Conbextra GP2 (T)
Conbextra GP2 (T)
Conbextra GP2 (T)
constructive solutions
Properties
Compressive strength : (BS 1881 - Part 116: 1983)
Advantages
Consistency
Flowable (W/P 0.18)
24
45
55
28
65
Age
(days)
75%
28
30
32
50
52
55
60
63
68
28
70
75
78
(days)
W/P 0.18
Description
1
2.0
7.0
9.0
28
10.0
Tensile strength
(W/P - 0.18)
3.5N/mm2 @ 28 days
17 N/mm2 @ 7 days
20 N/mm2 @ 28 days
Start : 20 minutes
Finish : 120 minutes
Freshwet density
Approximately 2220kg/m3
depending on actual
consistency used
Young's modulus
(ASTM 469 - 94)
28 kN/mm2
Technical support
An experienced technical advisory team is available to give
technical service on request.
Conbextra GP2(T)
100%
Specimens of Conbextra
GP2(T) remained undamaged
even after subjecting them to
alternate loads of 5N/mm2 &
25N/mm2 at the rate of 500
cycles / minute for two million
cycles.
Conbextra GP2(T)
Coefficient of thermal expansion 11 x 10 -6/ 0 C
Unrestrained expansion
Pressure to restrain :
plastic expansion
2 - 4 % in the plastic
state enables to
overcome shrinkage.
0.004 N/mm2 approx.
Application instructions
Grout
consistency
Foundation surface
Flowable
350
500
900
1000
1500
2000
1500
2000
3000+
Specification Clauses
Performance specification
All grouting shown on the drawing must be carried out with a
pre packed cement based product which is chloride free.
It shall be mixed with clean water to the required consistency.
The grout must not bleed or segregate.
Preparation
Levelling shims
Conbextra GP2(T)
Unrestrained surface area
This must be kept to a minimum. Generally the gap width
between the perimeter formwork and the plate edge should
not exceed 150mm on the pouring side and 50mm on the
opposite side. It is advisable, where practical, to have no gap
at the flank sides.
Mixing
For best results a mechanically powered grout mixer should
be used. When quantities up to 50kg are used, a heavy duty
slow speed drill (400-500 rpm) fitted with a paddle is suitable..
Larger quantities will require a heavy duty mixer.
To enable the grouting operation to be carried out continuously,
it is essential that sufficient mixing capacity and labour are
available. The use of a grout holding tank with provision to
gently agitate the grout may be required.
: 4.125 litres
Flowable
: 4.500 litres
Placing
0
Pouring should be from one side of the void to eliminate any air
or presoaked water becoming trapped under the base plate.
It is advisable to pour the grout across the shortest distance of
travel. The grout head must be maintained at all times so that
a continuous grout front is achieved.
Where large volumes have to be placed Conbextra GP2(T) may
be pumped. A heavy duty diaphragm pump is
recommended for this purpose. Screw feed and piston pumps
may also be suitable.
Curing
On completion of the grouting operation, exposed areas should
be thoroughly cured. This should be done by the use of
Concure WB curing membrane, continuous application of
water and/or wet hessian.
Conbextra GP2(T)
Limitations
Yield ( litres)
12.5
13.3
Storage
Shelf life
Precautions
Estimating
Packaging
Conbextra GP2(T)
bags.
is supplied in 25 kg
moisture resistant
Fire
Yield
Additional information
Consistency
Pourable
For further details about the use and selection of grouts refer
to the Fosroc Information module entitled 'Precision grouting
in the Construction industry'.
Flowable
Fosroc products are guaranteed against defective materials and manufacture and are sold subject
to its standard terms and conditions of sale, copies of which may be obtained on request. Whilst
Fosroc endeavours to ensure that any advice, recommendation specification or information it may
give is accurate and correct, it cannot, because it has no direct or continuous control over where
or how its products are applied, accept any liability either directly or indirectly arising from the
use of its products whether or not in accordance with any advice, specification, recommendation
or information given by it.
telephone
fax
++91 80-22240018/120
++91 80-22233474
www.fosroc.com