Third Karnaphuli Bridge

the first major cable supported bridge in Bangladesh

Presented by:

David Astin
Managing Consultant, High-Point Rendel

CBDG Conference
Thursday 7th July 2011
Thursday,
St Hughs College, Oxford

Third Karnaphuli Bridge


th fifirstt major
the
j cable
bl supported
t db
bridge
id iin B
Bangladesh
l d h

Fast Track Procurement


2001 Study concluded replacement bridge required
Decision to progress project on a D&B basis
basis, funded by KFAED and
Government of Bangladesh
Early 2005 Contractor Consortium Pre-Qualified
Pre Qualified
August 2005 D&B Tenders Invited
July 2006, Tender awarded to MBEC-ACL-COPRI JV
Julyy 2007 Construction Start
July 2009 final stitch
Construction complete early 2010

Project Location
Proposed Intersection - 01
(Chittagong end) at Bakulia

BAKULIA

SHIKALBAHA
KOLARPOOL

MOYZZERTEK

Proposed Intersection - 02
(Cox's bazar end) at Mozzartek

BAY OF BENGAL

Location of the new


bridge is 50m
upstream of the
existing
Shah Amanat Bridge

Functional Requirements

Concrete structure with low maintenance


Design to AASHTO LRFD 2004/2006
Two full lanes + one narrow lane of traffic each carriageway
(AASHTO 6 lanes for design)
200m spans with navigation clearance (4m depth at midspan)
Resistant to seismic and ship impact forces
Cantilever deck construction (minimise works in river)
Large diameter bored piles

Main Bridge Layout - Elevation

Main Bridge Layout - Pier

Main Bridge Layout - Midspan

Extradosed Bridge - Definition

Extradosed:
Cable-stayed:
Karnaphuli:
K
h li

Tower height = 1/15 to 1/10 of span


Tower height = 1/5 to 1/4 of span
T
Tower
height
h i ht = 1/8 off span

Extradosed:
Cable-stayed:
Cable stayed:
Karnaphuli:

<30% total vertical load carried by stays


>40% total vertical load carried by stays
45% total (dead+live) carried by stays

Main Bridge Articulation

(1) Construction (temporary erection loads); (2) Normal (traction,wind); (3) Seismic

Main Bridge Piers

Tabletop
2.25m diameter Columns
Pile Cap
3m diameter piles

Shock Transmission Units

Velocity Sensitive
Allows Slow movements (e.g creep, shrinkage, temperature)
Locks under impulse loading (e.g. seismic and ship impact)

RM2000 Model (Detail)

Permanent load
Stresses
(No Tension)

Deck Fibre Stresses


(P
(Permanent
t lloads
d only
l att end
d off construction)
t ti )

45MPa (cylinder)
Concrete
(cf 50MPa Specified)
LIMIT 1
(Construction 35MPa)
21 MPa Comp
2.97 MPa Tens
LIMIT 2
(Final 45 MPa)
19 8 MP
19.8
MPa C
Comp
1.67 MPa Tens
Includes reduction
f slenderness
for
l d

Deck Fibre Stresses


(Li lload
(Live
d only
l envelopes)
l
)

ONLY 2-3Mpa!

Tower Top Displacement due to Creep


(10 000 d
(10,000
days))

110mm transversely
due to deck curvature!

Deck Transverse Design


Features:
Single cell RC
Central longitudinal beam with struts @
8m c/c
Top slab transversely prestressed over
stayed length
Stay
St forces
f
balanced
b l
db
by strut
t t prestress
t
3D LUSAS analysis

Z
Y

Substructure Design
PIERS 8,9 AND 10
Compliant structure for seismic
3D Framework modelled in RM2000
Section design using SAM software
3.0m diameter piles
PIER 7
Insufficient height to fit legs
Stiffer so attracts more seismic
load particularly when unscoured
3.0m diameter piles
PIER 6
Transition between main bridge and
approach viaduct
Expansion joint
1.5m diameter piles
SOUTH ABUTMENT
Expansion joint

Transverse No Scour

Longitudinal No Scour

Pile Design
THEORETICAL PILE CAPACITY
1.5m or 3.0m diameter bored concrete
piles
AASHTO LRFD Method with
Service (unfactored), Strength
(factored), and Extreme (seismic)
capacities.
Scoured and unscoured ground
profiles
Capacities calculated using Nq and
(using lower bound friction angle)
NOT LRFD empirical method (based
on uncorrected N)
Pile toe founded in very dense sand
(N160>50) but Service loads mainly
carried in friction

Pile Testing

Pile Load Test Method


O-Cell test on 1.5m diameter piles
Cell is located 1m above toe to
measure end bearing resistance and
friction above toe
Shaft stresses measured with strain
gauges to show distribution of friction
(no need for two-level O-Cell)
Plot graphs:
Frictional resistance against
Displacement
End bearing resistance against
Displacement
Calculate Total resistance against
g
Displacement and check (See Table
opposite for Pier 3)
Results from Pier 3 confirm that
Service Loads carried by shaft friction
alone with 3mm settlement!

LIMIT
STATE

DESIGN
LOAD

PILE SETTLEMENT
CRITERIA

SERVICE

4.2MN

10mm differential settlement


= 20mm total say

STRENGTH

5.6MN

5% diameter=75mm total

EXTREME

6.1MN

5%-10% diameter=150mm
(Damage Criteria)

Stay Cable Design

SUMMARY
91No 15mm strand system individual encapsulated
Continuous across tower saddle anchored in deck
Stress
St
limited
li it d tto 45% tto 50% UTS ((conservative
ti to
t permitit
replacement)
Single stage stressing (but can be re-stressed) at deck level

Stay Cable System

Multi-Pipe Saddle

Tower Top Under Construction

Stay Cable Installation

Stay Cable Stressing

Concrete Supply

Deck 50MPa Cylinder


CEM I 42.5 OPC with
superplasticiser
p p
Local aggregates:
Sylhet sand
Pakur stone
Two batch plants:
50-80 cu m/hr from each
river bank
Access via temporary
trestle bridge to piers 7,8
and 9

Deck Cantilever Construction

Deck Cantilever Construction

ICE PAPER
Design and Construction of
Third Karnaphuli Bridge,
Bangladesh.
Astin, Xie and Gillarduzzi

Proc ICE
Bridge Engineering 163
December 2010 Issue BE4
P
Pages
161-171
161 171

Third Karnaphuli Bridge


th fifirstt major
the
j cable
bl supported
t db
bridge
id iin B
Bangladesh
l d h

FACTS & FIGURES


BRIDGE SPAN: 830m (950m with viaduct)
BRIDGE WIDTH: 24.4m
24 4m
EACH MAIN-SPAN OF MAIN BRIDGE: 200m
EACH SIDE-SPAN OF MAIN BRIDGE: 115m
CARRIAGEWAY: 2 x 7.30m
SLOW MOVING VEHICLE LANE: 2 x 1.65m
FOOTPATH: 2 x 1.5m
PILING: 40 x 1.5m dia. and 16 x 3.0m dia.

David Astin
BSc (Eng) ACGI CEng MICE

[email protected]

D: +44 20 7654 0556

High-Point Rendel
61 Southwark Street
London SE1 1SA
United Kingdom

T: +44 20 7654 0400


F: +44 20 7654 0401

2011 High-Point Rendel Limited

You might also like