Acknlwgemnt, Intro, Summary Dan Site Analysis
Acknlwgemnt, Intro, Summary Dan Site Analysis
Acknlwgemnt, Intro, Summary Dan Site Analysis
Assalamualaikum, First of all, I would like to thanks to Allah s.w.t because of His
Guidances and Blessings to us that make our assignment can be completed and be done
during the period given by our lecturer. Additional to, because of His Blessing for given us
very good health and good conditions that make us to complete our fully assignment.
Secondly, we also wish to acknowledgement to our lecture, Miss Nur Nazihah Binti
Chuweni, for allowing and supporting us to produce this work. Also reviewing the
manuscript and offering many helpful comments regarding its arrangement and content. A big
thanks to on her opinion and sharing some of her experience. Not least, for Encik Encik
Salman Bin Mohd. Idris who is officer at Majlis Daerah Perak Tengah for wanting to give
full cooperation and commitment to us during the process of completing this assignment.
Besides that, thanks to the officer at Unit Jabatan Perancangan Bandar dan Desa, Pejabat
Tanah dan Galian, Ipoh, Perak Darul Ridzuan that have spent their time and helped us by
providing the evidence to further strengthen our assignment work.
Thirdly, we would like to thanks our family members, thank you for the love and
support throughout the journeying producing this assignment. They have done many
sacrifices to make sure that our assignment can be finished. Without them, we may have a
problem especially for the financial problem. Because of them, all the problems have been
solve and can be deterred.
Lastly, we also to thanks to ourselves because can be a good partner and do this
assignment together. Last but not least, a big appreaciation to our fellow friends because of
their big idea that they have shared with us. We have spent very special time together while to
finish our assignment. We are very hope that our friendship will be not last. Lastly, a special
big thanks to all those that has helped us.
PURPOSE
: Feasibility Study
PROPERTY TYPE
TITLE NUMBER
LOT NUMBERS
: PT 9349
TENURE
: 6 Acre
: Building
The research aims are to identify and determine the potential market for the proposed
double storey bungalow development and to gain understanding about the viability and
profitability of the project. There are many factors to be considered to determine the viability
of a project which include site assessment, property market analysis, socio economic analysis
and the calculation in term of residual method.. The development will bring good prospect to
the developer in the future and profitable investment for a long term basis. The project
viability is dependent on the ability of the projects development to capture existing and future
hospitality market in the area.
2.0 INTRODUCTION
A preliminary study undertaken before the real work of a project starts. In general, it
is a documents that provides of a comprehensive analysis and the concrete data and
information on the market. Usually, the feasibility studies will cover all the information on
the market, technical, environment, managerial and administrative, financial, economic,
social, cultural, politics aspects of a project. Besides that, a market analysis searches for the
intersection of demand and supply that will create a market for a product at a given price.
Feasibility analysis tests whether a certain product will meet certain financial or social goals
in the market.
Before a decision is made to undertake any real estate development so it is imperative
that a feasibility study is carried out as to the viability of the project in relation to the existing
and future market conditions. The feasibility study was undertaken by the Suria Property
& Co for the client Miss Nur Nazihah Binti Chuweni pursuant to the instruction dated on
23rd January 2013 to develop the landed residential scheme. The objective of the feasibility
study is to determine the viability of the landed residential scheme project in Sri Iskandar,
Perak Darul Ridzuan. Besides that, the objectives of preparing the feasibility studies is for
to identify and qualify the potential market and scope of the work development in relation
with the potential buyer in Sri Iskandar. Moreover, it is to look out the trends, patterns,
designs the outlook of the house and causes for better judgement about potential use of
property. That is one of the studies to determine the current requirement of potential buyer
and also for the potential tenants that have the purchasing power towards of the future landed
residential development in Sri Iskandar.
2.1 OBJECTIVES
There is some objective of market study which is:
1. To determine the viability and feasibility of the residential housing at district Bandar
Universiti, Perak Tengah, Perak Darul Ridzuan.
2. To determine the most suitable and efficiently viable of the subject property.
3. To clearer understanding of the market about socio economic factors, policy and plan in
the development and property sector on the subject property.
4. Market study also help the plan development for knowhow of building to build
according to guidelines, selling time, construction period, the period, the price of
building and marketing.
According to the clients instruction, the following have been defined to be the scope of
work for the above feasibility studies:
i.
ii.
iii.
iv.
v.
vi.
vii.
Site Analysis
Property Market Analysis
Socio Economic Analysis
Competitive Analysis
Swot Analysis
Proposed Development
Conclusion and Recommendations
By gathering the information, the findings of feasibility study of the project could be used
to determine based on the combination of the several factors such as physical factors that
include the location, size, soil and environment factor while the technical factors will
consider the project management and construction technology. The aspects of project costing,
pricing, loan and equity will be implemented on the financial factors. Moreover, the market
and economic conditions will determine the demand and supply, competition, interest rate,
inflation and economic cycle. The social factors will be applied on identify the people
sensitivity and culture.
2.2 METHODOLOGY
For the purpose of carrying out the feasibility studies, the following methodology was
adopted such as:a) Face to face interview. For example, we as an interviewer and researcher have made
the direct questionnaire with the officer at Land Office and District officer. We have
make an interview with Encik Salman Bin Mohd. Idris to get more information on
the initial development process such as the conversion of the land use and planning
approval. We ask normally from questionnaire and record the responses.
b) Make enquiries from other relevant authorities. The example of the enquiries
authorities are Survey Department, Technical Department and Town and Country
Planning Department. It is as initiative to know about the land use and zoning of the
site project.
c) Make a references to several relevant officer publications pertaining to the landed
residential scheme such as Property Market Report, publications of population
growth, age & household size, income level, occupation profile, employment,
demand and supply rate from Jabatan Perangkaan, Ipoh, Perak Darul Ridzuan.
Our feasibility study covers only the above mentioned property and/or sub-sectors in the
locality of the subject property and its surroundings. Besides that, the information obtained
from the third parties have wherever possible been verified to the best of the ability to be
correct at the conducted. The certain information were classified as confidential and were not
available to us. This feasibility study has been prepared with the objective of advising the
client and shall not be used for other purpose with prior consent of the company. Official data
are available are up to 2011, as published by Valuation & Property Service Department,
Ministry of Finance
-Location
Our proposed site is part of the Bandar University Seri Iskandar and is located about
2 kilometers to the main road connecting highways Ipoh - Lumut at traffic light junctions
between Bandar Universiti or Taman Maju and it is located about 40 km from Ipoh. It is also,
located in Pentadbiran Majlis Daerah Perak Tengah. The proposed site is located in Mukim
Bota, Perak Tengah District where the lot number is PT 9349. Standard sheet number is 720
and the proposed site has an area of 6.00 acres.
-Topography Condition
Proposed site topography is flat. Although, the location of the land is quite low
compared to the surrounding area and swampy. So there is no any significant problem for this
landed residential development schemes.
Based on surveys of site, there are existing drains along existing roads in the south
and east of the site. This site is part of the pond area. Therefore, the water can be channeled
directly into the drains and retention pond nearby.
- The Current Land Use
Current state of the site is vacant land covered with green grass and trees. Part of this
site is swampy.
a) LOCATION PLAN
b) SITE PLAN
p
SUBJEC
T SITE
IpohLumut
Highway
Bandar
Seri
Iskandar
Subje
ct site
Bandar
Baru
Universiti
d) KEY PLAN
8
e) SUBJECT SITE
JALAN
BANDAR
SUBJECT
SITE
For our proposed development located at Bandar Universiti, District of Perak Tengah,
the particular of tile for the proposed subject are as follows:Contents
Details
Lot No.
PT 9349
Title No.
H.S.(D) 8034
Town
Mukim Bota
District
Perak Tengah
State
Perak
Land Area
6 Acres
Tenure
Building
Business Private Educational Institution
Restriction In Interest
No
Encumbrance
No
Table 1: The description of particular title for the proposed development located at Bandar
Universiti, District of Perak Tengah.
10
11
- FACILITIES
Local government has provided many facilities to the resident in order to fulfill their
basic needs of residents. The facilities that are provided in the area in Seri Iskandar such as
petrol station, police station, post office, bus stop, fire station and many more. The facilities
that were provided can make a resident to do all their activity with easily. All of the facilities
are provided can attract many people from the other area to living at Seri Iskandar, especially
at the proposed site.
- INDUSTRIES
There are several factories that located at Bandar Baru Seri Iskandar that near with
purposed site such Idaman Pharma Manufacturing and Pharma Safe Manufacturing. This
factory will helps by giving job opportunity and develop the economy of Bandar Seri
Iskandar.
12
4) Facilities and utilities located to the Northwest from the proposed site;
- Shophouse
- Tesco
- Bank Rakyat
- Kentucky Fried Chicken
3.4 ACCESSIBILITIES
The location of the proposed site for landed residential development scheme at PT
9349, Mukim Bota, District of Perak Tengah, Perak Darul Ridzuan is very strategic because
this area located at Bandar Universiti that can be access by main road that connecting
14
highways Ipoh - Lumut at traffic light junctions between Bandar Universiti or Taman Maju.
The residents and people outside the area of Mukim Bota can be easily access to the subject
property through the highway Ipoh Lumut. At the junction to Bandar Seri Iskandar which
located Tesco at the road frontage then turn left, then go straight about 1.5 kilometres and
access to frontage Jalan Bandar U-34 through the subject property.
3.5 UTILITIES
There are several utilities that are provided at the area of Bandar Seri Iskandar and
also at the proposed site. The district of Perak Tengah is control Majlis Daerah Perak Tengah,
and the public utilities that provided for this district is such as electricity, water supplies and
telephone. The entire utilities make the construction work easier and it also will make the
construction period goes smoothly.
Based on the Strategic Planning Development District of Perak Tengah 2020 (Draft of
Structure Plan Negeri Perak 2020), Seri Iskandar or Bandar Universiti has been marked as the
main township and Semi Central Zone Regional. Therefore it is appropriate to put forward
proposals to meet the above requirements. Below are planning requirements for terrace house
that suitable for the proposed site;
Subject
Site
Figure 8: The picture above shows the proposed site was zoned as a residential area.
Use of Land
Double Storey Terrace
Unit
78
Size (acres)
3.11
Percentage (%)
51.83
(22 X 70)
Open Space
Water Tank
Electrical Substations
0.60
0.30
0.09
10
5
1.5
Reserve
Road Reserves
Total
78
1.9
6
31.67
100
House
- Proposed residential areas involving 51.83% of the total site acreage. While the rest is in the
streets, lanes, water tanks, open space, and electrical substations.
II. Proposed road
- This proposal provides the following items;
a.
b.
c.
d.
Main Road
Housing Slip Road
Front Road Terrace House
Back and Sides of The Lanes
66
40
40
20
3.7 INFRASTRUCTURE
- Present Infrastructures
There are some present infrastructures that are provided for residents at District of
Perak Tengah. The existing of infrastructures in the area of Bandar Universiti gives facilities
to the residents surrounding that area. Some infrastructures have at the area of Bandar
Universiti for residents such as Hentian Seri Iskandar, Tesco, shop house, bank, petrol station,
17
tabika kemas and others. Besides, there have many education facilities at the area of Bandar
Seri Iskandar such as Univesiti Teknologi Mara, Institut Kemahiran Belia Negara, Sekolah
Kebangsaan Bandar Baru Seri Iskandar and Sekolah Menengah Kebangsaan Agama Sultan
Azlan Shah and others. Other than that, the existing of roadways that is highway Ipoh-Lumut
helps the residents at this area easy to go anywhere. Street light is also provided at the area.
Telecommunication system such as Celcom and Maxis help the residents to connect.
- Future Infrastructures
Future infrastructures will be built at surrounding the purposed site is Pedestrian Mall
and Kentucky Fried Chicken (KFC) drive-thru, this project besides Tesco which located near
the highway Ipoh-Lumut and the junction of Taman Maju. There also some future big project
which faced with the proposed site which is Iskandar Square. It will be the first shopping
mall exists in the area of Perak Tengah. The shopping mall will provide many shops such as
Billion, Cinema and bowling centre. This will help resident at Perak Tengah can save their
time because no need to travel to Ipoh to buy their needs and want and to find entertainment.
Other than that, it will be the main attractions to people to live in Seri Iskandar are in the
future. So that will give many advantages to proposed development. For the project
development of residential area there are project will done by MRCB which are under the
construction ,the project was consist single-storey terrace and single storey semi-detached
houses.
18
luxury items including the demand of fabulous homes and offices. This
shows that Malaysia property maker trend is growing day by day.
For 2012, Malaysias property market shows an optimistic outlook
based on a positive buying sentiment demand to own home and need for
housing. Also, the favourable interest rate (current base lending rate (BLR)
is 6.6%) environment, healthy employment market and the fact that
property investments are a proven reliable asset class will continue to
sustain and drive the property sector.
By property type, terraced house continued to dominate the new
housing market. This property type represented 56.6% (19,084 units) of
the national total. Single storey terraced unit made up 27.7% (9,344 units)
whilst 2-3 storey terrace formed another 28.9% (9,740 units). The
condominium/apartments constituted another 13.1% (4,410 units) of the
total. The 2-3 storey semi-detach and single storey semi-detach formed
8.5% (2,867 units) and 8.1% (2,743 units). The number and value of
property overhang (completed units which have remained unsold after
nine months of launching for sales) decreased from the previous quarter.
There were 29,003 completed units worth RM6.740 billion which remained
unsold in the market. These overhang units comprised 22,422 residential
units ,5,931 shops and 650 industrial units.
The Malaysian property market improved in tandem with the growth
of its economy. There were 376,583 transactions registered in 2010
with a total worth exceeding RM100 billion mark at RM107.44 billion.
4.1
RESIDENTIAL LAUNCHES
Launches of Residential
Units of houses
18,000
16,000
14,000
12,000
10,000
8,000
6,000
4,000
2,000
0
Units launched
Unit sold
Sales performances (%)
Quarter period
Quarter
Q2 2010
Q3 2010
Q4 2010
Q1 2011
Q2 2011
Units Launched
15,574
12,291
14,625
12,189
6,909
Unit Sold
2,412
1,637
2,346
1,123
1,449
15.5
13.3
16.0
9.2
21.0
Units
WP Kuala Lumpur
453
WP Putrajaya
WP Labuan
Selangor
619
Johor
99
Pulau Pinang
1,015
Perak
722
Negeri Sembilan
882
Melaka
537
Kedah
578
Pahang
567
Terengganu
139
Kelantan
184
Perlis
314
Sabah
Sarawak
800
MALAYSIA
6,909
Source:JPPH
For the period of Q2 2011, the highest state that have launches new
residential units is Pulau Pinang. The state of Pulau Pinang have rapidly
growth of development and have produced 1, 015 unit of residential on
that period. Secondly, it is followed by the state of Negeri Sembilan which
have launched 882 unit of residential that is almost similar with the state
of Sarawak that have launched with the 800 units. While, the state of
Perak have consistently at 722 unit of residential at the quarter 2 of the
year 2011.
22
4.2
23
24
The number and value of property overhang (completed units which have remained
unsold after nine months of launching for sales) decreased from the previous quarter. There
were 121,265 completed units worth RM28.472 billion which remained unsold in the
market.. All sub-sectors recorded better performances by registering lower number of unsold
units and value. The number of unit unsold at 2006 is 25,645 turns to decrease at 23,866 units
which decrease on 6.9% but within the year 2007 to 2008 shows the increasing at 9.1% when
the number of unsold units increased at 26,029 unit. While, there is decreasing at 13.2% to
22,592 unit. At the year of 2010, the number of unsold unit became increase to 23,133 unit at
2.4%.
4.4
FOR
PROPOSED
DEVELOPMENT.
4.4.1
this year compared with 4,582 units last year.The delivery of housing units in Perak was
9,747 in 2007, 6,513 in 2008 and 8,496 in 2009, according to a recent Finance Ministry
property market report.Real Estate and Housing Developers' Association Perak chapter
chairman Datuk Francis Lee told StarBiz that there was significant change in the attitude of
consumers in Perak towards the purchase of properties since the beginning of the year.
The property prices in Ipoh have increased by about 15% over the past one year. The
price of a double-storey terraced house has surpassed the RM200,000 mark, selling at around
RM240,000 in the Kinta district area, which is within 8km radius from Ipoh town. There are
10 districts in Perak. About 60% of the new property launches are located in the Kinta
district.The Larut, Matang, Selama and Manjung districts are the other areas where new
properties are being targeted for development.
The increase in property prices is largely caused by higher land cost, bureaucratic
compliance fees, and construction cost.Despite the rising property prices, developers in Ipoh
were not making additional margins from development. The projects include 300 units of
shop-lots with GDV of RM210mil, 500 units of double-storey terrace houses with GDV of
25
RM100mil, the RM135mil AEON shopping mall, and the RM80mil Pantai Hospital
Manjung. Despite having gone through a few recessions, Manjung has generated a steady
annual income of RM25mil to RM30mil to the group for the past 20 to 30 years,
The Royal Malaysian Navy Lumut base and dockyard is a strong source of support for
properties in Manjung. The residential property market in Perak is expected to remain to be
stable. New properties will be priced slightly higher because of rising building material
costs.The bulk of property purchasers are still locals. But in recent years, we are seeing more
buyers from other states, as the value of property in Ipoh is appreciating, he added.The
company has about RM55mil worth of properties to be launched in the second half of the
year in Bandar Baru Sri Klebang, compared with the first half of 2011 which saw RM65mil
worth of new launches.
4.4.2
26
Year
200
7
200
8
200
9
201
0
2011
Number of existing
stock
197
242
304
304
383
2007
2008
2009
2010
2011
2012
Existing Stock
Figure 1: The existing stock for Double Storey terrace house in Perak Tengah.
27
Based on Property Market Report, the performances of existing stock in Perak Tengah
for the type of 2-3 Storey Terraced House shows the increasing of growth. On 2007, the
existing stock shows at 197 unit while increase to 242 unit at 2008. At the year of 2009 and
2010, the bar chart shows the number of existing stock are consistently with 304 unit. Single
storey terrace houses supply also very consistent and keep on increasing that shown that of
residential are still in demand in the area of Perak Tengah. At the year of 2011, the number of
existing stock increase to 383 unit of house. It differences to the nearest district which Kinta
that show the existing stock on that area is at 53,957 unit while in Manjung have 7,157 unit.
The location of the development also have been affected to the number of existing stock.
4.4.2.2 The Completion
The completion of the building are referred to that property when the building of it
construction works are completed and a CF/TCF/CCC is issued within the review period. The
figures in completion are not accumulated from the previous quarter but represent only one
review period. The figure below shows the performances of the completion building in
Malaysis within the period of 2006 to 2010. )
Years
100
2007
80
units
Number of
completion
0
60
2008
45
40
2009
62
20
2010
2011
79
Figure 2: The completion for Double Storey terrace house in Perak Tengah.
Based on Property Market analysis, shows that the performances of completion
building for the period of 2007 until 2011 have a fluctuation and do not consistently growth..
At the year 2007, there is no completion house with 0 units. While at the year of 2008, the
number of completion started to be increase which 45 units. Next, the number of units
28
followed to increased by 62 units at the year 2009. At the year 2010, the number completion
units have spun to 0 units. The number of units started to increased at the huge amount which
increase at 79 units that differences with the completion unit building at near district which
Kinta and Manjung that shows the 1,854 and 409 unit at the year 2011 respectively.. Thats
shown the demand of this type of residential has started to be recover. Even though the
number of completion single storey terrace houses not so consistent but the demand are
always have and started to be increase for the next year that shown that type of residential is
have good demand in the area of Perak Tengah
Years
2007
2008
2009
2010
2011
Numbers of incoming
supply
304
370
373
449
406
29
Incoming Supply
Figure 3: The incoming supply for Double Storey terrace house in Perak Tengah.
From the overview of the Property Market Report from year 2007 to 2011, the
number of incoming supply single storey terrace houses shown there are fluctuated. From the
year to 2007, the incoming supply started to 304 units and become increasing over the year to
year until 2010. At the year 2008, the number of units increasing by 60 units from the
previous year total of 370 units. Then, on the next year the total of incoming supply
increasing to the 373 units and become decreasing to the 449 units on the next year which at
2010. Even though the number of completion single storey terrace house was inconsistently
but the demand that type of residential have good demand in the area of Perak Tengah.
Besides that, the incoming supply the nearest district which Kinta also shows the increasing
at 8, 135 unit on the year 2010.
houses in Perak Tengah, the conclusion can be made is this type of residential are still in
demand and also have potential to be built. On the year 2011, the incoming supply situated at
Perak Tengah turns to decreased at 406 units.
4.4.2.4 The Planned Supply
The determination of the planned supply in Perak Tengah is the one of the important
aspects that can conclude the future planning on that area. The future planning can interpret
the new development that will built up on that area. The planned supply can also be
determine as any development that do not construct yet and obtained the approval from the
local authority but that development has under planning by the developer or consultant.
30
Years
2007
2008
2009
2010
2011
Numbers of
Planned supply
504
424
359
393
357
2007
2008
2009
2010
2011
Planned Supply
Figure 4: The planning supply for Double Storey terrace house in Perak Tengah.
Based on the Property Market Report from the year 2007 until 2011 shows the
number unit for the planned supply is fluctuated over year to year. The highest number unit
31
shows at the year of 2007 while the lowest number of unit shows at the year of 2011 which at
357 unit. The number of units from the year of 2007 weak and show a decrease to 424 units
at the year 2008. And on the next year, the number unit of houses for planning supply shows
decreasing to 359 units. It may cause of delays and other reasons may rise. And it continues
to arise at 393 unit of planned supply residential at the year 2010. It prove that the
construction and development still running smoothly. At the year 2011, the number units of
planned supply turns to decrease with the small gap by 36 units from the previous year. For
the near district which Manjung show at the year of 2010, the planned supply turns to 501
unit of 2-3 storey terrace house. And the number unit of planned supply expected may
increased over year to year until now.
4.4.3
value the property. The prices of the house are fluctuated and differences for each type of
property. There are varieties of aspects that can consider determining the market value for the
house. As our proposed development located at Bandar Universiti, the price range for the
Double Storey terrace house is taken to determine the value of our proposed development.
The price is also taken refer to the newly launched residential unit in Perak Tengah that by the
references from Property Market Report from the year 2007 to the year 2011.
2007
150,000
2008
100,000
2009
50,000
2010
2011
32
Figure 1: The price range for Double storey terrace house in Perak Tengah
Based on the Property Market Report from the year 2007 until 2011 and the location
that covered for the area of Perak Tengah shows the price range within that year is fluctuated
and changes from year to year. Refer to property market report in 2011, the unit of newly
lunches at Perak Tengah on that year is at 70 units with the floor area range at 137 square
metre and the building area range at 121 sq. metre. The price range on that year show at
RM178,000- RM 199,800 with the 7.7% sales performances. While at the year 2010, the
sales performances for the newly launches residential increase at 43.1% with 51 units new
residential house. The floor area range is at 132 sq. metre and the building area range is at
167 sq. metre. The price range on that year is between RM167,800 to RM174,000.
On the year of 2009, there are 31 units of new residential house that have launches on
that year. The sales shows the growth at 61.3% of sales performances and the floor area range
is at 121 sq. metre. The building was sold at the prince range RM169,000 with the building
area range at 167 sq. metre. The performances on the year 2008, the price range for the new
residential house was at RM125,000 with the 50 units sold on that area. The floor area range
with the property that sold at RM125,000 is at 130 sq. metre and the building area at 104.09
sq. metre. Refer to the number of statistics in Property Market Report, the 59 number units
involve of newly lunched for the residential and type of Double Storey Terraced House with
the building area range at 207 sq. metre. The price range for that property shows at between
RM132,800- RM188,100 and the floor area range of the property for that price is at 207 sq.
metre. Refer to the PMR, the floor area range of the newly residential house on that year was
not available.
Summary of the Prices Ranges between year 2007 to 2011.
Year
2011
2010
2009
2008
2007
Units
70
51
31
50
59
Floor area
Building
range(sq. m)
area range
137 sq. m
(sq.m)
121 sq. m
RM178,800-
%
7.7%
167 sq. m
RM199,800
RM167,800-
43.1%
167 sq. m
104.09 sq. m
207 sq. m
RM174,000
RM169,000
RM125,000
RM132,810-
61.3%
10.0%
42.4%
132 sq. m
121 sq. m
130 sq. m
NA
33
Price range
Sales
performance
RM188,100
4.4.4
similar type property which 2-3 storey terrace house was taken as the analysis. Besides that,
the factors of location also as one of the aspects that have considered to determine the rental
value. The similar type of property located at Perak Tengah was taken as subject comparable
to determine the rental value.
price is at RM370,000 with rent out at RM1,500 per month. It is a double storey terrace house
with the rate of return at 4.9%. For the last comparable, the property was reant out for the
RM1,600 per month with the transaction price at RM373,000. The rate of return for that
double storey terrace house located at Bandar Universiti was at 5.1%. for our proposed
development, we have assumed that, the amount of rental out was at RM 1,550 per month.
4.4.5
amount that can be enjoyed by the owner to rent out for the property. Reversionary yield was
referring as the ratio between the current rental value and capital invested. It is determined
based on the amount of percentages. The amount of rent out will affect to the owner to
purchase the property and rent for that property. As the proposed development was expected
to rent out at RM1, 550 per month with transaction at RM265, 305 per unit
Solutions:Current Rental Value
X 100%
X 100%
Capital Invested
Price range
RM 265,305
Yield of the property must be high because to attract the investor and potential buyer.
The yield of the area Perak Tengah is affecting the demand and it will cause the whole area
for example is will be increase in market value. The yield Double storey terrace house is at
7.01%. So, the investor should take these opportunities to invest to get more profits.
35
Year
2009
2010
36
2012
Population
27.9 million
28.3 million
28.6 million
Labour force
12.1 million
12.4 million
12.6 million
Employment
11.6 million
11.9 million
12.2 million
Unemployment
rate
3.7%
3.4%
3.3%
Year
2009
Real GDP (RMmillion)
522.0
2010
2011
559.6
588.4
-1.6
7.2
5.0-5.5
Real GNI
(RM million)
497.4
516.8
545.5
Nominal GDP
(RM million)
679.9
766.0
847.3
Nominal GNI
(RM million)
665.3
739.5
820.2
23,850
26,175
28725
National Product
37
Economy of Perak
Perak was one of Malaysia's wealthiest states during Malayas colonial period, as
much of Malaya's mineral deposits were situated here. The tin industry here subsequently
flourished under the auspices of the British fuelled by the ongoing Industrial Revolution then.
The global tin industry collapsed in the 1980s, subsequently forcing the closure of many local
tin mines concurrently crippling Peraks economy.
This turn of events led the local state government to diversify the economy's base
towards commodity-based manufacturing. The mid-1980s witnessed a large influx of
electronics SMEs from Taiwan to Silibin and Jelapang industrial estates, but these have
relocated to China in the 1990s as a result of outsourcing. A local car manufacturing hub
called Proton City at Tanjung Malim has been developed with the establishment of state-ofthe-art car manufacturing facilities which is the largest manufacturer of Proton cars.
However, the economy has never fully recovered from the decline of the tin industry.
Agriculture is also one of Perak's main industries, especially those concerning rubber,
coconut and palm oil. Tourism is a growing industry given the state's abundant natural
attractions.
Perak is set to become the second state after Kelantan to introduce the gold dinar and
silver dirham as official currency
38
5.2 Employment
180
160
140
120
100
80
60
40
20
0
39
This is employment in Perak Tengah which is the most highest is service worker &
shop and market sales workers, so their can be highest prospect buyer for our residential.
Second is skilled craft related trade workers and follow with plant and machine operators. We
are targeting the highest group of employment is Government servant, the reasons is our area
is near with many administration centre, example is UITM, UTP and MARA and also many
of government office, example Pejabat Daerah Perak Tengah and fire station. Beside that we
also targeting private servant worker, example is worker factory, bank staff and KFC workers.
No
1.
2.
3.
4.
5.
6.
7.
8.
9.
Category
Legislator, Senior Officer and Manager
Professional
Technical and Professional Associates
Clerical Workers
Service Workers, Shop and Market Sales
Agriculture
Skilled craft related trade workers
Plant and Machinery Operator
Elementary Workers
Total
40
(000)
64.3
38.3
113.2
77.3
178.9
103.5
105.7
112.5
97.9
891.6
(%)
7.8
5.6
7.3
7.1
9.6
8.2
9.3
9.1
7.9
8.2
120,000
100,000
80,000
60,000
40,000
20,000
Population
Year
1991-2000
2000-2010
%
0.93
1.59
Based on the data, we can see that the number of population increasing years to years,
in years 1991 the population in Perak Tengah is only 75574 populations, but in years 2000 the
numbers is increase by growth rate which 0.93% population that means in years 2000 number
of population is 82,153. In years 2010 the number of population increased rapidly, the
number of population in that year is 98,897. So we are confident to build the residential at our
site because the number of the population is increasing and the demand is high.
41
25,000
20,000
15,000
10,000
5,000
1991
2000
2010
The number of household in Perak Tengah shows a great increase from years 1991 to
years 2010 because of the rapid development in Perak Tengah, other than that the increment
of the number of household also may cause by many person in Perak Tengah which they need
their own property.
So the chances to our property being sold are high because the number of household
here is greatly increased. The comfortable environment in Perak Tengah which has complete
infrastructure also one of the factor to attract people to live here.
42
140,000
120,000
100,000
80,000
60,000
40,000
20,000
0
No
.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
Range
Number of Population
0>4
5>9
10>14
15>19
20>24
25>29
30>34
35>39
40>44
45>49
50>54
55>59
60>64
65>69
70>74
75>
81,769
112,079
120,271
121,594
111,629
84,524
75,133
70,922
72,915
73,477
69,208
58,730
48,316
32,971
26,210
27325
Male age group in Perak Tengah was shown the most dominant age is 15-19 years.
But for the target group which is adult group the dominant age group for male in Perak
Tengah is 35-39, 40-44 and for this group of people, they will start to think about want to
own a property for their family and their golden age, so this age group also can increase the
number of prospect buyer for our property.
43
No
.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
Range
Number of Population
0>4
5>9
10>14
15>19
20>24
25>29
30>34
35>39
40>44
45>49
50>54
55>59
60>64
65>69
70>74
75>
82,626
110,394
119,521
122,220
101,924
75,013
68,763
68,474
73,904
71,741
67,434
58,405
49,675
32,661
29,079
33,881
Age group for the area of the Perak Tengah show the most dominant age group for
female is 15-19 years. However for the age group that we target to buy our property is adult,
44
which is 30-34 and 35-39 the dominant age that started to plan their life so, this age group
also can increase the number of prospect buyer for our property.
5.4 Income Level in Perak Tengah
10%
15%
Below RM1,000
15%
RM1,500-RM2,000
20%
RM2,500-RM5,000
RM5,500-RM7,000
RM7,500 and above
40%
Income at Perak show the highest range of income is RM2500- RM 5000. This show
the level of living standard of Perak started to increase. Other than that this group of income
are afford to buy our house, according to Bahagian Pinjaman Perumahan Perbendaharaan
Malaysia, the qualification to get loan for income RM 2500 to RM 2999 can reach to
RM280,000 while our prospective price only about RM 175,000-RM 200,000. So this can
guarantee the prospect buyer for our properties.
45
Malay
Bumiputera
Chinese
Indian
Non-Malaysian citizen
Others
The highest ethnic group in Perak Tengah is Malay which is 92,096 of peoples.
However, our target ethnic is Chinese which is 1,291. This is because the Chinese like to buy
the property especially house. So this can guarantee the prospect buyer for our properties.
competitive
development
nearby
such as
Flat,
For
49
50
Strength
Weakness
52
Opportunity
Threat
Location
53
Surrounding development
At the proposed site we can define the surrounding have the
mixed development namely industrial, residential, higher institution
and also commercial making it the centre of attention after Ipoh.
The proposed site for development is also near to Local Government
Offices such as Pejabat Daerah Perak Tengah and Headquarters of
Perak Tengah Police. Besides that, have more residential area such
as Taman Maju, Taman Lakeville and Taman Iskandar Perdana.
Furthermore, subject site is also located nearer to Bandar Universiti.
At Bandar Universiti it has a higher institution such as Universiti
Teknologi Mara (UiTM), Universiti Teknologi Petronas (UTP) and
Insitut Kemahiran Belia Negara(IKBN). It contains of lecturer,
students and staffs. They will be choosing the house is nearer to
that institutions. The commercial area such KFC, Hotel Sri Iskandar
and Petronas also near with proposed our site.
iii.
Accessibility
This site is has very easy access. This site can be access
through the highway Ipoh-Lumut. There is also no congestion in this
area because of the very good road system. Furthermore, it also
makes easy the suppliers of construction materials to send the
construction materials such as cement, sand, and others to the
construction site for the construction works. Other than, the future
buyers also can easily go to the proposed site because of the very
54
good of access. The propose site also near to other residential with
the completed infrastructure and facilities like road, lighting road
and signboard.
7.2 THE WEAKNESSES
i Environment
The environment at the site is near with a factory, but the factory was operate
for operation of light industries .So it wasn`t give too much effect to the resident.
Other than that this site also will be a bit busy, it is because near the site build the
Tesco and Billion and also has manufacturing it will make the area of our site become
more crowded and full with people and transport such as cars, motorcycle, and lorry.
ii Topography
The topography of this site is mining land and flat land. Because of that, the
developer should do many processes to get approval for the land. Need much capital
requirement and equipment to begin this project. Fill in works working should be
done. It requires long term process to fill in work. Developers should ensure safety
of land to live and proper planning should carry out, so this give disadvantages
when developer do a construction and will increase cost of site
clearance.
live and work in Bandar Sri Iskandar. The location is very strategic for build the purposed
build residential building because it is easily accessible via Ipoh-Lumut highway located
about 40 km from Ipoh; the township is close to the proposed site is Bandar Seri Iskandar.
This is about 2 Kilometer.
The opportunities of subject site can be identified as follows:
i.
Housing Needs
Seri Iskandar town is majority occupier with government servant because the area is
administrative centre .So, supply for housing scheme are needs for lecturer, police, teacher
and others. That is because many higher institution such as Universiti Teknologi Mara
(UiTM), Universiti Teknologi Petronas and IKBN. The supply of houses also will be needed
for student. The total numbers of student increase time to time so that the developer required
providing more housing. The increasing of the population and household are makes the
housing need is increasing.
ii.
Economy
The major sectors of economy in Seri Iskandar are commercial, and manufacturing.
Commercial is still the main economic sector, providing the majority of the population's
employment.The commercial sectors are such as KFC, Hotel Sri Iskandar and Petronas.
Business activities in Sri Iskandar include wholesale, groceries and services. People will go
to Bandar Seri Iskandar to get job and they need housing to live. So this will be attracting the
prospect buyer in the future.
iii.
Industrial
In the surrounding area of subject property found any industrial which not far away from
the subject property. Distance from the subject property to industrial in range about 4 km
only. Furthermore, this industrial offer many job opportunities to the public and also to the
56
resident that live at our residential area, so with job opportunities that offer by this industrial
may be the ratio of the unemployment in this area will decrease and the income level will
increase and directly the purchasing power to purchase our property that are double-storey
terrace houses will increasing.
Competitors
57
Category of land
Land status that result for building land which is for commercial land
58
To prepare site for double storey terrace house medium cost that comfortable, fully
59
b) 1.Ground floor
60
: reinforce
Roof structure
tile
: concrete roof
Ceiling
plaster ceiling
: skim coat/
Wall
: ceramic wall
Door
timber door
2. First floor
:front : decorative
:bath room : PVC door
:others door: timber
door
Window : front : aluminium frame with
glass
: back : adjustable louvered
window
Wall finishes : kitchen
8.1 Facilities
61
: half tiles
Public service and utilities is important thing that have to consider by every developer
62
The selling price of property is affordable and reasonable with surrounding people. It is
affordable for the residents or potential buyer so that the property can be sold successfully.
The selling price is considered suitable and it has been compared with others double storey
terrace house medium cost near our development to make sure the property is avoidable.
After consider all aspect, we have made decision the selling price for our development which
is double storey terrace house medium cost RM 265 305. The selling price of this project are
not accordance with the past selling price in the Property Market Report because our
company consider , the selling price for this project not suitable to be use for transaction or
selling price . This is because, this development involve high cost due to the increasing of
materials and equipments prices. Moreover, this place is became more strategic due to rapid
development growth occur in this area with several new development such as Pedestrian
Mall, Billion shopping mall, Commercial building and other.
63
The rental value can be determined by comparing the price with similar property in
surrounding development area. We did not use Property Market Report as to determines the
rental value for our development because there is no data about rental value for double storey
terrace house in Perak Tengah. So, we have used sales evidence as to determines our
development rental value. We have analysts several sales evidence around Bandar Universiti
which located near to our development as to determine our development rental value. After
make analysis with the comparable, we have considered that our rental value for this
development is RM 1550 per month.
Every developer has their target which means target people that will purchase the project. For
Our company, we have target market for this development comprises of local people,
businessman and government servant that work around Perak Tengah District especially in
Bandar Universiti. The location of our development and surrounding give us specific target to
focus.
Our main target market is owner of the shop house shop office in the Bandar univesrsiti. We
also target the lecturers from UiTM Seri Iskandar and Universiti Teknologi Petronas which
located near our development. Besides, the teachers from school nearby our development also
been targeted as our purchaser. Moreover, we also others target government servant likes
police, Pejabat Perak Tengah Staff, doctor and others. Lastly, we also target investor outsides
from Perak Tengah.
64
After considered all aspect, the period of our proposed development will takes about 3 years.
First stage will take nine to ten month for site clearance and foundation works in our
proposed site. For the second stage, it will take time about seven months which is for houses
structure works such as column and beams. For the next six and seven month is for
construction of the wall, building frame and other structure of the houses. For the other five
to six month is for infrastructure works, such as build road, painting, cement and other
installation for the houses. The final stage is for the testing of all the services for the
development. If any lacking in the services or appliances in the building, developer can
charge, repair or fixed it
Stages
1
Times ( month )
9 - 10
Work
Foundation: Site clearance and
foundation work.
Building structure:
6 -7
56
45
4
5
constructed
the building.
65
only one of the raw materials used. Others include building materials, infrastructure, labour,
finance and professional services. (David Cadman and Rosalyn Topping, 1995).
In general, before any developments wants to construct on that area the approval from
the Local Authority must be ensure first. The developer must have got the planning
permission from the regulatory bodies to make sure the developments that want to develop
on that area is legal with the approval for permission. There are a few steps that must be taken
along the planning process. The summarization about the planning is as follows:The first practices that involves on the land developments process is to get vacant
land from the authorities such as the Land Office or get with the purchase of vacant land from
parties or any individuals. The explanation of the circumstances and the land must be proved
by a title of the land. This is to ensure there are no barriers or obstacles that occur during or
before the construction work is done. If there is several limitations to be done with the
express condition instant conversion and release all the restrictions that arise.
Any particular project either a land development, or a mixed residential project, or a
simple building project requires authority approval at various stages of its development. A
landed residential is one of the several technical components of the projects that needs
approval authority. An efficient approval system for the project development is ideally
required. Documentation of the approval requirements is essential and all requirements
should reflect uniformity in standards and practises. The approval systems should be efficient
and transparent. The form G is be submitted to the director General within 14 days of making
an application of development to the relevant authority.
At the second stages, a developments proposal involves four main stages which
require approval applications for the land matters, planning permission, building plan and for
earthworks plans and road and drainage plans. Each applications process is provided for
under the various related legislations namely National Land Code 1965, Town and Country
Planning Act 1976 and Street, Drainage and Building Act 1974.
66
At the fourth stages, the Secretariat of OSC will distributes Application to the relevant
departments. It will accompany documents to the relevant departments for processing. For the
simultaneous application for conversion and subdivision will be processing by the Planning
Department of Local Authority on that area. Land use conversion is a standard procedure that
needs to be carried out first in any land/property development. Application for land use
conversion must be comply with the National Land Code and must be lodged with the
District Land Office. A proposed development shall be compatible with the established
Structural or Local Plan of the locality. It is good practice for the developer, or the
consultants, to meet with and consult the approving authorities to determine their
requirements prior to submission. This will reduce the time for review, comment and
processing of the application.
Submit
application
District Land
Office
Valuation Department,
Town and Country
Planning Department &
Local Authority
Department of
Environment, State
Economic Planning Unit
State Executive
Council (EXCO)
th
day of the following month. This form applies to category of land use in
Where the State Authority approves any applications for the alterations of a category
of land use s.124(1)(a), the State Authority shall direct that the category of land use applied
for shall be endorsed on the document of title to the land and that the existing category (if
any) shall be deleted. Furthermore, the State Authority may at its discretion impose such
conditions as it think fit in addition to the payment of a further premium and the reservation
of a new rent. In this instant, the State Authority has no power to direct that approval of
applications for conversion of category of land use and subdivisions is conditional upon the
registered proprietor surrendering his title in perpetuity in exchange for a 99 year State lease.
Section 124A allows applications for conversion and subdivision to be made
simultaneously. This is aimed at speeding up the development of housing projects as upon
land being converted, it needs to be subdivided into individual smaller separate title suitable
for housing and for purpose of selling it to purchaser. The application must be forwarded in
accordance with the relevant applications form, registration fees which RM 50 for per each
unit, official search and copy of the land title.
Subdivisions of land is a process whereby land held under final title is sub-divided
into two or more portions and each portion to be held by the same proprietor but under
separate title refer to sec. 135 (NLC). The conditions for approval of sub-divisions lands that
any necessary approval of planning authority has been obtained and that the shape of each
subdivided lot will in the opinion of the State Authority suitable for the purposes for which it
is intended to be used. For submission purposes, a development layout shall be proposed and
signed by a Registered Planner. The application must be made in the statutorily form P and
upon its approval, survey fees and land titles issuances fees must be paid in advance by the
applicant.
For the processing of Planning Permission Application by the Department of Town
Planning Local Authority, the process was referring to Development Plans and Planning
Guidelines. Besides that, it will refer to the State Planning Committee and the National
Physical Planning Council if required. They will prepare recommendation paper to the One
Stop Centre Sacreteriat. The Director of Town Planning Department shall table the
recommendation paper in the OSC Committee Meeting
69
At the fifth stages, the next step after land use conversion and subdivision is to apply
Building Plan approval. The application shall be submitted to the Local Authority concerned
and referred to the Departments of Fire and Rescue Services, Water Supply Corporation,
Department of Sewerage Services, Tenaga Nasional Berhad and other related technical
departments. For the building plan approval, the officer in the Building Department shall
undertake the following process such check Form A refer to Schedule IIU Uniform Building
By Laws 1984, receive comments from technical Departments and coordinate comments with
the agreed layout plans. The Director of Building Department shall table the recommendation
paper in the OSC Meeting.
The next stage taken is receiving comments by technical departments or other related
agencies. The relevant departments will receive complete documents from OSC Secretariat
and check the application. They will prepare and submit comments to relevant processing
departments according to application and comments on land development submit to Land
Office, comments on planning permissions and submit to Town Planning Department of
Local Authority. Besides that, they will comment on building plan and submit to Building
Department of Local Authority. The process take 14 days if a local plan is available.
The One Stop Centre Secretariat shall compile and coordinate all recommendations
paper and issue letter of calling for meeting with meeting agenda to all members of the OSC
Committee to consider and make decision on the application for planning permission and
building plans. Moreover, the committee shall make recommendations for pre-computation
plan and application for simultaneous subdivision and conversion. These documents shall be
signed by Director of Planning Department of Local Authority.
Within 24 days, the Land Administrator shall prepare a recommendation paper to the
State Director of Land and Mines to be tabled at the meeting of the State Executive Council
for decision. The State Director of Lands and Mines shall inform the States Decision to the
Land Administrator and make copy of the decision to the One Stop Centre Secretariat. On the
next 5 days, the Land Administrator will inform the Applicant of the Decision on the Land
Development Application of the subdivision that has been approved. Besides that, they will
inform for every subdivision, the category, conditions and expressed condition (if applicable)
as directed by the State Authority. additional premium rate and quit rent for every subdivision
70
as well as other payments that need to be made. At the same time, the period for the payment
of additional premium, quit rent and others and other conditions of approval as imposed by
the State Authority.
As the same time, the Land Administrator need to present the notice in Form 7G
requesting the applicant to make the necessary payments within the stipulated time as
follows:i.
Surveying fees if the survey is to be done by the Department of Land Survey; and
ii.
Payment for the preparation and registration of the Qualified Title for every lot in the
subdivision.
For section 204D, the Land Administrator shall inform the applicant of the following:-
i.
The terms of the approval for each unit that shall be re-alienated;
ii.
The additional premium and tax rates for each unit that shall be re-alienated;
iii.
Period of payment of the additional premium, tax and other payments that is charged;
and
iv.
The amount of premium in Form 5A in relation with each unit. The survey charges
shall not be included in Form 5A if the survey is to be undertaken by a licensed
surveyor and the Land Administrator has been given the assurance by the Board of
Surveyors.
At the next stages, the One Stop Centre secretariat shall inform the approval to the
applicant on the decision of the application enclosing the approved layout plan, building plan
and other related plan. Besides that, the OSC shall collect the approved documents signed by
the YDP or through empowerment to the Director of Planning, Director of Building and
Director of Engineering. The total time frame for the processing of simultaneous application
is suggested as 92 days (3 months and 2 days). If the application falls within an area with the
gazetted local plan, the normal time to process shall be 67 days which 2 months and 7 days).
71
An applicant for a housing developer license under the provisions of section 5 (3) of
the Act shall submit his application in the form as may be determined by the Controller from
time to time together with such documents and apply such other relevant particulars or
information as may be required by the Controller. The fee payable upon every application for
a license shall be fifty ringgit. Any misinterpretation of the particulars or information of this
regulation shall be an offence under these Regulations. The Controller may, in his discretion,
grant a license with or without attaching any condition or conditions thereto or refuse to grant
a license. Moreover, the fee payable for a license under this regulation shall be one thousand
ringgit per year or part of a year. A license shall be required in respect of each housing
development and where a housing development is to be developed in phases, a license shall
be required for each phase of such housing development. Besides that, a license issued under
this regulation shall be in the form as may be determined by the Controller from time to
time.
No advertisement or sale shall be made by any licensed housing developer without an
advertisement and sale permit having first been obtained from the Controller. Any
advertisement and sale shall be in accordance with the advertisement and sale permit as
approved by the Controller. An applicant for an advertisement and sale permit shall submit
his application in the form as may be determined by the Controller from time to time and
shall supply the following:
(a) a copy of the approved building plans;
(b) two copies of the proposed advertisement including the brochures containing particulars
(c) particulars containing selling price of every unit of housing accommodation in every
housing development;
(d) such other relevant particulars or information as may be required by the Controller.
The fee payable upon every application for an advertisement and sale permit shall be fifty
ringgit. Any misleading statement, false representation or description of the particulars or
information required under paragraph (2) of this regulation shall be an offence under these
Regulations.
72
73
Double
Storey
Terrace
House
78
Total
78
Price
Total Price
per unit
(RM)
RM265,
RM20,693,7
305
90
Total
RM20, 693,
GDV
790
Less (-)
Gross Development Cost
Land Cost
6 acre
Site
Preparation
Cost
i)Clearing
site
ii)Cutting,
filling and
levelling
the site
Building
RM 30 per square =
metre.
RM728,400
RM80,000
=
RM80,000
78 unit
subdivision
survey
Preparation 78 unit
of title
Infrastructu 78 unit
re Cost
Constructio
n Cost
i)Double
Storey
Terrace
House
Professiona
l Fees
i) Architect
ii) Engineer
Administrat
ive
Overhead
78 unit
RM78,000
@
=RM 3,900
=RM390,00
0
00
1.5%
Construction cost
=RM175,50
3.5%
Infrastructure cost
GDV
=RM13,650
=RM413,87
2%
5
@
Contributio
=RM604,50
infrastructure
0
=
to
authorities
Finance
=
RM11,700,0
Contingenci 5%
es
RM
130,000
9%
Full
cost,
half =RM1,932,
cost
development
906
Developer
period(1.5 year)
GDV
=RM3,104,
Total GDC
067
=RM19,354
15%
s profit
,798
Profit on Cost
Profit/Cost @ 100%
6.92% Say 7%
Based on the findings of the study, a conclusion will be made on the market potential
and viability of the proposed residential project at Bandar Universiti, district of Perak Tengah,
Perak Darul Ridzuan and the land area is 6 acres (24,280 square metres). The project viability
is dependent on the ability of subject development to capture existing and future residential
market in the area. Based on the calculation, the development is positive profit of the
development. After the calculation, the profit on cost shows a percentage at 7%. Besides that,
the profit on gross development value is at 6% respectively. Therefore, this shows that this
project will gain profit if the project is to be realized. It shows the profitability of a
development that used feasibility studies where land cost or value is a known factor and is
used as an item in developments costs. The residual value is the profits of the project where
the development potential of a property is based on its highest and best use.
As a recommendation, we are strongly recommend to our client which Miss Nur
Nazihah Bt Chuweni to proceed on that proposed development because it shows the big
potential if the construction work is continued. From the observations shows that the area of
Sri Iskandar will be rapidly growth on the future and the residential house scheme will be
more develop on that area. By these big opportunities, we are advice to our client to not miss
to this opportunity. It is a compromise between individuals needs and social requirements.
This proposed development shows technically possible, legally permissible, and financially
viable.
76
10 Appendices
77
11 References
78