Labour Rate
Labour Rate
Labour Rate
For this purpose we did our internship at Gokaldas images and are grateful
to the management who granted their permission and opportunity for the same.
ACKNOWLEDGEMENT
Ourselves, P.S.Shraddha and Radhika Ahlawat, students of four year
Apparel Production course in Department of Fashion Technology, in National
Institute of Fashion Technology,Hyderabad, for the partial fulfillment of our
course, underwent a Summer Internship at Gokaldas Images, at its Sri
Venkateshwara Garment Unit for eight Weeks.
For the same we would like to thank our course coordinator Ms. Sharmila
Sure, without whose concern and efforts, this internship would never have been
possible.
We are also highly grateful to Mr. Deepak Reddy, General Manager,
Manufacturing Dept., Gokaldas Images, Head office, who granted us the
permission to work as internees.
We would like to thank Mr. Bhimarao, Vice President, HR Dept.,
Gokaldas Images, Head office, who helped us during the project.
We would like to thank Mr. Prashanth, Factory Manager, Sri
Venkateshwara Garment Unit, our mentor and guide throughout the Internship,
who assisted us throughout our internship and made it a fine learning experience.
Apart from these, we would also like to thank the various workers and staff
members who were there to assist us at every step and to answer our queries.
PART-1
1. INTRODUCTION
1.1 COMPANY PROFILE
Since its inception in 1979, Gokaldas Images (GI) has achieved sustained
growth and crossed milestones, the present focus is however, is on achieving the
same, within the organization- through its people, processes, culture and quality.
One of the biggest achievements for GI, is the internal integration of man,
machine and thought into a single GI spirit. The existence of this spirit is what
resonates and throbs inside the organization and its actions and efforts is what
the world has seen as Gokaldas Images brand.
Flexibility in approach couples with agility in action has become GIs hallmark
and it sets them apart in the borderless business world.
1.2 FACT FILE:
Gokaldas Images (GI), since 1979
GI
One of Indias largest integrated clothing corporations.
GI body
7 divisions in manufacturing, retailing and exporting.
GI domestic
70 exclusive retail outlets and over 200 selling points.
GI size
18 automated factories with 4800 machines.
GI turnover
Exceeds USD 70 million
GI life
9000 committed and highly skilled people.
1.3 GI DIVISIONS:
GI today stands equal to the worlds largest fashion houses, with its export
operations organized into seven product- seven divisions that function as
independent profit centers.
1.3.1 Fashion wear:
Products
Mens and boys shirts, trousers, casual summer jackets and shorts, ladies and
girls dresses, skirts, trousers, embroidered and embellished tops, golf wear in
woven fabrics.
Fabrics
Cotton and cotton blends, linen and linen blends, silk and silk blends, wool and
wool blends, micro-polyester and polyester blends, yarn dyed, jacquards,
computerized embroideries and prints.
Monthly capacity
2,50,000
1.3.2 Outerwear:
Products
Light weight summer jackets in nylons and other weather proof fabrics, heavy
padded anoraks, woolen coats, windcheaters, parkas, athletic tanks, jogging
suits, ski-suits, track suits, swim wear, shorts for men and boys, riding and
hunting jackets.
Fabrics
Nylon and nylon blended fabrics, performance fabrics, fleece, micro-fiber
polyester, moisture wicking fabrics, anti-bacterial fabrics, breathable polyester
blends, faux suede in polyester and blends, light weight nylon.
Monthly capacity
100,000
Woolen and wool blends, polyester blends, silk, micro fibres, linen blends.
Monthly capacity
50000
1.3.7 Suits & Dress Pants
Products
Men suits, blazers, dress-shirts and trousers.
Fabrics
Woolen and wool blends, polyester blends, silk, micro fibres, linen blends, cotton
and cotton blend, fine, solid dyed and yarn dyed shirtings.
Monthly capacity
90000
1.4 GI USA
With the globe shrinking and distances dwindling, thanks to jet age and
computers, GI decided to be close to the client. The result was a a fully functional
office and showroom in New York. A dedicated team in this Manhattan office
works tirelessly to pre-empt and meet the client requirements.
1.5 COLLABORATIONS
Recognition of GIs effort in the global garment manufacturing scene came in the
form of several international tie-ups.
BARBARA has a joint venture with GI to manufacture and retail lingerie in India
and Europe.
PLAYTEX is a buy back agreement with Saralee Corporation.
K-LIFE is a license to produce urban clothing for USA.
OXFORD CLOTHING has a manufacturing agreement with GI for mens suits.
On the anvil is the extension of the same to formal wear.
LEVIS has a manufacturing agreement with GI, for denims in India.
1.6 GI LOGISITICS
Bangalore, the manufacturing base of GI, has over a dozen direct freighter flights
a week, landing at major European and American cargo hubs.
Chennai, a major port is just 6 hrs away by road.
1.7 GI INFRASTRUCTURE
1.8 GI RETAIL
Leveraging its core strengths in distribution, merchandising and image creation,
GI introduced the concept of branded clothing, franchising and the open store, to
Indian market WEEKENDER through its associate firm Personality Ltd. in 1987.
Weekender which focused on youth fashion was later extended to childrens
wear, for the 2-12 years age group and branded as Weekender Kids.
Every season Weekender and Weekender Kids launch more than 200 new
styles. Both the brands today are retailed through two separate franchise chains
in 70 exclusive outlets in cities across the nation. They are the leading brands in
their segment, in size, brand appeal and influence on the market.
The domestic retail initiative of GI also includes licensed brands from Warner
Bros. like Harry Potter, Tom & Jerry, Loony tunes and Mickey Mouse & Donald
Duck from Disney. These ranges are conceptualized and manufactured in-house.
Gokaldas Intimatwear, is a joint venture with Barbara of Paris. The JV shall bring
high quality ladies innerwear to the Indian market, with various brand offerings
beginning with enamor.
Fire drill and first aid training is provided at all facilities on regular basis.
The result is a certification and an approval from audit agencies and clients alike
GI has been found to have compliant facilities by agencies like SGS, CSSC, ITS
and Price Waterhouse Cooper.
1.11 GI CREATIVITY WITHOUT BORDERS
The shrinking marketplace, the constantly changing business environment and
the ever-changing needs of the customers, have redefined the way they do
business.
Backward integration, joint commitments, license agreements, extensive in-house
R&D, and our flexibility, all stem from the corporate mission, creativity without
borders.
1.12LOCATION
1.12.1 GI INDIA
7&12, Industrial Suburb, 2nd Stage,
Yeshwanthpur, Tumkur Road,
Bangalore-560022.
Tel: 91-80-3377059/60
1.12.2 GI USA
Suite 2704/05, 1400 Broadway,
New York
N.Y. 10018
Tel: 212-730-3950
Telephone no.:
91-80-23379194
Fax:
91-80-23471757
Contact Person:
Mr. Prashanth
Factory Manager
E-mail:
Total area:
Trousers
Jackets
Denims
Product strength:
Jackets
Fabric handling
Capabilities:
.
1.14ORGANISATION CHART
ORGANISATION CHART:
2. PROCESS FLOW
Buyer Orders
Sampling
o Sampling Execution & Follow up
o Costing
o Sampling Shipments
o Re sampling (If any rejections are received)
o Sampling Approvals
Planning
o Planning the time required for each of the processes involved in the
execution
o Raw material calculations as per average sheets, adding
wastage/shrinkage at appropriate processes.
o Raw material Procurement
o Fabric requirements
o Non fabric trims/ accessories requirements
o Packing material requirements
Cutting
o Instructions/Orders to the in-house Cutting Department
o Calculation
of
the
fabric
requirement
and
checking
the
Sewing
o Stitch Orders/Instructions
o Issue of cut pieces
o Calculation of raw material requirements
o Issue of raw materials
o Approval of a few stitched pieces before regularizing the issue of
fabrics/raw material
o Issue of other things like samples / patterns / designs / other special
considerations/ Measurement charts.
o Reception of Stitched pieces Checking
o Alteration (if required)
o Inspection comments
2.1
Re processing cycle
Shipment/dispatch
DURING
THE
PROCESS
FLOW
DIFFERENT
MEETINGS
ARE
CONDUCTED
2.1.1 PRE PRODUCTION MEETING
Objective
Broad Questions
Point person
Merchandiser
Chairperson
Merchandiser Manager
Participants
o Merchandiser
o Fabric technologist
o Planning manager
o Cutting room manager
o QC
Time Frame
Pre-requisite
1.
2.
3.
4.
5.
6.
Broad Questions
Point person
Factory Manager
Chairperson
Technical Manager
Participants
o Technical manager
o Factory manager or Production manager
o Production Supervisor.
o Industrial engineer
o Fabric technologist
o Cutting room manager
o QC
Time Frame
Pre-requisite
Broad Questions
Point person
Technical manager
Chairperson
Factory Manager
Participants
Time Frame
Pre-requisite
Broad Questions
Point person
Factory Manager
Chairperson
Merchandiser
Participants
o QC
Time Frame
Pre-requisite
3. MERCHANDISING DEPARTMENT
BUYER
MERCHANDISER
Design/Sampling
Production
Fabric
Quality check
Accessories
Documentation
Testing
Shipping
Marketing Merchandising
Product Merchandising
Marketing Merchandising
Main functions of marketing merchandising are:
Product development
Costing
Product Merchandising
This is from sourcing to finishing that is from first sample onwards, the product
merchandising work starts and ends till the shipment.
For each style the related merchandiser maintains a package file.
3.1 MERCHANDISERS PACKAGE FILE
1. List of orders pasted on the left hand inside cover of the file.
2. Tech pack.
3. CAD marker-costing and factory.
4. RMR-order wise and summary chart.
5. Trim pro forma invoices from the supplier.
6. Confirmation of the trim.
7. Commercial invoices (C.I.).
8. Confirmation of the CI from the store.
9. Order chart from the buyer.
10. P.O. copies from the buyers.
11. Fabric order confirmations with approved fabrics swatches.
12. Time and action calendar.
13. Hard copy of all incoming and outgoing crucial and important mails that
may be required for future references (buyer related).
14. Mills fabric reports-checking, testing.
15. Internal fabric reports-checking, testing.
16. Buyer approveda. Trim card
b. Shade bands
Design/Sampling.
Fabric.
Accessories.
Testing.
Production.
Quality Check.
Documentation.
Shipping/Forwarding.
Merchandising and obtains his signature confirming the delivery date. All such
mails signed copies are filed in a separate "'MASTER BOX FILE" titled "ORDER
CONFIRMATION FILE" which is always with GM-M. During the same period the
merchandiser also goes through all the details of order and verifies the "Order
Calendar Book"
Tech Pack
Trim charts
Fabrics cuttings
Thread approval
Embroidery or print approval- if any, from the respective SRS files that is
available with the sampling department -headed by the Sampling Manager.
The Merchandising department basically acts like a bridge between the buyer
and the factory. Its basic duty is to book orders from the buyers and make it sure
that the orders are executed according to the buyers requirements in terms of
style, construction, quality and quantity.
This is done by accurate communication between the buyer and the factory.
Hence the merchandiser plays the part of communicating in the form of minute
details, the requirements of the particular style.
3.4 GOALS SET UP BY THE MERCHANDISING DEPARTMENT:
1. To ensure reduction in Customer complaints.
2. To ensure timely response and delivery to Customers
3. To work towards increase in the sample approval at first time.
4. To Reduce Associate turnover
3.5 BASIC ACTIVITIES REQUIRED TO BE DONE ON A DAY TO DAY BASIS
REGARDING THE ORDER EXECUTION:
Receiving the order from Buyer and other relevant samples and product
information.
Giving sample material requirements to sourcing teams.
meeting.
Monitoring the production status and timely alert on deviations.
3.7 ACTIVITIES REQUIERED TO BE DONE FOR THE CONTINUOUS
IMPROVEMENT OF THE PROCESS:
Improving the on time sample development and dispatch.
Analyzing the Order completion reports and incorporating the learning in
subsequent orders.
Analyzing the Order completion reports and incorporating the learning in
subsequent orders.
Getting all the update on the product and quality areas by attending the
seminars and through magazines for the better improvement.
The
Thework
workisisdivided
dividedaccording
accordingtotothe
thetype
typeofofgarment
garment
being
beingdone,
done,e.g.
e.g.mens
menswear.
wear.
..
The
Thedivision
divisionisistaken
takenup
upfor
forthe
theorder
order
..
Packages
Packagesare
aresent
sentby
bythe
thebuyer
buyertotothe
thecompany
companywhich
which
carries
carriesthe
theTECHPAK
TECHPAKincluding
includingthe
thedetails
detailsofofthe
the
garment.
garment.
..
The
Themerchandising
merchandisingdepartment
departmentworks
worksout
outthe
theaccessories
accessoriesand
and
trims
trimsrequired
requiredand
andprepare
prepareaaBill
BillofofMaterial
Material(BOM),
(BOM),which
which
contains
containsthe
theconsumption
consumptionper
pergarment.
garment.ItItisispassed
passedon
ontotothe
the
Purchase
Department.
Purchase Department.
..
The
Thestyle
styleisisgiven
giventotothe
theCentral
CentralPlanning
Planningteam
teamtotowork
workout
outthe
the
SMV
values
and
operation
breakdown.
SMV values and operation breakdown.
..
The
TheTECHPAK
TECHPAKisissent
senttotoallallthe
thedepartments
departmentsconcerned
concernedi.e.
i.e.
sampling
samplingand
andsourcing.
sourcing.
Fabric
Fabricteam:
team:works
worksout
outthe
thecosting
costingofofthe
thefabric;
fabric;yarn,
yarn,knitting,
knitting,
processing,
processing,dyeing,
dyeing,wastages.
wastages.
..
..
Pattern
PatternMaster:
Master:works
worksout
outthe
thepatterns
patterns
..
..
PPC
PPCteam:
team:works
worksout
outthe
thekinds
kindsofofcost,
cost,totobe
beincurred
incurredduring
during
production,
production,finishing,
finishing,packing.
packing.
..
..
Costing
Costingteam:
team:prepares
preparesan
anentire
entirecost
costestimate
estimateofofthe
the
production
of
the
garment
in
bulk.
production of the garment in bulk.
..
The
Thebuyer
buyerisisinformed
informedabout
aboutthe
thepricing
pricingand
andthe
thesampling
sampling
process
processstarts.
starts.
..
. . Proto,
Proto,Fit,
Fit,Pre
PreProduction
Productionsamples
samplesare
aresent
senttotothe
thebuyer.
buyer.
Checkers/
Helpers
Checkers/
. . Helpers
..
Buyer
on
Buyerreviews
reviewsand
andsends
sendscomments
comments
onthe
theproduct
productfor
for
improvement
improvementorormanipulations.
manipulations.
.
..
The
Thebusiness
businessisisbooked
bookedonce
oncethe
thesamples
samplesare
areapproved
approvedininallall
respects
respects
..
..
The
Thelead
leadtime
timeand
andthe
thedelivery
deliverydates
datesare
areinformed
informedtotothe
thebuyer
buyer
according
accordingtotothe
theorder
ordersize.
size.
. . The
Thebuyer
buyerisisinformed
informedabout
aboutthe
thepricing
pricingand
andthe
thesampling
sampling
process
..
processstarts.
starts.
..
..
The
ThePurchase
PurchaseOrder
Orderisisreceived
receivedby
bythe
thecompany.
company.
..
.All
.Allthe
theconcerned
concerneddepartments
departmentsare
areinformed
informedabout
aboutthe
thecapacity
capacity
booked.
booked.
..
AATime
which
. made
Timeand
andAction
ActionCalendar
Calendarisismade
whichspecifies
specifiesthe
thetime
time
.
period
and
the
dates
of
all
the
activities
like
fabric
sourcing,
period and the dates of all the activities like fabric sourcing,
trim
trimsourcing,
sourcing,cutting
cuttingdate.
date.
..
The
about
. buyer
Themerchandiser
merchandiserinforms
informsthe
thebuyer
aboutthe
theprogress
progressofofthe
the
.
activities
activitiesand
andthe
theupdated
updatedTime
Timeand
andAction
ActionPlan
Planevery
everyweek.
week.
..
All
totomeet
..
Allthe
theabove
aboveactivities
activitiesare
areundertaken
undertaken
meetthe
theProduction
Production
Cut
Date
(PCD)
which
is
generally
30
days.
Cut Date (PCD) which is generally 30 days.
..
..
This department is the main link between the factory and the
buyers. The buyers rely on the merchandisers to provide them with
the information regarding the capacity available, the style feasibility
and the setting up of delivery dates for the shipment.
This process involves receiving the initial order details from the
buyers representative and communicating through E-mail and
telephonic conversations.
The merchandising team keeps the buyer updated about all the
developments taking place regarding the order.
The order booking and the order confirmation details are received
by the merchandising team who further transfers this information to
the other departments.
The merchandising team receives the details of all the style features
in the particular order. This also includes the following :
Fabric quality details
Thread Details
Finish Details
Accessories like beads, sequins, laces etc.
Prints and Embroidery
Trims like buttons, zippers
Wash care labels
Size labels
Brand labels
Packing Material details
Hangtags
Besides
receiving
this
information
from
the
buyer,
the
This BOM is entered into the ERP package by the Data Entry
Operators for access by the Purchase Department.
o
o
o
o
o
o
o
o
o
o
o
Sample development
Sample approval
Lab Dip approvals
Trims approvals
Accessories approval
Pre Production sample approvals
Cutting start date
Sewing start date
Embroidery start date
Finishing start date
Shipment dispatch date.
The planned and actual dates of the TNA are entered into the sheet
as and when the activities are carried out. Any deviations are
looked into and the decisions are made.
The sampling section is given the TECHPAK which contains all the
relevant details.
The merchandiser receives the buyer comments for all the samples
and makes it sure it is informed to the sampling and the necessary
changes made in all the required areas.
3.9.5 GETTING
APPROVALS
FOR
VARIOUS
PURPOSES
FOR
THE
GARMENT:
Yarn Dyed program: In case of yarn dyed order yarn lab-dip has
to be sent to the buyer for color approval. Upon confirmation, knit
down approval has to be taken from buyer where specified.
3.10
Fabric detailso GSM of all the types of fabrics used in the garment
o Fabric construction
o Fiber types
o Fabric width
o Fabric/garment finish type and hand feel description
o Buyer nominated supplier (in certain cases)
o Fabric swatch
Sewing detailso Stitch SPI for all the parts of the garment
o Stitch distance for all the seams e.g. distance of the top
stitch, distance of bottom hem from the bottom
o Single needle or double needle operation for all the seams
o Stitch no.
o Gauge and bight for overlock machines
o
o
o
o
o The font size and font style for the text on the labels
o The material of the various labels
o Types of labels required i.e. Wash Care Labels, size labes,
brand labels
o Positioning g of the labels on the garment with dimensions
mentioned on a diagram of the garment.
o Type of stitch used to attach labels
Finishing detailso Type of iron to be done( e.g. some garments require only a
mild touch up and the original fall of the garment is allowed
to come.
o A mention about the finishing quality (e. g. only steaming
requires that there should be no shade variation, seam /
water marks, seam impressions showing on the garment.
o Presentation labels and hangtags which are attached on the
garment before packing.
o Position of the attached hangtags and size labels on the
garment
o Final look of the packet after packing.
o AQL level to be followed while inspection in the finishing
section
Packing detailso Details regarding the type of packing material to be used
o No. of garments in each poly bag or any other kind of prepack.
o Written material on the packing material
o Size of the poly bags and the cartons
o No. of garments/pre-packs to be kept in each carton.
3.11 RECORDS AND FORMATS MAINTAINED IN THE MERCHANDISING
DEPARTMENT
S.No. FORMAT
/DOCUMENT PURPOSE OF USE
NAME
1
Sample Evaluation report
This report is maintained for all the
samples evaluated and inspected by the
Internal
Card
Approval
Consumption
chart
Material Requisition
This
format
is
filled
up
by
the
the
quantity
and
quality
required.
This is a formal order raised to the
Sampling
department
instructing
the
sample
preparation
are
also
Minutes
Meeting
of
Order
The
OCM
minutes
are
reference
in
case
of
some
and
the
factory.
i.e.
Garment hangtags
10
other
departments,
the
sheets
are
Assistant.
The costs incurred while sampling is
maintained in this document.
S.No FORMAT/MATERIAL
1
PURPOSE OF USE
Size set and pilot run The size set and pilot run reports deal with
reports.
Tech Packs
Purchase orders
quantity,
destination.
The
shipment
style
dates
and
numbers,
item
used
as the
Customer
samples.
Complaint The merchandiser maintains the complaint
Details
Shipment details
Letter
of
Credit
details
and
To determine the time value for each work component under the motion
study. This supports improvements and standardization.
To draw up plans and make estimates for a change of product or for the
construction of new orders.
To use the basic order for determining the unit cost manufacturing and the
wage rate.
Depending on the above, decide the feasibility of the manufacture of the garment.
To develop the new style requirement (NSR) sheet for the style.
Production summary.
Attendance chart
implemented by GSD.
Follow-up on low output operators. Finding out reason for low efficiency
Create and update skill matrix of each operator & submit the same to
personnel department.
In Gokaldas Images six grades are given to operators i.e. A+, A, B+, B,
C+, C,.
They are assigning following three grades on the basic of type of operations they
do. For both top and bottom garment the operators are given these three grades.
NOTE:
1. Grade A+
5 to 6 operations of B category.
2. Grade A
5 to 6 operations of B category
Grade A- Operations
Grade B- Operations
Attach yoke & edge stitch yoke Run stitch neck band
sleeve
placket
stitch arrow
Set sleeve
placket
Set
Grade C- Operators
stitch arrow
Match & run collar
Close collar
Locking operations
Attach
front
(kansai / DNLS)
Hem bottom (Manual)
Sew pleats
Hem sleeve
Attach pocket
Grade B - Operations
Grade C - Operations
yoke
Sew for front pleats Attach waist band to inner
(shapes)
Sew for back pleats
nylon
Overlock slit (front)
Welt pockets
lable
Overlock right fly
Hem pocket
(folder)
Finish waist band (Ditch stitch)
Overlock front(side)
J- Stitch
bag
Attach zipper to the Prepare waist band loops
Attach pockets
front
Attach zipper to the Overlock rises
lining
Edge stitch waist band
Below pieces
Tack waistband
5. SAMPLING DEPARTMENT
Sampling is basically the process of producing some few garment pieces in order
to match the various buyer requirements such as the design features, size, style,
etc. as soon as any order is received the tech pack is handed over to the
sampling department and various samples of the product are developed in order
to get the orders confirmed from the buyer.
When the product is in the sampling stage, the buyer might suggest few
alterations or changes as per the appearance and fit of the garment and the
requirement of the style which are incorporated in the further samples and finally
a green tag sample is made and approved by the buyer which is the actual
representation of the product and handed over to the production floor as a guide
for the operators to be followed while the bulk production is going on.
Though sampling is a costly procedure but it identifies the various
problems which might be faced during the bulk production if sampling is not done.
Maintain sampling status and maintaining the same from time to time.
5.2
Process Flow:
Receives
Receivesthe
thetechpak
techpakfrom
frommerchandising
merchandising
department.
department.
Pattern
Patternmaster
masterdevelops
developsthe
thepattern
pattern
Pattern
Patternisisdigitized
digitizedand
andgrading
gradingdone
donewith
withthe
the
help
of
CAD
help of CAD
Fabric
Fabricconsumption
consumptionisiscalculated
calculatedand
and
Mini
marker
is
developed
Mini marker is developed
Proto-sample
Proto-sampleisisdeveloped
developedas
asper
perthe
thebase
base
pattern
pattern
Sales
Salesman
mansamples
samplesare
aredeveloped
developedand
andsent
senttoto
the
thebuyer
buyer
Pre-production
Pre-productionsamples
samplesare
aredeveloped
developedonly
onlyinin
the
base
size
with
all
the
corrections
the base size with all the corrections
Pilot
Pilotrun
runisisdone
doneon
onthe
theproduction
productionline
lineand
andone
one
set
of
each
size
is
developed
in
each
colour
set of each size is developed in each colour
Bulk
Bulkproduction
productionstarts
starts
TOP
TOP(Top
(TopofofProduction)
Production)sample
sampleisissent
senttotothe
the
buyer
buyer
Shipment
Shipmentsample
sampleisissent
senttotothe
thebuyer
buyer
5.3
Types of sample:
The samples are send along with the sample submit sheet. The protosample is further worked upon to get the 2 nd proto-sample according to the
buyer comments received.
Fit-sample: - These samples are made to check the fit of the garments.
Size-set sample: - All the sizes of a particular style are made and send to
the buyer. Size set samples are used for checking the grading. Five
samples of each size are made for the size-set sample.
Pre-production sample: -This is made after the approval of style to be
produced in bulk. This is made with actual fabric and in actual trims. Four
PP samples are made.
Sealer sample: -This sample is made after the pre production sample with
changes (if any) or no change and sealed so that the production can be
started. It accompanies a package which contains following reports
Shrinkage report.
The package file is received from the merchandiser and the copies of it are
handed over to the sampling manager, CAD in charge, sampling
technician and the sampling QA in charge.
The weekly plan is then generated based on the requisition received from
the merchandiser and it is handed over to the sampling coordinator, CAD
in charge, merchandiser and the sampling QA in charge.
The CAD in charge receives the package file from the sampling
coordinator and after discussion with the sampling manager and the
technician the package file copy is handed over and discussed with the
concerned pattern maker.
The pattern maker after discussing with the technician makes the patterns
according the details in the package file and hand over the patterns to the
CAD in charge.
After the patterns are received by the CAD in charge, they are checked
and are handed over to the CAD operators for digitizing, grading and
adding shrinkage to the patterns.
The patterns along with the cutting plan are then handed over to the
sampling coordinator who in turn hands them over to the cutters.
The requisition is raised for the fabric and accessories by the sampling
coordinator and given to be signed by the sampling manager.
sewing machine and the garment is stitched. The meter gives the amount
of thread consumed (in meters). They then prepare the Thread
Consumption Report. This report contains the details Type of stitch,
Stitching length, SPI, Consumption per meter. This is filled for all the
stitches in the garment.
After receiving the fabric, the QA in charge holds a meeting with all in-line
and end-line QAs before the style starts.
Measurement audit reports of in-line and end-line QAs are checked and
the final inspection report of samples is generated for the finished
samples.
The sampling manager discusses with the merchandiser for the rejected
samples and records them.
One sample goes to the buying office from where the orders are
placed.
One sample goes to the buyer.
One sample goes to the concerned factory where production has to
take place.
Pre-production sample acts as the sealer sample which hangs on the
production floor to be used as a reference.
6. CAD DEPARTMENT
Merchandiser sends an indent to the CAD department requesting for
markers and patterns with required details. A marker is produced
considering the width, shrinkage to finally know the fabric consumption. Bulk
production markers are prepared to economize the fabric consumption.
Lectra systems is used to develop the markers and patterns.
Functions:
Receipt
Receiptofofsampling
samplingindent
indent
from
the
merchandiser
from the merchandiser
with
withtech-pack,
tech-pack,sample
sampleetc
etc
(if
any)
or
patterns
from
(if any) or patterns from
the
thepattern
patternmaster
master
Digitizing
Digitizingthe
thepatterns
patternson
on
the
digitizer
by
Lectra
the digitizer by Lectra
Systems
Systems
Making
Makingthe
thepatterns
patternson
on
Modaris
(Lectra
Systems
Modaris (Lectra Systems
software
softwarefor
forpattern
pattern
development.
development.
Grading
Gradingthe
thepatterns
patterns
according
accordingto
tothe
thedesired
desired
sizes
in
accordance
sizes in accordancewith
with
the
thespecs.
specs.
Development
Developmentofofmini
mini
markers
for
fabric
markers for fabric
consumption
consumption(sent
(sentto
to
merchandiser
for
costing).
merchandiser for costing).
Development
Developmentofofproduction
production
markers
to
be
issued
markers to be issuedto
to
cutting
cuttingdepartment.(these
department.(these
are
arechecked
checkedby
bythe
thepattern
pattern
master
masterininterms
termsofofright
right
grading
etc.).
grading etc.).
7. TRIMS STORE
7.1 FUNCTIONS
To check the quality as per standard and quantity received from the
supplier.
Name
Buttons
Label
Zipper
Tassel
Card board
Carton
Bar code sticker
Hanger
Elastic
Velcro
Thread
Interlining
Fusing
Packing tape
Poly bag
Draw board
Paper (drawing sheet for pattern)
7.3 Process Flow
Unit
Per gross
Per piece
Per piece
Per piece
Per piece
Per piece
Per piece
Per piece
Per meter
Per meter
Per meter
Per meter
Per meter/Yard
Per roll
Per Kg.
Per kg.
Per Rim
TRIMS
TRIMSRECEIVED
RECEIVED
PHYSICAL VERIFICATION OF
PHYSICAL VERIFICATION OF
TRIMS
TRIMS
10%
10%QUALITY
QUALITYAUDIT
AUDIT
STORAGE OF TRIMS IN
STORAGE OF TRIMS IN
APPROPRIATE
APPROPRIATERACKS
RACKS
ISSUE
ISSUETO
TOBATCHES
BATCHES
be audited.
First of all, the trims store in-charge receives the PO copy. This PO copy
contains various details such as the Sample Date, Prototype Sample,
Order chart, RMR.
The trim store in-charge takes out only the Raw Material Status Report
(RMR). This report gives the details as to the which trims are to be
received, the consumption per garment, the required qty, the qty ordered,
the qty received and the balance left to receive.
Stitching Part
Packing Part
The stitching part is executed first. A copy of the RMR is firstly sent to main
stores. The main trim store then sends the trims as per the ordered
quantity with a Delivery Challan.
When the trims are received, the unit checks them and makes an Inward
Challan. 3% extra is always added as for wastage considerations.
The trims store head maintains a Daily Status Report of the trims that are
issued from the main store and the balance left yet to receive. This is
maintained for the internal reference of the trims store.
The inspection of the trims and accessories is done in the main unit itself.
Hence, when the trims are received, they are only stored and issued to the
production at the trims store.
Out of the 1 roll or 1 box, 100 labels are inspected for defects or damages.
50 are unacceptable.
There are many types of labels that are used in the production:
ID/Wash care Label has the wash care instructions for the
garment
For Elastic, the shrinkage test is carried out by the trims store:
Fabric swatch
Matching thread for the fabric
-
fabric color
fabric code
Button
Button matching thread
This chart goes to the merchandiser for the approval. The merchandiser
signs the chart and sends back. The shades of the buttons (if present) are
then approved from the buyer and signed.
It should be not known that the buttons are of different shades (in case
they are accepted) and hence, they are stuck to the chart at the backside.
The rest of the trims are not inspected. After this inspection, a meeting is
held between the trim store head, Industrial Engineer Department head,
Production coordinator and the cutting department head.
In this meeting it is decide as to which color and style has to be cut first for
production. This is decided on the trims that are received. As to for which
style and color the trims are available for production.
After the meeting is over, the production starts. The cutting section then
sends a Slip. This slip contains the details Cut no, Size, Sr no, Lot no,
Qty, Shrinkage, Shade.
This is taken by the feeding helper who maintains a register called the
Cutting Book. All the details of the slip are copied into this book, except the
Shrinkage. The helper also fills in the time.
The store then receives the Requisition Slip which contains the details
material, Qty indent (required), qty issued and the dept.
The trims and accessories are then issued to the required dept as per the
required qty.
As soon as the materials are received, the left side of the ledger is
filled up. Details Date, Received from, DC No, PO No, IC No,
Total receipts
As soon as the materials are issued to the lines, the right side of the
ledger is filled up. Details Date, Issued to (line no), Regd Sr No,
No of Pcs supplied, Balance left.
The trims store also maintains Bin Card. The bin card contains the details of the
trims that are being stored in the rack, how much is issued and the balance.
Details Date, Received Qty, Date, Line no., issued qty, Balance.
8. FABRIC STORE
Gokaldas Images has a centralized main fabric store located at Tumkur Road. All
fabric and interlining is received by the main fabric store and distributed further to
various units according to required quantity. All the units have fabric sub stores
located in the unit itself.
The fabric main store consists of a fabric in charge, godown in charge, fabric
checker, fabric QC, QA executive, stores assistant, computer operator, DTP
operator and fabric assistants.
Point Assigned
1
2
3
4
Sticker color
Yellow
Green
Blue
Red
Acceptance/rejection of fabric:
Penalty points found per 100 meter
40 points in power loom fabric
30 points in mill-made and imported fabric
40 60 points in power-loom fabric
More than 30 points in mill-made & in imported fabric
More than 60 points in power-loom fabric
Action
Accept the lot
Accept the lot
Substandard lot
Rejection of lot
Rejection of lot
Missing picks
End out,
Mixed filling
Mixed ends
Dropped pick
Slubs
Yarn distortion
Weft bar
Pattern fault
Dobby faults
Stop marks
Smash
Holes, etc.
Dyeing/printing/finishing Defects:
Bowing
Color Bleeding
Puckering
Stains
Skewed or biased
Selvedge variation
Scrimp etc.
The Fabric Audit dept. supplies the fabric for shrinkage check.
The fabric (1 bit) =60*60 cm. Then on that they mark 50*50 send it to
washing dept. in washing the real shrinkage measure. An Audit check list
is maintained in this section in which all the details of fabric flow right from
delivery to inspection to dispatch to various units is recorded. Fabric in
charge, QAE and Auditor are accountable for upholding of this check list.
The fabric is issued, stored and inspected in the main stores. The fabric is
issued from here to all the other GI units.
First of all the merchandiser sends the Purchase order (PO) sheet to the
fabric sub store head. The required number of pieces (garments) is given
in the sheet.
After this the Fabric Cutting Chart is received from the Cutting section
head. In this chart the meters of fabric required by the cutting room is
given.
After this the sub store in-charge receives the Fabric Width and Shade
Report. Thus according to the various shades, the fabrics are separated
shade wise.
Then the merchandiser sends the Lab Test Report and Shrinkage Report.
This contains the results of the tests that are carried out in the unit lab.
Next the in-charge receives the Fabric Quality Inspection Summary. This
contains the inspection details of the fabric. This report also shows the
status of the fabric.
The in-charge then receives the Mini Marker from the merchandiser. This
is also called the YY Sheet. This sheet contains the quantity of fabric
required per garment (yy = meters/garment).
Based on this the in-charge prepares a chart. This chart contains the fabric
details (Swatch, Color, Order Quantity and the quantity required). The incharge calculates the quantity of fabric required after adding the waste
percentage.
This chart is sent to the merchandiser and the required quantity of the
fabric is ordered.
the specified rack marked Rejected Items. Follow the procedure, laid out for
returning the rejected items to the Supplier.
Raise the Goods Inspection Note for the passed items as specified. Store the
Fabric with proper Identification Tag (containing details like O.C. No./ P.O. No.,
date of receipt, Delivery note no., quantity received, number of rolls / bales,
Shade details , Type of Fabric, Supplier details etc.).
record the Rack number, where the item is stored for easy trace ability.. Single
item should be kept in single rack location and never mix up fabrics of different
O.C.s / P.O.s.
Prepare Report in specified format and send it to the concerned (like Fabric
Department, Marketing Department etc.). In case of deviation / short supply,
highlight it, to take necessary action.
Samples for Shade Band:
Cut approximately 7 inches x 3 inches samples from each roll. Write the Roll no./
Bale no. in each sample along with O.C. No./ P.O. No., supplier, date of receipt ,
width etc. Mark grain direction. Make shade band of the Rolls received and
accepted. Similarly make 4 to 6 sets of shade Bands for distribution as specified
to Marketing and Factories. Marketing department will take it up with the Fabric
Manager / Buyers Representative and provide the shade category (like shade A,
shade B etc). Use Light Box with specified Light for shade segregation.
If any center to selvedge shade variation problem occurs, such rolls are
marked separately and should be advised to the CAD and Cutting section for
revised Pattern Layout.
1. Shrinkage Test.
2. Color Fastness test.
3. Rubbing Test - Dry & Wet.
4. Count & Construction.
Record the Test results and file the Test certificate. Issue one copy of Test
certificates to Marketing department for their action.
8.10 Storing and Issue to Factories:
Based on the above information from Lab and Marketing, it is preferable to
segregate the Rolls / Bales in various Shades and Group Shrinkage percentage
wise and store them in the specified Racks with proper Identification Tag. This
procedure is useful to avoid mix-up of various shades and shrinkage bands. The
stores register should contain all the relevant details along with the Rack no,
(where it is stored).
While issuing to Production, issue as per shade band and shrinkage segregation
wise. Issue the Shade band along with the materials to Factories.
FABRIC INSPECTION
O.K. FABRIC
DEFECTIVE FABRIC
STORAGE OF FABRIC
REJECTED GOODS
RACK
FABRIC RELAXATION
RETURN BACK TO
H/O
FABRIC ROLL
SEGREGGATION
PREPARATION OF
CUTTABLE RATIO
ISSUE TO CUTTING
SECTION
9.2 Operating Procedure:
The stores should have the following designated area: Allot area for Incoming Goods and mark on the Rack concerned.
Incoming goods to be stored here.
Allot area for Inspected O.K. Goods and mark on the Rack concerned.
All inspected & accepted goods to be stored here.
Allot area for Rejected goods (Inspection / Audit failed) to be stored here
and to be disposed off as per instructions.
Allot area for Inspection and mark as Inspection Area. Provide Fabric
Inspection Machine or Table with White Laminate and light illumination of
minimum 1200 lux. Whenever the lighting level decrease, change the
Tube light bulbs.
9.2 Fabric Receipt:
Check & compare the Fabric quality & quantity received with Delivery Note
against each O.C. #. / P.O. #.
Record the receipt along with storage location. Check the actual rolls / bales with
the Shade band card came along with the Fabric. If required prepare Shade
band card for the with details of roll number, length, shade number and issue it
to Cutting section and other sections concerned for their reference. Store the
material in Racks with proper Identification Tag as mentioned earlier. The Fabric
receipt register to have the location of the Rack, where the fabric is stored.
Under no circumstance, the Fabric should be kept on Floor.
The following Test / Inspection
Metal Template # 2.
vertically on the sides of the square. The length of lines may be 2 inches
more or less at the center of the sides. This means the distance between
horizontal lines, and the distance between verticals should be equal to 25
inches.
5. Bartack on the lines which are at 25 x 25.
6. Over lock the edges of the swatch panels.
7. Wash the Swatch panel as per the Wash Standard given in the
Technical Specification manual or specified by Marketing Department /
Buyer.
8. Using Iron Box, iron lightly without using steam to make the washed
swatch flat.
9. Measure the distance between the Horizontal and Vertical Bartacks using
Stainless steel scale and record the reading.
10. Calculate the Washing shrinkage percentage both horizontally and
vertically (i.e. on warp side and weft side) and record it for each and every
swatch. Compile the Roll / Bale wise shrinkage in the prescribed format.
Record this information in each Identification Tags in each Roll (along with
shade category).
11. Check the Washing shrinkage percentage Range. If the Range is more
than 1.5 % , the Shrinkage Test to be conducted for all the Rolls / Bales
received ( i.e. 100% of rolls )
12. Check again the Washing Shrinkage percentage. For each 1.5 % step of
absolute shrinkage , Multiple Markers to be prepared. ( for example , for
absolute Shrinkage % range of 3.0 % to 4.5 % - Marker / Pattern # 1 ,
and for shrinkage of 4.5 % to 6 % - Marker / Pattern # 2- like that ).
Segregate and store the Fabric as per their Shrinkage - Marker / Pattern
range ( steps of 1.5% ).
13. Organize with Pattern Department for the preparation of Multiple Markers
based on Shrinkage level. The Marker / Pattern should contain Shrinkage
range for which they are prepared along with other information.
14. Color codifies the range of Shrinkage (steps of 1.5 %) for easy tractability
during the subsequent process. This information should be available in
the respective Patterns and Specification sheet .
Note: In case the shrinkage range happens to be within 1.5 %, against Pattern #,
put (dash - indicating that there is only one Marker / Pattern for
the P.O.)
9.5 Shade segregation for non- wash fabric: (Stretch & Rigid)
1. Cut swatches from all the Rolls / Bales received as specified to size 30
cms x 30 cms. It is preferable to use Metal Template for cutting the
swatches.
2. Identify the Face side and back side. Mark the Roll #, O.C. / P.O. # date
received on the back side of the swatch.
3. Using Light box with specified Light, segregate the swatches to visible
shade Category. .
4. Fabric Manager segregates the Rolls / Bales as
Shade category as
Finishing section,
swatches.
2. Identify the Face side and back side. Mark the Roll #, O.C. / P.O. # date
received on the back side of the swatch.
3. In case of Denim Fabric, join all the swatches by over lock to make a
Blanket.
4. Wash the Swatch Blanket as per specified wash program.
5. Fabric Manager segregates the Rolls / Bales as
Shade category as A,
B, C etc based on the shade of each Roll / Bale by viewing under Light
Box with specified Lamp.
6. Group the Rolls / Bales as shade category of A, B, C etc. Color code
each shade category. Write the shade category in the Identification Tags
on each roll / bale and color code it. The swatch card issued to Cutting
section should also contain this color codification (along with Shrinkage
%).
7. Cutting section: - Cut the Rolls / Bales shade wise as per the required
Ratio (of sizes during final packing).
8. Cutting section: - Mention shade category (A, B, C etc) on the Cut
Panels. Color code the shade category during Bundling.
9. Sewing section: - Identification Tag used in sewing section should have the
shade category mentioned in it for trace ability purpose.
10. Segregate Garments shade wise, bundle it separately, before dispatching
to Laundry to undergo specified wash program. (Mention wash program in
Identification Tag along with other information like O.C./ P.O.# etc.).
11. Washing Plant: - Wash Garment shade wise with different Recipes
(developed already) to bring all shades to one common standard shade.
12. Packing section: - Packing should be done in such a way that one Carton
should contain only one shade category of Garments.
13. The shade band cards should be available with Cutting, Sewing, Finishing,
Packing, Q.A. Department, Marketing and Buyers representative.
Note: In case , there is no shade variation , against Shade # , put ( dash indicating that there is only one Shade for the O.C / P.O.)
vertically on the sides of the square. The length of lines may be 2 inches
more or less at the center of the sides. This means the distance between
horizontal lines, and the distance between verticals should be equal to 25
inches.
5. Bartack on the lines which are at 25 x 25.
6. Over lock the edges of the swatch panels.
7. Iron the Fabric Swatch as per the specified Ironing Standard .
8. Measure the distance between the Horizontal and Vertical Bartacks using
Stainless steel scale and record the reading.
Pattern # , put ( dash - indicating that there is only one Marker / Pattern for
the P.O.). Rarely ironing shrinkage exceeds 1.5 %.
color, size, style etc. cutting section hence is the backbone of the unit and that is
why this section needs to be taken well care of.
Points to be considered:
Check for the presence of master pattern before commencing the bulk
cutting.
All the patterns received by the factory should be thoroughly checked for
notches, seam allowances, and alignment with other panels
All markers made for cutting should be either duplicate at the factory or by
using multiple carbons
MARKER
MARKERMAKING
MAKING
MARKER
MARKERCHECKING
CHECKING
LAYING
LAYING
QUALITY
QUALITYAUDIT
AUDIT
LAY
LAYRELAXATION
RELAXATION
MANUAL
MANUALMARKING
MARKING
NAMING
NAMINGOF
OFPANELS
PANELS
CUTTING
CUTTING
QUALITY
QUALITYAUDIT
AUDIT
SOBAR
SOBARNUMBERING
NUMBERING
FUSING
FUSING(IF
(IFNECESSARY)
NECESSARY)
100%
100%PARTS
PARTSCHECKING
CHECKING
PARTS
PARTSREPLACEMENT
REPLACEMENT
BUNDLING
BUNDLING
CUT
CUTPART
PARTSTORAGE
STORAGE
ISSUE
ISSUETO
TOBATCHES
BATCHES
10.2 Functions:
To make the cut order plan for all type of fabrics i.e. shell, lining, interlining
according to the PO
Getting the fabric issued from the stores according to the cut order plan
The work for cutting department starts right from the point of order confirmation.
The CAD department prepares the marker length using the pattern and the
sample prepared by the Sampling Department. It also makes estimation for the
consumption of the fabric for that particular order. The results then communicated
to merchandiser.
Once the order gets confirmed for bulk production then first they cut the garment
component for the pilot run. Once it is over then the Cutting, The IED, Sewing,
and Planning Department sits together to decide the no. of pieces to be cut and
supplied in advance, in accordance with the productivity derived for that style
from the pilot run.
The cutting department, 1 or 2 days in advance from the cutting date procures
the fabric then the fabric issued to the spreader is properly laid according to the
specified marker length and width. The number of piles depends upon the type of
Fabric, its thickness, cutting method and the desired height of lay. The no. of plies
also depends on type of fabric and weight.
After the fabric is laid QC checks the lay for the defects like Leaning, alignment,
Uneven Tension, Narrow goods, and other fabric defects. Then the marker is
spread on the top of the lay. Stickers including all the details as PO no, cut no,
style no, part name, part number and sizes is affixed on the top of the lay of all
individual parts. Before cutting the last inspection of lay has been done to check
that the marker is coming well in the lays width and length so it can properly cut.
Cutting room is one of the core areas in any garment organization. As a unit
cutting room has a greater effect on excessive manufacturing cost than any other
department concerned with the actual production of garments.
2. Mini marker
3. Fabric requisition slip
4. Table plan
5. Minusing register
6. Lay slip
7. Lay order report
8. Spreading quality report
9. Cutting quality report
10. Hourly report of numbering
11. Hourly report of fusing
12. Re-cutting register
13. Hourly report of sorting and bundling
14. Cut parts issue register
15. Parts bank (cut panels)
16. Fabric completion report
1. Unwind fabric from Roll and lay on Table / Flat area in concentric folds. It
is preferable to stager the folds (for Denim rolls it is a must). Allow for 24
hours of relaxation. The Lay should not touch any other item and nothing
should be kept on the lay which may prevent normal relaxation. The idea
is to see that, stretch occurred during the time of converting into Roll
form, returns to its normal condition. Generally the Rolls are wound in
tight condition to save volume & space.
2. Attach the Relaxation History Tag to each and every roll that is relaxed
indicating the O.C. / P.O. #, Type of Fabric, Length & width of roll, Date &
starting time of relation, Date and ending time of relaxation etc.
3. After allowing for 24 hour relaxation, the roll is ready for Laying &
Spreading. Enter the Actual Date and ending time of relaxation in the Tag.
4. Lay and spread the Fabric as per Lay Slip and specification.
5. Allow a minimum of 3 to 6 hours in the Spread condition as Lay
Relaxation before any other operation takes place.
6. Check for spreading quality.
Note: All the reference cards should be displayed in the concerned Display
Boards and Files should be available in the concerned places.
Storage of Cut parts: - Use Flat racks for storing cut parts. Mobile cut
parts storage also to be use. Use polythene bags to prevent dust and
stains.
Quality control: - Defined Quality control procedure in practice and record
to be available.
Notches on Patterns: - Process Audit to be done by Department Auditor.
Cut Panel Audit :- Cutting section QA to audit all cut parts, top, middle and
bottom with the original pattern and record findings and initiate corrective
action as required.
Cut Panel Inspection: -
Cut panel
inspection
to be conducted in a
The final garment comes out of a sewing department because of a set of wellcoordinated steps in each of the batches. It is the most dynamic department of
all. The layout, machines, batch size, no. of Batches, method of operation, no. of
workers on the floor etc can get changed according to the new style, order
quantity or production plan.
Once the Order gets confirmed for a particular style the planning department
comes in to action. It planned in well advance that which unit is going for
Production as well as the Quantity. It allocates the quantity & job order to different
units based on their capacity.
Then the IED Department in collaboration with Factory Manager, decides the
batch size, number of Batches and daily target to be achieved by the each batch.
Other details such as no of stitches/inch at different areas, measurement for
different sizes, placement of trims etc are finalized and standardized at the
sampling stage.
Manpower report
The shift starts at 9:30 am in the morning. The inline quality controller
checks the un-finished pieces of the garment and check against the
original sample garment.
The line supervisor check the hourly production of each part of the
garment and also check the daily production status which have details
regarding line numbers, order details, particular regarding man power and
the machine available , lines expected and actual target operation target ,
WIP and the operator daily operation output
The supervisor also ensures that necessary thread, label and tapes are
available with operator.
The pieces are inspected carefully and then feed into line.
They check the 1st ply, middle ply and last ply in a cut-piece bundle at the
time of feeding or when cut pieces arrives in sewing room.
The pieces are marked and notched by template for the particular
operation at the time of feeding or inline process.
When major problem arises in the line during production then quality
people put the check point over there for finding the reason for the
problem and solving the problem.
11.3Process flow
P.O.WISE
P.O.WISEPLANNING
PLANNING
M/C
M/CLAYOUT
LAYOUT
BATCH
BATCHSETTING
SETTING
PILOT
PILOTRUN
RUN
BULK
BULKPRODUCTION
PRODUCTION
100%
100%CHECKING
CHECKING
DISPATCH
DISPATCHTO
TOFINISHING
FINISHING
SECTION.
SECTION.
11.4Sewing
The operator in the lines have been trained on the operations they are
required to perform and have been given specific instruction as to how to carry
out the operation for each style. They have also been taught certain technical
aspects of sewing such as stitch length, bight width, and thread tension etc. so
that they can tell at once if at all there are any problems with their machines.
They have also been taught minor adjustment so that time is not wasted in calling
the service technicians.
Each operator is responsible for his/her own workmanship and thus, has
the responsibility of checking the quality of sewing as the operator is performed.
Moreover a Job card is hanged on the machine for showing mock stitch sample.
PROCESS 1: Feeding to the batches/sewing lines
Receive Cut panels from sorting section and verify against the delivery
note.
Panels are stored style wise / color wise /size wise with identification.
Line plan is received from the Supervisor/Floor in charge.
Cut panels are issued to the batches according to the Line plan.
Trims are collected from Sub stores and issued to the batches according
sequence of operations,
Folders,
representative and get his comments. Re-stitch the garment, if the comments
are major otherwise; take care of the minor comments during actual production. If
required, modify the Patterns to take care of measurement deviations and
shape. Take care of the non-conformances with appropriate department. Since
bulk production is going to be based on the pre-production, sufficient care has to
be taken and important points to be noted down for future use.
Folder / Attachment / Pressure Foot usage etc. If the garment has a Wash
program, check the garment after specified wash for the above.
Check for
and get their approval. Modify the Patterns / Multi Patterns, etc based on the
actual shrinkage observed during Fusing, Ironing,
stage, ensure that all the materials required are available, based on the Pilot Run
experience (especially the actual fabric requirement, requirement of other Trims,
Threads etc). In case if you observe any non-conformance, take it up with the
concerned immediately to avoid confusion at a later stage.
Attachments , Folders,
specification, seam
allowance, needle details etc. Record the Settings done on that machine, each
and every time with date and time.
The Maintenance card to contain the name of machine, type of machine,
make of machine, machine number, details of maintenance done with date and
time, details of preventive maintenance done with date and time.
Racks , etc to be provided for easy handling and to avoid stains etc.
Maintenance of these Equipments is equally important. Remove the Thread
pieces from the Wheels of the Trolleys. Clean this equipment at least once in a
week to prevent dirt, dust, etc. Oil the moving parts like wheels and take care to
see that the spillage of Oil do not spoil the Garments.
and Variable Control Charts for Measurements. Monitor the Charts at regular
intervals and take necessary correction action immediately.
11.5.11 End-Line Inspection:
All garments are to be 100 % checked at this point and necessary corrective
action to be taken. To enable proper checking display the Approved Garment
, Buyers comments on the approved Samples , Trim card , Fabric Swatch card,
Fabric defect standards ( clearly marked Acceptable and Not Acceptable ).
Display all the relevant files and details as instructed from time to time.
Attach a Follow up card, which details the nature of defect and the remedial
action taken. This will ensure that the Garment has been rectified and free from
defect.
11.5.12 Measurement Control:
Display the Measurement chart / In-process Measurement chart (in case
of wash program), Diagram showing the method of measurement etc. Multiple
Pattern Category # and their shrinkage ranges with color coding. Measure at
least 10 % of the Garments produced for the day. Prepare Variable Control
chart for necessary corrective action.
Sewing Supervisors , Production Mangers and Q.A.s should regularly- at least
4 times in a day - see the In-Line and End Batch check sheets and take
necessary corrective action. These corrective actions are to be recorded at the
back of these check sheets.
Statistical data on DHU (Defects per 100 units). Like Daily line defect %, Weekly
%, Month % etc to be collected and analyzed Graphs, Bar charts, Histogram etc
to be drawn for analysis.
11.6 FACTORY PRE-PRODUCTION MEETING
1. PP Meeting is held 5 days prior to starting production, this includes cutting.
2. It is Factory Managers responsibility to schedule all PP Meetings
3. All PP Meetings must be attended by following personnel:
a. Factory Manager
b. Production Manager
c. Quality Assurance Manager
d. Cutting Room Manager
e. Senior Supervisor
f. Industrial Engineer
g. Head Mechanic
h. Roving QC
i. End line QC
j. Finishing Manager
4. In order to hold the meeting, the following items must be available:
a. Style file, incorporating tech spec
b. Approved sample, signed and stamped
c. Trim card (approved for bulk production)
d. Fabric swatch (approved for bulk production) including shade
bands. Swatch must clearly define face side with approval stamp
e. Approved mending of embroidery(with approved thread colors)
f. Approved wash standards, and/or any treatments required, e.g.
Sand blasting/tints/abrasion etc.
g. Cut work for factory
5. Each department is responsible
for
providing
the
relevant
information/items.
6. Each department must ensure all relevant information/items are available
and handed to planning department two days before PP Meeting is
scheduled.
7. PP Meeting schedule is issued by Planning Department
8. Every Meeting is documented with:
a. Personnel attended
b. Notes/observation/areas of concern
9. Two factory PP samples are made after the meeting and before production
starts
a. The line supervisor is responsible for making factory PP samples
and Roving QC will assist on any quality/technical issues
b. The line supervisor and roving QC are responsible for measuring
and evaluating PP Sample. All measurements comments are
documented on the Factory PP evaluation sheet.
10. The factory pp sample must be evacuated and approved by technical
department before the production starts. Production will not be allowed to
start until this procedure has been satisfied and sample has been
approved.
Pressing
Supervisor
check
the
garment
for
thread.
Red
2nd re-inspection:
1. Roving QC examines 7-10 pieces
2. A) Zero faults found-replace green disc and proceed to next operator
B) One or more faults found, minor or major- Red disc remains same,
highlight fault,
Garments
Garmentsare
areinspected
inspectedas
asper
perA.Q.L
A.Q.L2.5
2.5
Grinding
Grindingififrequired
requiredfor
forthe
thestyle
style
Garments
Garmentssend
sendto
tofinishing
finishingfor
forpacking
packing
The washing section head receives the recipe and the desired finish
(wash) in the garment from the merchandiser, who gets this specification
from the buyer.
According to the wash and the recipe the washing section prepares 3-5
samples and sends to the buyer. The buyer approves one of the samples.
The washing section also alter the recipe accordingly and use.
After the buyer approves the sample, a Lot is given that wash (bulk
washing). 2 samples out of the bulk lot are sent to the buyer again for
approval.
If the buyer finds the earlier sample similar to the 2 new samples, it is
passed. Once it is passed, the bulk washing starts for the entire style
production (same recipe as made by the washing section is used).
Along with the garments comes the Delivery Challan. This Challan
contains the details of the buyer name, style number and the number of
garments received for washing.
If the garment is hard then the garment undergoes a proper Wash Cycle.
The wash cycle starts with the process of Desizing. This is the
process of starch/size removal which makes the garment stiff.
Time 30 mins
Temperature 60 C
Stones are used to remove the fuzziness and the
Time 40 mins
Temperature 55 C
After this process, the garments are drained of the entire water.
They are then washed once in fresh water and then loaded once
again in the washing machine for the Over Dyeing process.
The garments are loaded with 700 lt of fresh water. To this the color
(tint) is added. Along with this salt is also added and the garments
washed for 10 mins.
Then after 10 mins, soda is added and the garments washed for
about 10 mins. The use of soda causes the garments to smell,
hence to remove this smell Acetic acid is added and the garments
washed for 4 mins.
After this process the garments are drained of the entire water.
They are washed in fresh water and then dried in the Hydro
extractor.
After this the garments are again rinsed in 700 l of water in cold
conditions and Silicone Softeners are added. This causing the
softening of the garments.
The garments are then stored in the after wash racks near the
entrance door. The whole process takes almost 3 hrs to complete.
The garments are then loaded in the truck and a Confirmation Copy
is made. This copy contains the details and the number of garments that
are being sent.
4 copies are made, 2 copies are sent along with the garments
(truck) to the units from where they had come. 2 are kept in the washing
section itself.
1 copy from the 2 copies sent is sent back by the unit to the
washing section confirming that the correct and mentioned no of garments
have reached.
This copy sent back is then tallied with the 2 copies the washing section
have.
The left side of the ledger has the details of the garments
received. It stores the Date, PO No, Qty, and the Tot Qty. the
total quantity is the number of pieces that come in the whole
day.
The right side of the ledger has the details of the garments
sent after washing. It stores the Date, PO No, Qty, and the
Tot Qty. The total quantity is the number of pieces that are
washed in the whole day.
BATCH
BATCHRECEIVING
RECEIVING
COUNTER
COUNTERCHECKING
CHECKING
KAJA
KAJA&&BARTACK
BARTACK
SEND
SENDFOR
FORWASHING
WASHING
AFTER
AFTERWASH
WASHCHECKING
CHECKING
IRONING
IRONING
MIDDLE
MIDDLECHECKING
CHECKING
FINAL
FINALCHECKING
CHECKING
PRESENTATION
PRESENTATIONCHECKING
CHECKING
MEASUREMENT
MEASUREMENTCHECKING
CHECKING
TAGGING
TAGGING
POLY
POLYBAG
BAGCHECKING
CHECKING
CARTON
CARTONPACKING
PACKING
Finishing process is to check the garment for any defect and to make them
appealing through pressing. Garments are check according to quality system
approved by a particular buyer.
AQL of 2.5 is followed for maximum buyers.
Finishing is done to ensure that no defected garments are packed.
loose and uncut threads as soon as possible. As soon as button was attached
the garments pieces were brought to five tables meant for the purpose of thread
cutting. There were around 12 operators doing this job using the clippers. An
hourly production record was maintained for the thread cutting workers.
13.2.3 Spotting
Stains which are not removed from the garments after washing also are
removed by spotting in this process. As soon as the quality checkers comes
across a defect, he brings the defective piece to the operators meant for the
purpose of trouble shooting i.e. alteration and satin removal section. This section
comprises of the following personnel
alteration tailors (eight in no.) for the correction of stitching defects
spot washing gun operators ( eight in no.) for removal of various
type of stains.
An hourly and daily record of the number of pieces altered is
maintained. This helps in keeping a track on the quality of garments being sent
to finishing by the production floor. 20-30% is normally the alteration and stain
removal rate.
The whole idea of this seam ironing was to facilitate the quality checkers.
The ironing makes the seams visible. So, detection of any seam defects like
broken stitch, open seam, loose stitches etc became quite easy. An hourly
production record of seam ironers was maintained.
To crease the garment wherever required like in collars before top stitch
Not nearly as much attention has been paid to the technology of pressing as
to the technology of sewing and cutting. Some interesting points are:
The percentage of total manufacturing work content in pressing is around
50%.
The possibility of automation has been explored for some steam presses, but
most pressing operation requires the continual intervention of human hand.
13.2.5 Visual checking
Checking of all the garment is done according to required AQL. Each quality
checker is provided with two baskets (one for pass pieces and the other for
defective pieces), stickers for marking defects, thread clippers etc. each checker
is instructed to check the garments thoroughly, mark the defects with arrow
stickers and also to cut the uncut threads if found. Every checker puts the pass
piece in the plastic basket below the inspection table. It is the responsibility of
the quality checker to take the defective pieces for correction and after correction
put it in the pass pieces basket. The defects found at this stage could be
broadly of the following types
stitching defects
stains
weaving defects
button/buttonholing defects
Checker puts his allotted number on each of the garment piece passed by
him. All these checkers are given regular on-the-job training. Finishing incharge
or supervisors teach checkers the correct method of garment checking.
There are two types of production records that are maintained for these
quality checkers. They are
a) hourly production record
b) daily production record
supervisor also instructs the tagging operator as to where and how the tag has
to be placed. After passing through all the checking and pressing process price
tag is attached to the garment through tag gun. The most important thing to be
kept in mind while placing the tag was to match the size mentioned on the main
label and the size on tag or ticket.
13.2.9 Packaging of the garment
After the attaching the price tag to the garment; garments are packed in
the poly bags or hanged in hanger as per the buyer requirements. The packing
instructions given by the buyers can be like type of polybag, any printing on
polybag required or not, garments to be hanger packed or not, method of folding
and packing the garments etc.
Packed garments are packed in the cartons as per the packaging plan.
Each cartons has specified number of garments and the quantity can neither be
increased nor be decreased after its planned.
It is very important to check the packed garments for presentation. Checkers
check the packed garments for the following things
Poly bag is as per specification
Tags and price ticket should must be visible as per specification
Packing is secured or not
Poly bags should not be soiled and torn
Hangers are there or not if specified
Garment has been folded as per specification etc.
Once, checking is done they send the garments for the carton packing. The
following things were kept in mind during carton packing
Number of garments to be packed in one carton
Ratio asked for example M:L:XL=1:2:2
Decide on the plies and dimensions(as specified by the buyer) of
the cardboard to be used
Get the cartons tested for bursting strength
Packing the garments in the cartons as per specified
Large
Ratio
10
20
20
10
XL
Location packing:
In this kind of packaging, shipment is packed in parts as per the buyers
requirement. This is also commonly used as shipment has to be send to
different location. So an order quantity of 1,00,000 pieces can be shipped as
20,000 to New York, 65,000 to U.K. and 15,000 to U.S.A.
Color
Blue
Ratio
20
20
10
10
XL
non-conformances.
Display
copy
Before the Lot is offered for Inspection by Buyers representative, the lot should
be offered for Audit to the Corporate Q.A. team and get approved. They should
check for size wise count accuracy, carton audit, visual checks of garment &
packing. They should use slightly tighter sampling plan for audit. For example, if
Buyer is going to use AQL 4, the Corporate Audit team should use AQL 2.5 as
their sampling plan.
Buyers
Tech.pak,
actual Audit.
Warehouse, Cutting, Sewing, Finishing, and Packing. Job rotation is followed for
Q.As to ensure more effectiveness.
Style
produced.
This is the stroke number of the style audited. And
Colour
Batch Size
have to be used.
The total number of individual selling units in the
Sample
specific audit.
The total number of selling units inspected determined
by the sampling plan.
SAMPLE AUDIT
Major Faults
The number of garments, which have a fault/faults
Minor Faults
A/R
100% AUDIT
Major Faults
Minor Faults
remaining stock.
The total number of garments carrying minor faults
found in both the audit and 100% inspection of the
Fault Codes
remaining stock.
The total number of faults, by category found in both
the audit and 100% inspection.
Request
Requestfrom
frommain
mainstore
store
Receiving
Receivingsample
samplefabric
fabricfrom
frommain
main
store
store
Lab
Labnumber
numberisisassigned
assigned
Conditioning
Conditioning
Test
Testmethods
methodsfollowed
followed
Shrinkage
Shrinkageand
andtest
testreports
reportsare
are
prepared
prepared
Reports
Reportsare
aresent
sentto
tomerchandiser
merchandiser
In-house lab receives samples from suppliers for testing purpose. Each sample is
given a lab number before testing is carried out. The test carried out here are for
internal verification only, not for getting precise test results. The test methods
adopted are as per in-house procedures to enable the company to monitor the
quality of fabrics before sending them to the approved laboratories like Intratek or
SGS for final quality evaluation. Testing is done only for 10% of each lot. All the
specimens to be tested are conditioned under standard conditions of temperature
at 21 1C and relative humidity of 65 2% for four hours.
Count
Construction
GSM
Shrinkage
Colorfastness
inch is counted by removing all the threads one by one. The reading is
confirmed by taking another reading.
15.2.3 GSM:
The Fabric to be tested for GSM is folded in to and placed between the GSM
cutter and the cutting pad. When the safety catch is released, a slight
pressure on the hand wheel brings internal blades into contact with the fabric.
Specimens are cut by rotating the hand wheel under pressure. The GSM
cutter blade cuts fabric in a circular shape of diameter 11.2 centimeter. Out of
the two specimens place the specimen formed by the top ply on the weighing
machine and close the window so that no air is disturbs the fabric and thus
causing incorrect readings. After few seconds reading is taken. This gives the
GSM of the fabric. GSM cutter is used for knit fabrics. In case of woven fabric
a sample of 10 X 10 centimeter is cut and weighed on the electronic weighing
machine, the weight thus obtained is multiplied by 100 to obtain the GSM of
the fabric.
15.2.4 Shrinkage:
The sample size used for shrinkage should be of 75 centimeter length
minimum and full width of the fabric roll. Three markings of 50 centimeter are
marked on the fabric width with indelible ink in both directions. If sample is
small then 10 inches marking is done. In the case of knitted fabrics in tubular
form, two markings each on length wise are marked on each surface of the
fabric. They are washed in the washing machine for 12 minutes, rinsed for 6
minutes and spinning for 6 minutes. Few drops of wetting agent are added to
water before washing. The samples are dried using tumble drier (temperature
not exceeding 60C) or as per requirement. This cycle is repeated two more
times. The sample is cooled at room temperature and the final measurements
are taken. Under the shrinkage scale percentage shrinkage or extension is
directly read. Average value is reported. Formula for calculating shrinkage is:
Shrinkage %= change in dimensions/original dimensions
15.2.5 Color Fastness
(i) To Washing:
Color fastness is the property of a dye or print that enables it to retain its
depth and shade throughout the wear life of a product. Dyes are
considered fats when they resist the deteriorating influences to which they
will be subjected. The test is carried out using the launderometer. Two
specimens of 10 cm X 4 cm are cut from the sample and a multi-fiber
fabric (containing acetate, cotton, nylon, polyester, acrylic, wool.) is
attached to it by stapling. The launderometer is maintained at 49C 3C.
Neutral soap solution of 0.15 gpl concentration is prepared and 200 ml of
this solution is poured in a steel jar along with 50 steel balls (each of 0.6
cm in diameter). The specimen is then put into this jar and these jars are
rotated for 45 minutes to create agitation action. At a time 8 such jars
could be placed in the launderometer. The specimens are then removed
from the jars, rinsed under running water and allowed to dry under a
temperature not exceeding 70C.
(ii) To Rubbing (Dry/ Wet):
(a) Dry Crocking Test:
The test specimen is placed and fixed on the base of the crockmeter
resting flat on the abrasive material. A white test cloth square (crocking
piece) is mounted over the end of the finger. The covered finger is lowered
on to the test specimen, and rubbed 10 times to and fro for the full length
(approximately 1 rub/second). Remove the white crocking piece and
evaluate for staining using grey scale.
(b) Wet Crocking Test:
Clamp the test specimen as in the case of dry test, the white crocking
pieces are thoroughly wet out in distilled water and excess water is
squeezed out (so that wet pickup is approximately 60-65% for AATCC and
90-95% for ISO). The finger is lowered onto the test specimen and rubbed
10 times to and fro. The wet crock piece is removed and dried at a temp
not exceeding 60C. The staining is evaluated using grey scale.
The angle of inclination of the base plate of the crockmeter should be
maintained at 45 if AATCC standard is followed and 90 if ISO is followed.
15.2.6 Color Matching Cabinet:
The samples obtained after color fastness test are checked for any color
variation in the color matching cabinet.
The color matching cabinet has six types of light present in it Daylight,
Cool White, Horizon, Ultra Violet, TL 84, A.
The type of light to be used while matching is specific to the buyer and in
case if not mentioned then daylight is used.
Any change in the original color (shade) and /or staining or color transfer
on the standard fabric is evaluated by visually comparing the test
specimen to the AATCC gray scale for color change and staining for
American buyers and
ISO gray scale for color change and staining for European buyers. The
difference in color change and the amount of color transfer are given a
numerical value ranging from 5 to 1.
Class 5
Class 4
Class 3
Class 2
Excellent
Very good
Good
Fair
Class 1
Poor
PART-2
PLANT LAYOUT
LAYOUT OF GROUND FLOOR:
EMERGE
NCY EXIT
FABRIC STORE
STORE
FABRIC
(16.2 xx 18.5)
18.5)
(16.2
SPREADING/CUTTING TABLE
INSPECTION
TABLE
CUTTIN
G DEPT.
OFFICE
FUSING
MACHINE
OFFICE
OF
FACTOR
Y
MANAGE
R (12.9
x 12.4)
(11.8
x
19.10
)
I.E
DEPT.
STORE
AMBULAN
CE ROOM
ENTRAN
CE
SPREADING/CUTTING TABLE
RECORD
RECORD
STORE
STORE
GENERATOR &
GENERATOR &
TOILETS
TOILETS
(25.6 x 16.6)
(25.6 x 16.6)
B
B
U
U
N
N
D
D
LL
II
N
N
G
G
SPREADING/CUTTING TABLE
BAND
BAND
KNIFE
KNIFE
M/C
M/C
(11.8
x
19.1
0)
H.R
DEPT
.
TABLE
TABLE
C
C
H
H
EE
C
C
K
K
II
N
N
G
G
ENTRAN
CE
AREA=2600 SQ FT
CRECH
E
TOILETS
TOILETS
132 machines
TRIMS
STORE
GUEST
TOILET
(6.5)
26
WORK
30
WORK
STATION
STATION
S
S
(16.10)
(16.10)
30
WORK
23
WORK
STATION
S
(16.5)
STATION
STATION
S
S
(16.5)
(16.5)
STATION
STATION
S
S
(16.10)
(16.10)
30
WORK
STATIO
NS
(20.7)
30
WORK
STATION
STATION
S
S
(16.10)
(16.10)
ENTRAN
CE
CHECKIN
G TABLE
PM
TABLE
PM
TABLE
CHECKIN
G TABLE
Material Requirement
2.
Purchase Order
3.
Order Processing:
New Orders
Order confirmation
Delivery Schedule
4.
Order Allocation
Invoice
5.
Accounts Receivable:
Customer Payments
Purchase
Purchase Receipts
2.
Materials:
Material Requirement
Material Commitments
3.
Style:
Work in progress
Stock on Hand
Quantity on Order
Shipped