100% found this document useful (7 votes)
10K views2 pages

Basic Coiled Tubing Formulas and Conversions.

This document contains various formulas and conversions used in oil and gas drilling operations. It includes calculations for annular volume, uphole velocity, required pump rate to fill the hole while pulling out, ovality, shear value for disconnecting, equivalent pump rate using nitrogen, formation pressure, snubbing force, internal capacity, displacement, annular capacity, bottom hole temperature, and height fill-up. Many of the formulas include units like L/m to specify the units of measurement for different values.

Uploaded by

Jeeten G.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (7 votes)
10K views2 pages

Basic Coiled Tubing Formulas and Conversions.

This document contains various formulas and conversions used in oil and gas drilling operations. It includes calculations for annular volume, uphole velocity, required pump rate to fill the hole while pulling out, ovality, shear value for disconnecting, equivalent pump rate using nitrogen, formation pressure, snubbing force, internal capacity, displacement, annular capacity, bottom hole temperature, and height fill-up. Many of the formulas include units like L/m to specify the units of measurement for different values.

Uploaded by

Jeeten G.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Formulas & Conversions

Annular Volume
Unit = L/m
Bottoms up time =

Uphole Velocity =
=

True Space Factor Required to Overcome Fluid Colum: Hydrostatic of fluid to space factor
Hydrostatic = Weight *Gravity Constant*TVD

Required Pump Rate to Fill Hole While POOH (Pull out of the Hole):
= Coil displacement * speed

Ovality =

Shear Value for Disconnecting =

Equivalent Pump Rate using N2 =

Formation Pressure =

Snubbing Force =
Internal capacity =
Unit = L/m

Displacement =
Unit = L/m

Annular capacity =
Unit = L/m

Approximate Bottom Hole Temperature =

Annular Capacity =
Height Fill-Up =

You might also like