1st Addenda Corrigendum Vol-III Road Bridge Works Schedule 2014
1st Addenda Corrigendum Vol-III Road Bridge Works Schedule 2014
1st Addenda Corrigendum Vol-III Road Bridge Works Schedule 2014
FORMAT A
Format for analysis of rates of Bitumen / Bitumen Emulsion / CRMB supplied by Department
Step - 1
Basic Cost of materials including all taxes at the nearest source of the manufacturer as per Table I 2.
` (A)
Step 2
` (B)
Step 3
Necessary carriage cost from source of the manufacturer to different departmental godowns.
` (C)
Step 4
Add storage charge for storing the materials at departmental godowns / stackyard ( @ 1% of (A))
` (D)
(Vide AppendixI)
` (E)
Step 5
Add loading, unloading and carriage charges from departmental godowns / stackyards to the work site.
` (F)
Step 6
` (G)
` (H)
Deduct Contractors Profit already included in the analysis of the rate of the item (A) X 1/10 =
Rate of Bitumen to be added to the item rate
(H) - (I) =
` (I)
` (J)
Note : 1 Unchanged.
Note : 2 The Total marked J is the net cost of the bitumen to be added to the item concerned to arrive at the complete rate of the ite m.
2. The FORMAT D Case-(I) & Case-(II) (Page 218 of SOR 2014) to evaluate Issue Rate and Cost
at Site of Cement issued by the Department is replaced by the following :
FORMAT D
Format for analysis of rate of items involving use of cement supplied by Department.
CASE-( I ): For items , Where costs of cement is to be included in the item rate :Step 1
Rate of item as per relevant section of this Schedule.
Step 2
Add : Cost of cement = (Quantity of cement) x (Issue rate of cement vide Item no. 1, column 4, Table I
1 of the Schedule of Rates, 2014.).
` (A)
` (B)
Note: The quantity of cement shall be as per Section 3 of this schedule of rates.
Step 3
Deduct Contractors Profit already included in the analysis of the rate of the item= (B) X 1/10 =
Final rate of item = (A) - (C) =
`( C )
(D)
CASE-( II ) : For items , where costs of cement is already included to the item rate to arrive at the complete cost::
Step - 1 Rate of item as per relevant section of this Schedule.
Step -2
` (A)
Deduct Contractors Profit included in the analysis of the rate of the item =Quantity of Cement (Issue Rate
of cement) X 1/10 =
Complete rate of the item involving use of cement supplied by the department = (A) - (B) =
` (B)
` (C)
3. The FORMAT F (Page 219 of SOR 2014) to evaluate Issue Rate and Cost at Site of Steel issued by the
Department is replaced by the following :
FORMAT F
Format for analysis of rate of items involving use of Steel supplied by Department.
For items, where costs of steel is to be included in the item rate to arrive at the complete cost :
Step 1
Step 2
Step 3
Step 4
(A)
(B)
(C)
(D)
(E)
18
2.2
208
3.1
209
Row 3, Col. 2 of
TABLE 3.2
TABLE I-1
2 (v) (b)
215
In place of
The rates of major construction materials used in the
items .. need not be
considered further.
GENERAL RULES FOR THE MEASUREMENT OF
WORKS FOR PAYMENT(cl. 113 of MORT&H)
Approximate requirement of different materials of
construction in the ........... for a greater variation.
To be read as
The rates of other construction materials used in the
items .. need not be
considered further.
GENERAL RULES FOR THE MEASUREMENT OF
WORKS FOR PAYMENT
Theoretical Consumption of different materials of
construction in the ........... for a greater variation.
330.00 kg
280.00 kg
Kolkata / Durgapur
Siliguri
Kolkata / Durgapur
Siliguri
` 46000.00 per MT
` 47000.00 per MT
` 47400.00 per MT
` 48400.00 per MT
216
7 ofTABLE I-2
` 50336.00 per MT
` 53565.00 per MT
219
FORMAT E
(Step-3)
222
Note: 1
below TABLE III-1
225
229
235
241
243
Note at the
bottom of the
page
Note: 1
4.08 (A) & (B)
[ Note ]
Tonne
Cum
Deleted.
Do
Add cost at site of 1.28 m of the stone materials as
per specified grading to arrive at the complete rate.
2
Page No.
258
In place of
Construction of un-reinforced, dowel jointed, plain
cement concrete pavement over a prepared sub base
with 43 grade cement @ 400 kg per cum,
as per drawing and
clause 602 of Specifications for Road & Bridge Works
of MoRT&H (5th Revision).
To be read as
Construction of un-reinforced, dowel jointed, plain
cement concrete pavement over a prepared sub base
with 43 grade cement @ minimum 360 kg per cum,
...... as per drawing and clause
602 of Specifications for Road & Bridge Works of
MoRT&H (5th Revision).
[ Note ]
259
6.05
(1)
259
6.05
(2)
260
7.01
(Description of
items)
261
7.04 d) I.
(Rate of All
districts)
33500
335.00
7.04 e)
(Description of
items)
10.09 b)
(Description of
items)
273
10.14 (Description
of items)
274
11.02
[ Note ]
272
274
275
275
11.03 (A)
946.00
954.00
1080.00
1087.00
(B)
680.00
685.00
783.00
788.00
(C)
567.00
572.00
651.00
656.00
(D)
350.00
353.00
402.00
405.00
11.04 (A)
1153.00
1161.00
1326.00
1333.00
(B)
917.00
922.00
1064.00
1069.00
(C)
(D)
771.00
394.00
776.00
397.00
893.00
455.00
898.00
458.00
11.05 (A)
1951.00
2129.00
2218.00
2396.00
(B)
1397.00
1408.00
1603.00
1613.00
(C)
1168.00
1178.00
1335.00
1345.00
(D)
699.00
704.00
804.00
810.00
11.06 (A)
2365.00
2381.00
2710.00
2726.00
(B)
1871.00
1881.00
2165.00
2176.00
(C)
1575.00
1586.00
1819.00
1829.00
788.00
793.00
910.00
915.00
(D)
284
12.10
I. A (vi)
[Remarks]
Example
Example
Say for 35m, the rate will be ` 102256/- per metre for
All districts except Darjeeling Hill Area.
In place of
(Rate for All districts except Darjeeling Hill Area)
12.14 a) (i) 750 mm. diameter pile. ` 2549.00 per metre
(ii)1000 mm. diameter pile.
(iii)1200 mm diameter pile. ` 3873.00 per metre
To be read as
(Rate for All districts except Darjeeling Hill Area)
` 2729.00 per metre
(i)
(ii)
` 4352.00 per metre (iii)
(iv)
(v)
(vi)
Note: 3
303
308
15.09
[ Note ]
17.04 c)
[Unit]
metre
each
PREAMBLE
21
Section
Basic Cost of
Materials
(Page - 221)
9 (New)
of TABLEII-1
10(New)
of TABLE II-1
3.11 & 314
(Remarks)
Description
The rates finally arrived at after adding the cost of materials as stated to be added is complete rate including all
taxes and contractors profit but does not include Labour Welfare Cess.
Do
22
Construction Wing should add Labour Welfare Cess @ 1% against each operated items to derive the final cost in
terms of Clause 3 of Building & Other Construction Workers Welfare Cess Rules, 1998
General
2.2.4
Mode of Measurement
Specification
The modes of measurements of Brick / Concrete (Plain or Reinforced) Works, Reinforcement, Plaster, Painting,
Metal, Chips, Boulders, Bats, Sand, Lime, Carried Earth etc. will be as per (C) Mode of Measurement under
General Specificationsvide Page B 38 of P W D Schedule (Volume I).
Basic Cost of
Note
The above rates are inclusive of all taxes but exclusive of Contractors Profit which has been duly included in the
Materials below TABLE I-1 analysis of rate of the concerned item involving Cement and Steel materials.
Do
Note - I : 6
The above rates are exclusive of Contractors Profit. 10% Contractors Profit on cost of Bitumen has been duly
below TABLE I-2 incorporated in the analysis of rate of the concerned item.
Chapter 3
(Page - 237)
Description
Unit
12.22
(New)
Note:
(Darjeeling
Hill Area)
Laterite Boulder
Cum
268.00
Moorum
Cum
123.00
25,956.00
Chapter 12
(Page - 289)
Rate (`)
(All districts except
Darjeeling Hill Area)
MT
Section
Chapter 12
(Page - 289)
12.23
(New)
Chapter 17
(Page - 310)
Description
Rate (`)
Unit
(Darjeeling
Hill Area)
metre
metre
metre
metre
metre
metre
2549.00
2737.00
3217.00
3873.00
4352.00
4439.00
metre
metre
metre
metre
metre
metre
1080.00
1084.00
1108.00
1159.00
1210.00
1261.00
each
each
570.00
680.00
610.00
730.00
Superintending Engineer
Planning & Monitoring Circle, PWD &
Convenor, Combined Schedule
Committee of PWD.