Formwork Example
Formwork Example
1.20 m
2.50 m
Section A-A
Figure 4 (a)
The details of a formwork panel are given in Figure 1.
Panel construction: 19 mm Plywood Facing
Backed by 100 mm x 50 mm Softwood timber Strutting
Cost of 19 mm ply: RM 20 m2
Wastage allowance: 17 %
Cost of material
Volume of softwood timber
=
0.068 m3
0.068 x
1.17
40.5756
(RM)
RM 510/m3
2.50
3.00
m2
1.20
3.00
70.20 (RM)
1.17
20
RM 40.58
RM 110.78
RM 70.20
RM
RM 113.78
1.00
/m2
RM
113.78
RM
37.93
RM
22.76
RM
7.59
2 carpenters + 1 labourer
Carpenter cost
RM
15.00 /hour
Labourer cost
RM
12.00 /hour
(2 x 15.00 + 1 x 12.00)/3
RM
1.25 hour/m2
14.00 /hour
52.50
RM
52.50
RM
17.50
RM
10.50
RM
3.50
1.00 hour/panel
RM 14.00
RM 4.67
0.55 hour/panel
RM
7.70
RM
2.57
0.04 hour/m2
RM
1.68
RM 5.40
RM
7.08
RM
7.08
RM
2.36
RM 195.06
RM 65.02
RM 62.04
RM 20.69 per m2