BASF Brochure

Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

Solutions for tunneling and mining

Waterproofing

Expanding Horizons

Underground
Expanding hor izons underground

The Bonded Waterproofing Concept

An innovative approach, the MASTERSEAL 345 waterproofing membrane


Continuous Structure with a
Bonded Membrane

This bonded waterproofing membrane establishes a new concept for waterproofing.


A bonded waterproofing membrane can resolve technical problems which
have proved difficult to resolve with conventional sheet membranes.
The bonded membrane prevents migration of water along the concretemembrane interfaces on either side of the membrane.

Waterproof single-shell composite tunnel lining


Composite Mechanical
Behavior

The tensile bonding and shear strengths of the concrete-membrane result in


a mechanical behavior of a composite structure. Therefore the primary support lining and the inner final lining act together and can be considered as
part of the permanent support structure.

Permanent Long-term
Durable Tunnel Lining

Both primary lining and secondary lining together with the bonded membrane
can be designed for long-term durability: a permanent, long-term durable waterproof tunnel lining.

Main system advantages


For Owners

Reduced total construction time and costs


Reduced maintenance and operational costs
Reliable technical solution

For Designers

Composite waterproof tunnel lining opens up new cost-effective design


opportunities
Composite behavior of entire lining allows for significant reduction of
lining thicknesses
Compatibility with other waterproofing systems allows for combination of
two systems, and hence the possibility of better technical optimization
Exceptionally cost-effective for rehabilitation of old tunnels

For Contractors

Simple application methodology


High-speed application
Robotic, fully automatic application possible with MEYCO Logica
Fiber reinforced sprayed concrete final lining can be easily applied onto
membrane
plastic sheet membrane
(double welded joints)

geotextile fleece

the saving

temporary sprayed
concrete
(steel mesh
reinforced)

primary permanent
sprayed concrete
(fiber reinforced)

permanent
support design
thickness

temporary
support
design
thickness

permanent
in-situ
cast
concrete

permanent
support design
thickness

secondary permanent
sprayed or in-situ cast
concrete

Design Flexibility

Enhanced opportunities
Cost-effective Waterproof
Single-shell Tunnel Linings

The spray-applied membrane facilitates the construction of monolithic, single-shell tunnel linings using permanent sprayed concrete. Recent projects
adopting this approach have shown significant project savings over the double-shell method. MEYCO can assist you with this design concept.
MASTERSEAL 345 in combination with sprayed concrete offers unique advantages in refurbishment projects such as the maintenance of the existing tunnel
profile.

Drained and Undrained


Design Options Possible

MASTERSEAL can be used in combination with sheet membranes. Standard


joint details between MASTERSEAL and sheet membranes have been established, making the system totally flexible.
Both undrained and drained lining designs are possible. For drained solutions, geotextile or systematic drainage pipes are used.
MEYCO can supply you with a generic specification compiled by an international tunnel consultant.

Ideal for Complex Shapes of


Underground Structures

The MASTERSEAL spray applied system is ideally suited to underground


structures with complex geometries, such as lay-by niches, cross passages,
turnouts and crossover caverns.
MASTERSEAL may be applied to limited sections to provide isolated waterproofing, such as in the crown sections of tunnels where conductor cables
for electrical trains are situated.
MASTERSEAL is a continuous waterproofing system without discrete joints,
and does not require water stops or compartmentalization.

Application

Simple and flexible application methods


Cost-effective in Challenging
Conditions

Manual application rates up to 100 m2/hour.


Mechanized robotic application rates up to 180 m2/hour.
A small team of 3 operators is required for application.

Simple Surface Preparation

Water seepages in substrate are handled using small temporary drainage


holes.
Suitable surface roughness for the application of MASTERSEAL 345 is
achieved through adjustments of the mix design of the primary lining
sprayed concrete.

Fast and Safe Application with


a Small Working Team and
Simple Equipment

Application using dry spraying equipment (e.g. MEYCO Piccola).

Final Inner Lining

The final inner lining is applied when the waterproofing membrane has
achieved a sufficient curing condition.

Entirely safe for the application crew and the environment.


MASTERSEAL 345 can be used in conjunction with fiber reinforced
concrete.

Final inner lining is established by either cast or sprayed conrete.

Operational Security

Less Risk of Water Ingress

Technically functional and reliable system.


The bonding characteristics of MASTERSEAL 345 ensure that the migration
of water along the concrete membrane interface cannot develop.

Low Maintenance and Repair


Costs

Eventual rehabilitation or repair of leaks is far simpler compared to most


other waterproofing systems.

Long-term Durability

MASTERSEAL 345 contains long-term durable chemical compounds.


No decomposition of MASTERSEAL 345 under most known groundwater
conditions.
Functional requirements for waterproofing fulfilled over the design life of the
underground facility.

New Life to Old Tunnels

A unique asset of the MASTERSEAL 345 system is its versatility and costeffectiveness in rehabilitation situations.

Know-how and Service

Assistance During Design

MEYCO provides assistance to owners and designers in the layout of complete


system solutions with permanent sprayed concrete and MASTERSEAL.
Important issues in this process are:
interface possibilities with other waterproofing systems
specification details of the required properties of sprayed concrete
correct substrate characteristics
MEYCO brings extensive know-how gained through many years experience
solving challenging situations.

Practical Training and


Technical Service

MEYCO provides technical training of operator personnel for all phases of the
application of MASTERSEAL. Technical training is generally offered as on-site
practical education in which all details of the application process, including
the correct substrate treatment, are covered. During ongoing works with the
application of MASTERSEAL, technical specialists from MEYCO are available
for assistance and troubleshooting in order to secure a good technical result,
as well as optimizing the application process.

Headquarters
BASF Construction Chemicals Europe AG
MEYCO Global Underground Construction
Vulkanstrasse 110
8048 Zurich, Switzerland
Phone
+41 58 958 22 11
E-mail
[email protected]

BASF Construction Chemicals Europe AG


MEYCO Equipment
Hegmattenstrasse 24
8404 Winterthur, Switzerland
Phone
+41 58 958 27 00
E-mail
[email protected]

BASF Construction Chemicals


23700 Chagrin Boulevard
Cleveland, OH 44122-5554, USA
Phone
+1-216-839 7500
Fax
+1-216-839 8821
E-mail
[email protected]

BASF Construction Chemicals Australia


Pty Ltd
11 Stanton Road
Seven Hills NSW 2147, Australia
Phone
+61 2 8811 4200
Fax
+61 2 8811 3299

BASF SA

BASF Construction Chemicals Asia Pacific

Av. Brigadeiro Faria Lima, 3600


Andares do 8 ao 14
04538-132 So Paulo SP, Brazil
Phone
+55 11 2718 5507
E-mail
[email protected]

14/F, Harbour Ring Plaza


18 Xizang Road M.
Shanghai, 200001, P.R. China
Phone
+8621 2320 3000
E-mail
[email protected]

Brochures on our solutions are available at www.meyco.basf.com:

The information given in this BASF publication is based upon the present state of our scientific and practical knowledge. As the information herein is of a generic nature, no
assumption can be made as to a products suitability for a particular use or application and no guarantee or warranty as to its accuracy, reliability or completeness either
expressed or implied is given.

Documentation available on request:

MEYCO: 08/11/AB Crea

Reference list
Project reports
Design guidelines
Method statements
And more

Certified quality
Product Development Process
is certified according to

Expanding hor izons underground

Pictures of the Hindhead project are courtesy of Highways Agency and Balfour Beatty

www.meyco.basf.com

You might also like