Building Completion Inspection CRITERIA TRAKHEES

Download as pdf or txt
Download as pdf or txt
You are on page 1of 12

To:

All Business Units, Consultants & Contractors

Subject:

CED Building Completion Inspection Procedures

Our Ref:

CIRCULAR-38587/2008/sk

Date:

20-Aug-2008

Dear All,
In order to streamline the Building Completion Inspection Process and add to the
efficiency, we are pleased to provide you with the following documents pertaining to the
process:
-

Workflow Chart demonstrating the various stages of the process.


Submission Requirements for the various types of Building Completion Inspections.
The necessary forms to be filled when requesting Building Completion Inspections.
A comprehensive checklist for various types of Building Completion Inspections

We are confident that your improved familiarity with our procedures and their various
elements will help you communicate better with CED and be better prepared for its
Building Completion Inspection.
The documents referred above will be effective immediately and until superseded by a
further communication.

Yours faithfully,

RASHID AL FALASI
SENIOR MANAGER - PERMITS
TRAKHEES - PCFC
Cc: M-file

PORTS, CUSTOMS & FREE ZONE CORPORATION


TRAKHEES
CIVIL ENGINEERING DEPARTMENT
Building Completion Inspection Flowchart

PORTS, CUSTOMS & FREE ZONE CORPORATION


TRAKHEES
CIVIL ENGINEERING DEPARTMENT

Building Completion Inspection


Requirements and Checklists
LIST OF DOCUMENTS TO BE SUBMITTED
Copy of documents to be attached at the time of Inspection Letter
request for Final or Partial BCC:

EHS NOC for Final BCC or Partial BCC.


Clearance from Business units.
Application for obtaining Building Completion Certificate.

Copy of documents to be attached at the time of Inspection Letter


request for DEWA NOC:

Actual work executed (% of progress).


EHS NOC for DEWA NOC.
Application for obtaining Building Completion Certificate.

Documents required on site at the time of Inspection:

Building Permit (original).


Affection plan + Final Survey.
Structural site records (original).
Concrete Block files with certificate (for load bearing blocks only).
Quality Section clearance (at least for compressive strength of
concrete).
CED Approved drawings.
Certification from Specialist

PORTS, CUSTOMS & FREE ZONE CORPORATION


TRAKHEES
CIVIL ENGINEERING DEPARTMENT
APPLICATION FOR OBTAINING BUILDING COMPLETION CERTIFICATE
NAME OF Contractor

:______________________________________________

LESSEE OR OPERATING NAME

:______________________________________________

BUIDLING PERMIT OR NOC Ref.

:______________________________________________

NOTICE OF INTENT Ref.


(Ref. of JAFZAs cover letter)

:______________________________________________

BUILDINGS COMPLETED

Partial

Final

Offered for Inspection

Buildings Offered

:______________________________________________

STATUS OF DRAWING REVIEW REPORT COMMENTS


Civil

Resolved

Pending

Electrical

Resolved

Pending

Fire

Resolved

Pending

Safety

Resolved

Pending

Environment

Resolved

Pending

ELECTRICITY (DEWA)
Drawings

Approved

Pending

Not applicable

Application for connection

Approved

Pending

Not applicable

Inspection

Approved

Pending

Not applicable

Submitted

Pending

Not applicable

ETISALAT
NOC for Lead-Ins

ALL DOCUMENTS SUBMITTED


Compliance with List of documents to
be submitted for final inspection. :

Yes

No

SIGNATURE & STAMP OF CONSULTANT

PORTS, CUSTOMS & FREE ZONE CORPORATION


TRAKHEES
CIVIL ENGINEERING DEPARTMENT
Consultant Covering Letter format

(Letter Head)

Ref:
Date:

Ports, Customs & Free Zone Corporation (PCFC)


Civil Engineering Department
P.O Box 17000
Jebel Ali

Attn: Senior Manager Building Permit Section

Project :

(List Project details as in Building Permit Description)

Location:

Plot No. and Area

Subject :

Request for Building Completion Certificate

The above projects have been substantially completed as per the CED
approved drawings, Building Regulations & Design Guidelines and Building
& General Civil Work Construction Regulations . We assure you that all the
required tests have been done and found satisfactory.
We request CED to inspect the premises and issue Building Completion
Certificate.

Thanking you

Yours faithfully

(Signature)
____________
(Designation)

PORTS, CUSTOMS & FREE ZONE CORPORATION


TRAKHEES
CIVIL ENGINEERING DEPARTMENT
Clients Undertaking Letter format

(Letter Head)

Ref:
Date:

Ports, Customs & Free Zone Corporation (PCFC)


Civil Engineering Department
P.O Box 17000
Jebel Ali
Attn:

Senior Manager Building Permit Section

Project :
(Mention the detail of project as in Building Permit
Description)
Location:
Subject :
cate

Plot No. and Area


Undertaking Letter to Process Building Completion

The above projects have been completed satisfactorily as per the contract
terms, conditions and project specification. We assure you that there are no
outstanding issues related to this project.
We request CED to inspect the premises and issue Building Completion
Certificate.
Thanking you

Yours faithfully

(Signature)
____________
(Designation)

PORTS, CUSTOMS & FREE ZONE CORPORATION


TRAKHEES
CIVIL ENGINEERING DEPARTMENT
INSPECTION CHECKLISTS
1- Towers
Documentation
Sl.
No.

Description

1.

Building Permit

2.

Affection Plan

3.

Final Survey

Approved Drawings from CED

5.

EHS NOC for BCC (Final or Partial)

6.

Structural Record (Original)

7.

Client's undertaking letter if there are some


works remaining in internal finishing only.

8.

Steel Structures Certificate by Third Party for


towers that use this type of structure.

Yes

No

Remark

Site Observation
Sl.
No.
1.
2.
3.
4.
5.
6.
7.
8.

Description
Building orientation as per approved drawing.
Gate level in relation to bench mark or asphalt
as per approved drawing.
Width & Clear height of ramp as per approved
drawing.
Slope of ramp as per approved drawing.
Installation of barrier gate & location as per
approved drawing
Clear height of drive way & parking area as per
approved drawing
Number of car parking as per approved
drawing
Number of basements and floors as per

Yes

No

Remark

PORTS, CUSTOMS & FREE ZONE CORPORATION


TRAKHEES
CIVIL ENGINEERING DEPARTMENT
9.
10.
11.
12.
13.
14.
15.
16.

17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.

approved drawing and BP


Ground Floor, Mezzanine & Typical floor height
as per approved drawing
Corridors height & width as per approved
drawing
Projection length & height as per approved
drawing
Doors & Windows sizes & locations to be as
per approved drawing
Internal finishing to be as per approved
drawing
Staircase finishing & hand rail height to be as
per approved drawing
O.T.S to be as per approved drawing
Access to be provided to O.T.S & Cat ladder to
be provided as per approved drawing and also
drain for rain water
Roof finishing to be as per approved drawing
Glass cleaning machines to be as per
approved drawing
Sanitary fittings & all bathrooms to be as per
approved drawing
Ventilation for kitchen & all bathrooms to be as
per approved drawing
Health club floor to be as per approved drawing
(Swimming pool, Gymnasium, etc.)
Mechanical floor dimension & finishing to be as
per approved drawing
Wheel stopper at parking area to be as per
approved drawing
Rubber Guard to be provided to protect all
vertical elements as per approved drawing
External paving to be as per approved drawing
All elevation to be as per approved drawing
Wardrobe, pantry & kitchen cabinet to be as
per approved drawing

PORTS, CUSTOMS & FREE ZONE CORPORATION


TRAKHEES
CIVIL ENGINEERING DEPARTMENT
2- Villas
Documentation
Sl.
No.
1.
2.
3.
4.
5.
6.
7.
8.

Description

Yes

No

Remark

Building Permit
Affection Plan
Final Survey
Approved Drawings from CED
EHS NOC for BCC (Final or Partial)
Structural Record (Original)
Client's undertaking letter if there are some
works remaining in internal finishing only.
Warranty for specialist item if it is required

Site Observation
Sl.
No.
1.
2.
3.
4.
5.
6.

7.
8.
9.
10.

Description
Unimpeded Access to the Villa
Compound Wall detail and location
Gate level in relation to approved Temporary
Bench Mark
Setback Distance
Paving Works check for slope and settlement
External wall finishes check for uneven
plastering and peeled off painting ( Algae
formation)
Swimming Pool check for depth label, ladder
and overflow channel & setback
Elevations as per the approved drawings
Installation of Cat Ladder for Roof Access
Internal finishing works including wall painting

Yes

No

Remark

PORTS, CUSTOMS & FREE ZONE CORPORATION


TRAKHEES
CIVIL ENGINEERING DEPARTMENT
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.

22.
23.
24.
25.

Floor Plan check the layout and levels in


relation to approved Temporary Bench Mark
Staircase and balcony balustrade height
Skirting, wall and floor tiles grouting and
sealants
Sanitary fittings and sealant finishing
Toilet Mirrors and Vanity Unit finishes
Door architraves, stoppers and installation of
furniture
Door openings shall not overlap each other
Servant blocks dimension & elevation as per
approved drawing
Garage shade as per approved drawing
External finishing for boundary walls as per
approved drawing
Pump room for swimming pool in location &
level & finishing & floor water discharge as per
approved drawing
Roof finishing & height of parapets
Building orientation as per approved drawing
Ramp width & height
Clear height of parking

3- Factories & Warehouses


Documentation
Sl.
No.
1.
2.
3.
4.
5.
6.

Description
Building Permit
Affection Plan
Final Survey
Approved Drawings from CED
EHS NOC Final or Partial BCC
Structural Record (Original)

7.

Client's undertaking letter if there are some


works remaining in internal finishing only.

8.

Steel structure certificate from a third party

Yes

No

Remark

PORTS, CUSTOMS & FREE ZONE CORPORATION


TRAKHEES
CIVIL ENGINEERING DEPARTMENT
Site Observation
Sl.
No.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.

Description
Paved Access to the plot
Compound Wall in the front side of plot and its
height
Plot boundary fencing completion
Retaining Wall construction type (RCC or Solid
Block)
Gate level in relation to the approved Temporary
Bench Mark
Setback Distance all around the building
Run off slab width
Paving Works check for fold line and settlement
Water Tank and Pump House Location
External works check for the wall heights,
cladding detail
Elevations check for unauthorized changes
Cat Ladder check for safety hoops and
provision of hand rail at roof top
Loading / Unloading Bay (fenders, sump,
handrail etc.)
Finished Floor Level in relation to approved
Temporary Bench Mark
Floor Plan check the layout details and level
Mezzanine Floor Layout
Staircase (width, riser, go and head room)
Skirting, wall and floor tiles grouting and sealants
Structural Steel Member sizes
Connection details and bolts projection (Minimum
3 threads)
Wall Bracings
Roof Bracings
Eaves Struts
Portal Frames
Number of Sag Rods in a bay and their diameter
Rafter Stay locations
Rafter joints detail (knee & splice)
Stiffener plates
Purlin System (Sleeved / Overlapped)
Purlin Cleats
Nested Purlins
Strut Purlins / Pipes / Tubes
Location of Translucent Sheets
Side Wall Girt Stays
Crane Rail Beam diaphragms

Yes

No

Remark

PORTS, CUSTOMS & FREE ZONE CORPORATION


TRAKHEES
CIVIL ENGINEERING DEPARTMENT
36.
37.
38.
39.
40.
41.
42.
43.

Crane Stoppers
Number of cranes in a bay at a time and their
safe distance
Cladding Sheets, Fixers and Insulation
Expansion Joints
Isolation Joints
Internal finishing works
Parapet Wall Height
Flat Roof insulation details and drain down pipes

4- DEWA NOC Checklist


Documentation
Sl.
No.

Description

1.

Building Permit

2.

Actual work executed (% of progress)

3.

EHS NOC for DEWA Purpose

4.

Deposit for nominated period as per EHSs


NOC

Yes

No

Remark

Site Observation
Sl.
No.

Description

1.

All MEP works nearing completion

2.

Cladding works finished

3.

External works finished

Yes

No

Remark

You might also like