0% found this document useful (0 votes)
145 views4 pages

Muhammad Javaid: Objective

Muhammad Javaid is seeking a position as an electrical supervisor utilizing his education and experience in electrical engineering. He has over 20 years of experience in operating and maintaining power generation plants and electrical systems. His experience includes working at Maple Leaf Cement Factory as an assistant electrical engineer maintaining their 56MW power plant, at Indus Motors as a team leader for their 10MW co-generation power house, and at various other power generation companies as an electrical supervisor and technician. He has extensive experience working with and maintaining diesel generators, steam turbines, electrical panels, motors, transformers and other electrical equipment.

Uploaded by

Rizwan Farooq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
145 views4 pages

Muhammad Javaid: Objective

Muhammad Javaid is seeking a position as an electrical supervisor utilizing his education and experience in electrical engineering. He has over 20 years of experience in operating and maintaining power generation plants and electrical systems. His experience includes working at Maple Leaf Cement Factory as an assistant electrical engineer maintaining their 56MW power plant, at Indus Motors as a team leader for their 10MW co-generation power house, and at various other power generation companies as an electrical supervisor and technician. He has extensive experience working with and maintaining diesel generators, steam turbines, electrical panels, motors, transformers and other electrical equipment.

Uploaded by

Rizwan Farooq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

MUHAMMAD JAVAID

House # F-22 Maple leaf Cement China Colony


Iskanderebad District Mainwali
Cell: 0334-1760071 / 0303-0421780
[email protected]
[email protected]

Objective:
Seeking a challenging position to utilize my education and experience in the field of electric
engineering profession. To attain and strive for the position of target achievable personally and
along with allowable resource. Establishment of ideal working relationship with professional
staff at all levels in a team to meet companys standards of quality and accuracy. Management
of multiple tasks by setting priorities according to need, demand and urgency.

Personal Profile:
Father Name
Date of Birth
N.I.C No
Passport #
Permanent address

:
:
:
:

Religion
Marital Status
Nationality
Cell No

:
:
:

Muhammad Ramzan
15-04-1972
31301-1443067-7
AT8690671
Gulshan-e-usman colony near almacca petrol pump
Rahim Yar Khan Road, khan Pur, Distt. Rahim Yar Khan
Islam
Married
Pakistani
0302-2071943

Post Applied For

ELECTRICAL SUPERVISOR

Qualification:
DAE (Electrical)

Govt. College of Technology Karachi from S.T.B. Karachi

nd

1991 - 2 Division

Matric (Science)
nd

1988 - 2 Division.

Govt. Hight School khan Pur District Rahim Yar Khan (BISE Bahawal Pur)

Professional Experience
1-Mapel Leaf Cement Factory Limited
(Cement Manufacturing Plant Iskanderabad District Mianwali)

Position: Assistant Electrical Engineer


20-04-2011 to date

Work Duties:
In Power Generation Plant maintenance & operation department. My duties include:
Operating and Breakdown plan
Preventive, Predictive & Annual Maintenance Following Equipment:

56W Dual Fuel Power Plant


1. Niggata Diesel 18v32clx capacity 5.96MW each x 4 sets. 24MW
2. Wartsila 18V50DF capacity 16MW
3. Kawasaki WHRP Steam Turbine 16MW
Have well knowledge of troubleshooting & Power System Protection, Control Relays, Electrical Power, Control
Circuit faults Rectify, H.T panel (SF6 Merlin Gerin Schneider, VCB Toyo Denki, and Siemens), 132kv/6.6kv grid
station capacity 50MW, 10MW also
inspection and Maintenance work, Control& power work, L.T distribution system Sivicon Siemens Technology,
Maintenance & Overhauling Lt, Ht Motors (Maximum 200kw) &Transformers, Steam turbine, Waste Heat
Recovery Boiler and all related electrical work & instruments, MOV calibration &all related adjustment work .
Plant electrical & instrument inspection & calibration work.
Coordination with Load dispatch, Plant availability, daily coordination with MLCF grid station.
Planned and executed maintenance of Wartsila 18V50DEngines for mentioned operating
Hours 26000hrs & 36000hrs.and other above equipment
Synchronization of engine (Wartsila) & Turbine (Kawasaki) with grid (WAPDA) during start up and stoppage of
engine (Wartsila). We synchronize with WAPDA during our energized system and also during unenergized
system.

Computer Skills:
Good Knowledge of M.S Office
SAP (Systematic Applicable Program)
Company Software of MLCF.

2-Indus Motor Company


(Formally Toyota, Daihatsu Automobile Manufacturing Company Karachi).

Position: Team Leader Electrical (Utility) in


05-11-2007 to 30-04-2011

Work Duties:
At plant Engineering and Maintenance Department, I worked on Operating and Breakdown plan, Preventive,
Predictive & Annual Maintenance Following Equipment:

10 MW Co-Generation Power House:


1. G3516C Catter Pillar 1600KW X 3 Sets
2. D3516B Catter Pillar 1800KW 1 Set
3. GPB Kawasaki 1.5KW 1 Set

760 kW Power Generation Stand By:


1. Cater Pillar 3412, 400 kW each 2Sets Total = 800 kW
2. F.G Willson 80kw
3. F.G Willson 40kw
Having well knowledge about troubleshooting & good knowledge of Electrical Protection,
Control Relays, Electrical Power, Control Circuit faults Rectify, Communication System.
Maintenance & operation work all utility area.
Maintenance Overhauling Lt, Ht Motors (Maximum 800kw) &Transformers, H.T panel (Siemens) control &
power work, L.T distribution system & Rectify Faults of LT, HT System. Oil free air Compressor (Screw Type),
Oil Injected Air Compressor Screw Reciprocating Types. All types of cooling Towers (Balty More), Soft water
plant, Raw Water and Fire Fighting (fukada).

Computer Skills:
M.S Office, SAP (Systematic Applicable Program), Company Software of IMC.

3- Anoud Power Generation


Client of National oil Refinery, Kesc, Enar Petro Tech Service, P.S.O.

Position: Electrical Supervisor


02-06-2000 to 02-11-2007

Work Duties:
Provide 10MW Kesc Korangi grid station .At Bengali camp near bilal chorangi Karachi.
I worked in maintenance and operation department

24MW Power Generation Korangi Industrial Area Karachi:


Niggata Diesel 18v32clx capacity 5.96MW each x 4 sets.
Good knowledge of Electrical Protection, control relays & rectification faults.
Having well knowledge about troubleshooting & maintenance of all auxiliary such as viscosity controller,
Exhaust gas boiler (Clayton Belgium), Water treatment plant, maintenance of Vacuum circuit Breaker, LT Air
circuit breaker, Adjustment of Temperature switch, Pressure Switch & Flow Switch
Maintenance of transformer, generator, Lt, H.t, motors .H.T Cable jointing work, Earth system & Battery bank
acts.

Anoud Power Plant (Site Noori Abad)


Capacity, 900KW X 4SETS =3.6MW Waukesha Lt 5794
I took part in erection of Anoud power generation Ltd. All electrical installation and commissioning completed
under my supervision. I performed duty for six month (during commissioning) .

4- Descon Engineering Ltd.


Client of Pak Arab oil refinery (PARCO) Muzafargarh (During commissioning)

Position: Electrician
05-04-1999 to 23-05-2000

Work Duties:
Worked at control & power instruments, cable termination , loop testing & commissioning work , H.T. cable
testing work, L.T testing work, temperature, pressure, flow, level switch adjustment & calibration work.
Testing of H.T, L.T Motor testing, Transformer and substation panels and Meggering,

5- Swanmet (Malaysia) Sdn Bhd.


Ferious non-Ferious foundry

Position: Senior Electrical Technician


27-01-1997 to 20-09-1998

Work Duties:
Operation & maintenance of
kone crane, Damage crane 20ton, Mould mixer machine, Angle grinder high frequency 200Hz, Furnace (pillar
company) 1100KW,
All types of H.T, L.T motors, generators and transformers.
H.T, L.T Power distribution System

6- Gulistan Power Generation Ltd.


12MW Power Generation Shekhepura Faisalabad- Niggata diesel 8v32clx 3 x 3.94each sets.

Position: Electrical Technician (Maintenance & Operation)


01-02-1994 to 20-01-1997

Work Duties:
Troubleshooting & maintenance of:
all auxiliary such as H.F.O & L.O purifier, viscosity controller, exhaust gas boiler and water treatment plant
H.T, L.T maintenance work, H.T circuit breaker, Air circuit breaker, Thermocouple, Pt 100, Temperature,
Pressure, Flow, Level Switch. Maintenance of transformer, generator etc
L.T motors, Earthing system, Battery bank etc

You might also like