The document provides cost estimates for cement pointing and cement plastering work per 100 square meters. For cement pointing with a 1:4 mix, the total cost is Rs. 9,136.73 per 100 sqm, or Rs. 91.36 per sqm. For 12mm thick cement plastering on ceilings with a coarse sand 1:4 mix, the total cost is Rs. 11,139.26 per 100 sqm, or Rs. 111.39 per sqm. The estimates include costs for materials, labor, tools/plants/transportation, water charges, and contractor profit.

Uploaded by

padmanabhdixit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
3K views6 pages

Rate Analysis

The document provides cost estimates for cement pointing and cement plastering work per 100 square meters. For cement pointing with a 1:4 mix, the total cost is Rs. 9,136.73 per 100 sqm, or Rs. 91.36 per sqm. For 12mm thick cement plastering on ceilings with a coarse sand 1:4 mix, the total cost is Rs. 11,139.26 per 100 sqm, or Rs. 111.39 per sqm. The estimates include costs for materials, labor, tools/plants/transportation, water charges, and contractor profit.

Uploaded by

padmanabhdixit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Cement pointing 1:4 - Unit 1 sq.m - Take 100 sq.m.

ITEM

DESCRIPTION

QUANTITY

UNIT

cement -4 bags

0.13

m3

sand-local

0.51

m3

Material per 100 m2


A

TOTAL MATERIAL per 100 sqm=


Labour per 100 m2
Head mason
B

0.33

nos/day

mason

10

nos/day

Helper

10

nos/day

Curing

0.5

nos/day

TOTAL LABOUR per 100 sqm=


Tools and plant, 100 sqm= 2% of labour
transportaion charge
C

scaffolding
sundries
TOTAL T&P, SCAFFOLDING,
SUNDRIES, 100 sqm=

Total of material, labour and T&P

Water charges, 3%

Contractor profit, 10%

GRAND TOTAL=

RATE PER SQM IS Rs. 9,137/100 = Rs. 91.36/Sq.m, say 91Rs/

Page 2 of 4

12mm thick cement plaster in ceiling 1:4 with coarse sand, Unit 1 sqm, tak
ITEM

DESCRIPTION

QUANTITY

UNIT

cement -12 bags

0.4

m3

sand-local

1.6

m3

Material per 100 m2


A

TOTAL MATERIAL per 100 sqm=


Labour per 100 m2
Head mason
B

0.25

nos/day

mason

10

nos/day

Helper

10

nos/day

Curing

nos/day

TOTAL LABOUR per 100 sqm=


Tools and plant, 100 sqm= 2% of labour
transportaion charge
C

scaffolding
sundries
TOTAL T&P, SCAFFOLDING,
SUNDRIES, 100 sqm=

Total of material, labour and T&P

Water charges, 3%

Contractor profit, 10%

GRAND TOTAL=

RATE PER SQM IS Rs. 11,139/100 = Rs. 111.39/Sq.m, say 111R

Page 2 of 4

Page 2 of 4

RATE(Rs)

TOTAL(Rs)

4,410.00

573.30

150.00

76.50

IAL per 100 sqm=

649.80

500.00

165.00

450.00

4,500.00

250.00

2,500.00

250.00

125.00

UR per 100 sqm=


2%

7,290.00
145.80
included
included
included

SCAFFOLDING,
ES, 100 sqm=

145.80

A+B+C=

8,085.60

3%

242.57

10%

808.56

GRAND TOTAL=

9,136.73
for 100sqm

.36/Sq.m, say 91Rs/Sq.m

Page 2 of 4

Page 2 of 4

d, Unit 1 sqm, tak


RATE(Rs)

TOTAL(Rs)

4,410.00

1,764.00

150.00

240.00

IAL per 100 sqm=

2,004.00

500.00

125.00

450.00

4,500.00

250.00

2,500.00

250.00

500.00

UR per 100 sqm=


3%

7,625.00
228.75
included
included
included

SCAFFOLDING,
ES, 100 sqm=

228.75

A+B+C=

9,857.75

3%

295.73

10%

985.78

GRAND TOTAL=

11,139.26