Part C - Conditions of Tender
Part C - Conditions of Tender
Part C - Conditions of Tender
1.
Any conditions appended by the tenderer, which are at variance with the conditions set out below, shall invalidate the
tender.
2.
The sub-contract
The sub-contract to be entered into between the Main Contractor and the Sub Contractor shall be in terms equivalent to
those of the Standard Form of Sub-Contract dated 2006 issued under the sanction of the Pertubuhan Akitek-Akitek
Malaysia.
2.1
The terms, in so far as they apply to the sub-contract works, of the PAM Standard Form of (main) Contract which the
applicable non-Standard particulars are given in item 12 of these Conditions.
2.2
3.
Payments
Payments by the Main Contractor to the Sub Contractor shall be in accordance with clause 27.2 (vii) and (viii), 27.3, 27.6
and appendix Items under clause 30.2 and 30.4 of the main contract (see item 12.5 of these Conditions for details of 30.2
and 30.4.
4.
Order of works
The Sub Contractor shall execute his work in conformity with a programme
comply with the requirements of item 16 of these Conditions.
5.
The prices in this tender shall determine the variation of extra work of a similar character executed under similar
conditions as work priced therein.
5.2
The prices in this tender shall be used as a basis for determining the value of extra work, which is not of a similar
character executed under similar conditions, so far as is reasonable, failing which a fair valuation shall be made.
5.3
Where extra work cannot properly be measured and valued the Sub Contractor shall be allowed day-work prices:
5.3.1
5.3.2
5.4
At the rates contained in the schedule of day-work prices (if any) annexed to the specification or bills of
quantities on which the Sub Contractors estimate is based: or, if no such schedule is annexed.
At rates considered fair and reasonable by the architect and/or quantity surveyor
The price in the Sub Contractors accepted tender shall determine the valuation of items omitted, provided that if
omissions substantially vary the conditions under which any remaining items of work are carried out prices for such
remaining items shall be valued under principle 5.2 above.
6.
Unloading, etc.
.
Unloading and distributing the Sub Contractors materials and plant shall be the responsibility of the Sub Contractor and is
deemed to be included in his tender. The Main Contractor will however perform this service on receipt of the Sub
Contractors written order to this effect undertaking to reimburse the Main Contractors reasonable charges for so doing
(see item 17 of these Conditions).
7.
Storage area
The Main Contractor shall provide free use of a suitable storage area for the Sub Contractors materials, plant, etc. The
Sub Contractors tender shall include for any enclosure and protection he requires for this storage area.
8.
Water
Adequate water shall be provided by the Main Contractor
9.
10.
11.
C.1
continued
All conditions on the front and back of this sheet must be completed by the Enquirer
12.
12.3 In addition to the Insurances which the subcontractor is required to maintain under the
terms of clause 19.1 of the main contract, he is
also required (in the contract specification / bills
of quantities) under the terms of clause19.1 to
insure against the risks stated opposite.
12.4
20.A.....
20.B..
20.C.....
20.A, B or C
Date of Commencement
21.0
Completion date
21.0
22.0
26.0
30.1
C.2
continued
All conditions on the front and back of this sheet must be completed by the Enquirer
12.
13.
(continued)
30.5
10%
30.5
5%
30.10
Type of tender
This is a Firm Price Tender.
14.
Location of site
15.
16.
Order of works
Building owners stipulations affecting
the order of the main contract work :-
19.
20.
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
}
C.3