Transportation TT: Engineering

Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

^+'-

CV

l0cY63
Sixth Scmester B.E. Degree Examiration, Dec.20l:l/Jan.20I5

Transportation Engineering - tt
\ot.:

l. )nsteer tn! F|YEJ ll qrunio$, selectilg


att.a\t TWO t!ksnohsto cach pai
2.

)sst,te

issnte .tata sailahtj

ilo,r,

PART A
:
,.

h
c.

Ditlv a cross seclon ola pemrnenr wa), in emblnkmcnr and dncuss


lunclions olurious componen6 ol] railray rack.
B i..ro-' h
znrge.o - tr p,.r ,n. \ir ..,g1"J
Biefl) disctrson doubleherdcd (DH), butlheaded (BH)andlll fooled(FF)rails Horv rrc

it!

r.

Bnefly dn.us oi the follouire ia$dne6:

ii)

Pmd.ol clip lorcon.ere steepem.

\rnhnsureb nsourthe E.luiFnrcn6 oinshplare

ond

bearjngptxleforrart$ay!ack.

(03:\h

s)
.1.LcL, k. 1L,oe-' 01...
c..rDepu eo b. _ I .o , o .. I tr r.d
Lorpd.od-\ 'p1.e1.." lr-'.r.t "erl.
, Jo.::r|c. {t ll(r"nn-, otunspeed ol90 knah on a shighl levdl rrck (B.C). Aho catculale lhe spced redurtron iaihc"
tmin hastu clinlbm r in 175 giadicnr
(07!a*n

a2

zi

tsrieiy discu$ on

l)

a.

Grtue

the lolloNin-q
on cunes.

.lmt.nslion

Derennine dE lcnglh oIt.ansili.D

ve

iltlr.

dcsien speed

olhin on.u^e

A i degrcctrwe diverges iom a I dege mrin curve in relesednedion in


tsG. tard. It lhe lpeed on fie bn..h iiie is rest crd to 40 knp[ En
nsl ctd speed on dremanrliie

lumou lh askerch:
Thcorelical and aclual nosc r.nre.
SLVith xngle mJ uo$i|pon,rle.
Cxlctrhl illlhe nc.csa.y etenenls requircd ro set oul I ir l2 tumour laktnE oII
Dis.u$otr the ldllo\Li'ig conpoirnc ol r

b.
:
Z

c.

i)
ii)

i
iom a
n'rr"'Bri i".lL tr,. ,..r g.,i ,trod- ^Cet!.o...eo crrrtr.,t, t-JJo
llE he orrhe toncue mil ind pa$ing rlmud) TNcr Given hcc diycrsencc(d)= 1l..rcms.
TNC = droredcal nose cc,lre

Brien),discuss.n:

i)Crosow iilDimond

cessin8s and,ii)S,gnak

10cv63
PART- B

Menlron lhediilerertchara.leristicsof

b.

Expl.iir the procedure ololGntinathc ton{ay.


Whal is nreanr by basic rutr*ay lenatil How is n deGmined dn
pcrfomance chamcteri$ics olrhe ai(mft usirrg the airpon?

c.

!.

b
c.
a.

lirro8

and

hor ihcy rlL.r

the

planningrndiesign

(r[M,rr,

(06]\l,rl,
$e b$h ol the
(03

!L

The tunway lenerh requned br llndnrC at sex !e!c! is 1000m in srandad dh.spherir
condilion md fie lenarh ofrunqay rorlakeoll fll sca lcvelir srodrd ahospteric condilion
is 25oom.Ihe ef.rtrce rempeoiurc,t the0trporl is 25cC The attoosihcrc rcmperatLtre a1
clcvalioo ofaiDon at 200m n l5'c. The ellcctirc run*ay eddie.r is 0 5'%. Delennilc ihe
(03Yr d
runr,rlengdr lobc porided
(06 \hrk,
thc
Iayouroltaxirvry
Explain bielly the vanous th.1o6 whi.h affscts
whlt is the neccsily olvnual aids tor iirportsl witc bieny nore on Runwxy liahira.
(06lir*t
Tarivay llghling dAponandHang lighring
Dunng setdngourofhmelbrienybringodl ho\v do,vou set outlunnels centre linc on rhc

undergtutr.d
b.DiscnsoiNeedlebe!,nmethodoltuntrelingin$ils.
c Bieflylvtueahotc onverlillrionorhnneh.
groundsu ice and nansleicenlre line lmm rur&ce

ro

(l0rk'*,

(osMsrk,
(o5Nrirk,

Cive r skerch sho*ing the hyout ofhe hlrbour shorlie brca* wxrer. enrmnce chaDnel.
(16 Nrrko
runing bsin. pie6 .nd {har6.
olharbours
lilturalcurenhon
rhc
d.sign
Bneflydis.usonreleruNeofwl.d.tidesard

rii)
iv)

(06

Transitsheds and ware honses


Break

Mrertypes.

rt,rlg

O3\lirt,

t0cv6t
Sixth Semester B.E. Degree Examination! Dec.20l4lJan.2015

Environmental Engineering - I
qrcstionE yl..rnq
at lqst TWO qwstions fion eath patl.
2. Missirydafi Dar be srnably assah.d.

r|oret l. Ahs4er I:l yE

ful

Define ldrake aid explaiD rari.ns tncrorc nmuen.insrhc selecrmn ofa sire lorinrake.

E\pl,inasubmersedinrakervirhrhcnldoanearsketch
list ihe lacro6 influencirg t[c selection ol pump and explain any rwo.

(06]I!rk9
10s\!,r1,

(06\rrrk,

2i.

Lisr Oe larlotrs mcthodsolpotjul,.on rorecastins and extlain any nvo inderail. (0llrlirkt
Dcline rare otdetuand and explainrhcrarious hcrors iniluencins rhe per capna demand
(03Nhrkn

i1

a
?A2

b.
c.

J'..

lrplain

rF. oo r r-.'o

'

'

l(J,000

16.000

'e)d2'lijbta.r.'o.e'tralr0.r.e-er-.d

sig.ificarce olrhe tullo\ins impuriries with r.spcct to qualilr


i) Tnrbidtry ii)Hadne$ ili) Fluoride iv) Nirraro
Exphir rhenrultiple ferm.nralion rube re!
\vrne a oote on $ater bomc diselses and then controi.
dre

ollster:
(os\!x!kn
(orJ

M k,

(0{NLrk,

sednnentari.n trnn ii
(osNr,rl\)
lxplainrhc methodofderemrininsopriNumdosage olcoagulaDlqithtlr aid ofnear sketch

Denne s.liinentation.

Shol rhat scnlcneni or dE

irdependentofdeprh

par.icles

in

sedime ation fi.cd sirh $nnddftr ,nechuical sludge ,..""", ,. i:tilTlil


5milliorlltes'dlyolseNase'Iakedetenrionpoiodasihranddepthofrankaslm Fr.d

A .ircular

ae

the

dia olrhe

tonk.

(06:uark,

8!A.r=_B

s a

Detine nltrarion. Exphlr thcprinciple uderlying nhrarion pro.d\\


operatins problenN duriDs ihc filmronpDce$.

b. Ltt ard exphin the \arious

a Deli.ednornrtion,ndertlainthc\ariouslomofchlorinarioD. Osrr,rkt
b k s rcquired td supplyrvalci foraroNnrvirhaFopulxiion oll0.l]00 ar percapnadem.nd ol
c

150 lnEs. The disinfedant ro be used is the bleachire poFdcr nhich conranN 30!1,.1
avarlablc cnlorine Dcbtuinc how much bleachina po*der is rcquncd amually ar rvarer
q orks wirh 0.3 me/L ol.hlorlne dose s requned fordrinltction.

E\plainihczcohepocssofhddnessrmolal
I

!r2

l0cv6l

7 a.
b.

c.

List the diffsenr layout ofdishibution system rnd.aplain the Crid iro. disribution sysem

inddail.

dctail,

Explain fluoridation md defluo.idation i.


Explainrhe Sluice valve usd usually indistriburion systenwith

notes on sy four ofthe fo llowing


dehands of trate!

wrire shon

a.'Five

a neot

sketch.

(o3Mrrk)
@6Mrrtr,
(06Msrk)

b. Io6luarionCoUery
c. Indi.olbr orsanism.
e.

NaleondtLchniqrc
(10

M.*,

r0c\

62

Sixth Semester B.E. Degree Examination, Dec.2014/Jan.2015

Design and Drawing of RC Struciures


\ore: t. )hspt ah, Two.fu .luosnons fio'n Part-A
and ONE qncliori ?ott Pan-B.
2. UsaollS 15n2000 aa.l SP-l6 is pe titted.
i. Asutke a$,,.isi"R data suitabb.

PrepdrdagencFl layout shounrg lhcposrtion aDd size of colums and foori,lg to a suilable
s.alc tbr an nrdusnialbuiLdinsl
A clc0r dinrension offacro.r:hdd floo. i: ll 75i l9 75 m

SDicinsofconmrns 4nc,c

olcollm

150nnn
SDaDofsteelTNs- l2 m c'c
RCC columns are provlded !t rhe gable
Slzc

150

Allthc walh rtourd


Si2e

+-=

i2

are 2s0 m'n

tral

sides rnd thctr szc

thi.k

oli(nnioa l5xl.0m

Thicknes offooting.100 nm u.ibrm


Deptholfnurdation I zmbcl.weroundlcvcl

onc *ay contnruous slab hrs been Dturided tbr a lrallofclqar dnrcnsions 8rl
slab issipposedon RCC bcan,. lhe 6l1o$iDgdetaik arerren:

i)
il)

1ii1

l!l
v)

C/c disianc e o I supponing belms =

It

Col!flnsdlnrensionsorwhichbeamEs=lsonn!
Ct olthcbcrnr 150x600'nnr
Slab rhickness = 150

500mm

'nnr
Berrn dcpth is inclusiveolslabdepth
vi) Mrio posrne Einforcement at the erd and nxeriorFaneh = 10 mn {.-4l20mr clc
vii) Nlain nqatllc rci.lorceffenl ar all rhe suFFons: l0 dm + @, ll0 inft.,.
viirDisnibntion neel:3 mh d 250 mnc,c

ix)

Gnde oicondde and st*l= Mlo and fe,rls.


dE
ructuraldetaik witha$ritable scale and drx*rlrc lolloslns
Sho*

, Secii.ml.lev l.n.r.l,h
b. Platr showing rhedelailsolreinlorcenht{Bottom view&TopyieN)
A sqtrrc RCC colutu1 ,150x450m1 is to Esl on sloped RCa square footins. The deptn of
r.Lidahon n l.5m belo$ cround lcrcl lhc dcptn ol dre lnotnrE is Educed nom Tsonm at drc
riroc olrhc.olutu 10 300 nnn at the edge olthe lbotnrg The fooring size r 2.0r2.0m. The
column rciolorccnent consish ol8 bar ol20 u0 diomeler. sith 3 mr dia Iatcml tics.r
200 ff.1 .,c atui the tuotiIg renri,,cenrenr cdnsi( ol 12 nnr dianreter ba^ rt 150.1n.rc bodl
rxts Vlg dc.onft.re and I..115 gtudc srccl arc us.d. DFi ro a sunable scab. n{ lcdiorl
scction and plan olthc lnotinE .nd coluM sho{inc dre rnnnrccmenr dchils, and rlso preparc

10cv52
PART, B
Design a combined footing for the two RCC colums separated by a datance ot4 n c/c.
Colum 'A' is 500x500 mnr and cades a load of 1250 kN and colunB B n 600t6O() ntu and
canics a load.l 1600 kN. The bedns capaciry ofsoil is 2OO kN/inr (safe). Use Mr concrere
and FqLs steel. The widthofthe footing is rcstricied to 2.5
(,10 [r:rk,

n.

i)
ii)

longitudinal scctionalelelaiio.
Ch d.vo differeir ph@s to shorvthe maxinrumdeiails olrcinlorcenent

A single bay lfled portal name has an eiiective span of7 m and an erecnve heisht of4.2 n
Spacing ofport.l names n 4.2 m. Consids an imposcd load ofl kN/# o. rhe sldb. Colunn
.i/. 100r
,l00n.o s.-'r be adopreo D,ign rhe con..aLoL. \tdh and po a
c
'onioerinsv., graoe coD. mrc d ld I e Lce sBr orsoi is lJo
ro

D6v

l\

the halfsecrional elevation ofrhc portal nane snoNing the details of renrnrcemnt in
footing. columand the beam ofthe porlal tame Aho sbos the cross s*ti.nal dei,ik nf 6P,h

Sixrh Semester B.E. Degrcc Examination, Dec.20l4lJrtr.2015

Geotechnical Engineering -

Notct A,s*er a

r.

b.

c.

! FIt

lnl qatrlio,s, stt"dit,s zlt.ott

ll

TWO questio,s lio,n zach

paf,

IABLI

DrnLs!abourrhe inl|)odanceolsub soilexplororionprcgr.m


Ixplainrhc nlerhod olrienic ]Ulzction.
rvh0trrc the nelh.ds xvaihbld lorJervatchrgl Explain any orc method

a. Deile

!;

dE crpr.$ions ror renical $re$ and shc slEs by usns Bousnesq s theory.
(03 \hrtt,
Aho conrpxrc lhir rhoory rvth \\,cncrgaad! thcory.
write a nore onprssuredisiriburion dia-!mN.
(06]krk,
A lord ol I000KN xct as aFoinr load rl dr \ufa.! oi0 soil mas. Eslimle lhe slres ar a
poiDl ln bdlorv and 4.r xway llom rhe poinl olacion.irhc load olBou$tnesq s lbmnLtn
(un'p1rc
L rtu( $ rth rle Ls lr horn \rcner-rirn \theur)

ac

\l

a'l
.E

b.

'he

.,2

rc l . ,e..ll\p.,tr h-.,a. ct'

$1. r4e
'.^lao"n.r1 . cned Ler..

letr

E\pldin GraphicalDrerhod Ior dmr in! flou ner.


Forahomogcn.ousoanhdarn:lzrnhieh !d 2m Eeebomd.aflorvnelNxsconslructcd wnh
4 ioN channels The numberoltotenlial drops Nas 20 nre danlas a horizodnl ilrer ar
the bac ncar rhe loe flre coeficienl ol permcabihy ol lhc sorl wrs 9
10r.1n\.
Dc Ghlnr e the illic ipale! sccDaec,iirhc lcnlth ollhedamr l00r

z.!

Lldfine Al

Esl,Acrile

rd Passile

EaihpEssurcs

b. Erplain Ranhre's dreory lor mlculating

ai.,u.ns1.il
sith

?i

Ac

+.'oor!\...d|b4\.

[hrr,
in .ohesidn les so,l! Iir no
(06

e Fre$uft

n,F.J..n eLr."llJ..e d, L,d.ll.

rhe rollowins prcpenics

0 5mdepth C =0,+ =:loo.r=lNKN,inr


Bclor
c o,0 =i,l|,r=20 K\_,nr.

ShoR raractive edh pieslre di*ibution, r$unine dal

the lvrler lable is wellbelow the

(03l\lr*,

PART B

(06rirk,
ofslopes?
b.Discn$rheSrvddahmeihodofllicesforacohesivel.iclionaLsoll. r0! br[n
.. \i.c'0.'kr'
4,r'n..'i '-lt o'.r'.. r hesl' .in,.d-leor. ,nq
1.rr'"'. l' J
ep 'OOl\'' "e n'q1ts]" .o' '.
l3 oK\/'n'. il Trylois slibility numbcr is 0.06, li.d the laclor ofsatlly with Especl ro
(06y!rk,
cohesion
a. wharrc

rhe causes lor

failuF

a. D.lincsarebeaingclpacitrsafeLrea ngFe$ureandallonablebea nepre$uE,

r0cv64

t,

b. Wnte a note oD stdnddd penenadon test ed its coftdions.


c. C.lculal. th. trltimL hceing cap*ny oI r ,a wid. .qu@ foolins restine
s,,rface ofasnd den.llt wirl rhefoll.wino nmEtiee:

il""i,;;.T'ilitt d#l*
sme foolils

$hfl

N.-42.2.
w'ik

a 0orc on se

ii"'.i,-*in'lifiiii"l

ir h pla(ed ,r depil"

nrero

or

of lm 6.low

r"."

rhe

".

soud

103

the

Mrr&,

gbud

*1",ru,. ueq*)
\{,-y4..4 .

(urta(e.
^r.o Tale

(\Yroy.*''
^9**

hotincs.

A laEEkd cloy 8m !hic( under[es a prcpoen nes blrlding The e^fting overblJden
prsslrt r $e <-ft ofclay ht.r is iOOXla md load dd. ro r 0." bhdDs mFas. lh.
o-oKtr zoorp,. rhe I di limir oi r[e soil is 7s9o. [arer mnEnr olso,l is 509'
bs - :.l.hurratc onsotraarion
n, V

"enlenmr.

'4,,.

Discus

Ine

pmp&6p oI

isola ed

rootins.

(l

{06rlr*a

.aiorolclah!,do1orp,l. r.Lndabons. ra

,v
l*

r\

A"

^o"

,dU

il
'o,C/.
.]

10cv65

Sixth Scmcstcr B.E.DegreeExaminrtion! Dcc.2014/J.n.2015

Hydraulic Structures and lrisation Design Drawing


rote: t.Ars,4, at4' TwoJk q"esrioht.fran PART A
o,.la'D ONE qucttion jrot, PART B.
2. Asst,,c his!i,! dala etnahlr,

'i1

DcfincreservoiL Explahrnd
Tlrc lollo$irg inlimal on is

!.
!-

a'i

;.4

rypesolieservons.
L\d

l0Tllarkn

reLri.n\hir bc$.cn raD .fticrcncr

9i
Flnd $e pmbabie life olrhe reservoir snh rn in ial aenoircapacir_w ol3o mlllion crbi.
mereLs. il d1e aveDse aDnud 0ood is 60 tuillion cubrc melers and lhe .verage aDurl
sediin.,l inflo* tr 1.00-000 bmes. AlsuDe a sFcrfic \eight oithe sedimcDr cquxl ro
I 2 g,n Der ! c. The usunl lile olihe rcseroir Nill reiminare vhen 30% olinilial caplciry is
fill.d \rnh
to8lhrkn

sedinrent

Defincgmviry dam

!a

BA]=!

E\tlai| llrious lorcesI[

donxgau,)-dam

(07vsrk,

lollownedxldsereobrafi cd liomrhesrbiftr,analysnolaronoete grarnydam


i) aoolovenuning nronrcnr ahouioe = I r l0rkN m
ii) Toul ftsislirg rnonrnr sbouno. =2:10! kN nr
iii)Toulveni.allbr.c\ ab.\r base = 50000 k\
ivl Basd*nnh.aihc dx,n = r0,n

!)

Slope

oflh.

DS

lice=0.8(H) l(v)

Calcllale rhe mNinun and n,nirnunl venical srs to $hi.h rhe bmdxlon ulL
subje cd1oshristhera\iDtrnrpriircipal rssariocrA$ufrerhereisnoitsdler

bd

(03\h![,

:i
?-.

,.]

Whd 6 eadhem

bnefy
L,*

d nl,Sk ch.n,l.lrsil-

rhc

J,demrl \pesolernhem drDrs dd erp[nr

((lTMorkn
3nd briely crplan the rnedrods of seeprlc conrol rhmugh 6undrrion and body ol

c!.lheDdm!.

(0$

M in

PART B
A shic. n rr operins.ofuolled by a gate lor dm[ing supptLes imn a rork. resenon or
caral er. The brnel oirhc sluir! i1r)- be olmasonry or ccmcrn .oncrcl. or R C.C. lipe
DdsiEr a hnk sluice for an canhcn dan(rllkbunr:t) rid)the aolloringpanrculars:
Varinrum \,1oh\el(V\\L) = -1]6 0 n
Los \rarerlevel(f\\L) = 1230r
R L ol lop olbund (-f BL) = +121.00 tu
Sidc slopc ollhc btrnd= 2 I oiiboth slder
Iop \ drh olbund = 2.0 m
R.L ol sill ofslui..= Irln{) n

10cv65
Bed level olcanal=+122.0
Side

slopesol.anal= l%: I

Canal bed widrh = 1 2 m


Canal dncharee = 0.2 nlh

Cood foodation

orh

d rcck

le\l

- +l2l s n

Generalgrcudlevel=+122.5n
a.
b.

c.

(rs

Desier lhe banel.cislcm eic. Dmw the folioNingliews:


I-ongitodral elevarior alonC fie centreolsluice batrel.
tlalfplan arbp and hallplan ar tou.darion,
End

O0hrk,
(rirlrrk,

view.

Desien acmsl

dnr olthc

o0]r!

notch rype. Cilen the rollowingd

cBt
+51.50

FSL
HSL

+51.00

+52 50
side slopcs (on enher side):

ll

tL)
+50.50

Had soil lorfomdalion is mel at

r ruitable scale, completly dimcnsioned liews


HallDlan atbp md nalfplan al lomdation.
Dm*.

a.

b
c.

to

Longitud inal seclion d r the . mal d mp


Halfcro$ieclio. alone thedrop wau

sd

tvrrk,

of rhe followines:

halfelevanon looring trcmrhe dh

You might also like