Workshop Manual
For use by UK-RHA member companies only
A pre-course guide to the installation of rainwater
harvesting systems, for use in conjunction with training
workshops run by UK-RHA members
Copyright the UK Rainwater Harvesting Association
Approved 23rd October 2012
Context
1. The UK Rainwater Harvesting Association (UK-RHA) is the trade-body for the
manufacturers, suppliers and installers of rainwater harvesting (RWH) systems in the UK.
2. All UK-RHA member-companies, recommend that their systems be installed by trained
installers, to which end Installer-grade membership of the Association can only be
achieved by one of two routes:
a. By holding a BPEC (or equivalent) qualification in RWH, backed by the
recommendation of a Full Member with first-hand experience of their work
b. By attending a training workshop run by a Full Member covering the syllabus within
this publication and achieving a 90% pass-mark in the open book test it includes
3. This manual is therefore aimed at providing the material used by members for running
training workshops, and acts as both pre-workshop study material and a post-workshop
reference; before attending the workshop, mark this manual with any queries you have.
Pre-qualification
4. The training workshops run by UK-RHA members are aimed at construction industry
professional tradesmen or managers who fit one of the following categories:
a. Qualified and experienced to undertake plumbing, electrical or ground-works
b. Qualified and experienced in the management and supervision of site works
Workshop Aims
5. The aims of training workshops run to this syllabus are to enable delegates who meet
the pre-qualification criteria and achieve the required written-test pass-marks to:
a. Assist clients in selecting the most appropriate RWH system to meet their needs
b. Supervise and project manage the installation of RWH systems in accordance with
the manufacturers instructions
c. Undertake aspects of an installation that are relevant to their trade qualifications
d. Provide maintenance and repair services for RWH systems, in accordance with
manufacturers instructions
6. The workshops are therefore industry generic, although deliverers of the workshops are
encouraged to illustrate principles using their own products.
2
www.ukrha.org
Syllabus Contents
National drivers for RWH
Page 3
Page-8
Page-12
Page-15
Page-20
Filters
Page-23
Page-25
Typical schematics
Page-28
Happy Customers
Page-29
Maintenance
Page-31
Self-assessment Questionnaire
Page-34
3
www.ukrha.org
Environment Agency
4
www.ukrha.org
sustainable drainage
13. The first issue arising from climate-change impacts is the need to ensure that surfacewater run-off from new developments does not increase the risk of local or downstream flooding.
14. This is reflected in the 2010 Flood & Water Management Act which brought into play a
number of factors that will inevitably lead to an increased future requirement for
sustainable urban drainage systems (SUDS).
15. The first and foremost requirement of future new-build projects is that no more surface
water must be allowed to leave a site post-development than was the case beforehand;
this will usually mean that during certain weather events, such as very heavy and/or
prolonged rainfall, the surface water will need to be held-back on site (attenuated)
before being slowly released at a rate that can be handled by the drainage
infrastructure.
16. Allied to this, the Act requires that not only the quantity of water must be managed, but
also its quality and its contribution to the environment; this change of emphasis is
illustrated below:
5
www.ukrha.org
17. Alongside this change of emphasis, is a requirement to demonstrate that the proposed
SUDS will replicate as far as possible the way in which green-field sites dissipate water,
that is through a
combination of:
Infiltration
Evaporation
The forming of puddles &
ponds
Running-off via historical
water-courses to
streams, rivers & the sea
18. Another key requirement of the Act is that future SUDS must be adopted by a Local
SUDS Adoption Board, likely to be the local County or Unitary Authority, to ensure that
its performance at handling surface water does not deteriorate over time. This in turn
means that the system must be capable of both inspection and maintenance.
19. Taking all these factors into account, allied in times of overall water shortages to the
simple principle that water should be used rather than wasted whenever possible, an
integrated SUDS/RWH system becomes an elegant and cost-effective solution to both
water-shortage and surface water management issues:
6
www.ukrha.org
21. The Code for Sustainable Homes (C4SH), for example, identifies current national average
domestic mains water consumption as 150-litres per person per day and aims to bring
this down to 80-litres in all new homes by 2016. Although economising measures such
as smaller toilet cisterns, dual-flush cisterns, aerated taps and shower-heads, smaller/no
baths, smaller sinks/wash-basins, and low water-usage dish and clothes-washing
appliances all assist greatly in working towards that target, realistically it can only be
achieved by substituting water from other sources for mains-water.
22. This in turn is recognised in the latest update to Part-G of Building Regulations which
came into force on 6th April 2010. These, for the first time, permit the use of two
standards of water in new dwellings, namely wholesome water (ie mains-water) for
bathing, showering, cooking and drinking, and non-wholesome water that can be used
for applications such toilet-flushing, clothes-washing and the outside tap.
23. Building Regulations also helpfully identify possible sources of non-wholesome water,
the most readily-available and cost-effective of which will often be harvested rainwater.
The Regulations then move on to set an upper consumption limit of 125-litres per
person per day in new dwellings, a figure to be derived using an associated Water
Efficiency Calculator.
24. The assumed amount of any non-wholesome water to be substituted for mains-water
must also be derived using the Calculator, but can then be deducted from the
households usage of mains-water, thus bringing the target of 80-litres per person per
day within reach.
25. BREEAM assessments work in a similar way for other (non-housing) developments.
module summary
26. To summarise, all of the following act as significant drivers for the increased future use
of RWH systems to help supplement mains-supplies:
27. As water supplies come under greater stress in future years, this may impact on waterpricing policies and lead, in turn, to there being an economic as well as environmental
case for the more widespread use of RWH.
7
www.ukrha.org
d. Part-H: All pipe-work must be clearly identified and tap outlets clearly marked Not
drinking water as illustrated below (see WRAS Guidance Note No 9-02-05).
Underground tanks must also have a heavy-duty cover or be secured by screws
water regulations
33. Water Supply Regulations are issued to prevent waste, undue consumption, misuse,
contamination or false metering of water. They require that the local water authority be
notified under a range of circumstances, which means that installation of a RWH system
would generally be notifiable before work commences. They also stipulate:
a. The mains supply must be protected from back-siphonage of the harvested
rainwater using a Type-AA or Type-AB air-gap, or by conforming to EN-1717
b. A Type-AA air-gap is to be used either when the mains back-up is fed into the main
rainwater storage tank, or into a header cistern which is not fitted with a float
operated valve
c. A Type-AA air-gap must have unrestricted over-spill, with a minimum air-gap of 20mm, or twice the inlet bore whichever is greater
d. A Type-AB air-gap must be used if mains back-up is via a header tank fed by a floatoperated valve; the air-gap must be achieved by cutting a weir overflow into the side
of the tank, which conforms to EN-13077:2003
9
www.ukrha.org
air-gap illustrations
Type-AA
Type-AB
electrics
34. All electrical work must be carried out in accordance with IEE regulations, and the work
notified if it involves (which it usually will) electricity use exterior to the building.
10
www.ukrha.org
codes of practice
35. BS-8515 is the UK Code of Practice for the on-site collection and use of rainwater as an
alternative to the public mains water supply for non-potable water uses in the home,
workplace and garden. Its purpose is to meet the need for standardization to protect
the public and to ensure that reliable systems are designed, installed and maintained.
36. It is a condition of the UK-RHA Bye-Laws that members are committed to meeting the
requirements of BS-8515 which covers matters such as:
System sizing
Water collection
Water filtration
Water storage
Materials & fittings
Power supply
Back-up water supply and backflow prevention
Pumping
Overflow & drainage
Controls & metering
Distribution pipe-work
Installation
Water quality
Maintenance
Risk management
37. The UK-RHA Bye-Laws also require members to commit to the Associations own Code of
Practice which covers matters such as:
Dealing with customers
Avoiding, through inaccurate performance claims or faulty products, bringing the
technology into disrepute
Negative marketing of competitor products or services
risk management
38. Installing and maintaining RWH systems requires all the normal H&S measures to be
taken, with risk assessment being carried out for every stage of a project from design,
through shipping, on-site receipt & handling, to installation and subsequent use and
maintenance.
39. The risk assessments should consider the effects of exposure to, and potential impacts
of, the system on people, the environment and the property.
40. The risk assessment should also consider water quality, potential sources of
contamination, and any necessary water quality control methods.
11
www.ukrha.org
12
www.ukrha.org
49. For retrofit projects, irrigation-only systems would therefore normally be recommended
as this alters a number of important factors:
The pattern of collection & use changes from frequent/regular, to seasonal
The aesthetic quality of the water may be less important than quantity, so an
oversized storage tank can be considered to maximise available water when needed
Even with a large storage tank, collection can be limited to a single roof-slope and
down-pipe which limits/removes, the need to interfere with existing drainage runs
Mains-water back-up would normally be omitted as this would make the system
subject to hosepipe bans
tank sizing
50. To ensure good water quality is maintained in full domestic systems, three
considerations are taken into account when calculating the size of the storage tank in
accordance with BS-8515 (simplified approach):
a. Yield: This is a straightforward calculation based upon:
Roof plan area (m2) x annual rainfall (mm) x roof type coefficient = annual yield (litres)
b. Consumption:
c. Water Quality:
Ensured by calculating a size of tank that when full will
provide a turn-over of the water it contains every 18-days (exceptionally 21-days),
based upon the calculation:
The lower of the Yield/Consumption calculations above x 0.049 = storage tank size
impacts on mains-water consumption
51. Rainwater harvesting reduces demand on mains water supplies by intercepting rainfall
that would otherwise be unrecoverable and substituting it for non-wholesome
applications such as toilet-flushing, clothes-washing and irrigation.
52. The formula for calculating the amount of mains water saved in this way is quite
straightforward being a function of the area and type of the collection surface, and local
average rainfall. In domestic applications the quantity of water that can be substituted
in this way is limited to around 75-litres per person per day, the remainder of domestic
water use requiring wholesome water for bathing, drinking, cooking and dish-washing.
53. As a typical example, a small modern new-build home with an 80-m2 roof will harvest
around 43,000-litres annually in the relatively dry south-east of England, thus reducing
household consumption by about this amount whilst meeting around 80% of the nonwholesome water requirements of two people; other example yields are shown in the
table on the next page.
13
www.ukrha.org
58. It can be seen that only occasionally will the calculation coincide exactly with the tank
sizes offered by a particular manufacturer. The nearest fit will therefore often be
selected, which is a technically acceptable compromise, bearing in mind that some of
the inputs to the underlying calculation are based on annual estimates.
14
www.ukrha.org
15
www.ukrha.org
systems overview
62. The diagrams below shows the schematic layouts of typical Direct Pressure and
Header-Tank systems, where the harvested rainwater is first collected into a main
storage tank.
Points to Note:
1. The main storage tanks need to be able to overflow to soak-away or stormdrain which must be adequate to cope with the rate of flow to avoid
contaminated water back-flowing into the storage tank
2. Mains water supply to provide top-up, when needed, must be via a Class-AA
tun-dish air-gap in a direct-pressure system, or a Class-AB air-gap in a headertank
3. Supply to services must be via dedicated pipe-work; which must not be crossconnected to the mains pipe-work
direct pressure systems
63. Domestic systems would normally use only the property roof for collecting the rainwater
which is then usually stored in an underground tank to provide non-wholesome water
for toilet flushing, clothes washing machines, and the outside tap.
64. Collection from a conventional roof is recommended, avoiding green and sedum roofs
wherever possible. The roof water is channelled through the normal guttering and
down-pipe arrangements, before being brought together into one or more drainage
runs which feed into the storage tank.
16
www.ukrha.org
65. In accordance with the requirements of BS 8515, the water is filtered before entering
the storage tank to remove solid particles; the filter needs to be maintained by a
programme of regular servicing to ensure its harvesting efficiency
66. Having passed through the filter, the water enters into the tank via a calmed inlet
designed to avoid splashing and gently introduce the fresh and highly oxygenated
rainwater into the bottom of the tank. This helps to avoid stagnation at the lowest level,
and assists maintenance of the quality of the water stored in the tank.
67. The stored water is then supplied to the non-wholesome services on-demand; this
demand, which is sensed by either a Control Unit or the pump itself, activates the
electric pump in the tank to meet the demand. When the demand for the water supply
ends, this too is sensed and the pump stops. Under this direct pressure arrangement,
the pump is effectively linked direct to the service concerned
68. In periods of prolonged rain, the storage tank will become full and overflow through the
connection provided to the surface water management arrangements for the project (ie
soak-away, storm drain or attenuation system) and may be protected from back-filling
by a back-flow prevention valve. As the water storage tank may already be full when a
heavy downpour is experienced, the whole of the tank volume cannot be taken into
account when making the attenuation calculations for the project.
69. Conversely, in dry spells the tank contents may be in danger of becoming exhausted and
need to be supplemented by mains water to ensure continuity of supply to the services.
This too is recognised by the system which then activates a solenoid to allow a limited
quantity of mains water to enter the tank via a Class-AA air-gap; this prevents back-flow
from the non-wholesome pipe-work/water to the mains-water supply.
70. Irrigation-only Systems: These operate on the direct-pressure principle noted above,
but the tank size may not be constrained by BS-8515 as applied to full domestic systems;
this enables more water to be stored for irrigation purposes. Also, they are not fitted
with a mains-water backup as this enables them to be exempt from hose-pipe bans.
71. Booster-sets:
On large commercial projects, a
header-tank system might in principle be preferred
to cater for peaks demands; where, however, the
characteristics of the project preclude installation
of a header-tank, then intermediate booster sets
(sometimes known as Break-tanks) may be included
to provide additional pumping power. These
combine some of the working characteristics of a
header tank system, including possible use of a
Class-AB air-gap.
17
www.ukrha.org
header-tank systems
72. Many of the working principles of direct
pressure systems apply equally to header-tank
systems; the main differences between the
systems being:
The services are fed from the reservoir of
water held in the header-tank, rather than
direct from the pump in the main storage
tank
The water level in the header tank is
maintained by:
o Activation of the pump in the main
storage tank as before; or by:
o Top-up direct from the mains
water supply if the main storage
tank supply is exhausted
73. Most header tanks used in RWH systems work on the basis of two water-levels in the
tank, both controlled by their own float-valves. The upper level is maintained by
pumping water from the main storage cistern until it becomes exhausted; the water in
the tank then drops to the second (lower) level at which stage mains water is allowed to
enter the tank direct. Contact between the mains water and the harvested rainwater
already in the tank is prevented by a Class-AB air-gap between the two.
gravity-fed systems
74. These are still relatively new in the UK market,
with general systems generic patterns yet to
evolve; the basic operating principles however, are
show opposite, and comprise:
An arrangement to intercept roof water at a
suitable level along the roof line(s)
An integral filter
Water storage tanks at a high level in the
building
All connected services to be gravity-fed from
the tank(s)
A mains top-up arrangement to maintain
continuity of supply when the stored rainwater
is exhausted
18
www.ukrha.org
Booster-set
Systems
Customers Requirements
Header-tank
Systems
system integration
76. The RWH system has done its job at the point it provides a water supply to the
dedicated pipe-work serving the non-potable services.
77. The system is also connected to the underground infrastructure to allow harvested
water to flow into the neck of the tank, and to overflow to waste once the tank is full; to
meet the requirements of BS-8515 the water must be filtered before it enters the tank,
and usually the drainage arrangements need to allow for invert drop across this filter.
78. There also needs to be a connection between the tank and the property being served to
carry underground cables (recommended) such as power to the pump, and any float of
sensor cables required. It also carries the MDPE water delivery pipe, and free-flowing
mains top-up water in direct pressure systems not using booster-sets. During
installation of the service duct, a robust, water-proof draw-string is to be installed for
subsequent pulling through of cables; this should always be left in-place thereafter.
19
www.ukrha.org
Tanks
module aim
79. The aim of this module is to provide an understanding of how RWH tanks should be
chosen, handled and installed.
general characteristics
80. Tanks used for the storage of harvested rainwater are generally durable and should be
expected to give many years in normal service (perhaps 50 or more) before they need to
be replaced.
tank materials
81. Tanks are usually made from:
Polyethylene (PE):
o Single-piece (usually rotational-moulded)
o Two-piece clam-shell
Glass-Reinforced Plastic (GRP):
o Single piece
o Sectional (for assembly above ground)
Metal
Concrete
82. All tanks regardless of material can be both heavy and relatively fragile until fully
installed, and thus easy to damage before and during the installation process; they are,
accordingly, to be handled and installed strictly in accordance with the instructions
provided by the manufacturer.
tank selection
83. Tanks will normally be buried to ensure the quality of the water being stored, and
should be selected for a project taking fully into account factors such as:
20
www.ukrha.org
84. Above-ground tanks may also be chosen to meet the specific requirements of a project,
although these are generally a more expensive option, and precautions need to be taken
to keep the tank frost-free.
look out for!
85. Once purchased, the tank will need to be compatible with the planned drainage layout
which means:
a. The duct (service duct) which links the tank to the system controls, and which
carries a relatively inflexible delivery pipe, needs to be aligned with the system
controls (see diagram below)
b. The service-duct need to have a nominal drainage slope (1:80 minimum) towards the
tank in direct pressure systems to facilitate gravity-fed mains top-up
c. The rainwater feed into the tank, and the overflow from the tank, need to be aligned
with the direction of drainage flow (see below)
d. Due allowance will need to be made in the overall drainage scheme for any invert
drop across the filter
tank handling
86. All risks associated with receipt of a tank on-site, its on-site handling, its installation and
post-installation implications are to be assessed and associated method statements
used.
87. Tank transportation to site is normally arranged by the supplier who will coordinate
associated arrangements with site personnel, and provide guidance on how the tank is
to be handled and installed.
21
www.ukrha.org
88. Responsibility for the tank passes to the buyer once unloading commences; it is
therefore important that the buyer accepts the condition of the tank on arrival before
attempting to move it. Tanks are only to be lifted and moved in accordance with the
manufacturers instructions.
89. Tanks are designed to be lifted and manoeuvred only when empty; they are not
therefore to be lifted when containing water under any circumstances as this will add
considerable weight that the tank is not designed to support until installed.
tank installation
90. The tank must be installed in accordance with the manufacturers instructions, taking
due note of stated limitations, including factors such as:
Installation depth
Installation sequence
Ground & water-table conditions
Proximity to structures and topographical features
Post-installation load-bearing requirements
Filters
92. Filters are designed to provide full domestic RWH systems with aesthetically pleasing
water, ie crystal clear, but non-wholesome. A range of types of filters can be used
individually and collectively to achieve this requirement, as follows:
Leaf-traps at the top of down-pipes
Pre storage tank filters, to keep all solid particles in excess of 1.25-mm out of the
tank (a BS-8515 requirement)
Fine mesh/gauze filters, designed to remove fine sediment
Carbon filters, to bring non-wholesome water up to wholesome quality, or to
prevent particle screening when using:
UV filters, again for bringing the water up to wholesome standard
93. For pre-storage cleansing of the harvested water, sedimentation traps that are effective
in preventing solid particles in excess of 1.25-mm entering the tank are also permitted
by BS-8515.
pre-storage filters ..
94. Of the above filters, only the pre-storage tank filtration of the harvested rainwater is a
mandatory requirement of BS-8515. The filter used must be rated to handle the volume
of water generated by the roof during heavy downpours, and the invert-drop across the
filter must be taken into account when designing the associated drainage runs. Various
examples of filters used in RWH systems are illustrated below:
23
www.ukrha.org
24
www.ukrha.org
25
www.ukrha.org
self-activated pumps
99. Self-activated pumps, once primed and connected to the system they are supplying,
switch themselves on when a demand for water is sensed, and off again when the
demand ceases.
100. Such pumps usually also incorporate inbuilt dry-run protection, but reliance upon
this can give rise to a number of possible undesirable side-effects, such as:
Cavitation before shut-down
Intake of poor quality water towards the bottom of the storage tank
The pump cutting in and out of operation with minor fluctuations in storage tank
contents (when intermittent light rainfall is experienced for example)
The need to re-set the pump once the inbuilt dry-run protection has been activated
101. To avoid these possible side-effects, self-activated pumps are often fitted with a
secondary float-operated low-level cut-off switch calibrated to stop the pumps power
before the water supply is exhausted. This arrangement does not practically affect the
harvesting potential of the system.
control-activated pumps
102. Control-activated pumps will run whenever power is supplied to them, and
conversely stop running only when the power is removed; this means that they need to
be controlled by a management system that usually comprises the following
components:
A management unit that makes power potentially available to the pump whenever
there is sufficient water in the storage tank; this unit may also incorporate an
indication of tank contents and other system control functions such a mains top-up
A pump control unit that:
Senses when demand for supply of water starts/stops
Instructs a pump-capacitor to start/stop the supply of electrical power to the
pump
Even when demand exists, instructs the pump-capacitor to cease providing
power to the pump if no water-flow is sensed; this covers two failures which
might potentially damage the pump:
o Failure of the management unit to activate mains-water top-up when
needed, hence causing the pump to run dry
o Rupture or disconnection of the delivery pipe between the pump and the
system supply pipe
The pump-capacitor referred to above
26
www.ukrha.org
water intake
103. Water quality at the point of use in a correctly-sized system is maintained by a
combination of factors, including:
Allowing only water harvested from a suitable roof to be collected
Suitable pre-tank filtration
Use of calmed inlets
104. Notwithstanding these measure, a fine silt can be
expected to settle at the bottom of the storage tank; to
avoid ingesting this material, the pump must take its water
from a level in the storage tank which is clear of the silt.
This is achieved by:
Suspending pumps at the correct height within the tank
and/or
Using floating intakes (as pictured), which is essential
for pumps that simply rest on the base of the tank
common errors
105.
27
www.ukrha.org
System Schematics
module aim
106. The aim of this module is to identify the schematic layout of typical domestic
systems, and to illustrate the relationship between their components.
overview
107. Although component specifications will vary from system to system, their function
and relationships are likely to be similar. The schematics below help to identify
commonly-used layouts for domestic systems; commercial systems will also share
similarities with these layouts, but on larger projects may be more complex.
28
www.ukrha.org
Happy Customers!
module aim
108. The aim of this module is to identify how best to make a complete success of a RWH
project and keep your customers happy.
the happy factors
109. The keys to having a happy customer are providing them with a reliable system at
the right price; this entails:
Choosing the right system (using the information provided above)
Installing it in accordance with the suppliers instructions
Proper commissioning
A proper hand-over to the customer and end-user
110.
successful installations
111. The details of every installation will vary from system to system, and must be
undertaken strictly in accordance with the manuals provided by the system supplier;
failure to do so may prejudice the systems fitness for purpose.
112. Bearing in mind that once complete, some aspects of an installation can no longer be
visually checked, it is important that the project be supervised throughout by a
competent person and that individual tradesmen take a professional pride in their work.
113.
29
www.ukrha.org
commissioning
114. System commissioning is the final stage in preparing hand-over of the system to the
client, the process for which will again vary from system to system and must be
undertaken in accordance with the suppliers instructions; typically, commissioning will
entail confirming that:
The installation has been completed in accordance with the suppliers instructions,
and has been pressure-tested
Correct pipe-work and labelling used throughout
Any manufacturers recommendations for non-supplied parts, such as toilet cistern
valves for example, have been followed
All electrical and plumbing connections are sound
The pump is correctly installed, has been primed and operates on demand
Any floating component, such pump intake and float-switches, and associated
cabling are untangled and operate freely
All operations function correctly, such as:
o Gauge readings
o Dry-run protection cut-out
o The mains top-up function
o System warnings & alerts
The filter is correctly installed (and sealed if end-use is not imminent)
The system operates normally and holds pressure when inactive
There is no evidence of leaks or weeps
hand-over
115. The system is now ready to be signed-off by the commissioning tradesman, and
handed-over to the client, covering all relevant points such as:
Arrangements also need to be in place to ensure that the end-user receives an equally
comprehensive hand-over.
30
www.ukrha.org
Proper risk assessments are to be made on all aspects of any work undertaken.
119. For most of the checks to be made during routine maintenance and repair activities,
electrical power will need to be on, and all system stop-cocks open; however, care
must be taken to:
Isolate electrical power when appropriate to the work being undertaken
Close stop-cock and isolate the pump when plumbing connections need to be broken
(during removal and cleaning of in-line strainer, for example); re-made connections
are to be properly re-taped with PTFE, where appropriate
routine maintenance
120. The routine maintenance requirements of domestic RWH systems is limited to a
periodic check (usually quarterly) of:
Whether the user has experienced any problems or unusual symptoms
The correct operation of services
No signs of leaks or weeps
No sign of wiring deterioration
Correct operating pressure (where a gauge is available)
Gutters clean, leaf filters in place, and pre-tank and in-line filters removed/cleaned
Good water quality in the main storage tank, and to services
No tide-mark in the neck of the tank to indicate over-filling (ie overflow failure)
Tank contents matches contents gauge (if present) and the weather/usage pattern
31
www.ukrha.org
customer service
121. It is important for the development of the RWH industry that developers and endusers experience of the technology should be wholly positive; performing good
installations and providing good after-sales support plays a massive part in that.
122. Nevertheless, failures might arise, in which context it is important that end-users
are:
Provided with the contact details (installer and/or supplier as appropriate) of their
primary source of after-sales support
Encouraged not to live with irritating issues (water-quality, erratic performance
etc), but report problems at an early stage
Asked to report faults whilst either they or their tradesman are on-site, so that
diagnostic support can be provided
fault finding
123. The manuals provided with the system by the supplier are the best source of
information for tracing faults; most suppliers also supplement their manuals by
providing free telephone hotline support. As noted above, this is best accessed whilst
on-site so that diagnostic advice can be given.
124.
125. NB:
It should be noted on header-tank systems that a system failure may not be
immediately apparent to the end-user, as water will still continue to be available to
services via the mains top-up feature. End-users therefore need to be advised how to
detect such failures in supplier manuals.
water quality issues
126. As noted above, checking quality of the water in the main storage tank is one of the
main requirements of periodic maintenance because:
Poor quality water in the tank will provide poor quality water to the services which is
unacceptable
It may be an indicator of pre-tank filtration issues, which may additionally affect its
efficiency at harvesting water
Poor quality water may damage the pump, or reduce pump life
127.
System being left unused between installation and occupancy (avoided by sealing
the filter until the system is ready for use)
Foreign matter being allowed to enter the tank during the construction process
(which must be avoided)
Ground-water ingress (avoided by sealing properly all underground connections
during installation)
Back-flow from under-performing soak-aways (avoided by installation of one-way
valves on the over-flow)
33
www.ukrha.org
Self-Assessment Questionnaire
128. This manual is designed to provide pre-reading before attending a training workshop
provided by a member of the UK Rainwater Harvesting Association; reading the manual
beforehand will enable you to get best value from a workshop that will cover a lot of
information in a relatively short time.
129. As you have read through this manual, you have been advised to make a note of any
points which are unclear so that you can question them during the workshop.
130. On completion of the course you will be able to achieve the 90% pass-mark on a
concluding questionnaire which will qualify you for Installer-grade membership of the
Association; more importantly, it should give you confidence that you can successfully
supervise the installation of domestic rainwater harvesting systems, undertaking the
work yourself relevant to your trade.
131. The questions below are designed to help prepare you for both the workshop and
the above questionnaire; award yourself 1-marks for every correct answer; use the
manual to check your answers are correct.
Background Knowledge:
Q1:
List the 3 main factors that are driving the need for RWH in the UK
Q2:
List 3 government-backed policy documents that result from the above factors
Q3:
Q4:
What is the RWH-related relevance of the 2010 Flood & Water Management Act?
Q5:
What is the daily average of mains water consumption in the UK per person per day?
Q6:
Q7:
Q8:
Q9:
How do you calculate how much water is likely to be used in a new home?
Q10:
Why are mains water supplies under stress in the south & east of the country?
/20-marks
34
www.ukrha.org
Q12:
Q13:
List the 2 ways used to avoid rainwater contaminating the mains supply
Q14:
Q15:
Q16:
Q17:
Q18:
For what type of domestic projects are full RWH most cost-effective?
Q19:
Q20:
Q21:
What governs the size of the storage tank in a full domestic system?
Q22:
Q23:
List the 3 main parameters used to calculate tank size for a full RWH system
Q24:
List 3 customer requirements that would best be met by a direct pressure system
Q25:
Q26:
Q27:
Name the main customer requirement that would affect tank installation
/20-marks
35
www.ukrha.org
Installation:
Q28:
List 3 aspects of the tank connections that need to be checked before ordering
Q29:
Q30:
Q31:
Q32:
Q33:
Q34:
Q35:
Q36:
Q37: Where in the system should a cross-over loop be fitted to ensure continuity of
supply in the event of a power cut or system failure?
/25-marks
Maintenance:
Q38:
Q39:
Failing that, list the first three things you would check on an inoperative system?
Q40:
Getting it right!
Q41:
Q42:
List 5 of the things you would check when commissioning the system
/10-marks
/100-marks
36