Trace Elliot V8 Service Manual
Trace Elliot V8 Service Manual
Issued by:
RESISTORS
560R 1W 72-RM560R 2 R1 R2
12K 1/4W 72-RM12K 1 R4
22K 1/4W 72-RM22K 2 R7 R8 R13
47K 1/4W 72-RM47K 5 R5 R9 R10 R11 R12
330K 1/4W 72-RM330K 1 R3
1M0 1/4W 72-RM1M 1 R6
CAPACITORS
SEMICONDUCTORS
CONNECTORS
SOCKETS
RESISTORS
DIODES
CAPACITORS
1
2200u 35V elect radial 72-C2200-35VER 4 C14 C15 C33 C34
22u 450V elect radial 72-C22-450VER 5 C11 C12 C13 C20 C21
220u 400V elect radial 72-CAP-220400V2 2 C10 C29
470u 400V elect radial 72-CAP-470400V 2 C8 C26 (PHILIPS 157 46471)
SEMICONDUCTORS
CONNECTORS
SOCKETS
FUSE HOLDERS
2
C12-PCB-V8-PREAMP
PARTS LIST FOR V8 PREAMP
ISSUE 1 4/5/00 PS
Description Part Code Qty Where Used
PCB PC00120 issue 1 1
*** = formerly obsolete (Part to be used when old part is used up)
A.I. MACHINE
1
2nd STAGE
SEMICONDUCTORS
CONNECTORS
POTENTIOMETERS
2 track modifications
2
V-TYPE V8 TEST PROCEDURE
ISSUE A PS 2/3/2000
Initial Checks
1) Check the polarity of all electrolytic capacitors and diodes on power board.
3) Set all rotary controls to midway position, all push switches out. (front and rear)
Set to FULL POWER and turn both BIAS ADJUST pots fully clockwise.
Set rear panel mains switch to OFF and front panel toggle to STANDBY.
Connect unit to (4Ω) load station. Connect mains socket to variac set at minimum.
4) Switch unit to standby mode. Gradually turn up the variac to the appropriate voltage.
Green lamp and front and green mains switch will light up.
Voltage Tests
5) Check following Test Points (TP):- (all DC TP’s are w.r.t. TP0 0V)
6) Turn variac to minimum. Switch from STANDBY to ON, return variac to correct voltage.
8) Check biasing of other valves, if necessary adjust bias again to bring all valves within the
0.270 – 0.330V range.
1
Sine wave tests
10) Insert 1Khz, -20dBu (77mVrms) sine wave into the PASSIVE INPUT.
Turn up GAIN I fully then adjust MASTER until the output starts to clip.
Check the power is >400W (40vrms @ 4Ω Ω ) and the EM84 display valve is fully lit.
Using screwdriver handle gently tap each valve and check for microphony and instability.
12) Turn GAIN I back to half way. Insert sig. gen. lead into ACTIVE INPUT and then back into
PASSIVE. Check that when in ACTIVE the output level approximately halves.
15) Push DEEP. Signal should increase slightly. Push out again.
Rear Panel
22) Check there is an output at the correct level from the following sockets:-
24) Connect to load & sig. gen., set up for full power and soak test for approx. 30 minutes.
End of test.
2