TYPO OF BOILER
COAL
PARAMETERS
SYMBOL
UNITS
Q
TPH
Quantity of steam (dry) generated
Kg/h
Steam pressure (guage)/temp
q
TPH
Quantity of coal consumed
Kg/h
Feed water temperature
T
C
GCV of coal
GCV
kcal/kg
Enthalpy of steam at 10 kg/cm^2 pressure
hg
kcal/kg (saturated)
Enthalpy of feed water
hf
kcal/kg
Boiler efficiency
%
Evaporation ratio
TYPO OF BOILER
COAL
PARAMETERS
SYMBOL
UNITS
Quantity of steam (dry) generated
Q
TPH
Steam pressure (guage)/temp
Kg/h
Quantity of coal consumed
Feed water temperature
q
TPH
GCV of coal
Kg/h
Enthalpy of steam at 10 kg/cm^2 pressure
T
C
Enthalpy of feed water
GCV
kcal/kg
Boiler efficiency
hg
kcal/kg (saturated)
Evaporation ratio
hf
kcal/kg
Boiler efficiency
%
Evaporation ratio
INTEGRANTES
GIOVANNY ALTAMAR RODRIGUEZ
CARLOS FONTALVO SUAREZ
CAMILO HEREDIA SARMIENTO
CARLOS LOPEZ PAREJA
L7
L8
Boiler efficiency
%
%
%
CT METHOD
COAL BOILER
MAGNITUDE
5599.17
21937.5
43
377
96
14%
0.55%
190
31
304
0.0204
70
343
3.5
90
800
452.5
90:10:00
8.63%
31.6%
41.65%
2%
1.6%
14%
3501
CT METHOD
4.9119
0.1358
0.0347
20.67%
47.452
7.2427
7.6561
7.9973
3.4400
5.9170
0.3020
17.0062
0.3702
0.11154
1.7748
63.0810
6.1933
7.0848
0.0328
0.3029
0.3813
86.0049
22.3934
5.8138
* You are evaluating three quotations, each proposing a 400 BHP, 150 lb
Cleave
PARAMETER
Boiler Design ouput
Boiler design pressure
Boiler operation pressure
Fuel Oil N 2 heat value
Fuel Oil N 2 heat price
Operation Period
proposing a 400 BHP, 150 lb. design steam boiler to burn No. 2 oil or natural gas and operate at 125 PSIG. The q
Cleaver-Brooks, $91,000 for Alternate #1, and $86,000 for Alternate #2.
UNITS
BHP
Btu/hr
psi
psig
Btu/gal
$/gal
C-B BOILER
VALUE
400
13390000
150
125
140000
2.08
82%
%
Btu/hr
gal/hr
Btu/hr
gal/hr
15660818.713
111.863
hr/yr
hr/yr
hr/yr
4000
3000
2000
85.5%
16329268.293
116.638
$/yr
$/yr
$/yr
$
$
years
months
ALTERNATIVE N 1
VALUE
400
13390000
150
125
140000
2.08
4000
3000
2000
970425.087
930700.084
39725.004
100000
91000
9000
BROOKS
al gas and operate at 125 PSIG. The quoted cost, including freight,etc. is $100,000 for
00 for Alternate #2.
ALTERNATIVE N 2
VALUE
400
13390000
150
125
140000
2.08
COMMENTS
design steam boiler
1BHP = 33475 Btu/hr
design steam boiler
table 6; pag 19
The literature for both Alternates guarantees 82%
efficiency firing No. 2 oil.
82%
The Cleaver-Brooks FTSE guarantee is 85.5% at 100%
load (per table 6).
16329268.293
116.638
4000
3000
2000
86000
14000
CLEAVER BROOKS
Units
BHP
psig
%
F
F
CO2
Stack loss
Radiation and convection losses add
Total loss
Fuel- to - steam efficiency
%
%
%
%
CLEAVER BROOKS