- Visual Check
- Dimensional Check
9. Painting
Verified document
Reference
Inspection Report
Inspection Report
Inspection Report
Inspection Report
AFC Drawing
ASME VIII & Owner Specs
AFC Drawing
AFC Drawing
Inspection Reports
AFC Drawing
Welding Record
Welding Map & Welding Record
Certificates & Welding Record
Welding Record
PWHT Report
NDE Report
NDE Report
Calibration Certificates
Hydrostatic Test Procedure and
Report
Owner Specs
Test Procedure, ASME VIII/ Owner Specs
Inspection Report
AFC Drawing
Inspection Report
Packing & Delivery Report
QC & Fabrication Dossier
AFC Drawing
Handling & Packing Procedure
ASME VII / Owner Spec
OK/Not OK
Comments