Solicitation
Solicitation
AND AWARD
1. SOLICITATION NO.
2. TYPE OF SOLICITATION
SEALED BID
W91B4P-11-R-0072
(IFB)
3. DATE ISSUED
PAGE OF PAGES
20-Jul-2011
1 OF
X NEGOTIATED (RFP)
59
IMPORTANT - The "offer" section on the reverse m ust be fully com pleted by offeror.
4. CONTRACT NO.
6. PROJECT NO.
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
W91B4P
TEL: 318-851-5398
See Item 7
FAX:
9. FOR INFORMATION
CALL:
TEL:
FAX:
A. NAME
B. TELEPHONE NO.
318-581-5398
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
The Contractor shall provide all labor, tools, materials, equipment, transportation, and supervision to furnish, construct,120EA steel and
concrete trash rack denial system , and install all items according to this statement of w ork, specifications, and draw ings.
- Verbal explanations given before aw ard w ill NOT be binding. Offeror shall acknow ledge receipt of amendments in block 19 of SF Form 1442
or by returning a signed copy of the amendment(s) w ith the offer.
- The magnitude of this project is betw een $250,000 and $500,000 USD.
- Offerrors must submit both their Defense Base Act (DBA) insurance coverage and have completed their "SPOT" personnel employee
records prior to the contracting office issuing a Notice to Proceed (NTP).
- Offerors must carefully read Section L Proposal Preparation and Section M Basis for Aw ard.
- Mandatory period of performance is 120 calendar days from receipt of the Notice to Proceed (NTP).
- Liquidated Damages w ill be applied in accordance w ith FAR Clause 52.211-12, if prime contractor fail to meet the 120 calendar day period of performance.
- Type of contract is a Firm Fixed Price Contract.
- NOTE: SUBMIT PRICING IN AFGH( Use currency Exchange 49.1176 AFGH = 1 USD)
- Paktya province
15
120
11. The Contractor shall begin performance w ithin _______
calendar days and complete it w ithin ________
calendar days after receiving
aw ard, X notice to proceed. This performance period is
X mandatory,
negotiable.
(See _________________________ .)
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES
X NO
is,
X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
60
D. Offers providing less than _______
calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
NSN 7540-01-155-3212
1442-101
See Item 14
CODE
FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specified below in strict accordance w ith the terms of this solicitation, if this offer is
accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
(Insert any number equal to or greater than
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
20B. SIGNATURE
22. AMOUNT
ITEM
26. ADMINISTERED BY
10 U.S.C. 2304(c)
41 U.S.C. 253(c)
CODE
CODE
Contractor agrees
Y our of f er on this solicitation, is hereby accepted as to the items listed. This award con-
to f urnish and deliv er all items or perf orm all work, requisitions identif ied
summates the contract, which consists of (a) the Gov ernment solicitation and
on this f orm and any continuation sheets f or the consideration stated in this
y our of f er, and (b) this contract award. No f urther contractual document is
contract. The rights and obligations of the parties to this contract shall be
necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses,
representations, certif ications, and specif ications or incorporated by ref erence in or attached to this contract.
30C. DATE
TEL:
(Type or print)
EMAIL:
BY
NSN 7540-01-155-3212
(REV. 4-85)
W91B4P-11-R-0072
Page 3 of 59
Section B - Supplies or Services and Prices
ITEM NO
0001
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
1
Lump Sum
Mobilization/Site Preparation
FFP
The contractor shall provide all plant, equipment, tools, parts, materials,
transportation, labor supervision to fabricate one-hundred and twenty (120) steel
and concrete trash racks culvert denial systems located on Route Virginia from
checkpoint 601 to checkpoint 60 and Route Lathe from 42S WB 72834 87672 to
Shembawat in Khost and Paktya Provinces, Afghanistan, in accordance with this
statement of work (SOW), specifications, and drawings.
FOB: Destination
PURCHASE REQUEST NUMBER: RCE1J3F4B04675
SIGNAL CODE: J
AMOUNT
NET AMT
ITEM NO
0002
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
20
Each
Trash Rack Denial System (Small)
FFP
Vendor shall provide all equipment, tools, parts, materials, and labors to fabricate
twenty (20)each small trash racks denial systems to cover culvert openings smaller
than 35 diameter (round pipe), or smaller than 35 height or smaller than 35 in
width (square or box culvert),located on Route Virginia from checkpoint 601 to
checkpoint 60 and Route Lathe from 42S WB 72834 87672 to Shembawat in Khost
and Paktya Provinces, Afghanistan in accordance with the SOW and Drawings.
FOB: Destination
PURCHASE REQUEST NUMBER: RCE1J3F4B04675
SIGNAL CODE: J
NET AMT
AMOUNT
W91B4P-11-R-0072
Page 4 of 59
ITEM NO
0003
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
80
Each
Trash Rack Denial System (Medium)
FFP
Vendor shall provide all equipment, tools, parts, materials, and labors to fabricate
eighty (80)each medium trash racks denial systems to cover culvert openings
between 35 and 50 diameter (round pipe), or between 35 and 50 height or
between 35 and 50 in width (square or box culvert) located on Route Virginia
from checkpoint 601 to checkpoint 60 and Route Lathe from 42S WB 72834 87672
to Shembawat in Khost and Paktya Provinces, Afghanistan, in accordance with the
SOW and Drawings.
FOB: Destination
PURCHASE REQUEST NUMBER: RCE1J3F4B04675
SIGNAL CODE: J
AMOUNT
NET AMT
ITEM NO
0004
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
20
Each
Trash Rack Denial System (Large)
FFP
Vendor shall provide all equipment, tools, parts, materials, and labors to fabricate
twenty (20)each large trash racks denial systems to cover culvert openings larger
than 50 diameter (round pipe), or larger than 50 height or larger than 50 in
width (square or box culvert) located on Route Virginia from checkpoint 601 to
checkpoint 60 and Route Lathe from 42S WB 72834 87672 to Shembawat in Khost
and Paktya Provinces, Afghanistan, in accordance with the SOW and Drawings.
FOB: Destination
PURCHASE REQUEST NUMBER: RCE1J3F4B04675
SIGNAL CODE: J
NET AMT
AMOUNT
W91B4P-11-R-0072
Page 5 of 59
ITEM NO
0005
SUPPLIES/SERVICES
QUANTITY
1
UNIT
Lump Sum
UNIT PRICE
AMOUNT
Demobilization/Clean up
FFP
Vendor shall provide all equipment, tools, parts, materials, and labors to mobilize
all items and perform site prepartion in accordance with the SOW and Drawings.
FOB: Destination
PURCHASE REQUEST NUMBER: RCE1J3F4B04675
SIGNAL CODE: J
NET AMT
ITEM NO
0006
SUPPLIES/SERVICES
QUANTITY
1
UNIT
Lump Sum
UNIT PRICE
NET AMT
AMOUNT