Assignment 1
Section A - Objective questions True/ False
1. Operations, marketing, and finance function independently of each other in most
organizations.
2. Goods producing organizations are not involved in service activities.
demand
4. The operations manager has primary responsibility for making operations system design
a. intangible output
b. high customer contact
c. high labor content
d. easy measurement of productivity
e. low uniformity of output
9. Operations and sales are the two line functions in businesses.
a. strategic
b. tactical
c. support
d. value-adding
e. line
10. Which is not a significant difference between manufacturing and service operations?
a. cost per unit
b. uniformity of output
c. labor content of jobs
d. customer contact
e. measurement of productivity
Section B
1. List five difference and five similarities between production and services operations.
Manufacturing and service are often similar in terms of what is done but different in terms of how it is
done.
Major differences between production and services are
golf ball, a
refrigeratoranything that we can see or touch. It may take place in a factory, but can occur elsewhere.
Service, on the other hand, generally implies an act. A physicians examination, TV and auto repair, lawn
care, and projecting a film in a theatre are examples of services.
2. By its nature, service involves a much higher degree of customer contact than manufacturing. The
performance of a service often occurs at the point of consumption. For example, repairing a leaky roof
must take place where the roof is, and surgery requires the presence of the patient. On the other hand,
manufacturing allows a separation between production and consumption, so that manufacturing may
occur away from the consumer. This permits a fair degree of latitude in selecting work methods, assigning
jobs, scheduling work, and exercising control over operations.
3. Service operations are subject to greater variability of inputs than typical manufacturing operations.
Each patient, each lawn, and each auto repair presents a specific problem that often must be diagnosed
before it can be remedied. Manufacturing operations often have the ability to carefully control the amount
of variability of inputs.
4. Quality assurance is more challenging in services when production and consumption occur at the same
time. In manufacturing, errors can be corrected before the customer receives the output.
5. Services often require a higher labour content whereas manufacturing can be more capital-intensive
(i.e., mechanized)
6. Measurement of productivity (i.e., output per unit time) is more straightforward in manufacturing due
to the high degree of uniformity of most manufactured items. In service operations, variations in demand
intensity and in requirements from job to job make productivity measurement considerably more difficult.
Major similarities between production and services are
1. Most service organizations typically sell goods that complement their services. For example, a lawncare firm usually sells goods such as weed killers, fertilizers, and grass seed.
2. Both face issues of cost control. Manufacturing operations must find suppliers of raw materials at the
lowest cost and highest quality possible. Likewise, service operations' indirect cost of providing services
must be kept low so that the organization can provide competitive prices to customers and still turn a
profit.
3. Both face the issue of forecasting demand for products and services and staying competitive in the
marketplace.
4. Both production and service operations are links of a specific supply chain.
5. Like products are designed in manufacturing organizations services are also designed as blue prints of
service designs.
2. Describe each of these systems; craft production, mass production and lean production
Craft Production
In craft production goods are produced by highly skilled craftsmen using simple, flexible tools produced
goods according to customer specifications in small shops. Under this system, it is common for one
person to be responsible for making a product, such as a horse-drawn wagon or a piece of furniture, from
start to finish. Since the products are made by skilled craftsmen with custom-fitted parts in craft
production, production is slow and costly. And when parts fail, the replacements also need to be custom
made, which is also slow and costly. Another shortcoming in craft production is that production costs will
not decrease as volume increases; there are no economies of scale. In craft production each small
company will have its own set of standards.
Mass production
Mass production is a system of production in which large volumes of standardized goods are produced by
low-skilled or semiskilled workers using specialized equipment. The key concept of mass production is
based on inter-changeable parts and division labour.
Lean production
Lean production systems use much less of certain resources than mass production systems use less space,
less inventory, and fewer workers to produce a comparable amount of output. Lean production systems
use a highly skilled workforce and flexible equipment. In effect, they incorporate advantages of both mass
production (high volume, low unit cost) and craft production (variety and flexibility). And quality is
higher than in mass production. Lean production is a broad approach to just-in-time
3. Read the emirates Air lines annual report 2013 2014 and identify the challenges in Air line operations
management.
According to trait theory, individual behavior is the result of inherited or acquired traits. Trait theorists
subscribe to the premise that certain traits will be disposed to react to a given situation in a certain way.
Agency theory has been developed from economic assumptions of self-interest behavior and utility
maximization with consideration of the situations that influence employees behavior. Agency theory
suggests that the employer as the principal wants to obtain maximum performance from the employee
as the agent. Therefore, agency theory assumes that agents will behave opportunistically if given the
chance. For example, employees will always shirk or misrepresent their capabilities if they can get away
with doing so.
Psychological contract theory is the idiosyncratic set of reciprocal expectations held by employees
concerning their obligations and their entitlements. For example, the employee will work for an employer
with the expectation that they will receive something in return. Unlike agency theory, psychological
contract theory considers trust in the organization by assuming that employees are honest and ethical.
Misconduct occurs in an organization when the psychological contract is violated with perceptions of
injustice or unfair treatment in the workplace. In other words, honest and ethical employees may commit
acts of misconduct when they feel that they work in an unjust environment and that their trust has been
violated.
At managerial position, the employee feels some degree of pressure to meet job expectations, such as
meeting sales targets, performing correct budget expenditures, conducting activities on time. These
pressures may lead to unethical conduct by an employee, whereby he/she has chosen to commit an act of
misconduct in order to fulfill the job requirement.
1. Location decisions are basically one-time decisions usually made by new organizations
The first step is deciding on the criteria for evaluating the alternatives.
3. For service organizations, the dominant factors in location analysis usually are market-related
4. Retail businesses generally prefer locations that are not near other retailers, as this reduces
their competition.
Retailers prefer to locate near customers, which means they often locate near one another
5. The center of gravity method is a location planning technique that determines a composite
center.
7. Nearness to raw materials would be most important to a
a. grocery store
b. tax preparation service
c. manufacturing company
d. post office
e. hospital
8. Which statement best characterizes a typical search for location alternatives?
a. Normalize.
b. Eliminate
c. Average
d. Minimize
e. Document
Section B
1. The administration at State University wants to construct a new student athletic, shopping, and dining
complex on campus. The university planning office is considering possible sites around the campus.
They have studied a number of factors related to the location of the complex and they have scored the
most important ones for each site as follows
Score (0 to 100)
Location
Weight
Site 1
Site 2
Site 3
Site 4
0.25
70
75
84
68
2. Student/dorm concentration
0.20
65
91
85
96
3. Parking availability
0.15
100
83
90
92
4. Utilities
0.15
87
96
80
85
0.10
69
85
80
95
6. Drainage
0.10
50
68
92
77
7. Aesthetic considerations
0.05
86
100
95
80
Score (0 to 100)
Score (0 to 100)
Score (0 to 100)
Score (0 to 100)
Location
Weight
Site 1
WS
Site 2
WS
Site 3
WS
Site 4
WS
0.25
70.00
17.50
75.00
18.75
84.00
21.00
68.00
17.00
2. Student/dorm concentration
0.20
65.00
13.00
91.00
18.20
85.00
17.00
96.00
19.20
3. Parking availability
0.15
100.00
15.00
83.00
12.45
90.00
13.50
92.00
13.80
4. Utilities
0.15
87.00
13.05
96.00
14.40
80.00
12.00
85.00
12.75
5. Proximity to local
0.10
69.00
6.90
85.00
8.50
80.00
8.00
95.00
9.50
6. Drainage
0.10
50.00
5.00
68.00
6.80
92.00
9.20
77.00
7.70
7. Aesthetic considerations
0.05
86.00
4.30
100.00
5.00
95.00
4.75
80.00
4.00
merchants
74.75
84.10
85.45
83.95
WS = Weighted Score
Select Site 3
2. Masafi Water wants to build a new distribution center in Al Quoz area. The center needs to be in the
vicinity of uncongested Al Barsha area and Al Qussais. The coordinates of these three sites and number of
20liter water bottles delivery per day are as follows
Using the center-of-gravity method to determine the possible locations for the central warehouse
xiWi
i=1
X=
i=1
Wi
=
748,000
38,000
= 19.68
yiWi
i=1
y=
i=1
Wi
732,000
38,000
(30,14)
30
(20,8)
20
KM
= 19.26
15
(14,30)
10
5
10
15
20
KM
25
30
ii).Distinguish between a process and product layout and give an example of each
The layout features departments or other functional groupings in which similar kinds of activities are
performed. A manufacturing example of a process layout is the machine shop, which has separate
departments for milling, grinding, drilling and so on. Items that require those operations are frequently
moved in lots or batches to the department. Process layouts are quite common in service environments.
For example, hospitals, banks, auto repair shop, airlines, public library etc. such as hospitals have
departments that specially handle, surgery, maternity, psychiatry, etc. In process layout the equipment is
arranged by type of process rather than by processing sequence. This is also known as functional layout
because the layout is designed to perform a set of functions on variety of jobs. Material handling is
inefficient and unit handling costs are generally higher than in product layout.
Product layouts are used to achieve a smooth and rapid flow of large volumes of goods or customers
through a system. The work is divided into a series of standardized tasks, permitting specialization of
equipment and division of labor. For example if a portion of a manufacturing operation requires the
sequence of cutting, sanding, and painting, the appropriate pieces of equipment would be arranged in the
same sequence in a line. This line is referred as production line or assembly line. Because items move
quickly from operation to operation, the amount of work-in-progress is often minimal.
Smoother flow lines and shorter travel distances are expected than for process layout
Offers benefits of both product and process type of layout because it is a compromise between the
two
Has some of the disadvantages of product and process type of layout; it is a compromise between the
two
b). In a factory material is being moved by forklift from one station to the other to finish a product. That
is product layout (F)
c). Ship building requires both product and process layouts (F)
d). The process of equalizing the amount of workload at each work station is called line balancing (T)
e). The objective of the process layout is to minimize the nonadjacent loads.(T)
4. Use the load summary chart below to arrange departments 1 through 9 on a 3 x 3 grid so that nonadjacent loads are minimized.
Dept.
--
50
100
25
60
40
--
80
10
65
--
55
10
45
--
75
15
60
--
25
25
150
40
40
50
--
10
--
65
--
140
175
--
65
145
90
160
90
110
75
5
75
35
100
100
60
100
65
50
240
75
115
Load
1-1
1-2
50+40
90
1-3
100+10
110
1-4
25+10
35
1-5
60+15
75
1-6
0+0
1-7
0+0
1-8
65+10
75
2-3
80+65
145
2-4
2-5
2-6
150+25
175
2-7
40+25
65
2-8
2-9
3-4
55+45
100
3-5
3-6
40+50
90
3-7
3-8
4-5
75+0
75
4-6
4-7
4-8
50+65
115
4-9
100+140
240
5-6
5-7
60+100
160
5-8
5-9
5. Draw and label a precedence diagram from the following assembly information
Work Element
Predecessor
Time (min)
c, e, f
Set up an assembly line that will be capable of producing 120 units in a 10 hour day. Calculate the
theoretical minimum number of work stations and the efficiency of the line
600
120
= 5 minutes
Station
Time
Remaining
1
2
3
4
5
1
5
3
2
5
5
2
a
b,c
b
d,e
e,f
e,f
f
g
A
b, c
B
D
E
F
-
Assign
Task
Time
a(4)
c(1)
b(2)
d(1)
e(0.3)
e(5)
f(3)
Revised
Idle
Time
Time
Remaining
1
0
3
2
2
0
2
2
-
Idle time =
Since the time required to complete the last activity is more than the remaining time, we cant produce
120 in 10 hours. Therefore plan for less number of units in the given time. We can try for 100 units in 10
hours
Cd =
600
100
= 6 minutes
1
2
3
4
Time
Eligible
Remaining
6
2
6
5
6
3
6
a
b,c
c,d,e
c,e,f
c,f
c
g
Will fit
Assign
Task Time
a
b, c
c,d,e
e
f
c
g
-
a(4)
b(2)
d(1)
e(5)
f(3)
c(1)
g(4)
Revised
Time
Remaining
2
0
5
0
3
2
2
Idle
Time
Idle time =
Percentage idle time = 4/4x6 = 0.166 =16.67% ; Efficiency = 100 16.67 =83.33%
2
2
6. Using the information in the following grid, determine if the department locations shown are
appropriate. If not modify the assignments so that the conditions are satisfied
Rel
A
E
I
O
U
X
Dept
1
3,8
6
Dept
2
7
6,8
Dept.
3
5,6,8
Dept. 4
5,8
3,5
2,7
Dept.
6
8
Dept. 7
7
8
7
5
Dept.
5
7,8
Dept.
8
A link
1-3
1-8
2-7
3-5
3-6
3-8
4-5
4-8
5-7
5-8
6-8
X Links
1-2
1-7
2-4
Q.No.7. Given the following load summary chart, design a layout on a 2 x 3 grid that will minimize
nonadjacent loads
50
25
20
100
30
10
75
40
60
Q.No.8
The noodle fast food restaurant chain uses a distribution center to prepare the food ingredients it
provides its individual restaurants. The company is attempting to determine the location for new
distribution center that will service five restaurants. The grid map coordinates of the five restaurants
and the number of trucks loads transported annually to reach each restaurant is as follows
Restaurant
Coordinate X
Coordinate Y
Truck loads
120
300
25
210
190
24
24
380
35
280
170
40
400
200
38
y
120
210
24
280
400
w
300
190
380
170
200
25
24
35
40
38
162
3000
5040
840
11200
15200
35280
x
y
7500
4560
13300
6800
7600
39760
217.7778
245.4321
rejects - The house of quality is a means of integrating the voice of the customer into the product
or service development process.
2. One of the main advantages of standardization is that it increases the potential variety of
very narrow range of conditions. - Robust designs perform satisfactorily across a wide range of
conditions.
5. Modular design increases costs of purchasing and controlling inventory compared to non-
conditions. 7. A service blueprint is quite similar to an architectural drawing - A service blueprint shows the
the same time. - Concurrent engineering means that engineers, marketing, manufacturing and
purchasing personnel often are jointly involved in the product design.
9. Product liability means that a manufacturer is liable for any injuries and damages caused by a
Section B
1. Mention the factors that cause organizations to redesign their products or services?
The main reasons that initiate design or redesign are market opportunities and threats. The factors that
give rise to market opportunity and threat can be on or more changes ;
a). Political, liability or legal (e.g., government changes, safety issues, new regulations)
b). Economic (e.g., low demand, excessive warranty claims, the need to reduce costs)
c). Social and demographic (e.g., aging population, population shift)
d). Technological (e.g., processes, in product components, rate of change of technology )
e). Cost or availability (e.g., of raw materials, components, labor, water energy)
b).Reliability
Reliability is the probability that a given part or product will perform its intended function for a specified
length of time under normal conditions of use. Maintainability refers to the ease and/or cost with which a
product is maintained or repaired. Maintainability and reliability are closely related. For example, if a
product is cheap to manufacture and priced so low that customers throw it away when it fails (such as
calculators, telephones, and watches), maintainability may be a moot issue. Similarly, if a product is so
reliable that it rarely breaks down, then ease of repair many not be important. On the other hand, it may
be less costly to make a product easy to maintain than to increase its reliability. And for some products,
both reliability and maintainability are very important (e.g., office machines, computers).
System Availability is calculated by modeling the system as an interconnection of parts in series and
parallel. The following rules are used to decide if components should be placed in series or parallel:
a). If failure of a part leads to the combination becoming inoperable, the two parts are considered to be
operating in series
b).If failure of a part leads to the other part taking over the operations of the failed part, the two parts are
considered to be operating in parallel.
Availability in Series
The combined availability is shown by the equation below:
A=PxQ
The implications of the above equation are that the combined availability of two components in series is
always lower than the availability of its individual components. Consider the system in the figure above.
Part P and Q are connected in series.
Availability in Parallel,
In this system, two parts are considered to be operating in parallel if the combination is considered failed
when both parts fail. The combined system is operational if either is available. From this it follows that
the combined availability is 1 - (both parts are unavailable). The combined availability is shown by the
equation below:
A = 1-(1-P )2
Delayed differentiation is a postponement tactic, in this approach goods, almost finished form are held in
inventory
until customer orders are received, at which time customized features are incorporated
Modular design is a form of standardization. Modules represent groupings of component parts into
subassemblies, usually to the point where the individual parts lose their separate identity. Modular design
enables producers to quickly assemble products with modules to achieve a customized configuration for
an individual customer, avoid the long customer wait that would occur if individual parts had to be
assembled. One familiar example is computers, which have modular parts that can be replaced if they
become defective.
4. Explain what Quality Function Deployment (QFD) is and how can it be useful?
Quality Function Deployment (QFD) is a structured process that translates the voice of the customer to
technical requirements at every stage of design and manufacture. QFD forces management to spend more
time defining the new product changes and examining the ramifications of those changes. More time
spent in the early stages of design means less time is required later to revise the design and make it work.
Reduce approach examines the functions of parts and material in an effort to reduce the cost and improve
the performance of product. Typical questions that would be asked as part of the analysis include; could a
cheaper part or material be used? Is the function necessary? Can the function of two or more parts or
components be performed by a single part or lower cost? Can a part be simplifies? Could standard parts
be substituted for nonstandard parts?
Reuse approach attempts to refurbishing of used products by replacing worn-out or defective components,
and reselling the products. Reusing the parts helps reducing the landfills and depletion of natural
resources such as raw material and fuel.
Recycling means recovering materials for future use. This applies not only to manufacturing but also to
material used during production, such as lubricants and solvents. Reclaimed metal or plastic parts may be
melted down and used to make different products.
Inventory Management
Assignment 5
Section A - Objective questions True/ False
1. A retail store that carries twice the inventory as its competitor will provide twice the customer
service level.
There is a limit to how high service level can go; if the competitor's service level is 90%, the
retailer can't double that.
2. To provide satisfactory levels of customer service while keeping inventory costs within
reasonable bounds, two fundamental decisions must be made about inventory: the timing and
size of orders.
3. The A-B-C approach involves classifying inventory items by unit cost, with expensive items
classified as A' items and low cost items classified as C' items.
A-B-C approach classifies inventory according to some measure of importance.
4. EOQ inventory models are basically concerned with the timing of orders.
graph of the total cost curves will have the same EOQ for each curve.
Total cost curves will differ across the price levels.
6. In EOQ model the ordering cost and carrying costs are same at the economical point
7. The two basic issues in inventory are how much to order and when to order.
8. Which of the following is not one of the assumptions of the basic EOQ model?
10. Dairy items, fresh fruit and newspapers are items that:
Section B
Q.1
a).What are the primary reasons for holding inventory
Inventories serve a number of functions. Among the most important are the following
a). To meet anticipated customer demand
b). To smooth production requirement
c). To decouple operations
d). To protect against stock outs
e). To take advantage of order cycle
f). To hedge against price increase
h). To permit operations
i). To take advantage of quantity discounts
b). briefly describe each cost associated with inventory
Four basic costs are associated with inventories: purchase, holding, transaction (ordering) and shortage
costs.
Purchase cost: Purchase cost is the amount paid to a vendor or supplier to buy the inventory, it is
typically the largest of all the inventory costs.
Holding or carrying costs: Holding or carrying costs relate to physically having items in storage. Costs
include interest, insurance, taxes, depreciation, obsolescence, deterioration, spoilage, pilferage, breakage,
tracking, picking and warehousing cost (rent, security, lighting, heating or cooling etc). They also include
opportunity costs associated with having funds that could be used elsewhere tied up in inventory. This is
the variable portion of these costs that is pertinent.
Ordering costs: Ordering costs are the costs of ordering and receiving inventory. They are the costs that
vary with the actual placement of an order. Besides shipping costs, they include determining how much is
needed, preparing invoices, inspecting goods upon arrival for quality and quantity and moving the goods
to temporary storage. Ordering costs are generally expressed as a fixed dollar amount per order,
regardless of order size. When firms produce its own inventory instead of ordering it from a supplier,
machine set-up costs (e.g. preparing equipment for the job by adjusting the machine, changing cutting
tools) are analogous to ordering costs, that is they are expressed as fixed charges per production run,
regardless of the size of the run.
Shortage costs: Shortage costs result when demand exceeds the supply of inventory on hand. These costs
can include the opportunity cost of not making a sale, loss of customer goodwill, late charges, back order
costs and similar costs. The cost of lost production or downtime is considered as shortage cost. Shortage
costs are sometimes difficult to measure, and they may be subjectively estimated.
2. Al Jareer Stationary Company purchases upholstery from Al Khaleej Textiles. The company uses
45,000 yards of material per year to make sofa. The cost per order for the company is AED 1,500, the cost
of holding 1 yard of material in inventory is AED 0.70 per year. Determine the optimal number of yards
of material sofa world should order, the minimum total inventory cost, the optimal number of orders per
year and the optimal time between orders
D 45,000
Co $1,500
Cc $0.70
Cc
0.70
13,887.3 yd
TC
Co D CcQ
Q
2
13,887.3
$9,721.11
Number of orders
D 45, 000
365
112.6 days
3.24
3. Caesers bakery makes cupcakes. The bakery operates five days a Week, 52 weeks a year, can produce
at the rate of 116 cakes per day. The set up cost for production run of one lot of cakes is AED 700. The
cost of holding cakes in storage is AED 9 per cake per year. The annual demand for cupcakes is 6,000
cakes. Determine the following;
a). Optimal production run quantity Q
b). Total annual inventory cost
c). Optimal number of production runs per year
d). Optimal cycle time (time between run starts)
e). Run length in working days
D 6,000
d 23.08 / day
p 116 / day
Co $700
Cc $9
a.
2 700 6, 000
2Co D
d
23.08
5 1
Cc 1
116
p
1,079.41
b). Total annual inventory cost
b.
TC
Co D CcQ d
1
Q
2
p
$7,782.84
c). Optimal number of production runs per year
c.
D
6, 000
260
46.67 working days
5.96
23.08
1
116
e.
Q 1079.41
4. Zulekha hospital orders syringes from a hospital supply firm. The hospital expects to use 38,000
syringes per year. The order cost to deliver the syringes is AED 790. The annual carrying cost is AED
1.85 per syringe because of security and theft. The supplying company offers the following quantity
discount pricing schedule. Determine the order size for the hospital
Quantity
0 9,999
10,000 -19,999
20,000 - 29,999
30,000 - 39,999
40,000 49,999
50,000 +
Price
$3.40
$3.20
$3.00
$2.80
$2.60
$ 2.40
2 (790 x 38,000)
QO =
=
Cc
1.85
5,697
CO D
Q
790 x 38,000
=
5,697
5,269.45
AED 139,739.17
CC QO
+ PD
2
1.85 x 5,697
2
5,269.72
+ 3.40 x 38,000
+ 129,200
790 x 38,000
10,000
3,002
AED
1.85 x 10,000
2
9,250
+ 3.20 x 38,000
+ 121,600
133,852
790 x 38,000
30,000
1,000.66
1.85 x 30,000
2
27,750
+ 2.80 x 38,000
+ 106,400
AED 134,650.6
Capacity planning
Assignment 6
Section A - Objective questions True/ False
1. The term capacity refers to the maximum quantity an operating unit can process over a given
period of time.
2. Capacity decisions are usually one-time decisions; once they have been made, we know the
limits of our operations. A number of factors can either increase or reduce a unit's capacity over
time.
3. Stating capacity in dollar amounts generally results in a consistent measure of capacity
regardless of the actual units of measure. The dollar value of a unit's output can change even
though that unit's capacity hasn't..
4. If the unit cost to buy something is less than the variable cost to make it, the decision to make
or buy is based solely on the fixed costs. Cost is not the only consideration that enters into the
"make or buy" decision.
5. Increasing productivity and also quality will result in increased capacity.
Effective capacity can be increased over time by these and similar factors.
6. Utilization is defined as the ratio of effective capacity to design capacity
a. hospital
b. theater
c. restaurant
d. all of the above
e. none of the above
10. Utilization is defined as the ratio of: Utilization measures the usage of design capacity.
a. actual output to effective capacity
b. actual output to design capacity
c. design capacity to effective capacity
d. effective capacity to actual output
e. design capacity to actual output
Section B
1 Given the following information, what would efficiency be?
Effective capacity = 80 units per day
Design capacity = 100 units per day
Utilization = 48%
A. 20%
B. 35%
C. 48%
D. 60%
E. 80%
Efficiencey =
48
80
= 0.60 = 60%
Under level capacity strategy, variations in demand are met by using some combination of inventories,
overtime workers, subcontracting, and back orders while maintaining a steady rate of out-put. Matching
demand implies a chase demand strategy. In chase demand strategy the planned output for any period
would be equal to expected demand for the period. To maintain a constant level of output and still satisfy
varying demand, an organization resorts to some combination of subcontracting, backlogging, and use of
inventories to absorb fluctuations.
Though level workforce is appealing, workforce changes through hiring and firing can have a major
impact on the lives and morale of employees and can be disruptive for managers. Moreover changes in
workforce size can be very costly, and there is always the risk that there will not be a sufficient pool of
workers with the appropriate skills when needed. To maintain a constant level of output organizations can
adopt a combination of subcontracting, backlogging, and use of inventories to absorb fluctuations.
Subcontracting requires an investment in evaluating sources of supply as well as possible increased costs,
less control over output, and quality considerations. Backorders can lead to lost sales, increased record
keeping and lower levels of customer service. Allowing inventories to absorb fluctuations can entail
substantial costs by having money tied up in inventories, having to maintain large storage facilities, and
incurring other cots related inventories.
Choosing a right strategy depends on; company policy, flexibility and costs.
3. In what ways the aggregate planning of the Service industry is different from manufacturing?
The major differences between aggregate planning of service industry and manufacturing industry are;
a). Demand for service can be difficult to predict.
The volume of demand for services is often quite variable. In some situations, customers may need
prompt service (e.g. police, fire, medical emergency) while in others, they may simply want prompt
Service and may be willing to go elsewhere if their wants are not met. Consequently, service providers
must pay careful attention to planned capacity levels.
Process requirements for services can sometimes be quite variable, for example what would be the
capacity of a bank teller? Bank tellers called upon to handle a wide variety of transactions and requests
for information, making it difficult to establish a suitable measure of their capacity.
c). Labor flexibility can be an advantage in services
Labor often comprises a significant portion of services compared to manufacturing. In case of both the
manufacturing and service industry, use of part-time workers can be an important option. In self-service
systems, the (customer) labor automatically adjusted to changes in demand.
4. Given the following cost and quarterly sales forecasts, determine whether
(a) Level Production or (b) Chase demand would be more economical to meet the demand for sports shoe
QUARTER
Spring
Summer
Fall
Winter
Hiring cost
= $100 per worker
Firing cost
= $500 per worker
Inventory carrying cost = $0.50 per pair per quarter
Regular production cost per pair
= $2.00
Production per employee = 1,000 Pcs per quarter
Beginning work force = 100 workers
Quarter
Sales forecast
Production plan
Inventory
Spring
60,000
77,500
17,500
Summer
30,000
77,500
65,000
Fall
100,000
77,500
42,500
Winter
120,000
77,500
310,000
125,000
$ 682,500
Sales forecast
Spring
60,000
60,000
60.000/1000 = 60
40
Summer
30,000
30,000
30,000/1000 = 30
30
Fall
100,000
100,000
100,000/1000 = 100
70
Winter
120,000
120,000
120,000/1000 = 120
50
5. Blue Star Hotel, over books two rooms a night. Room rents run $ 100 a night and costs $30 to maintain
it. Bumped customers are sent to a nearby hotel for $80 a night. What is the cost of overbooking? What is
the cost of under booking ? Given the following distribution of non -show should Blue star continue its
policy?
No-Shows
0
1
2
3
4
Probability
0.30
0.20
0.10
0.30
0.10
P(n < x)
P N X 70 / 70 80 0.467
Hotel should over book only one extra room instead of two.