SECTION 01 43 00
- Quality Assurance
May 2013
Project :
Location :
DIVISION
SECTION 01 43 00
1.1
GENERAL REQUIREMENTS
-
Quality Assurance
GENERAL
Notwithstanding anything herein specified or provided that may be construed to
the contrary, all materials, and equipment must conform to all laws, ordinances,
regulations and building codes now or hereafter may be in force and applicable
during the period of construction, and the Contractor shall obtain the necessary
permits and pay the required fees therefore to the proper authorities. The
Contractor shall bear any and all damages by reason of any delay in the work
arising from his failure to comply with the provisions of this clause.
1.2
EQUIPMENT
A.
B.
2.
Quality Assurance
01 43 00
Page 1 of 5
2.
3.
4.
Catalog data for equipment approved does not in any case supersede the
Contract Documents. The approval of the Architect and the Engineer shall
not relieve the Contractor from responsibility for deviations from Drawings
or Specifications, unless he has in writing called their attention to such
deviations at the time of submission, nor shall it relieve him from responsibility for errors of any sort in the items submitted. The Contractor shall
check the work described by the catalog data with the Contract
Documents for deviations and errors.
1.3
2.
Quality Assurance
01 43 00
Page 2 of 5
B.
C.
3.
4.
Samples of Materials: The Contractor shall furnish for approval, with such
promptness as to cause no delay in work, samples as specified or required.
Work shall be in accordance with the approved samples.
1.
2.
Each sample shall be labeled, bearing material name and quality, the
Contractors name, date, project name and other pertinent data.
3.
4.
5.
6.
Materials shall not be ordered until approval is received in writing from the
Architect. All materials shall be furnished equal in every respect to
approved samples.
2.
3.
4.
Quality Assurance
01 43 00
Page 3 of 5
E.
F.
G.
1.
2.
All cement, lime, and other materials affected by moisture shall be stored
on platforms and protected from weather. Materials shall be so stored as
to insure the preservation of their quality and fitness for the work. Stored
materials shall be located so as to facilitate prompt inspection.
3.
2.
Failure or neglect on the part of the Architect, or any part of his agents to
condemn or reject bad or inferior materials shall not be construed to imply
an acceptance of the materials if said bad or inferior materials are
discovered at any time prior to the final acceptance of the work by the
Owner and the release of the Contractor.
Quality Assurance
01 43 00
Page 4 of 5
1.5
1.6
MANUFACTURERS DIRECTIONS:
Quality Assurance
01 43 00
Page 5 of 5