1st Addenda Corrigendum Vol-III Road Bridge Works Schedule 2014

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

1st Corrigenda & Addenda to PWD (WB), SOR: 2014

Volume III : Road & Bridge Works

1st. ADDENDA & CORRIGENDA

TO THEPWD (WB), SCHEDULE OF RATES - 2014


Volume III: Road & Bridge Works
A. CORRIGENDA OF SCHEDULE OF RATES 2014
1. The FORMAT A (Page 217 of SOR 2014) to evaluate Issue Rate and Cost at Site of bitumen /
CRMB / bituminous emulsion issued by the Department is replaced by the following :

FORMAT A
Format for analysis of rates of Bitumen / Bitumen Emulsion / CRMB supplied by Department
Step - 1

Basic Cost of materials including all taxes at the nearest source of the manufacturer as per Table I 2.

` (A)

Step 2

Necessary cost for loading, unloading & stacking.

` (B)

Step 3

Necessary carriage cost from source of the manufacturer to different departmental godowns.

` (C)

Step 4

Add storage charge for storing the materials at departmental godowns / stackyard ( @ 1% of (A))

` (D)

(Vide AppendixI)

Departmental Issue Rate = (A) + (B) + (C) + (D)

` (E)

Step 5

Add loading, unloading and carriage charges from departmental godowns / stackyards to the work site.

` (F)

Step 6

Deduct cost of container (Vide Note I-3, Table I-2)

` (G)

(in case of packed bitumen, CRMB or bituminous emulsion is considered to be used)


Rate of Material at Site = (E) + (F) (G) =

` (H)

Deduct Contractors Profit already included in the analysis of the rate of the item (A) X 1/10 =
Rate of Bitumen to be added to the item rate
(H) - (I) =

` (I)
` (J)

Note : 1 Unchanged.
Note : 2 The Total marked J is the net cost of the bitumen to be added to the item concerned to arrive at the complete rate of the ite m.
2. The FORMAT D Case-(I) & Case-(II) (Page 218 of SOR 2014) to evaluate Issue Rate and Cost
at Site of Cement issued by the Department is replaced by the following :

FORMAT D
Format for analysis of rate of items involving use of cement supplied by Department.
CASE-( I ): For items , Where costs of cement is to be included in the item rate :Step 1
Rate of item as per relevant section of this Schedule.
Step 2

Add : Cost of cement = (Quantity of cement) x (Issue rate of cement vide Item no. 1, column 4, Table I
1 of the Schedule of Rates, 2014.).

` (A)
` (B)

Note: The quantity of cement shall be as per Section 3 of this schedule of rates.
Step 3

Deduct Contractors Profit already included in the analysis of the rate of the item= (B) X 1/10 =
Final rate of item = (A) - (C) =

`( C )
(D)

CASE-( II ) : For items , where costs of cement is already included to the item rate to arrive at the complete cost::
Step - 1 Rate of item as per relevant section of this Schedule.
Step -2

` (A)

Deduct Contractors Profit included in the analysis of the rate of the item =Quantity of Cement (Issue Rate
of cement) X 1/10 =
Complete rate of the item involving use of cement supplied by the department = (A) - (B) =

` (B)
` (C)

1st Corrigenda & Addenda to PWD (WB), SOR: 2014

Volume III : Road & Bridge Works

3. The FORMAT F (Page 219 of SOR 2014) to evaluate Issue Rate and Cost at Site of Steel issued by the
Department is replaced by the following :
FORMAT F
Format for analysis of rate of items involving use of Steel supplied by Department.
For items, where costs of steel is to be included in the item rate to arrive at the complete cost :
Step 1
Step 2
Step 3
Step 4

Rate of item as per relevant section of this Schedule.


Add : Cost of Steel = (Quantity of Steel) x (Issue rate of Steel vide Item no. 2, column 4, Table I
1 of the Schedule of Rates, 2014.).
Add : Cost of carriage of from departmental go-down to the site of work including loading and
unloading .
Deduct Contractors Profit already included in the analysis of the rate of the item = Quantity of
Steel x (Basic rate of Steel vide Item no. 2, column 5, Table I 1 ) X 1/10

(A)
(B)
(C)

(D)

Final rate of item = (A) + (B) + (C) - (D) =

(E)

Following corrections to be made to the items as shown below :


Page No.

Item / Sl. No.


19
of PREAMBLE

18

2.2

208

3.1

209

Row 3, Col. 2 of
TABLE 3.2
TABLE I-1
2 (v) (b)

215

In place of
The rates of major construction materials used in the
items .. need not be
considered further.
GENERAL RULES FOR THE MEASUREMENT OF
WORKS FOR PAYMENT(cl. 113 of MORT&H)
Approximate requirement of different materials of
construction in the ........... for a greater variation.

To be read as
The rates of other construction materials used in the
items .. need not be
considered further.
GENERAL RULES FOR THE MEASUREMENT OF
WORKS FOR PAYMENT
Theoretical Consumption of different materials of
construction in the ........... for a greater variation.

330.00 kg

280.00 kg

Kolkata / Durgapur

Siliguri

Kolkata / Durgapur

Siliguri

` 46000.00 per MT

` 47000.00 per MT

` 47400.00 per MT

` 48400.00 per MT

216

7 ofTABLE I-2

` 50336.00 per MT

` 53565.00 per MT

219

FORMAT E
(Step-3)

necessaryloading - unloading from nearest.

222

Note: 1
below TABLE III-1

necessaryloading - unloading and stacking from


nearest.
The above rates are inclusive of all charges such as
Royalty, VAT, Supervision Charges, etc. and also
include allowance for sinkage and/or shrinkage and
10% contractors profit

225

1.03 (A) & (B)


[Unit]
Note: 4
below TABLE 1

229

235

241
243

Note at the
bottom of the
page

Note: 1
4.08 (A) & (B)
[ Note ]

The above rates are inclusive of all charges such as


Royalty, VAT, Supervision Charges, etc. and also
include allowance for sinkage and/or shrinkage but
excluding contractors profit which have been duly
incorporated in the analysis of rate of the items.

Tonne

Cum

For down-hill area above Hill Cart Road, Tiger Hill


Road above Hill Cart Road and for hill roads leading
upwards from Teesta Valley Road, Pesoke Road,
lower Rishi Road and Relli Road, rate of items for
road transport carriage shall be enhanced by 50%
over the rates provided for Darjeeling Hill area.
Compensation for earth will vary from place to place
andwill have to be assessed realistically as per
particularground situation. The rate for
compensation for earth isto be determined by the
Superintending Engineer of theconcerned Circle.
This is applicable for all items of Earthwork where
land is to be owned and arranged byContractor.

Deleted.

Do
Add cost at site of 1.28 m of the stone materials as
per specified grading to arrive at the complete rate.
2

The rate for compensation for earth for land owned


/ arranged by the contractor add ` 25.00 per m3
extra over rate of E/W for land owned / arranged by
the Department & for royalty charge on earth @ `
18.00/m3 as per Govt. notification which will be
paid on production of necessary documents in
support of payment made towards the royalties.
During initial payment of bill, a deduction @ `
18.00/m3 may be made.
Do
Add cost at site of 1.28 m of the materials as per
specified grading to arrive at the complete rate.

1st Corrigenda & Addenda to PWD (WB), SOR: 2014

Page No.
258

Volume III : Road & Bridge Works

Item / Sl. No.


6.02
(Description of
items)

In place of
Construction of un-reinforced, dowel jointed, plain
cement concrete pavement over a prepared sub base
with 43 grade cement @ 400 kg per cum,
as per drawing and
clause 602 of Specifications for Road & Bridge Works
of MoRT&H (5th Revision).

To be read as
Construction of un-reinforced, dowel jointed, plain
cement concrete pavement over a prepared sub base
with 43 grade cement @ minimum 360 kg per cum,
...... as per drawing and clause
602 of Specifications for Road & Bridge Works of
MoRT&H (5th Revision).

[ Note ]

Construction Wing will add the cost & carriage of 0.90


cum/m crushed stone & Cement @ 400 kg/cum of
concrete only to arrive at consolidated rate.

Construction Wing will add the cost & carriage of


crushed stone, cement, sand, plasticizer, silica fume,
fly-ash, etc. as per design requirement and should
specify the required flexural strength.

259

6.05

(1)

` 465.00 per sqm

` 489.00 per sqm

` 734.00 per sqm

` 758.00 per sqm

259

6.05

(2)

` 455.00 per sqm

` 473.00 per sqm

` 572.00 per sqm

` 590.00 per sqm

260

7.01
(Description of
items)

Construction of a narrow filter sub- surface drain


consisting of porous or perforated pipe laid in narrow
trench including
excavation and backfilling.

Construction of a narrow filter sub- surface drain


consisting of porous or perforated geotextilepipe
of150 mm dia. Laid in narrow trench
. Including excavation and backfilling.

261

7.04 d) I.
(Rate of All
districts)

33500

335.00

7.04 e)
(Description of
items)
10.09 b)
(Description of
items)

Earth fill with granular material which is to be retained


by the wall. Granular material will be as per
of MoRT&H (5th Revision).

Back fill with granular material which is to be retained


by the wall. Granular material will be as per
of MoRT&H (5th Revision).

One brick-on-edge laid in herring bone pattern


(thickness 125 mm)

One brick-on-edge laid in herring bond pattern


(thickness 125 mm)

273

10.14 (Description
of items)

Maintenance of 200 metre km stone by way of refitting


of tilted stones repairing with cement mortar, cleaning,
repairing and lettering for
Rural Roads of MORD.

Maintenance of 200 metre km stone by way of refitting


of tilted stones repairing with cement mortar,
cleaning,
repainting
and
lettering
for Rural Roads of MORD.

274

11.02
[ Note ]

Add cost and carriage of materials to get the


finalconsolidated item rate.

TypeA: Add the cost of cement and coarse aggregates


to get the complete rate.
Type B: Add the cost of required sand or moorum or
granular material as the case may be.

272

(Rate for All districts except


Darjeeling Hill Area)
274

274

275

275

(Rate for All districts except


Darjeeling Hill Area)

(Rate for Darjeeling


Hill Area)

11.03 (A)

946.00

954.00

1080.00

1087.00

(B)

680.00

685.00

783.00

788.00

(C)

567.00

572.00

651.00

656.00

(D)

350.00

353.00

402.00

405.00

11.04 (A)

1153.00

1161.00

1326.00

1333.00

(B)

917.00

922.00

1064.00

1069.00

(C)
(D)

771.00
394.00

776.00
397.00

893.00
455.00

898.00
458.00

11.05 (A)

1951.00

2129.00

2218.00

2396.00

(B)

1397.00

1408.00

1603.00

1613.00

(C)

1168.00

1178.00

1335.00

1345.00

(D)

699.00

704.00

804.00

810.00

11.06 (A)

2365.00

2381.00

2710.00

2726.00

(B)

1871.00

1881.00

2165.00

2176.00

(C)

1575.00

1586.00

1819.00

1829.00

788.00

793.00

910.00

915.00

(D)
284

(Rate for Darjeeling


Hill Area)

12.10
I. A (vi)
[Remarks]

Example

Example

Say for 35m, rate will be = `107684/- per metre.

Say for 35m, the rate will be ` 102256/- per metre for
All districts except Darjeeling Hill Area.

1st Corrigenda & Addenda to PWD (WB), SOR: 2014

Volume III : Road & Bridge Works


Page No.
286

Item / Sl. No.

In place of
(Rate for All districts except Darjeeling Hill Area)
12.14 a) (i) 750 mm. diameter pile. ` 2549.00 per metre
(ii)1000 mm. diameter pile.
(iii)1200 mm diameter pile. ` 3873.00 per metre

To be read as
(Rate for All districts except Darjeeling Hill Area)
` 2729.00 per metre

(i)
(ii)
` 4352.00 per metre (iii)
(iv)
(v)
(vi)

750 mm. diameter pile.


800 mm. diameter pile.
900 mm. diameter pile.
1000 mm. diameter pile.
1200 mm diameter pile.
1500 mm diameter pile.

` 2956.00 per metre


` 3540.00 per metre
` 4353.00 per metre
` 5119.00 per metre
` 5637.00 per metre

b) (i) 750 mm. diameter pile.


(ii)1000 mm. diameter pile.
(iii)1200 mm diameter pile.

Note: 3
303
308

15.09
[ Note ]
17.04 c)
[Unit]

` 1515.00 per metre

` 1417.00 per metre

` 1878.00 per metre (i) 750 mm. diameter pile.


(ii) 800 mm. diameter pile.
` 2213.00 per metre (iii) 900 mm. diameter pile.
(iv) 1000 mm. diameter pile.
(v) 1200 mm diameter pile.
(vi) 1500 mm diameter pile.

` 1467.00 per metre


` 1593.00 per metre
` 1758.00 per metre
` 2073.00 per metre

Add cost & carriage of stone materials only to arrive


at the consolidated rate.

` 2609.00 per metre


The rate is inclusive of cost of concrete for the
length of pile above cut off level (dummy length)
and cost of dismantling the same.
Add cost & carriage of 1 cum of stone and 0.2 cum
of stone spallsto arrive at the consolidated rate.

metre

each

The cost of dismantling the length of the pile above


Cut off level is to be added.

B. ADDENDA OF SCHEDULE OF RATES - 2014


Section

Item / Sl. No.

PREAMBLE

21

Section

Item / Sl. No.

Basic Cost of
Materials
(Page - 221)

9 (New)
of TABLEII-1
10(New)
of TABLE II-1
3.11 & 314
(Remarks)

Description

The rates finally arrived at after adding the cost of materials as stated to be added is complete rate including all
taxes and contractors profit but does not include Labour Welfare Cess.
Do
22
Construction Wing should add Labour Welfare Cess @ 1% against each operated items to derive the final cost in
terms of Clause 3 of Building & Other Construction Workers Welfare Cess Rules, 1998
General
2.2.4
Mode of Measurement
Specification
The modes of measurements of Brick / Concrete (Plain or Reinforced) Works, Reinforcement, Plaster, Painting,
Metal, Chips, Boulders, Bats, Sand, Lime, Carried Earth etc. will be as per (C) Mode of Measurement under
General Specificationsvide Page B 38 of P W D Schedule (Volume I).
Basic Cost of
Note
The above rates are inclusive of all taxes but exclusive of Contractors Profit which has been duly included in the
Materials below TABLE I-1 analysis of rate of the concerned item involving Cement and Steel materials.
Do
Note - I : 6
The above rates are exclusive of Contractors Profit. 10% Contractors Profit on cost of Bitumen has been duly
below TABLE I-2 incorporated in the analysis of rate of the concerned item.

Chapter 3
(Page - 237)

Description

Unit

12.22
(New)
Note:

(Darjeeling
Hill Area)

Laterite Boulder

Cum

268.00

Moorum

Cum

123.00

25,956.00

For compensation for earth from land owned / arranged by


the contractor add ` 25.00 per m3 extra over rate of E/W for
land owned / arranged by the Department & for royalty
charge on earth add`18.00/m3 as per Govt. notification
which will be paid on production of necessary documents in
support of payment made towards the royalties. During initial

Chapter 12
(Page - 289)

Rate (`)
(All districts except
Darjeeling Hill Area)

payment of bill, a deduction @ ` 18.00/m3 may be made.


Providing MS casing pipe around RCC cast-in-situ bored
piles of different diameters in position including cost of all
materials, fabrication, handling etc. complete as per
direction of Engineer-in-Charge.
The rate provided is exclusive of cost of steel materials

MT

1st Corrigenda & Addenda to PWD (WB), SOR: 2014

Volume III : Road & Bridge Works

.Construction wing should add cost of 1.02 MT (considering


2% wastage) of steel to arrive at the final consolidated rate.

Section

Item / Sl. No.

Chapter 12
(Page - 289)

12.23
(New)

Chapter 17
(Page - 310)

Description

Cost of boring using drilling mud to stabilized the bore and


flushing the bore of excess mud with fresh drilling fluid for
the portion of the pile above cutoff level and up to the level of
island for providing RCC cast in situ bored pile in position
including the cost of mobilization and hire charges of all
equipment necessary for boring.
(a) Using hydraulic piling rig with power unit and complete
accessories including cost of shifting of machinery from one
bore location to other, removal of excavated earth with all
lifts and lead up to 1 km by tipper trucks:
(i) 750 mm. diameter pile.
(ii) 800 mm. diameter pile.
(iii) 900 mm. diameter pile.
(iv) 1000 mm. diameter pile.
(v) 1200 mm diameter pile.
(vi) 1500 mm diameter pile.
(b) Using tripod, winches and other accessories including
shifting of all machinery from one bore location to another
and removal of excavated earth with all lifts and lead upto
150 m.
(i) 750 mm. diameter pile.
(ii) 800 mm. diameter pile.
(iii) 900 mm. diameter pile.
(iv) 1000 mm. diameter pile.
(v) 1200 mm diameter pile.
(vi) 1500 mm diameter pile.
17.05 B. v) Collection of Undisturbed soil sample from the bore hole to
be made by the concerned Division / Party at their cost.
(iv) 30.0m-40.0 m
(v) 40.0m-50.0 m

Rate (`)

Unit

(All districts except


Darjeeling Hill Area)

(Darjeeling
Hill Area)

metre
metre
metre
metre
metre
metre

2549.00
2737.00
3217.00
3873.00
4352.00
4439.00

metre
metre
metre
metre
metre
metre

1080.00
1084.00
1108.00
1159.00
1210.00
1261.00

each
each

570.00
680.00

610.00
730.00

Superintending Engineer
Planning & Monitoring Circle, PWD &
Convenor, Combined Schedule
Committee of PWD.

You might also like