Plate Calculation
Plate Calculation
Plate Calculation
Document Number
2006-4200-1J-0001
SOE
KVJ
01 Jul 13
Nguyen Van
Tinh
Orlando Rivera
Kamal K.
Ravi
Rev
Date
Purpose of Issue
Prepared
Checked
PM Approval
KVJ
PTSC MC
Approval
CLJOC Approval
Document No.:
2006-4200-1J-0001
Revision: E
No.
Rev. No
Content of Revision
Date of Revision
01 Jul 13
TABLE OF CONTENTS
1.
2.
3.
4.
5.
6.
7.
8.
SCOPE
DEFINITIONS
REFERENCES
3.1
CODES, STANDARDS AND SPECIFICATIONS
3.2
COMPANY PROJECT SPECIFIC SPECIFICATIONS
3.3
OTHER REFERENCES
DESIGN PARAMETERS
4.1
DESIGN PRESSURE
4.2
DESIGN TEMPERATURE
4.3
ALLOWABLE STRESS VALUE
4.4
CORROSION ALLOWANCE
4.5
EROSION ALLOWANCE
4.6
MECHANICAL ALLOWANCE
4.7
MILL TOLERANCE
METHODOLOGY
EXCEPTIONS
PIPE WALL THICKNESS CALCULATION
7.1
PIPING CLASS A1
7.2
PIPING CLASS A2
7.3
PIPING CLASS A6
7.4
PIPING CLASS A8
7.5
PIPING CLASS A9
7.6
PIPING CLASS B1
7.7
PIPING CLASS B6
7.8
PIPING CLASS D1
7.9
PIPING CLASS D11
7.10
PIPING CLASS E1
7.11
PIPING CLASS E6
7.12
PIPING CLASS E11
7.13
PIPING CLASS F1
7.14
PIPING CLASS F6
7.15
PIPING CLASS F10
7.16
PIPING CLASS F11
7.17
PIPING CLASS G6
CONCLUSION
4
4
4
4
4
4
4
4
4
5
5
5
5
5
5
6
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
1.
SCOPE
The purpose of this document is to perform calculation of pipe wall thickness of all piping classes which
are applicable in Su Tu Den wellhead A & B, Su Tu Vang CPP and Su Tu Nau Field Development Project. The scope covers pipe
wall thickness of deck platform piping and topside pipelines, which are subjected to Internal Design Pressure.
2.
DEFINITIONS
Definition applicable to this document are:
COMPANY
CONTRACTOR
3.
3.1
REFERENCES
CODES, STANDARDS AND SPECIFICATION
Following Codes, Standards and Recommended Practices are referred for calculating pipe wall thickness
for topsides piping or pipelines.
ASME B31.3
Process Piping
ASME B31.8
Gas Transmission and Distribution Piping Systems
ASME B31.4
Pipeline Transportation Systems for Liquid Hydrocarbons and other Liquids
ASME B36.10M
Welded and Seamless Wrought Steel Pipes
ASME B36.19M
Stainless Steel Pipes
API 5L
Specification for Line Pipe
EEMUA 144
Specification: Tubes - Seamless and Welded
Note: Latest edition should be referred.
3.2
3.3
OTHER REFERENCES
Ameron Bondstrand Product Catalogue 2000MFP
4.
4.1
DESIGN PARAMETERS
DESIGN PRESSURE
The design pressure for a piping system shall be a minimum of 10% or 3.5 barg above the maximum operating
pressure, whichever is greater, unless otherwise specified by COMPANY.
4.2
DESIGN TEMPERATURE
For service above ambient temperature, the design temperature shall be a minimum of 28o C above the
maximum operating temperature.
For pipe wall thickness calculation design pressure and design temperature shall be as per Piping Specification (A-G)
Doc. No. 2006-4200-1L-0001
4.3
4.4
4.5
EROSION ALLOWANCE
Erosion allowance as stated in piping class is used as applicable.
4.6
4.7
MILL TOLERANCE
Mill tolerance has been considered as (-)12.5% for Seamless Pipes & Welded (with 100% RT) pipes.
5.
METHODOLOGY
a) Pipe Wall Thickness Calculation as per ASME B31.3
The formula for metallic pipe is as follows :
PD
(ASME B31.3 para. 304.1.2)
t=
(when t is less then D/6; or D/t > 6)
2( SEW + PY )
tm = t + c
T' = (T" x (1.00 - MT))
(wall thickness selection validity; T' > tm ; ASME B31.3 Appendix S para. S301.2)
The formula for GRE pipe is as follows :
PD
(ASME B31.3 para. A304.1.1)
t=
( 2 SF + P )
tm = t + c
t
tm
c
MT
T"
T'
P
D
S
E
Y
W
F
tm =
2 SFET
t+c
t
tm
EXCEPTIONS
Pipes with sizes 1/4, 11/4, 21/4, 31/2, 5, 7, 9 and 22 shall not be used unless required by equipment
connections. For non-standard pipe size, the pipe wall thickness calculation should be calculated as per case
basis.
7.
Document Title:
1
Design Code :
ASME B31.8/31.3
:
:
E11
900#
5
6
Material Type
Design Pressure, P
153.0
barg
Design Temperature, T
S @
38.0
:
:
38.0
4482
12
13
14
15
7
16
17
10
11
18
19
20
21
22
23
24
29
###
###
65000
psi
psi
###
###
###
###
(psi)
4482
65000
4482
65000
0.5
38.0
4482
65000
1.00
65.0
4482
65000
1.00
85.5
4482
65000
1330
barg
ASME B31.8
19290
psi
para. 841.11
Phyd * D
2 * tsch1
Phyd
=
=
1.5 * P
229.50
barg
22.95
MPa
Pipe
Pipe OD
tr
ts
tm
NPS
( in )
(mm)
(mm)
(mm)
6.625
168.3
5.745
8.745
10
10.750
273.1
9.322
12.322
tSch1
tPL
T"
Shoop
0.9*S
Hydrotest Check
(mm)
(mm)
(mm)
(MPa)
(MPa)
(Pass / Fail)
80
12.70
9.50
9.50
152.04
403.34
Pass
60
14.30
12.70
14.30
219.11
403.34
Pass
Sch1
32.79
53.20
###
###
###
###
###
###
(bar)
A36
###
###
###
###
###
###
###
###
( 0C )
0.0
mm
###
###
### II) PLATE COVER THICKNESS CALCULATIOn
###
###
###
###
Temp
22.0
25
26
27
28
2219.08
C
barg
LEGEND:
Sch1 = Schedule selected as next higher of t m, as per ASME dimensional standard.
tSch1 =