CC Tall Buildings Guide
CC Tall Buildings Guide
CC Tall Buildings Guide
Tall Buildings
Structural design of concrete buildings up to 300 m tall
A working group of The Concrete Centre and fib Task Group 1.6
Foreword
Tall buildings are now a common feature on the skyline of many cities throughout the world with concrete as
the predominant building material used in their construction. Concrete provides a strong, durable, economic and
versatile material which can be engineered to respond to demands placed on it when used in the foundations,
columns, walls and floors of tall buildings. The design and detailing of tall buildings requires detailed knowledge,
experience and expertise to properly understand their behaviour. Guidance on the design of tall buildings is
provided in many of the national codes and standards however as the clients, architects and engineers push the
boundaries of what is possible our understanding of the structural behaviour is constantly being updated.
In 2009 the fib (fdration internationale du bton) working in collaboration with The Concrete Centre
established a Task Group with a mandate to gather the experience and know-how pertinent to the development,
design and construction of tall concrete buildings. The findings of the task group are presented in this state-of
the-art report. The report is based on the experience gained by some of the leading individuals and companies
involved in the design and construction of tall buildings throughout the world.
The report provides information to engineers who are familiar with the design and construction of low-rise structures
and who wish to gain an understanding of the key factors which influence the design of tall concrete buildings.
Andy Truby
Convener, fib Task Group 1.6
Acknowledgements
The Task Group would like to acknowledge the support of:
The authors and their respective companies; Claire Ackerman and Jenny Sheerin, The Concrete Centre (editing and
production); Alyson Magee (editing); The Concrete Society (production); Stephen Blundell (writing and technical
expertise); Alan Mann (technical expertise) and all the members of the working group (full list on inside back cover).
Published by MPA The Concrete Centre and Fdration internationale du bton (fib)
Gillingham House, 38-44 Gilliingham Street, London SW1V 1HU
Tel: +44 (0)207 963 8000
www.concretecentre.com
CCIP-058
Published September 2014
ISBN 978-1-908257-14-7
Price Group R
MPA The Concrete Centre and Fdration internationale du bton (fib)
Cement and Concrete Industry Publications (CCIP) are produced through an industry initiative to
publish technical guidance in support of concrete design and construction.
All advice or information from MPA -The Concrete Centre is intended only for use in the UK by those who will evaluate the
significance and limitations of its contents and take responsibility for its use and application. No liability (including that
for negligence) for any loss resulting from such advice or information is accepted by Mineral Products Association or its
subcontractors, suppliers or advisors. Readers should note that the publications from MPA - The Concrete Centre are subject to
revision from time to time and should therefore ensure that they are in possession of the latest version.
Printed by Berforts Information Press, Eynsham, Oxford.
Working Group
Tall Buildings
Convenor:
Authors:
Contents
1. Introduction
2. Structural design strategies
Other Contributors:
3. Structural framing systems
4. Structural elements
5. Foundations
1
3
14
25
39
6. Buildability
48
7. Loading
58
8. Building dynamics
66
9. Wind engineering
74
86
106
12. Materials
124
129
References
141
145
Introduction
1
1. Introduction
Tall buildings present unique challenges in terms of both design and construction. Their
sheer scale demands that particular attention is paid simultaneously to strategic and
detailed issues. Tall building design and construction requires an integrated approach,
with the need for various engineering disciplines to coexist efficiently from the beginning
of the project. This multi-disciplinary approach extends to consideration of how the
building will be constructed, and thus ideally involves an integrated team (including
construction and design professionals) at the earliest stage of the project.
The definition of tall for a building is not absolute. It is understood here as when the
geometry of the building, for example overall height or height-to-minimum-plan
dimension, significantly influences aspects of the design. These aspects are:
structural lateral strength and stiffness
vertical transportation
fire escape
services distribution
vertical building movement (shortening)
setting-out and verticality
hoisting of materials.
One definition is that if the building aspect ratio, height divided by lowest overall lateral
dimension, is more than 5:1, then the building may be considered tall.
For consistency, this document will refer to tall buildings in preference to other common
terms including skyscraper, high-rise or tower, with the exception of sections
describing historical context. The term tall may also be sub-divided as follows:
Table 1.1
Definition of Tall [1]
Tall
Super-tall
Residential (3.0 m)
Office (4.0 m)
Up to 75 storeys (300 m)
The following chapters provide guidance and insight into the design challenges and
considerations relating to the design of Tall buildings formed in concrete. Some
guidance is provided for buildings in the Super-tall range; however, it is recommended
that readers interested in Super-tall buildings research this subject further using the
references provided throughout this document.
Historic precedents
The word skyscraper originated as a naval reference to the tallest mast or main sail of a
sailing ship. Tall buildings were in evidence around the globe long before the term was
first applied in the late 19th century.
1 Introduction
The highest of the Pyramids of Giza, built circa 2500 BC using rudimentary technology
and manpower alone, still stands at 146.6 m and was not surpassed until the 14th
century, with the construction of Lincoln Cathedral in England.
The earliest known examples of urban living based on vertical or tall construction are
the many (around 500) tower houses built in the 16th century to protect the
inhabitants of Shibam in Yemen from Bedouin invaders. Often called the oldest
skyscraper city in the world, the mud towers range from five to 16 storeys, reaching
heights of up to 40 m and accommodating one or two families on each floor.
Examples are profuse across Europe, from masonry towers in Bologna dating from the
11th century onwards and reaching heights of 97 m, to the 11-storey, stone-built
structures of Edinburgh constructed upwards in the late 17th century in response to the
confines of the defensive stone walls of the Scottish citys boundary.
Earlier in the century, Joseph Monier had invented reinforced concrete, using metals
originally iron but latterly steel cast into fresh concrete. In 1867 it was patented and
exhibited at the Paris Exposition. The devastating Great Chicago Fire of 1871, meanwhile,
not only prompted a rewriting of statutory fire regulations but revealed strong evidence of
the inherent fire resistance of concrete as a structural material in tall buildings.
By the early 20th century, the skyscraper was becoming the most prominent and
progressive building type, aided by innovations such as mechanical lifts, the telephone
and central heating systems. Urbanisation and increasing wealth had further boosted
prospects for the proliferation of tall buildings.
The Ingalls Building (1903) in Cincinnati, Ohio, with its 15-storey monolithic frame,
standing at 64 m tall, was the first reinforced concrete skyscraper.
Today, concrete is firmly established as one of the leading tall building construction
materials. Enhanced construction techniques, dramatic increases in concrete and
embedded steel strengths, and recognition of inherent properties such as natural
damping, fire resistance and sound insulation have all contributed to longevity in its use.
Indeed, today the tallest buildings are built almost exclusively with reinforced concrete.
Tall building design involves all of the design interfaces present in low-rise construction
but there are also a number of key additional factors which designers must consider. This
is particularly relevant for structural engineers but equally so for clients, architects and
building services engineers. In addition, the design development is likely to involve input
and collaboration from other specialists, including:
Faade engineers
Wind specialists
Geotechnical specialists
Seismic specialists
Fire consultants
Lift specialists
Construction advisors.
For a design to be effective and economic, it is essential that all disciplines work
holistically and gain a good understanding of the critical factors which have an impact
on the associated disciplines.
The following sections give an overview of the various elements structural engineers
need to be aware of when embarking on the design of tall buildings. Further detail is
provided in subsequent chapters. The reader will however need to research the various
topics in more detail using the references provided throughout this document.
For low-rise construction, measures to resist lateral loading are well understood by most
designers and include well-positioned stiff vertical elements working in conjunction with
horizontal diaphragms or braced panels. Such provisions, in conjunction with the
provision of vertical and lateral ties for robustness, produce safe solutions which have
stood the test of time.
For tall buildings, the relative magnitude of lateral loadings to gravity loads generally
increases significantly, just by virtue of building height. Wind loadings tend to increase
with height from the ground which, combined with the large face area of a tall building
and lever arm to the ground, serves to produce the dominant load case and hence
govern the design and sizing of many of the main structural elements, particularly core
walls and columns.
Additionally, in tall buildings, lateral displacement or drift must also be calculated and
may need to be limited. Excessive lateral displacement could potentially affect finish,
internal partitions and external cladding, particularly if the inter-storey drift (lateral
displacement over one storey) is too high.
The dynamic performance of tall buildings must be considered in detail. Loading from
wind and seismic actions occurs across a broad spectrum of frequencies and the
response of the building will be influenced by its natural frequency and the degree of
inherent damping. Where the natural frequencies of the building are close to the
frequencies of applied loadings there is a risk that the response is amplified, resulting in
increased loadings and movement. This mechanism requires detailed consideration by
the structural engineer to investigate the performance of the structure across the full
frequency spectrum of the applied loadings. If accelerations associated with any
movement are excessive, building users could potentially experience motion sickness.
At the initial planning stage, it is advisable to consider the basic proportions of the
structure. The slenderness ratio (SR) can give a good initial indication of how hard the
structural system will need to work. The SR is obtained by dividing total building height
by the smaller base width. SRs of around H/6 or less can usually be accommodated
whereas for H/8 or above the structural system will be working harder and the dynamic
behaviour is likely to be dominant in the structural solution.
The SR should, however, only be used as a guide to the potential behaviour of tall
buildings. The following sections discuss the stability of tall buildings in more detail, and
present a number of stability systems which can be used. As will be shown, the actual
behaviour of the tall building is more closely related to the ratio of building height to the
smaller dimension of the stability system.
Figure 2.1
Diagram of slenderness ratio.
Slenderness Ratio,
SR = h/b
Where,
h = building height
w = building width
b = building breadth
and where
b<w
To provide a structure with both the strength and stiffness to resist large lateral loadings
and limit drift movement and excessive accelerations, designers must carefully consider
the structural framing system (of which the building core will often form a major part).
Structural framing system types are detailed in Chapter 3.
It is essential for engineers to explain the fundamental aspects and behaviour of the
selected structural system to other members of the design team and discuss the
interfaces with other disciplines. Such discussion and explanation will allow further
optimisation of the structural solution, for example, by combining structural zones with
plant-room requirements.
It is good practice for the engineer to prepare a summary, in text and simple sketches or
possibly 3D model shots, of the selected structural system as part of the design
documents. This not only is an aid to the contractor and other major stakeholders, but
is also a concise way of showing that, as designer, you fully understand and, more
importantly, can show others the way the structure works.
Structural engineers need to work closely with other disciplines to achieve a truly
integrated and holistic design. With regard to building services, a number of factors
impact on the design of mechanical and electrical facilities and require different
solutions than those applicable to low-rise structures.
Crucially, tall buildings require the distribution of services vertically over a significant height.
Water services cannot always be sufficiently high-pressurised to be pumped the full
height of a tall building. This frequently means that water storage tanks are required at
intervals of every 30 floors or so up the height of the building.
Electrical services can be inefficient in distributing at low voltage over heights of more
than 100 m. Often, this means that high voltage primary distribution is used, requiring
the incorporation of electrical substations within the height of the building.
Ventilation providing fresh air to the building can require the movement of large air
volumes requiring very large ductwork sizes and associated plant. To keep duct sizes
down to a reasonable size, the air systems are often split into zones, thus requiring
multiple plant rooms distributed up the building.
Data distribution requires hubs to be provided at perhaps 90 m intervals up the
building, connected by fibre optic cabling.
Multiple plant spaces are a common requirement of tall buildings and are often
accommodated at ground/basement level and at the top of the structure in buildings up
to 200 m tall. For taller structures, plant rooms may also be required at intermediate
levels. Where the building has mixed uses, for example, office and hotel/residential, the
services to each use will need to be split to ensure that supplies are independent of each
other. Also plant rooms will need to be provided close to the relevant section of the
building. For this reason plant spaces are frequently introduced at intervals up the
building to match the levels where use changes. From a structural engineering
perspective, such plant spaces can be useful in offering the opportunity to introduce
additional structural elements and thus provide increased strength and stiffness.
It is essential for structure engineers to understand the engineering philosophy for each
of the mechanical and electrical systems, and contribute to solutions accommodating
these requirements so as to conform to structural engineering requirements.
The type of faade system adopted is very much dependent on the aesthetic requirements
specified by architects, as well as the structural design of buildings. However, there are
some additional issues prevalent in tall buildings which should be given close attention.
Difficulties can arise at the interfaces between disciplines and, indeed, the actual
interfaces of elements relating to junctions and tolerances. The construction strategy
greatly influences these details and vice versa. The following aspects affect faade
engineering of tall buildings and must be taken into account:
Achieving planning permission height constraints
Technical code compliance
Commercial budget certainty and perception of risk
Programme construction and procurement strategy
Performance especially energy efficiency
Occupant comfort including ventilation strategy, daylighting
Lettable area.
Movement, both horizontal (shear and bending) and vertical shortening, of tall buildings can
influence the jointing provision between panels, particularly at transfer levels in the structure.
The movement to be accommodated in the stack joint at such locations is primarily due
to differential vertical movement between floors and the effects of axial shortening.
The mid-level of tall buildings and returns in the tall building envelope are vulnerable to
high wind pressures and driving-rain ingress, requiring the design of exterior walls to
buffer these adverse conditions and prevent unwanted air and water infiltration. A full
regime of testing is normally performed on prototype mock-up specimens prior to
full-scale production of the system.
Mechanical systems can also greatly affect the faade and vice versa. Natural ventilation
and domestic windows are not suitable for high-rise construction.
When installing the faade of tall buildings, there are advantages to be gained from
systems that require lightweight cranes and hoists, as the use of tower cranes would
conflict with construction of the main structure.
In dealing with potentially high cladding pressures, the main structures fixing system
should be easily installed and compatible with the structural floor system. The fixing
system must also allow for relatively fast installation of panels, as all other trades
depend upon closure of the building by the exterior wall system.
The above considerations must be considered early in the design process and require
agreement and collaboration between all the design disciplines and the constructor.
Specialist input from a faade engineer is recommended at the early design stage.
The core of a tall building is arguably the most fundamental and important element
under consideration during the design process. The core will generally house all elements
of vertical distribution within the building and be used daily by every user of the building.
For most tall structures, the core will form the main backbone of the building and play a
significant role in carrying a large proportion of vertical loading and, frequently, the
majority of lateral loading.
An inefficiently planned core will lead to slower construction, lower quality and wasted
floor area, all of which increases cost.
When planning the core layout, designers must consider many factors which interact
and influence each other. Structural engineers should work in close harmony with
architects, building services engineers, fire advisors, lift specialists and clients. In
addition, the construction methodology must be considered from the outset, as one of
the key elements in the viability of a tall building is its speed of construction.
For a shear wall structural system, the core shear walls are generally provided around the
perimeter of the core area to encompass lift shafts and lobbies, staircases and primary
vertical services shafts. For maximum structural efficiency, core walls should be as long
as possible and, ideally, symmetrically placed relative to centre lines of the building.
While core walls are sized to resist applied loadings, wall thicknesses may vary between
350 mm and 600 mm or more for buildings up to 200 m tall. Such wall thicknesses may
be unfamiliar to design teams not used to designing tall buildings and it is important,
therefore, for structural engineers to make an early estimate of wall thickness and thus
allow architectural planning of appropriate structural zones.
The layout of the structure immediately outside the core can also impact its performance.
To resist applied lateral loads and resultant overturning, the design should maximise
vertical loading carried by the core, as this provides a restoring moment and helps resist
tensile forces produced by the overturning moments. In planning its layout, the structural
efficiency of the core - and hence overall design - is helped greatly if the column
arrangement outside the core is such that floor spans onto the core walls are maximised.
For low-rise construction, it is common to position service risers close to the lift or stair
cores. This is sensible as such cores are generally distributed around buildings at intervals
to suit the escape travel distances and access every floor, generally at a corridor position.
This is compatible with normal requirements and routes for distribution of mechanical
and electrical services.
For tall buildings, this logic is often carried across from low-rise construction and can be
appropriate but there are some major additional considerations. Tall buildings are likely
to require the provision of fresh air and, thus, large duct and riser sizes. Providing this
space within the core can reduce its efficiency. Furthermore, core walls will have to be
penetrated to pass any ductwork and services through from inside the core to the floor
plates. Such penetrations can be large, reducing the stiffness and capacity of the core
walls significantly while also being difficult to form during construction, thereby
complicating the detailing and speed of construction.
Service riser shafts are thus sometimes positioned immediately outside the core,
eliminating the need for core wall penetration whilst maintaining locations and access
to, for example, corridor zones. However, the transfer of vertical and lateral loads from
the floor slabs is also very important to the overall structural system, and it must be
ensured that such load transfer is not compromised by positioning large openings at key
zones. Where service openings are required through the core walls, they should be
positioned at mid-length along the core and avoid the highly stressed areas at the ends
and corners of core walls.
Type of usage can greatly affect the core design and hence the overall design, cost and
efficiency of buildings. Tall buildings generally have four main uses:
Residential usage is generally in the form of apartments with one or two bedrooms
or perhaps a few larger apartments or penthouses. Each apartment will contain living
space, a kitchen and bathrooms, with the layouts generally repetitive between floors.
Acoustic separation between floors, and between apartments, is a key design
consideration. Often two-storey (duplex) apartments are also provided, necessitating
the introduction of relatively large openings in the intermediate floors to allow for
staircase access between floors.
Hotel-usage floor layouts above the main reception area and function rooms or
dining spaces generally comprise repetitive en-suite bedrooms spaces. Hotel rooms
also require a good degree of acoustic separation.
Commercial usage tends to entail large open spaces to allow flexibility for office
layouts.
Retail usage is generally contained within the lower floor levels of tall buildings,
perhaps in podium structures. They too require large open spaces, and may also
require larger floor-to-ceiling height and, potentially, larger ceiling zones.
Although the use can introduce its own design requirements for layout, floor-to-floor
height and acoustic separation, the major design factor is occupancy rate. For example,
looking at a typical tall building with a floor area of around 1000 m2 (net):
Occupancy per floor would range from 20-30 people for residential usage, 35-40
people in a hotel and as many as 80-120 occupants in an open-plan office. Thus, for a
40-storey building, total occupancy could range from 800 people in a residential
building to over 4,000 people for commercial usage.
The impact on lift strategy is significant and, in the case of commercial usage, would
result in increased demand for lifts around peak usage times coinciding with the
arrival and departure times of office workers. For the example given, the number of
lifts required could vary between three and ten, depending on the lift speeds and car
sizes used.
Often a mixed-use building may be proposed and, while this can offer some
economy, there is often a need for dedicated lifts for each use for reasons of security
and occupant separation.
Residential usage, including hotels, frequently require floor plates to be split by robust
walls, which can provide both acoustic and fire separation. In such cases, it may be
possible for the structural form to utilise these walls as part of the stability system and
thus produce an efficient structure. The live loadings for residential usage are similar to
those for low-rise buildings and can be relatively low. However, due to requirements for
the separation of spaces, the dead loading from dividing walls can be relatively high.
For office and retail usage, there is generally a desire to provide clear open spaces
offering flexibility of layout for the users. Such arrangements preclude the adoption of
cross wall stability systems. Design live loadings are generally higher than for
residential uses.
The layouts of tall buildings vary to suit the particular requirements of any given project
and are influenced by the available site footprint, adjacent structures and planned use.
The following layouts show a number of arrangements covering residential, commercial
and mixed usage. Further layouts are provided with the case studies contained in
Chapter 14.
Office / Residential
Office
Residential
Figure 2.2
Typical building plan arrangements.
10
The core provides the main access point for all users of the building and generally houses
all vertical access systems, namely, lifts and stairs. At the scheme design stage it can be
beneficial to take advice from a specialist in vertical transportation. It is essential for
movement patterns, occupancy rates and waiting times, for example, to be considered in
selecting the optimum number of lifts, lift sizes and other specifications.
A number of lift strategies are viable to optimise lift provision, such as the provision of two
lift cars operating independently within a single shaft or double-decker lift cars serving
either odd or even floors respectively; however, these systems can be expensive and are
not that common. For very tall buildings, express lifts transport users to a sky lobby where
slower lifts then take them to their required floor, which could be above or below the sky
lobby level.
More sophisticated systems are also available which monitor lift patterns and allow users to
preselect their destination, either directly or via automatic monitoring of ID swipe cards; the
system then directs users to the fastest lift. Such systems can reduce the number of lifts
required within buildings, saving valuable space within the core, but should be investigated
and incorporated at the right stage in the process or some of the benefits may be lost.
Calculating the required lift movements and specifying the lift speeds is a specialist area
and advice should be sought from a lift specialist at an early stage in the design process.
In planning the layout of tall buildings, fire escape requirements must also be considered
early in the process, with space provisions incorporated into the core layout. The escape
strategy is key to many aspects of the design, including:
Location, size and number of escape stairs
Width and details for escape stairs
Need for sprinkler systems
Requirements for wet/dry risers
Provision and requirements for fire-fighting lifts/shafts
Compartmentation, fire door and escape lobby requirements
Smoke control provisions.
All these factors can impact on subsequent design activities, and therefore early
specialist advice is required to avoid abortive work.
11
2.8 Buildability
Speed of construction can be paramount to the viability of tall buildings. With the
capital cost representing a huge investment for clients and developers, obtaining a return
on investment is usually a key driver.
The core area represents a significant proportion of the building footprint. The core
usually lies at the heart of the construction site and will inevitably be used in some way
for vertical access during construction. Designers must consider, therefore, how the core
can be constructed quickly and efficiently. In modern construction, most contractors will
cast the core walls using either slip-forming or jump-forming techniques [2]. The layout
of the walls can be affected by the casting technique adopted.
Other elements of the structure must also be designed to allow efficient and quick
construction. The cycle time from floor to floor can greatly affect the overall
construction programme. Designers must, therefore, carefully select the form of
columns, walls and floors and consider the method of construction. Ideally designers
should obtain specialist construction advice.
Tall structures will inevitably deflect laterally (drift) under the effects of wind and seismic
loads. Designers typically set limits on the magnitude of these drift deflections and often
quote these in relation to the overall height, h. An overall drift limit of h/500 is typical,
however, the movement of one storey relative to the next (the inter-storey drift) is also
important in the design of the cladding system. Values for the inter-storey drift in the
range of h/500 to h/200 have all been used successfully in the past and h/300 probably
strikes a good balance, while h/400 is easier for cladding suppliers to deal with.
Although the drift values give an indication of performance the more important factor is
the dynamic response of the structure and designers must have a sound understanding
of the dynamic behaviour. A key factor affecting dynamic behaviour is the degree of
damping inherent in the structural form.
All buildings respond dynamically to changing load. A building has natural frequencies,
with associated mode shapes, at which it will respond when excited by changing loads.
For static loadings, such as those resulting from gravity, the natural frequency of
response has no effect on the loadings and displacements of the structure. However, for
dynamic loadings such as those induced from wind and seismic action, the natural
frequency of the structure needs to be considered. Where the frequency of the loading is
close to the natural frequency of the buildings response, a resonant displacement
build-up can be induced which will magnify the forces and displacements.
Tall buildings formed of in-situ reinforced concrete do, however, have an inherent degree
of natural damping. Damping, which is a measure of a structures ability to dissipate
energy, has a significant effect on the dynamic performance of buildings and limits
resonant displacement build-up under repeated wind or seismic loading.
12
Natural damping values cannot be altered other than by accepting increased cracking
levels and, as they are uncertain in magnitude, the output of dynamic analytical models
will also be uncertain. While it is possible to add damping to a structure by various
mechanical means, this can have practical and cost drawbacks. It is recommended that
the dynamic performance of buildings is investigated at the early design stages using a
range of damping values to establish the sensitivity of the response. Such modelling is
particularly important for slender towers.
Early identification of resonance problems will allow time to either modify the structure or
determine if some form of additional damping or energy dissipation system is required. If
required, the practical aspects of accommodation and costs can be included within the
overall plan. The use of auxiliary damping, if required to satisfy serviceability limit states,
must be reviewed in the context of building form and construction and maintenance
budget, so as to balance client aspirations with functionality and serviceability.
The overall aim of designing tall buildings to withstand accidental loads is similar to that
for all buildings, in that the structural system devised by engineers must maintain a level
of service or stability after the occurrence of an accidental event, such as an impact,
explosion or consequence of human error. This will require the structure to have
redundant load paths and adequately proportioned tie forces for robustness. As with all
structures, it is crucial for the structural system to be arranged to avoid disproportionate
or progressive collapse. More importantly, structural integrity will depend on the
maintenance of an adequate load path ensuring that all of the loads, including accidental
combinations, are transferred to the foundations after an accidental event. Accordingly,
a structure should have sufficient redundancy or multiple load paths.
Tall buildings constructed with a central concrete stability core surrounded by an in-situ
reinforced concrete frame have good inherent robustness against a major impact or
event. A number of factors contribute to this. Reinforcement provides good continuity,
holding the frame together, while the mass and capacity for plastic deformation provide
a high level of energy absorption. Good inherent fire resistance is also a major benefit.
Concrete columns designed for significant axial loads will generally be found to resist the
standard impact loads specified in design codes without any special treatment.
13
Selection of the most appropriate structural system for tall buildings depends on many
factors including, but not limited to, geographical location, construction skills, building
height, plan dimensions and intended use, as well as preferred visual appearance and
architectural requirements. The full complement of parameters is outside the control of
structural engineers.
Tall concrete framed buildings will almost always rely on the lift and stair core for a large
proportion of their lateral stability and overturning capacity. Structural engineers need
to pay particular attention to the position, size and arrangement of the core. Centrally
located cores are preferred but are not an absolute requirement. Positioning the core too
far from the centre of a building plan may necessitate the use of other lateral stability
systems to resist building twist.
All of the systems outlined below are based on the use of conventional cast in-situ
technology, excluding auxiliary damping systems used to control movement and
acceleration. For cases requiring an increased level of occupant comfort, various aspects
of the building performance can be improved with the use of auxiliary damping systems.
See Section 8.1.
Khans Structural System Chart The introduction of a framed tube structure by Fazlur
R. Khan (19291982) in the 1960s, together with industry-wide development in
understanding the range of structural behaviour appropriate to tall buildings, was a
major contribution to the evolution of skyscrapers.
Khans motto was the structural system is dictated by the structural logic and he
transformed the high-rise building design process, developing a Structural System Chart
for tall buildings (see Figure 3.1 although not all systems shown are appropriate for
reinforced concrete framed buildings or within the height scope of this publication).
Development of this wide variety of structural typologies has allowed modern engineers
to develop their designs with more clarity. Virtually all contemporary tall buildings will
have a structural system recognisable in the Structural System Chart.
For most tall buildings, system combinations may be applicable and engineers should
allow reasonable time to determine the most appropriate structural system for each
case. This task becomes easier with experience and is often based on a process of
elimination.
14
Figure 3.1
100
Number of storeys
80
60
40
20
1. Frame system
This section explains the structural principles and significant aspects for each of the
framing systems. At some building heights, there will inevitably be a crossover in the
structural performance of adjacent framing typologies, leaving final decisions to the
judgment of structural engineers who consider cost and efficiency.
For buildings at the taller end of the scale (above 200 m), some of the structural systems
will have a significant impact on the aesthetics of the building and, consequently, may
require far greater collaboration with the architects.
This is a relatively simple structural system, in which beams and columns are rigidly
connected to form moment-resisting frames in two orthogonal directions resisting
lateral and gravity loads.
Each frame resists a proportion of the lateral load, determined on the basis of its relative
stiffness compared to the sum total stiffness of the frames. For increasing structure
height, there is an associated direct increase in the size of the frame elements to satisfy
lateral drift and deflection limits.
The most economical arrangement, ensuring a relatively easy construction method, is the
flat-slab rigid-frame structure. The spans and floor-to-floor heights, and therefore flexural
stiffness of the rigid frame members (flat slabs, columns and connections) govern the
lateral stability of the entire structure. Typically, the most economical flat slab span is the
range of 8-9 m, but this will also depend on the building and floor heights.
15
Figure 3.2
Type 1 - Frame system.
Indicative internal
gravity columns
Internal frames
can also be used
This system consists of shear walls designed to resist lateral forces in two orthogonal
directions. Figure 3.3 shows a typical arrangement, with shear walls arranged near the
centre of the structure to house lifts, fire-escape stairs and other building servicing, thus
providing a stiff structural spine to resist horizontal loads in two directions. This is often
termed a core system, with the core designed to act as a single vertical cantilever with
sufficient lateral, torsional and bending stiffness to resist the worst combinations of
service and ultimate conditions.
A variation on this system involves the dispersal of additional shear walls evenly throughout
the plan area of the building. If this layout is adopted, it is beneficial to attain a level of
symmetry in the wall dimensions and positions across the plan to mitigate building twist.
Particular attention should be given to cores positioned away from the geometric wind
centre or the seismic mass centre of the building, in one or both directions. In this case, the
torsional or twisting loads on the core should be accurately determined and designed for.
Pure central core systems. In this instance, the walls act as vertical cantilevers
transferring horizontal loads to the foundations through flexural action and base shear.
For this framing typology, the very large relative lateral stiffness of the walls, compared
16
to the remaining vertical elements (columns), ensures lateral loads are resisted entirely
by the main shear walls. The columns are then designed to resist gravity loads only,
simplifying the design process and flat slab construction.
Architectural requirements and the need to run mechanical and electrical duct work
from within cores to floor areas usually leads to repetitive wall and opening
arrangements. This can result in effectively separate banks or groups of shear walls in the
same plane, which are separated by some distance, such as a lift-lobby corridor. It is
common in high-rise construction to connect these walls by stiff slabs and link beams at
each floor level. This creates what is known as a coupled wall structure and achieves a
much greater flexural stiffness than separate core wall elements.
Tieing multiple parts of a core together with link beams can result in a doubly curved
deflection profile within the core alone, similar to that shown in Figure 3.5.
The shear and moment that will occur in these beams, will usually make design and
detailing more complicated, particularly where the beams are slender or shallow, but the
advantages for the deflection performance of the structure are considerable.
Application of this system (and indeed any system where large structural elements are
tied together to achieve much greater bending stiffness) can result in large tensile forces
at foundation level, as a result of the base overturning moments from the peak lateral
load combinations. It is essential for the shear-wall layouts to be planned and arranged
for overall stability, in balance with gravity loads.
This system is generally sufficient for buildings up to 120 m tall. Although making shear
walls larger and longer within the limits of the floor plan may achieve significantly greater
heights (well into the super-tall category) other systems may prove more economical.
Figure 3.3
Type 2 - Shear-wall system.
17
This framing typology is essentially a combination of the two systems already outlined.
The combined lateral stiffness of rigid or semi-rigid frames and core shear walls allows
designers to reach heights of around 160 m cost-effectively.
This structural system is a common framing system for many tall buildings. However,
with the tight floor-to-floor heights often required in modern residential construction
and where flat plate slabs are used, it may be difficult to generate enough frame action
to provide a significant contribution to stability. The use of beam-and slab-floor framing
could potentially generate an economical level of frame action.
An advantage of the combined system, besides the ability to build taller, lies in the
reduction of lateral drift at the tip of the building. At the top of the building the shearcore walls are restrained by the frames while, lower down the building, the frames are
restrained by the shear walls. This interaction will typically induce a reverse-curve drift
profile, so that the overall lateral deformations are maintained within acceptable design
limits, and will achieve greater lateral force-resisting capacity. Refer to Figure 3.5, which
shows the effect of this type of combined system on the deflection profile near the top
of the building.
Figure 3.4
Type 3 - Shear-wall and frame-system.
Indicative beam
frame lines
18
Flexural-deflection
profile (pure cantilever) core only
Shear-deflection
profile - frame only
Figure 3.5
Pure bending and shear deflection
profiles.
Conceptually, this system is based on a hollow tube, with the large distance between the
tension and compression elements in both directions serving to resist lateral forces. The
structural principle is based on the flange of the tube frame being perpendicular to
lateral wind forces, tied at each end by the webs of the framed tube which are oriented
parallel to the wind.
Figure 3.6
Type 4 - Framed-tube system.
19
The invention of the tube system was a major advance in tall building technology. Repetition
of the structural pattern allows for simple and relatively fast construction, further enhanced
by the arrangement of internal slab elements. However, this system will have a strong impact
on the architectural aesthetic and may, at the outset, be deemed inappropriate.
When Khan created the framed-tube system, he demonstrated that reinforced concrete
as more economical than a similarly tall steel structure; although economic conditions
and material costs at any given time may have an impact on this equation.
The framed tube system is suitable for buildings up to approximately 150-170 m in height.
This system combines the stiffness of the perimeter-framed tube (Type 4) with a set of
stiff internal reinforced concrete core walls. Structurally, this arrangement will act in a
similar manner to the shear-wall and-frame system but will be considerably more robust
due to the strong lateral strength of the outer tube.
Figure 3.7
Type 5 - Tube-in-tube system.
20
The final arrangement of the internal core and external frame, and the degree to which
these two framing systems are combined, will govern the overall bending, torsional and
shear capacity of the structure. A high degree of analysis, planning and coordination will
be necessary to achieve the most economical balance for a particular building and, as
highlighted in Type 4, this system will largely dictate the appearance of the building.
The application of this system allows for the design of buildings up to approximately
180-200 m in height.
Types 6-8 are best suited to super-tall buildings and are outside the scope of this
guide but included here to provide a holistic view of available options.
This system is best suited to building heights greater than 70 storeys, or super-tall structures.
While this system performs in the same manner as the tube system, the number of
flange frames is increased by introducing inner web wall or frame elements splitting
the plan area into a series of modules. The term bundled describes the adjacent nature
of the modules, all of which should be apportioned to share lateral loads across the
width of the building in both directions.
The principal benefit of this system lies in the robust linkage of relatively smaller flange
sections by numerous web elements. This decreases the effect of shear lag within the
effective flange sections, thereby using the strength capacity of the flange frames more
efficiently. This system also typically allows for greater space between the outer columns,
inadvertently benefitting the architectural arrangement.
Khan called this system a rigid tube and a true cantilever, and the significantly
increased stiffness will allow the efficient design of 225 m-tall buildings.
Figure 3.8
Type 6 Bundled - tube system or modulartube system.
21
Similarly to the bundled tube, this system uses diagonal bracing added to the perimeter
tube frames to increase the tube systems lateral stiffness and accommodate increased
building height. This allows for greater column space and thus more free area for glazing
within the faade. With this structure, the aesthetic form of the building is largely
dictated by the diagonal bracing lines.
The external tube elements act as bracing frames by transferring lateral loads to the
foundations along the diagonal tension and compression lines, and also redistribute the
gravity loads from the highly stressed to less stressed columns, ensuring a high degree of
structural redundancy and many load paths.
This system is most suited to buildings up to 300 m, or super-tall.
Figure 3.9
Type 7 - Bracing-tube system.
Indicative
diagonal
bracing
Elevation
Plan
22
Type 8 - Outrigger-
braced system
This system is used for the design of structures up to 350 m tall, or super-tall. The
concept of using outriggers can be applied to much shorter buildings.
Attaining the necessary increase in overall lateral stability of the structure requires
perimeter columns as a fundamental part of the structural system. This can be done
through the introduction of horizontal outrigger elements (often trusses) of one or two
floors deep, connecting the core with the outer columns at regular height intervals up
the building. At the same level as the outriggers will be exterior solid walls or trusses
often termed belt trusses up to two storeys deep, connecting the perimeter
columns to the outriggers and also serving to distribute vertical loads.
This type of system activates a series of push-pull couples in the perimeter columns,
redistributing stresses due to vertical bending in the core and consequently reducing
uplift at its base. Horizontal deflections at the top of tall buildings are reduced,
compared to similar systems, since the core is restrained by the perimeter tube.
Figure 3.10
Type 8 Outrigger - braced system.
Indicative outrigger at
belt wall / truss level
Belt wall
Plan
Belt wall
Elevation
23
24
The substantial lateral stiffness of this system is provided mainly by the central megacore governing the overall structural bending, shear and torsional stiffness of the
structure. The large size of this core does not usually preclude the use of this system; it
is, in fact, a natural requirement given the structures height as well as the great number
of occupants and lifts that this system must accommodate.
Structural elements 4
4. Structural elements
Tall buildings are made up of the typical elements used in low-rise construction, namely,
walls, columns and floors/beams. Their use in tall buildings can, however, impose
additional demands on their performance and this needs to be considered and addressed
by the engineer during the design, detailing and construction stages.
When embarking on the design of tall structures an engineer now commonly use 3D
computer software, which adopts finite element modelling (FEM) techniques. Many
software packages offer a high degree of sophistication in modelling structural
behaviour, allowing the engineer to gain a very good understanding of how the structure
will behave when subjected to various load cases. However, care and experience is
required when using such software to ensure that the various structural elements are
modelled appropriately.
To ensure the quality and reliability of the structural analysis carried out with FEM
software (that often have hundreds of thousands of nodes) elementary precautions
should be taken including:
Checking the following key results with a straightforward approach based on simple
It is also important that the engineer considers the likely construction sequence during
the formulation of the structural FE model and in the design of the structural elements.
The construction sequence and methodology can impose additional load cases and
design considerations, for example, where the core walls are progressed ahead of the
surrounding floors and columns.
25
4 Structural elements
4.1 Floors
The primary purpose of floors is to support the applied floor loadings and distribute the
loading to the supporting walls and columns. Depending on the structural framing
system adopted, the floor structure may also contribute to the lateral-load-carrying
system, either via diaphragm action or in more complex ways. For certain stability
systems, the floors may contribute directly and form the horizontal elements of
moment-resisting stability frames. In some cases, integral beams are added to the floor
construction to provide increased stiffness and load capacity. When the floor does
contribute in some way to the lateral load carrying system, load reversal may be possible
and strength assessments should be used to ensure all load cases are addressed.
Floors are subject to bending, shear and axial loading, and require adequate strength and
stiffness to resist the applied loading whilst remaining within the specified deflection
and vibration limits. While all of the flooring systems used for low-rise construction can
be adopted for tall buildings, a number of factors narrow down the choice. The primary
considerations are discussed in this section.
Floor depth
As the floors within tall concrete buildings repeat many times, even a small saving on
floor depth can become significant. For example, a saving of even 100 mm per floor
would result in a 4 m saving over the height of a 40-floor building, allowing an extra
floor to be accommodated within the same original envelope and producing valuable
additional revenue. Alternatively, a 4 m height of cladding could be saved, which over
the full perimeter of the building could produce significant cost savings.
Overall weight
Any weight saving is multiplied across repeating storeys, thus any saving can have a
significant effect on the sizing of vertical elements and the foundations. Weight and
material savings can also speed up the construction through reduced cranage requirements.
Speed of construction
Speed of construction plays a vital role in the viability of a tall building. The time taken
to achieve a return on the investment is crucial to funding arrangements; construction
cost is influenced greatly by construction period. The floor construction will, in turn,
influence the contractors ability to construct the building quickly. In comparing flooring
systems, one of the key criteria should be the cycle time from floor to floor. For most tall
buildings, the contractor will aim to achieve a cycle time of somewhere between four
and seven days. This is a very short period and it should be noted that this period
includes the time needed to construct the supporting columns and walls at each level.
The floor design needs to facilitate such rapid construction demands and the designer
will need to consider factors such as concrete strength gain, back-propping requirements
and reinforcement fixing details. The ability to prefabricate reinforcement cages, for
example, can offer an advantage.
Additionally, normal serviceability criteria will need to be considered during the design
process, including cracking, deflection, acoustic performance and vibration response.
Careful consideration must be given to construction tolerances and floor deflections,
particularly at the slab perimeter, where cladding systems are attached.
26
Structural elements 4
For tall buildings, the effects of differential axial shortening must be considered in floor
design. Differential axial shortening can occur in all buildings but becomes more
noticeable as building height increases. Differential axial shortening arises due to the
different levels of axial stress in the columns of the building compared to the core.
Core walls are generally quite large, with their size influenced by both axial stress
requirements and stiffness requirements to resist lateral loads. Columns, by contrast, are
usually kept as small as possible and are generally more heavily stressed. As construction
progresses, columns and core walls undergo elastic and creep shortening at differing
rates. The effect on the floor slab is like having a spring support at some of the support
locations altering the distribution of moments and shear forces around the floor plate,
requiring reinforcement rates to be adjusted accordingly in floor design. The differential
relative settlement of supports can also affect the levelness of floors and, if not carefully
considered and compensated for in design and construction, may give rise to tolerance
issues for floor finishes and cladding details.
Modelling Floors
particularly in zones where constraints are concentrated e.g. close to supports. Advice
should be sought from the FEM software provider as necessary.
Reinforced concrete floors can rarely be fully fixed into the core due to practical
considerations, for example, limitations on the diameter/spacing of passivereinforcement steel projecting from the core. The floor/wall connection should
therefore be modelled appropriately so that the stiffness of the wall/floor joint is not
over-estimated.
Cracking will occur in the floor elements, which will affect the stiffness of the floor.
Again the material properties used in the FEM model should be set accordingly.
Where floors include beam elements the model must accommodate the eccentricity
of the beam and floor centre line. Such effects can induce bending within the floors
and beams, particularly where the horizontal elements also transfer significant
in-plane forces.
27
4 Structural elements
For all of the above options, either reinforced concrete or post-tensioned concrete can
be adopted. Post-tensioning of the flooring elements is a popular choice for tall buildings
due to the improvements it brings in reduced overall thickness and weight, while
speeding up construction. Where post-tensioning is proposed, it is important to consider
the following points:
Restraint to the pre-stress shortening due to stiff-core walls and columns
Access to undertake the stressing often required from the building perimeter
Method of providing a tie into the core walls when progressed ahead of the floors
Post-tensioning will generally only be designed to resist gravity loadings and traditional
reinforcement may be required to cater for any load reversals caused by lateral loading
from wind or seismic events.
The use of precast concrete floors systems can offer some advantages in terms of speed of
construction and can also offer large-span floors, which are attractive for office and retail
uses. Precast solutions also have benefits relating to concrete supply at high level, back
propping and strength gain. Where precast floors are used it is essential that the engineer
fully considers the robustness of the structure and provides the requisite ties between the
individual precast elements to ensure that the structure as a whole can perform
adequately in the event of accidental loading.
Precast systems require more cranage to construct the building. If a precast flooring
system is proposed it is essential that the cranage and lifting strategy to be used for the
construction is well considered ideally in conjunction with the constructor.
28
Structural elements 4
Table 4.1
Floor solutions.
Slab type
Floor
depth
Overall
weight
Speed of
construction
Overall
rating
Comments
Flat slab
Waffle slab
- Poor
- Good
- Excellent
29
4 Structural elements
4.2 Columns
The primary purpose of columns is to support the floors and distribute vertical loading
to the ground. Columns are generally spaced at regular intervals along the perimeter of
the structure but, for larger floor plates, interior columns are frequently needed to
reduce the span of the floors.
The design of the core benefits from supporting a larger share of the vertical loading, as
this assists with resisting overturning from lateral loads. Spacing of columns from the
core should, therefore, ideally be maximised. The central core may typically support
about 60 % of the vertical loading, with the columns supporting the remaining 40 %.
Columns may be arranged to form part of the stability system, as discussed in Section 4.2.1,
and this will make further demands on the performance of the columns.
Columns are mainly subjected to axial compression. When selecting the column
arrangement, engineers should consider the following factors:
4.2.1 Performance
requirements
Concrete is well suited to economically resist high levels of compression stress and can
be pumped at high altitudes (614 m from the ground for the Burj Khalifa in Dubai).
High-strength concretes can be used if the type of construction allows it; the gain in
usable floor area, resulting from the reduced column cross section, can compensate for
any additional cost.
Modelling columns
When a column changes dimensions between two successive levels, the model
should take into account the corresponding offsets in the column centre lines or it
may neglect the associated bending moment induced within the column. This
situation is common in faade columns, whose dimensions reduce towards the top
of a structure and where the faade face is continuous.
Where walking columns are used, the offset of the columns can be significant and
30
Structural elements 4
Column spacing is generally kept in the range of 6-10m, as this produces economical
column sizes and floor depths whilst maintaining usable floor plates. Wider spacing is
generally more suitable for office use, with smaller spacing acceptable for residential
purposes. Should the building use change through the height of the building, a single
transfer floor may be appropriate and can generally be assigned for plant and equipment
or as part of the buildings stability system.
The eccentricity of the vertical loading at each floor is resisted by tension and
compression forces within the floor structures. Floors, therefore, become part of the
vertical load carrying system and, in addition to gravity loadings, must be designed and
reinforced to resist additional lateral loadings and treated appropriately in terms of their
response to accidental loadings, robustness and disproportionate collapse.
Column spacing at the perimeter of the building can be influenced by the selected
faade. In modern buildings an open faade is often provided and columns centres are
maximised for the least intrusion into the faade line and views for the building occupants.
Figure 4.1
Walking columns.
Tension
Walking
column
Eccentricity in column
compression transferred
through floors to core
Compression
31
4 Structural elements
Often, a short cantilever slab is provided at the building perimeter, allowing the faade
to run past the outer columns in an uninterrupted line. This can simplify and regularise
the details for the faade and help with the detailing of the column/floor slab connection.
If the outer columns of the building are utilised as part of the lateral load carrying
system - for example, in a framed-tube structure - column spacing will be much smaller
(perhaps 2-4m) and the slab edge will be formed with the stiff interconnecting beams.
The initial sizing of columns will take into account the following factors:
Axial and bending stresses
Slenderness, particularly for very tall columns (entrance areas, double height spaces)
Fire resistance and, hence, cover requirements, particularly for columns using
When sizing the columns in tall buildings, the designer should also consider the
following factors:
Obtaining uniform stress levels across the columns and walls in a single floor plate in
32
Structural elements 4
Table 4.2
Comparison of common column shapes
Column shape
Technical
feasibility
Economy
Ease Of
planning
Overall
rating
Comments
Circular
Square
h
Rectangle b:h < 3:1
Key to ratings:-
- Poor
- Good
- Excellent
33
4 Structural elements
The compression stresses applied to columns can quickly be determined by carrying out
a floor-by-floor manual vertical load take down, assigning the floor area supported by
each column. Increases should be added for the continuity of floor structures. Manual load
distribution techniques can also approximate the stresses generated from lateral loadings.
Another vertical-load take-down comes from the analysis model for the entire building.
It is good practice to use both manual and computer techniques, as this provides a good
insight into the load paths through the structure and also acts as a good method of
verifying that the analysis results are correct.
An analysis of the full building will only look at the completed structure as a whole and
may not fully take into account loading conditions during the construction process,
which may produce more onerous load cases. For example, in the absence of higher axial
loadings in the final condition, higher bending stresses in columns may require additional
reinforcement. Good practice involves undertaking a consideration of column design at
key construction stages to investigate such effects.
When selecting column sizes, axial loading can reduce significantly over the height of the
structure. While corresponding changes in the column cross-section can be appropriate,
consideration should be given to construction and design impacts, as frequent changes
can be costly in terms of formwork and speed of construction. Changes in cross-section
should be limited and, ideally, only undertaken at a minimum of every five floors.
Changes in column size can also produce localised additional bending forces in the
structure, if the column centre lines are not aligned. Architectural design often requires
one face of a column to remain in line at such changes in size, changing the centre line of
the column cross-section and, thus, the line of action of the vertical load. Such steps in
the column lines can usually be accommodated through appropriate design and detailing
of the reinforcement at these locations.
The use of high-strength concrete, particularly for columns, is not unusual and strengths
up to 80 N/mm2 are often used. High-strength concrete (up to 120 N/mm2) has been
used on some tall buildings although this is less common. High-strength concrete can
perform differently in a fire situation and, hence, where high-strength concrete is
specified, the fire resistance should be thoroughly researched and verified.
Where high-strength concrete is selected for use in the columns, care should be taken
with the design and specification of floor slabs between the columns. For example, if
C80 concrete is specified for the columns and C40 for the floor slabs, a design check will
be required to confirm the column loadings can be adequately transmitted through the
lower-strength slab zone. Most national standards provide guidance for this situation and
may require the provision of additional containment reinforcement through the slab or
set a limit on the differential concrete strengths between column and slab. A higher
concrete grade can be specified in the slab zone in the immediate vicinity of the column,
34
Structural elements 4
although this is difficult to achieve in practice and is not recommended unless rigorous
procedures are put in place at site level to ensure compliance.
Figure 4.2
Comparison of composite column
configurations.
Fully encased
Partially encased
As using composite columns can greatly increase the unit cost of columns and slow
down construction, they are generally only adopted if standard reinforced columns are
uneconomical due to size constraints.
35
4 Structural elements
4.3 Walls
When structural walls are provided within tall buildings, they frequently have two
primary functions. The inherent in-plane stiffness of the walls will normally contribute to
the lateral load carrying system in the building. They also support vertical loadings and,
wherever possible, the vertical loading in a wall should be maximised to counter lateral
loadings by helping to resist associated over-turning.
As noted in previous sections, the core walls of tall buildings may resist most, if not all,
of the lateral loadings and typically may support around 60 % of the total vertical
loading on the building.
The individual walls making up a core are often connected by link beams. Such beams are
often used to connect discrete walls and, thus, increase the overall stiffness of the core.
Link beams can attract significant forces and must be sized, designed and detailed accordingly.
Walls are mainly subjected to in-plane shear forces and axial compression. When
selecting the wall arrangement, engineers should consider the following factors:
Reducing walls geometric footprint to maximise usable floor area
Ease of detailing and connection to floor structure
Speed of construction, particularly ease with which walls can be slip-or jump-formed
Robustness of walls and their resistance to fire.
Concrete is well suited for use in the walls of tall buildings, as it can most easily
accommodate in-plane shear forces and associated compression. As wall sizes are most often
established from requirements for stiffness rather than strength, high-strength concrete is
not commonly used in the construction of walls, except for the tallest of structures.
When modelling wall elements and any connecting link beams within an FE model,
consideration should be given to the following points:
When a wall changes dimensions between two successive levels, the model should
take into account the corresponding offsets in the wall centre lines or it may neglect
the associated bending moment induced within the wall. This situation sometimes
occurs in core walls, where the wall thickness reduces towards the top of a structure
and where inside face is continuous.
Where link beams are provided to connect between the walls of the core, the correct
beams are generally relatively deep in comparison to their span and hence are
dominated by shear deformation rather than bending. This can lead to an increased
degree of cracking with the beam section. The rigidity (EI) of the link beam is normally
adjusted (reduced) to take account of this increased degree of cracking.
36
Structural elements 4
In the FEM software the link beams are often represented by beam elements
connecting between the wall elements of the core. It is good practice to increase the
length of the FE elements by one or two FE mesh nodes at each end to more
accurately represent the attachment of the beams into the core walls.
While the spacing of walls within building footprints will be determined in collaboration
with clients and architects, structural engineers have a key role to play with positioning
of the main lateral load carrying walls critical to the performance of the building.
Ideally, walls should be placed symmetrically around the global centroid of the building in
each principal horizontal axis, to reduce the torsional response of the building to lateral
loadings. Positioning walls to intersect at right angles can greatly increase the stiffness and
stability of the walls overall, allowing them to work compositely to resist lateral loading.
Frequently, the main walls in a tall building are positioned around the central core where
the lift shaft and staircases serving the building are housed. A convenient location for the
structural walls, it provides a very efficient structural form and is often the first pass layout
for the walls; from which a final layout can be developed following an iterative process.
The initial sizing of the walls will take into account the following factors:
Axial and bending stresses
Overall stiffness to resist lateral forces and limit lateral defections
Buckling resistance, particularly for very tall walls (entrance areas, double height
spaces etc.)
Fire resistance and hence cover requirements - guidance is provided in most national codes
Structure robustness criteria.
In addition, wall sizing decisions must take into account the following factors more
specific to tall buildings:
Standardisation of shape and cross-sectional area to aid with speed of construction
and buildability.
Obtaining uniform stress levels across the walls and columns in a single floor plate to
37
4 Structural elements
Manual load distribution techniques can also approximate stresses generated from
lateral loadings using simple hand methods of calculating and attributing the relative
wall stiffnesses. The results from hand analysis can be compared to a full computational
analysis model for the entire building for verification.
Again, as for columns, it should be remembered that the analysis of the full building will
only look at the completed structure as a whole and may therefore miss loading
conditions during the construction process. Temporary conditions may produce more
onerous load cases, particularly if core walls are advanced ahead of the remainder of the
structure with techniques such as slip- or jump-forming. Core walls can, in some cases,
be advanced 10 or more floors ahead, with the result they are exposed to very different
loading and restraint conditions than in the final design. Studies should be undertaken
to consider the behaviour and strength of walls during construction.
Axial loading in the walls will reduce significantly over the height of the structure.
Although wall thicknesses are sometimes reduced at increasing height up buildings,
constructional difficulties can arise and the impact of walls overall stiffness must be
factored into the design.
Changes in the thickness of walls will produce out-of-plane bending moments if the wall
centre lines are not aligned. Architectural design often requires one face of the wall to
remain in line at changes in size, changing the centreline of the wall cross-section and,
thus, the line of action of the vertical load. Even small offsets in the wall centre lines can
produce very large bending moments, as the vertical loads involved can be significant,
although they can often be accommodated by appropriate local reinforcement detailing.
Openings (such as lift shaft doors) will be required through most of the walls to facilitate
access for users of the building and for mechanical and electrical services. Opening
positions can significantly influence the stiffness and strength of the wall. Any openings
through the main walls should be positioned away from the end sections or any
junctions with perpendicular walls, as these zones tend to be more heavily stressed.
Openings should ideally be placed in the middle half of the plan length of the wall.
Openings repeating at each floor level, as is the case with lift doors, can leave only
relatively shallow sections (or link beams) connecting two longer sections of wall. Link
beams are required to transmit very large shear forces as they often act to couple two
sections of wall. Modelling the behaviour of link beams requires careful consideration, as
does their design and detailing, to ensure the link beams can resist the applied forces and
can be constructed efficiently.
38
Foundations
5
5. Foundations
Early tall building developments tended to be in areas such as Chicago and New York,
where, fortunately, ground conditions were conducive to carrying high building loads. As
these types of structures have spread to other parts of the world, more challenging
ground conditions have been encountered.
This has inevitably resulted in the adoption of various foundation solutions to reflect the
strength and compressibility of the underlying deposits. For example, while Chicago and
New York are underlain by high-strength rocks Dolomite and Metamorphic,
respectively - Shanghai within the Yangtze River delta is underlain by over 100m of soft
sedimentary deposits and yet has super-tall buildings (at time of publication, Shanghai
World Financial Centre, at 492 m, is the tallest). London is to a large degree underlain by
stiff London Clay but, generally, tall buildings such as those at Canary Wharf are
supported by piles bored into the dense Thanet Sands found below the clay deposits.
When founding on deposits of high strength and low compressibility, with evident spare
capacity in the ground to carry anticipated building loads, taking accurate measurement
of parameters is not of paramount importance. However, failure to properly sample, test
and evaluate many deposits can result in adopting inefficient and overly expensive
foundation solutions.
Over recent years, considerable effort has been expended on improving laboratory and
in-situ testing methods to more accurately measure parameters used in design.
Historically, much design work has relied on empirical correlations as an approximate
means of deriving a foundation solution but they can be generic and conservative,
resulting in an over-designed and relatively expensive sub-structure.
Prevailing ground conditions and a site investigation should point towards a basic
methodology for foundation design. The options range from fully piled solutions using
caissons or barrettes to transfer loads away from weak deposits towards deeper and
firmer strata, to a raft transferring all the building loads directly onto the strata
immediately below the building footprint.
In many cases engineers opt for one of these two basic approaches. The advent of better
modelling techniques, however, enables composite systems using a raft and piles in
combination to be used. Composite systems can better address uncertainties in the
ground and in the performance of individual elements of the foundation system. For
example, if the raft has a tendency to settle to a greater degree than anticipated, the
piles take a greater share of the load while, if the piles perform worse than expected, the
raft carries the additional load. To an extent, the combined system is self-compensating.
Ground conditions
39
5 Foundations
Basements
The majority of tall buildings have deep basements associated with the overall
development; frequently extending well beyond the footprint of the main building.
Often the permanent groundwater table is well above basement level and, therefore,
significant uplift pressure can be generated. Outside of the main building footprint, the
basement either has to be held down (generally by tension piles or anchors) or the entire
area has to be under-drained.
To support the soil and water pressures exerted on the basement walls, lateral loads have to be
carried by slabs, unless permanent ground anchors are employed. The slabs need to exhibit
continuity across the full extent of the basement and building structure. Additionally, with
large spans, consideration has to be given to construction methodology to ensure shrinkage
and creep of the slabs does not lead to excessive displacement of the basement walls.
sequences of deposits.
There is inherent uncertainty in using historical evidence to design buildings that are
often substantially taller and heavier than those previously built in the region.
deposits and possible geo-hazards, such as cavities, buried channels and landslips.
Conducting sufficient boreholes and trial pits to examine the variability of deposits
across the site.
Taking boreholes deep enough to examine deposits significantly loaded by the
structure. A raft foundation will affect strata many tens of metres below founding
level. In weak deposits, piles may have to extend up to 80-100m below ground level.
Obtaining good recovery of all material present. Too frequently in rotary boreholes,
core recovery can be only 50-60 %. While the 40-50 % lost is probably the weaker
material which will in fact dominate foundation performance, these deposits have
not been sampled and will not be tested.
Using sampling methods that limit the disturbance of samples, for example, pushing
rather than hammering in tubes for cohesive deposits. For cored samples, select clean
sub-samples and wrap for testing as soon as the core is obtained, as a great many
materials deteriorate rapidly on exposure.
40
Foundations
5
the central portion of the sample as measurement of platen ends is highly inaccurate.
Ensuring laboratory testing is carried out on undisturbed samples, representative of
Tall buildings must be solidly anchored in the substratum. Under the effect of horizontal
forces, the structure of tall buildings is comparable to a cantilever embedded at its base;
any lack of stiffness at the base can be detrimental to the performance of the structure
overall. Depending on the nature of the foundation soil, tall buildings may either rest
directly on the ground via a raft foundation or be embedded on deep pile-type
foundations, as described in preceding sections.
Soil-structure interaction influences the distribution of vertical loads on the ground and
stresses in the structures, design of foundations, soil settlement study and the dynamic
behaviour of the building under the effects of horizontal forces (wind and seismic forces).
Incorrect evaluation may lead to cracking caused by differential settlement. It may also
lead to a structure failing to meet user-comfort criteria as a result of an overestimation
of the stiffness of the building. Correctly taking into account this phenomenon allows for
the acurate evaluation of the settlement on neighbouring structures.
When considering the vertical load in a building and its distribution on the ground via
the core and the columns, a corresponding settlement trough will occur, leading to a
distribution of vertical stiffness on the whole area of the vertical loads. In the same way,
soil stiffness distribution will be associated with the horizontal forces.
41
5 Foundations
Figure 5.1
Comparison of geotechnical and
structural models.
Structural model
Geotechnical model
The distribution of soil springs under the structural elements in contact with the soil has
a direct effect on the distribution of vertical loads.
Foundations for tall buildings inevitably have to carry very high loads. Frequently
designers prefer to adopt a deep-piled solution, which takes loads to competent strata.
However, with a good understanding of anticipated soil and rock behaviour, engineers
should consider a far broader range of options to derive a safe, yet economical,
foundation system.
5.3 Methods of
foundation analysis
When built in solid rock, foundations could simply be a number of spread footings, used
in conjunction with a raft to support the main core of the structure. On a more general
basis though, designers should evaluate the use of rafts and piles, with a view to
combining them.
As buildings have become taller, rafts have become complex feats of engineering in their
own right. Rafts can be several metres thick to accommodate the punching-shear effect
of heavily loading columns, while adequate load spread should be ensured onto the
underlying strata. Aspects requiring an appropriate judgement by structural engineers
undertaking any form of modelling include:
42
5.3.1 Rafts
Foundations
5
Deciding whether to treat the raft as an elastic medium; concrete is either assumed
to be uncracked or cracked.
Considering the benefits of the reinforcement, often of very substantial proportions,
walls will substantially reduce the flexibility of the portion of raft underlying these elements.
When considering the interaction between the raft and the ground, structural engineers
frequently analyse the problem by simplifying the entire substrata as a series of springs.
This process entails identifying zones on the raft with equivalent loading. An appropriate
spring is derived based on the area of loading and the modulus of the underlying
ground. A simplified procedure is presented in Figure 5.2.
Figure 5.2
40
C
40
12
10
12
10
25
25
Figure 5.3
2D Model Analysis.
a) 2D model springs
b) Deflected shape
43
5 Foundations
A better representation of the performance of the raft interacting with the soil can be
achieved by using a 2D finit element, soil-structure interaction, software. While the raft
is represented in its simplest form as an elastic element, the full sequence of soil and
rock strata can be modelled beneath the raft, with the appropriate elastic moduli.
Working in two dimensions means that the adopted section can only relate to a specific
load distribution which is assumed to be the same across the full extent of the raft, while
the third dimension is infinite and offers columns and cores represented by continuous
walls. Despite these restrictions, a good geotechnical numerical modeller can provide a
reasonable evaluation of springs to be used for the structural model and a good check
on the anticipated deflected shape of the raft from sagging or hogging.
Errors in soil stiffness or load spread through the raft will inevitably give varying degrees
of error in the final output. To address this, ranges of soil parameters are normally
considered, to check whether variations in the deflected form of the raft are likely, and
to account for this in the final detailing of the raft and its reinforcement.
Figure 5.4
3D soil structure interaction model.
is recommended.
plant rooms)
A grid of spring supports with constant node spacing (generally 20 % of the average
column spacing).
44
Foundations
5
The soil-structure interaction should then be undertaken using the following procedure:
1. Assign a constant spring under each node in the structural model to achieve overall
5. Assign this set of spring values (k) to all the nodes in the structural model to derive a
until the nodal settlement from the structural and geotechnical model matches. This
can generally be achieved in around three and five iteration cycles.
Once the settlement in both the software models converges (as established from a
comparison of the settlement outputs, see Figure 5.5) the bending moment, shear,
bearing pressure and deflection of the raft can be determined.
Figure 5.5
Convergence of settlement from
structural and geotechnical software.
5.3.2 Piles
When a pile solution is adopted under high-rise buildings, designers usually evaluate
the adoption of significant groups of large diameter piles. Although emphasis is often
placed on the testing regimes of single piles to validate the overall pile design, there
are distinct differences between the performance of a single pile and that of a large
pile group.
The performance of a single pile is governed by two discrete facets:
Friction generated between the pile shaft and the ground
Strength of the soil/rock underlying the base of the pile.
45
5 Foundations
For a pile group, the piles encompass a large volume of soil and the action of piles and
soil working in combination will dictate group performance. As with a raft, the base of
the pile group is loading a significant area of the underlying strata, and material well
below the base of the piles is stressed and will thereby effect pile group settlement.
Some relatively simple procedures have evolved enabling designers to assess pile group
performance, however, it is recommended that advice is sought from a geotechnical
specialist.
While many foundations are either simple rafts or end up as large pile groups, the
benefits of both forms can be realised in a pile-assisted raft. This approach affords
considerable efficiencies over the adoption of a fully-piled system, while using a raft to
avoid excessive settlement.
In its elemental form, the pile-assisted raft can be envisaged as a raft with piles
strategically placed beneath highly-loaded columns to reduce the overall load on the raft
and limit settlement. However, the full benefit is realised when analysis is able to
reasonably predict the portion of load carried by the raft and by each pile.
Analysing pile-assisted rafts is complicated by a three-fold load path, with the building
load applied to the top of the raft, transferred in turn to the piles, being stiffer than the
ground, and then to the soil beneath the raft as the piles settle. The load in the ground
then increases the stress induced on the piles themselves.
46
Foundations
5
Elements that can be seen as relatively unique for tall buildings are:
Ensuring slab continuity across the basement to resist lateral soil and water pressures.
Controlling the impact of slab shrinkage and creep pulling in the permanent
basement walls.
Accommodating the significant load changes occurring at the perimeter of the tower
Due to the many parameters set out above, it is difficult to give precise guidance on
issues relating to basement construction in tall buildings. However, general guidance on
the design of concrete basements can be obtained from The Concrete Centre publication:
Concrete Basements, CCIP-044 [3].
47
6 Buildability
6. Buildability
Early contractor involvement is essential to inform the decision-making process within
the design and detailing of tall buildings. With the design team and contractor working
in partnership from an early stage, fundamental choices affecting the design can be
made, such as core construction methodology, tower cranes, access (hoists and stairs)
and screens. In addition, early collaboration affords time to ensure the most
advantageous construction sequence can be realised, developed and understood by
all parties.
of forming.
The formwork system used for core construction needs to be considered integrally with
the cranage and logistics solutions for the construction, including the relative position
and height of core links to the cranes. If the crane is tied to the core, the two can
progress together, whereas if the crane is tied to the slabs, then the core and crane
progression will be directly linked to slab progress.
Structural engineers and contractors should engage in workshops from an early stage,
enabling restrictions on the height of the core beyond the following slabs to be fully
understood by all parties. It may be necessary to re-examine the foundation solution to
ensure it can cope with the different load case when the core has been jumped in
advance of the rest of the building.
Figure 6.1
High-rise construction.
Photo: Laing ORourke Plc.
48
Buildability
6
Table 6.1
Core-forming options and some key attributes.
Attributes
Crane climbed
jump-form
Self-climbing
jump-form
Self-climbing
slip-form
Self-climbing intermittent
slip-form (Stutterform)
Good
Good
Concrete required
As per structural
requirements
Concrete placement
Skip
Skip
200-800mm
200-800mm
200- 450mm
200- 450mm
Frame-to-core
connection
Embedded plate or
cast-in couplers or
pull-out bars
Concrete corbel or
embedded plate or
cast-in couplers or
pull-out bars
Embedded plate or
cast-in couplers or
pull-out bars
4 days
4 days
Cranage required
Moderate demand
High demand
High demand
Yes
Yes
Yes
Yes
Special
considerations
N/A
N/A
Figure 6.2
Schematic of the self-climbing jump-form system
Image: Select Plant Hire Limited & Laing ORourke Plc.
LEVEL (N+3)
LEVEL (N+2)
LEVEL (N+1)
49
6 Buildability
Figure 6.3
An example of a crane-lifted
jump-form.
Image: Peri Ltd.
All of the systems can accommodate changes to the core wall thicknesses but these
should be minimised. Refer to Figures 6.1, 6.2 and 6.3.
With all of the outlined systems, a level of integration is required between temporary
and permanent works. The plan layout of the walls, floor-to-floor heights and location
of any penetrations needs to be frozen at an early stage.
Although these are standard formwork systems, early engagement can lead to a more
refined system. The aim is to cast as many of the structural elements in the initial pass
as possible and minimise any return visits or trailing platforms. Further refinements can
be made to install precast stairs through the formwork systems. Again, this needs to be
fully understood by all parties to ensure that a core being progressed in advance of the
rest of the structure has the necessary stability.
Additional pockets and cast-in plates required for any of the systems need to be
coordinated, as the preferred location may not be possible due to the design of the core.
Typically these pockets should be considered as penetrations and detailed as such, but
there will be a need for additional reinforcement to accommodate concentrated loads.
Detailing needs to reflect the sequence of core construction, as some walls and slabs
may be cast from a trailing platform. The structural connection between these elements
needs to be fully designed to allow accurate detailing. Beams within the core walls need
to be considered early to allow efficient placement of rebar through layering and
orientation of bars.
50
Buildability
6
Figure 6.4
An example of a slip-formed core
Photo: Laing ORourke Plc.
Consultation between structural engineers and contractors must take place to ensure
contractors can pre-set building levels to account for any settlement and axial
shortening of structures over the construction phase. Sequence and loading at every
point within the programme must be fully understood and calculated.
Element levels at each floor will need to be cast higher than the desired final level by a
variable amount predicted by theoretical calculation. Contractors will need to monitor
all element levels at each floor regularly as construction advances, and report these to
designers for comparison with theoretical and target levels and potential adjustment
based on actual movements. If conducted collaboratively, using the same approach as
the original design, an improved result can be achieved. Further guidance on presetting
and monitoring the structure during construction is provided in Chapter 11.
6.2 Column and wall
construction
However, if precast is not a viable solution, an on-site solution can be used. To choose
the appropriate methodology, impact on cranage and lay-down must be considered.
51
6 Buildability
It may be beneficial to prefabricate the rebar and then lift it into place, possibly using
double height cages to minimise the impact on cranage, while slab-to-column
connections should be considered to ensure buildability.
For a double-height pour, the formwork would require more hook time as it would not
be light enough for manual placement. If single height is utilised, then a lightweight
formwork solution would be appropriate but due to cranage and economies of scale, it
may be more prudent to fabricate bespoke shutters offering the advantage of being a
single-lift item to the exact project specifications.
Consideration should be given to the structural form of the slabs, and its impact on
construction. General guidance, irrespective of structural form, includes:
In-situ floor construction has commonly been adopted for high rise concrete structures.
For in-situ slabs, options include reinforced concrete (RC) or post-tensioned (PT)
construction. If PT is chosen, particular care should be given to:
Temporary movement joints and pour strips
Tensile shortening of slabs inducing restraint cracking in edge columns
Slab deflections
Fixing points for the faade and any cast-in inserts which will need to be coordinated
52
Buildability
6
Contractors may prefer a PT option as it can provide quicker cycle times for the
falsework and minimise the weight of reinforcement within the slab.
not suitable, from an architectural perspective, for all end uses. Although it provides
permanent falsework, propping is still required at a reduced quantity. It may be that
these loads inform the permanent works design.
Lattice girder with in-situ beams can be more economical than an entire lattice plank
slab but requires more falsework.
Hollow core slabs finish is generally inferior to a RC slab and may need to be made
good or covered. Speed of installation is high with little temporary works
requirement, although the connection to vertical elements is restrictive and may
require additional items (steel angles) or for cores to be left open to allow for tying in.
Double T Units provide a fast solution, able to cope with large spans with little
temporary works requirement. It is necessary to ensure the slabs are tied into the
core efficiently and diaphragm action has been accounted for.
An early decision is required on which reinforcement type will be used to inform the
detailing, whether loose bars, rollmat or specialist mesh. Standardisation needs to be
investigated to ensure flexibility, quality and speed, and prevent the fabrication process
and delivery from holding up site progress.
Each option will require different amounts of crane time, with a hook time analysis to be
carried out in combination with a cost/benefit analysis of the various options. For
example, if rollmat proves to be expensive, standardisation of loose bars and the
associated L and U bars may be preferable.
53
6 Buildability
Cast-in items
Cast-in channels will need to be cast-in for cladding and other follow-on trades. Channels
sitting on the soffit can be easily accommodated and held in place but channels on top of
the slab require ski supports from the formwork. The channels should be supplied by the
specialists using them, along with the relevant setting-out information. Cast-in channels
should be coordinated with stressing anchors where PT slabs are adopted.
Figure 6.5
Integrated enclosure system
and load-out platform
Photo: Laing ORourke
Slab edges
Prefabricated steel forms may be preferable to timber shutters and should be made
off-site in relatively short lengths for man-handling and moving between levels in the
formwork hoist or load-out platform.
Alternatively, precast concrete edge units could be adopted, offering the advantage of
accommodating cast-in items (such as channels or stressing heads for post-tensioned
slab) very easily and accurately. Workshops should be held to ensure all parties
understand any requirements to move the nominal slab edge and overcome any effects
of axial and elastic shortening.
Tower-cranes will be jumped and tied into the structure as it progresses. A specialist
tower-crane supplier with experience in tall buildings should be consulted at an early
stage to ensure temporary tie loads, which can be significant, are fully coordinated with
the permanent works. The tie could either be back to the core (for a crane within the
core) or the slabs (for a crane external to the building). See Table 6.2.
54
6.5 Cranage
Buildability
6
Table 6.2
Crane options.
Additional loads
Potential issues
External to building
footprint
Within core
Coordination will need to extend to the specialist cladding contractor to ensure the ties
allow the cladding to commence and the building to become watertight at the earliest
available opportunity. Removal of the ties must be fully considered as part of this
exercise. Coordination of the pre-welded jumping lugs and the ties back to the structure
must be carried out, as this may become an issue when dismantling the crane.
Climbing can take up to four days but typically can be completed in two, if deliveries are
effectively scheduled and a suitable weather window is selected.
The interface between the counter-jib and the core formwork needs to be considered.
With the sway of the mast increasing as the height increases, it may become an issue as
construction progresses. Consideration must be given to climbing time for crane drivers.
A sensible solution is to have access points at the ties back to the superstructure. This
allows drivers to use the passenger hoists as high as they can and climb the final section.
Figure 6.6
Tower crane ties to structure.
55
6 Buildability
Hoists
Hoists can be internal to the core or external to the building. A hoist is required in the
core to service the core formwork system. However, sectional handovers may require
the hoist to be jumped up within the core to allow follow-on trades to commence work.
The hoist would then sit on a grillage suspended at a higher level transferring additional
loads back to the core and would then require additional external hoists.
While internal hoists are not weather-dependent and users are less likely to be nervous
compared to travelling in an external hoist, the interface with a formwork system and an
internal hoist would need to be coordinated to ensure clashes are eliminated. For an
external hoist, tie loads and locations require coordination, with the impact of these
discussed with follow-on trades, particularly cladding, to ensure minimal impact on the
programme.
Additionally, a formwork hoist integral to the screens - similar to a load-out platform but
also an elevator and typically covering five levels to allow swift movement of materials
can be used. It is hydraulically-driven but needs careful consideration for delivery as
the rails are typically greater than 20m long. There will also be several floors of backpropping or a locally-stiffened slab to accommodate these loads.
The hoist may be seen as an unnecessary expense but it reduces reliance on the tower
crane, thus further de-risking the activity and making it less weather-dependent.
Enclosure systems
Enclosure systems (screens) are required to fully enclose the working areas, and are
essential for the safety of the workforce and public. These systems can be hydraulically
jacked to ensure hook time is minimised. Delivery and logistic issues need to be
thoroughly examined to ensure there is room on site for assembly. These systems can
also be delivered to site fully assembled.
Bespoke systems specific to the slab layout and thus minimising gaps can be
manufactured and, while expensive, offer an advantage if there are multiple corners or
steps in the slab. Back propping to the slab edge may be required unless the slab is
sufficiently stiffened to accommodate the increased loads.
Levels beneath the screens may require closing off with netting or full height guards,
both of which require maintenance.
Design coordination should happen early to ensure tie loads and locations are allowed
for, and are not detrimental to follow-on trades. It may be necessary to add buffer rails
to prevent straps and chains snagging on the screens when installing cladding units on
levels below.
Figure 6.7
Hydraulic self-climbing enclosure
systems for core and slab construction.
Photo: Laing ORourke Plc
56
Buildability
6
Cores are generally poured via self-erecting placing booms using a high-flow mix with a
rapid early-strength gain (typically C50/60). Use of the cranes to place concrete via a
skip must be minimised.
Slabs are poured using a large static pump with a line running up the building, tied to the
core. Typically a C32/40, S3 or S4 mix would be used. Early engagement with readymixed concrete suppliers is necessary to ensure mixes are fully developed and trialled,
particularly for pumping through multiple floors. In addition, it may be advantageous to
use in-situ thermal monitoring and maturity methods to improve striking times.
6.7 Tolerances
Local codes of practice and standards may not always provide relevant guidance on
tolerances (the position in which the elements of the structure are cast) for high-rise
construction. Construction tolerances are deemed to be pre-strike and do not include
movement or deflection after removal of formwork/falsework, or medium- to long-term
settlement, shrinkage, creep, shortening or thermal effects.
Tolerance issues can be exacerbated through the choice of lightweight concrete, as both
pumping and finishing can be more difficult and time-consuming.
Surveying teams need to carry out as-built surveys as quickly as possible to ensure there
is enough time to agree and complete remedial solutions without any impact to
follow-on trades. It is good practice to monitor foundation settlement during the
construction phase against sufficiently remote datums, which are unlikely to be affected
by the building construction. Also it may be appropriate to undertake monitoring of
adjacent structures to establish any effect caused by high-rise construction activities.
57
7 Loading
7. Loading
The dominant loads on tall buildings are lateral horizontal wind and seismic loads; the
magnitude and predominance of which are determined in accordance with the
appropriate loading code. Accurate determination of these forces and effects is critical to
the development of framing systems, and evaluation of the size of the main structural
members.
As with all structures, the vertical elements need to accommodate the worst
combination of gravity and lateral loads. Although the gravity loads will be large
particularly in very tall buildings wind and seismic loads, acting on what is essentially a
large vertical cantilever, dominate assessment of structural sizes for the preferred lateral
framing system and will necessarily inform the architectural layout and spatial
arrangement.
The size of the building will typically determine the structural system. Although several
configurations may be open to structural engineers, experienced engineers have a good
understanding of the typical rules of thumb for the proportioning of the various
elements. Preliminary analysis is, nevertheless, required during the early phase and
should entail a rough evaluation of the lateral and gravity loads.
From this preliminary information, the size and layout of structural framing elements
will be developed in conjunction with architects. More detailed and thorough
assessment of all loads will normally be carried out in subsequent project phases.
Designers must consider all applicable dead and imposed loads for a building, including
pattern loads and temperature effects. Having evaluated the often large range of
individual load cases, designers should assemble a full complement of load combinations
for overall stability calculations and ultimate limit state (ULS) designs.
Gravity loads
There are two types of gravity loads - static and dynamic. Static loads are relatively
constant and unchanging over a long period up to the life of the building. Dynamic loads
are time-dependent and typically vary between a series of upper and lower values over a
relatively short period of time. They are usually only considered in the evaluation of the
dynamic behaviour of floors.
Static gravity loads are further split into dead and imposed (live) loads. Dead loads are
permanently applied to structures for the life of the building, such as main framing
elements and services fitments. Imposed loads are produced by the intended occupancy
use, including the weight of movable partitions in office buildings.
Snow loads are of relatively low significance for the global design of a tall building, given
the typically small surface area of the roof, or even of multiple roofs. As expected, and
similar to the design of shorter buildings, the local effects of snow loading on exposed
slabs and parapets need to be considered.
58
Loading
7
Wind loads
While preliminary wind loads for tall buildings can often be determined from the
appropriate code of practice, for a more detailed building analysis or if a building is very
slender or has complex geometries, it is common for designers to procure a wind tunnel
test. For further information, see Chapter 9.
Whilst the magnitude of gravity loads will directly affect the size of the main structural
elements, they should also be considered as part of the global restoring force in the
overall building stability equation, when evaluated against the overturning forces at the
base of the building.
The great advantage of tall concrete buildings is their inherent self-weight which serves
to naturally enhance structural stability. This mass and the contiguous nature of the
construction of concrete framed towers also provide a greater degree of structural
damping, dissipating cyclical sway from lateral forces.
While seismic loads act in a lateral horizontal and vertical direction, horizontal loads are
typically more significant for tall buildings. If considered significant and controlling in
respect of the overall structural frame, seismic loads can usually be idealised as
equivalent static lateral shear forces or, for taller or more slender frames or where the
ground conditions dictate, as a load or response spectrum. Further reading of Chapter 10
and the applicable code of practice, in conjunction with specialist texts and papers
covering current practice, is recommended.
Seismic loads
Dead loads acting permanently on the structure can typically be calculated with a high
degree of accuracy, even at the early preliminary stages of a concept design. Dead load is
made up of the self weight of the main structural elements and the permanently-applied
building fixtures and fittings.
As with any other building design, estimation of the dead loads is relatively straightforward and, although minor inaccuracies can occur, early assumptions of material
weights and elemental loads can be adjusted and corrected during the detailed design
phase to ensure accuracy of the final solution.
The structural self weight of the floors, columns and walls and other main members is a
function of the three-dimensional size of the structural elements and the known or estimated
material density. The superimposed dead load will account for permanent fixtures including:
Floor finishes and topping screeds
Non-structural walls and finishes
Cladding loads
Raised floors and ceilings
Building services fitments such as electric lighting, under-floor heating and
permanent ductwork.
59
7 Loading
At the preliminary or concept design stage, many of the final weights of various
elements such as screeds and cladding are yet to be determined. While every effort
should be made to accurately evaluate these weights, resources are available to aid
early assessment.
Imposed or live load is a gravity load specified in accordance with the occupancy of
the space and its intended use. The imposed load is typically defined as a uniformlydistributed gravity load acting downwards onto a floor area and affects the design of
all buildings.
For the overall lateral stability assessment, it is usually adequate to only consider the
general area live loads but in certain areas, such as plant rooms and parking areas, the
final design of individual elements may depend on the application of the appropriate
concentrated live load case associated with use of the space.
The theory of statistical probability in relation to the variable nature of imposed loadings
on a structure confirms the unlikelihood of the full intensity of the code-prescribed live
load acting simultaneously at any plan position up the full height of the building for the
entire life of the structure. As a result, loading codes allow for live load reduction;
typically expressed as a percentage reduction of the main loads and evaluated according
to the number of floors or the relative areas in the building.
Reference should be made to the appropriate code of practice for imposed load
allowances and reduction factors typically tabulated in accordance with building type
and usage. Structural designers should also refer to latest guidance on long-term
realistic floor loads suitable for use at various stages of the design.
All structures are subjected to gravity loads acting downwards and lateral loads acting in
different horizontal directions. All relevant combinations of the worst case load effects
must be checked.
60
Loading
7
Design of individual reinforced concrete elements for all buildings is typically based on
ultimate-limit-state combinations. In accordance with the provisions of this ULS method,
the reduced or factored design capacity of the structure or element must be greater than
or equal to the worst case combination of the ultimate-design load effects.
The relevant code of practice will normally provide several load combinations, with
different load factors relating to the nature of the load and the type of combination. All
applicable combinations must be checked in the detailed design phase; often by using
3D finite element design packages.
In smaller buildings, the worst case loading condition is often ascertained by an intuitive
investigation of the frame arrangement. However, for the design of tall buildings, the
critical combination depends largely on the building frame and bracing characteristics.
Furthermore, the combination producing the worst case effects in one critical element
may not necessarily produce the worst case loading condition in another separate member.
Where applicable, for the design of individual slab elements, pattern load distributions of
the imposed loads should be applied to alternative spans, in accordance with the
relevant code recommendations.
For particularly slender buildings, more prone to vortex-shedding excitation, wind tunnel
testing should almost certainly be considered for the evaluation of final design wind
loads. This type of detailed testing can also help to define adjustment of the standard
load factors from some codes of practice. For further guidance, see Chapter 9.
Consideration of construction loads in the early stage of the design process is of great
importance. In some cases, construction loads are greater than loads applied to the
building over the entire life of the structure, particularly at the podium and basement
levels but also on the upper suspended tower floors where spaces will be used for lay
down and materials storage. Reference should also be made to Chapter 6.
61
7 Loading
A newly-cast concrete floor slab will typically lack sufficient strength to support the
weight of the falsework, formwork and wet concrete of the next slab up (or possibly the
next two or three slabs higher up). To mitigate the risk of misunderstanding and
mistaken responsibility between design teams and contractors, and ultimately ensure
slabs are not damaged, it is imperative for the construction methodology to be clearly
established as early as possible. This point is particularly relevant for design and build
projects, in which the engineering team is directly engaged by the contractor.
Where the chosen construction sequence requires the core to be advanced well beyond
the floor slabs, the designer will be required to consider the associated temporary load
case. This is particularly relevant where the core is tied in the permanent condition with
link beams, but not tied in the temporary condition. Depending on the arrangement,
the movements and forces generated may require alterations to the design of some
elements, or detailed consideration of the proposed erection sequence to mitigate
adverse effects.
Another critical load aspect with a potentially significant effect on the design of various
building elements is the placement of temporary tower cranes. Cranes are usually seated
on piled, reinforced concrete bases cast integrally with the basement works and, in some
cases, may also be fixed back to the core or the slabs at various positions up the height of
the building. The associated loadings should be considered within the structural design.
For evaluation of the various factors relating to the construction methodology of tall
buildings, it can be beneficial to procure early contractor involvement services, whereby
a main contractor with an appropriate level of experience in tall building construction
would work with the design team.
Figure 7.1
Loading from construction materials and
activities may be the dominant imposed
load.
62
Loading
7
As with all building structures, tall buildings should be designed to avoid disproportionate
impact from accidental action. In most building codes, a weighting is placed on the
consequence of failure and tall buildings will generally fall into a high consequence
class in terms of potential loss of life. As a result, codes typically require an assessment
of specific risks of accidental damage and making a proportional provision in the
design. The approach to avoiding disproportionate collapse should be agreed with the
approving authority.
Although attempts have been made to design buildings for particular accidental events,
such as a notional aircraft impact, this approach is not generally recommended. It is
considered better to incorporate an appropriate level of general robustness in the
structural design concept and detail, by meeting codified tying requirements or
designing the structure to remain stable following the removal of any one structural
element. Any element fundamental to the stability of the structure is designated a key
element, requiring special attention in design to ensure it will remain in place.
Simple application of codified tying rules will not always be sufficient for tall buildings
falling within the scope of this document. However, the project specific risk assessment
may establish that an adequate level of robustness can be achieved using tying
principles. Horizontal tying ensures vertical loadbearing elements are tied into floor
diaphragms to prevent the vertical element being blown out leaving the floor without
vertical support, while vertical ties are provided to ensure columns are continuous and in
the event of a lost lower column, the column above will act as a hanger suspending an
area of floor from above.
Typical practice for checking element removal will involve static analysis of a structural
model without the removed element. In practice, removal of an element in an
accidental occurrence could lead to significant dynamic magnification, depending on the
failure mechanism of the element and the structural system relied upon to support the
structure following removal. This can be allowed for by applying a dynamic
magnification factor to the calculated loading, with engineering judgement required to
arrive at an appropriate factor.
A key element, the removal of which could lead to collapse of the structure or a
significant part of it, is typically designed to withstand a codified over-pressure or impact
load considered as an accidental load. Where risk assessment shows that code standard
pressures or impact may not be sufficient, these will need to be increased accordingly.
Transfer structures, such as deep beams carrying columns from above, will commonly
fall into the category of key elements.
63
7 Loading
Given variability in potential conditions at the time of construction, and the nature of
appropriate environmental conditions and time-dependant changes in the internal
(through-thickness) temperature of the structure, establishing a realistic set of
temperature parameters for design is not straightforward.
As with the design of all buildings, some combinations such as snow loads with increased
temperature cases will become redundant. However, depending on the geographical
location and exposure of various elements as well as the framing system, temperature
load cases can result in the worst case moments and forces for some elements.
Temperature loads are fundamentally different from other externally-applied loads such
as imposed gravity or wind loads, as they are self-straining loads. While an indeterminate
concrete structure has the capability to redistribute its load resistance based upon the
relative stiffness of structural members in the frame, the structure as a whole must
come into static equilibrium with externally applied loads to remain stable.
Applied loads are wholly independent from the characteristics of the structure itself. In
the case of self-straining loads, the applied loads are at least partially related to the
characteristics of the structure, resulting as they do from volumetric changes in the
member itself.
64
Loading
7
Prediction of self-straining stresses becomes quite difficult due to the inelastic behaviour
of reinforced concrete once cracking has been initiated, making it often impractical to
design for such stresses.
If this cannot be achieved, the design must account for internal stresses and cracking
that may arise in the members, with accuracy dependent on analysis taking into account
the nonlinear nature of the material stiffness.
A purely elastic analysis will be overly conservative for the strength design, and in many
cases will lead to highly uneconomical designs but conversely may be very unconservative
for serviceability if the stiffness-reducing effects of cracking are not considered.
65
8 Building dynamics
8. Building dynamics
Serviceability limit-state (SLS) design checks are a key aspect in the total design of tall
buildings, and careful studies should be considered as routine during the early stages of
any project. Lateral stability and gravity load-resisting elements must be planned and
designed to resist worst case ultimate load effects, and to maintain adequate function or
serviceability for occupants. With the continual advancement of design and construction
practice, tending towards more flexible structures as better materials are used more
efficiently, it is not uncommon for serviceability limit states to govern the structural
design of tall reinforced concrete buildings.
Wind and seismic loads are the primary lateral loads which must be resisted by tall
buildings. Wind forces are more frequent than seismic forces and may govern the design
of tall buildings in most, but not all, geographic locations at both serviceability and
ultimate limit states. Engineers must understand how tall buildings respond during
loading events to avoid adverse behaviour.
Tall buildings are, in effect, vertical cantilever beams, and will naturally respond to lateral
forces by moving in the direction the force is applied, and since wind and seismic forces
are not static, the structure will tend to sway back and forth as a result. Lateral loads are
applied in varying degrees and often in roughly repeated cycles over any given period, for
example, gusting winds in a storm. Regardless of whether the loads are applied as
individual or idealised one-off events, or as a repeated or cyclical event, the result will be
building motion which will require consideration during the design phase. The structural
system and building weight will play a large part in how the building responds, as will
factors such as the force direction, force magnitude, building height and foundations.
Tall buildings formed of in-situ reinforced concrete have an inherent degree of natural
damping, the measure of a structures ability to dissipate energy. Natural damping can
have a significant effect on the performance and response of buildings, and should be
considered at an early stage in the design. Damping values are typically quoted as a
percentage of critical, defined as the damping required to bring the motion to rest after
only one cycle. During the early stages of design, it should be possible to prepare a
simplified building analysis model enabling early examination of building frequencies and
modal response, using a range of tools, from hand calculation techniques through to 3D
modelling using specialist software. Use of more sophisticated tools is recommended for
slender tall buildings.
66
Building dynamics 8
8.1 Damping
All of the contributors listed below are indicative of sources of natural damping in
buildings:
Inherent material damping of heavy concrete elements under elastic deformation.
Additional material or mechanical damping due to inelastic deformation (for
A higher level of damping and, thus, increased energy dissipation has the effect of
reducing the lateral acceleration response of the building in wind or seismic events. To
achieve a reduction of the lateral acceleration response (for example, to satisfy occupant
comfort criteria) would require optimisation of the structural system to increase stiffness
or changing the aerodynamic properties and/or shape of the building. The latter would
require very close collaboration with architects at the earliest project stages, even before
the building form has been fully agreed upon.
Alternatively, higher levels of damping can be achieved using auxiliary damper devices.
Without their use, it is not typically economical to markedly change the levels of
damping in a structure.
67
8 Building dynamics
Engineers must recognise that assessment of factors affecting the serviceability design of
tall buildings is subject to significant error, for example, the amount of cracking is often
over-estimated while the stiffness and Youngs modulus are typically under-estimated.
Estimates of the period of vibration of reinforced concrete structures may be out by as
much as 20 % or more because of these assumptions, which might then result in
conservatively higher wind load estimates due to the dynamic component.
Further data collection errors may arise if data has been collected on a gusty day,
when the amplitude of motion is quite small and the level of damping will be low, and
unrepresentative of typical design criteria.
Care should be taken in opting for values that are too low, as to do so may have a
marked effect on the economics of tall building design.
Concrete structures have higher natural damping than steel structures. The damping is
produced, in part, as the concrete cracks and thus absorbs energy. Damping is, therefore,
dependent on the amplitude of the movement, as for larger amplitude movements
more cracking occurs and, thus, the natural damping is increased. In designing the
structure the engineer, therefore, needs to use judgement to determine the appropriate
value of damping to be used in the design/analysis.
Engineers will typically use different damping values for the serviceability design, such as
estimates of accelerations, as opposed to ultimate limit state design where more
cracking in the structure can be expected and tolerated. For the serviceability design, the
wind forces will be based on more frequently experienced wind events, namely those
with a short return period whereas for ultimate-limit-state design longer return period
events will be used.
There remains much debate in the engineering community, even amongst experienced
engineers, regarding what damping values are appropriate for any given structure. The
selection of the damping value used in the design can be critical, as the impact on the
design lateral forces can be significant. It is often prudent, therefore, to undertake a
sensitivity analysis on the damping values used.
Historically, damping values of 2 to 5 % of critical have been used; however, more recent
data has cast some doubt on the use of values at the higher end of this range,
68
Building dynamics 8
particularly for the short-return-period events. Recent research projects have measured
damping within real buildings and have indicated damping at and below 1 % (ref Smith,
R. Merello, R. and Willford, M. `Intrinsic and Supplementary Damping in Tall Buildings,[4]). It
is noted, however, that the damping data was extracted for relatively common wind
events in which the amplitude of movement and, thus, the total damping might be
lower than for rarer (longer period) events.
As a starting point for design, engineers undertaking the design of a reinforced concrete
tall building, up to approximately 250 m tall, could consider the following damping
values quoted as percentages of critical damping:
As the design develops the damping value used may be adjusted as the engineer considers
the building height, in conjunction with the structural system, which could include a
primary and secondary lateral system, and the deformation characteristics, which could be
based on shear deformation or cantilever beam bending or a combination of both.
The figures above should be used as a guide only. Engineers undertaking designs of
dynamically sensitive tall or super-tall buildings should make every effort to update their
knowledge of the most recent research and debate surrounding this very complex topic.
It may also be appropriate to contact wind engineers and wind-tunnelling experts, who
may be able to offer guidance on the assessment or application of damping values.
Auxiliary damping
Auxiliary damping devices may also be used to significantly increase the level of overall
damping in a structure and reduce the peak lateral accelerations. Either active or
passive in nature, auxiliary dampers are typically not considered as the first option in
reducing building motion but are increasingly specified in the design of tall buildings,
particularly when project constraints limit the viability of other means for achieving
target serviceability criteria.
Active devices rely upon external controls to deliver applied loads in response to the
motion of the building, particularly in situations where the seismic response of the
building requires control.
69
8 Building dynamics
In wind applications, passive dampers are typically more appropriate and rely upon their
own mass and damping to counter-act the motion of the building so as to reduce lateral
wind response. Common examples of passive dampers include tuned mass dampers,
tuned liquid-column dampers and tuned sloshing dampers, with the last two usually
considered first for reinforced concrete building applications.
Dampers in reinforced concrete buildings must have enough overall mass to affect
the motion of the building (approximately 1 % of the modal mass of the building)
and must allow for modification or tuning to the in-situ building period, once in
place.
A characteristic of liquid-column dampers and sloshing dampers, both of which use water,
is that they allow modification. Any auxiliary damping device necessarily requires physical
space for installation and may add significant cost to the project and to future building
maintenance plans. A building monitoring program is also typically required to assess the
performance of dampers and determine if, and when, dampers require further tuning to
achieve optimum performance.
Taller and more slender buildings present a unique serviceability limit state related to
the occupants perception of the buildings lateral motion. Sometimes referred to as the
habitability limit state, it affects only the human inhabitants of the building rather than
any mechanical function. Reinforced concrete structures inherently have relatively high
stiffness, mass and material damping characteristics, all of which are beneficial in
limiting the magnitude of building motion under the action of wind. However, for
super-tall buildings above 300 metres, it is quite likely that this habitability limit state
may become a governing limit state in the structural design of the building.
8.2 Occupant
comfort criteria
70
The structures natural periods of vibration for the first few lateral modes are useful
indicators of the potential for wind-induced dynamic response of the building. For
preliminary purposes, the fundamental building period can be estimated as equal to the
height of the building divided by 46 or - following a North-American rule of thumb equal to the number of storeys divided by 10. 3D finite-element-based analyses are
commonly used to better estimate the structures natural periods of vibration.
Building dynamics 8
The analysis model should incorporate only elements contributing to the lateral stiffness
of structures and should not be overly complex. The natural frequency analysis should
give particular attention to:
Joint stiffness and connection types
Expected amount of service-level cracking
Effects of P-Delta deformation
Foundation stiffness
Realistic estimates of expected imposed loads (mass).
Even the most detailed finite element analysis should only be considered as an
approximation of the real in-situ building period of vibration, as reinforced concrete
structures have an inherently high variability in their overall stiffness.
Some of the factors contributing to this variability include simplistic estimation of the
real concrete elastic modulus and its change over time, difficulty in estimating the actual
level of concrete cracking in the lateral load-resisting elements and the change in levels
of cracking as the building loads change, together with the effects of creep and shrinkage.
An under-estimation of building stiffness will generally lead to a conservative estimation of
wind-induced dynamic forces.
In tall, slender structures, it is common for both the maximum lateral drift and peak
lateral accelerations to occur in a direction perpendicular to the approaching wind
direction (National Research Council of Canada, 2010). This is referred to as acrosswind motion, and results from the effects of wake excitation due to the vortex
shedding phenomenon[8] . Further discussion on this phenomenon can be found in
Chapter 9.
Human perception
The perception and sensitivity of humans to building movement and vibrations vary
significantly and are dependent upon a large range of complex and unique physiological
and psychological characteristics. This includes the individuals understanding of the
physical phenomenon to which they are subjected, and their perceived fear of risk or injury.
These complex factors, combined with a lack of reliable data from practical testing
programmes, make it difficult to develop concise and transferable building motion
criteria to ensure occupant comfort. However, over the past few decades various
organisations have developed limiting criteria for building motion. Lateral acceleration
and torsional velocity limits, used in the dynamic study of buildings, should limit the risk
of occupants perceiving the building motion as uncomfortable.
71
8 Building dynamics
Examples of wind-induced motion criteria typically used in North America for 10-year
return-period wind events are listed below as a percentage of the gravity acceleration,
but these should be checked with current references (Ref: NBC and CTBUH):
Residential occupancy:
Office occupancy:
The National Building Code of Canada (NBC) [9, 10] describes the evaluation of the peak
across-wind and along-wind accelerations at the top of buildings, recommending a range
of formulae for preliminary calculations. However, wind tunnel testing will always
provide the most accurate means of estimating expected levels of building accelerations
due to wind and can also take account of the dynamic response of buildings and
wind-structure interaction. In some cases this interaction, known as aerodynamic
feedback, can lead to a reduction in the peak building response.
10 to 15 milli-g
20 to 30 milli-g
For example, if one building has a natural period of oscillation of five seconds and another
10 seconds but both buildings are oscillating at the same peak acceleration value, the
building with the 5-seconds period has a rate of change of acceleration higher, or more
abrupt, than the 10-seconds building. This higher rate of change of acceleration is likely to
be more strongly perceived by the average inhabitant. This effect has been demonstrated
quite distinctly through the use of motion simulation experiments, and is reflected in the
latest developments of acceleration limit criteria. In addition, this frequency dependence
is reflected in ISO 10137 criteria.
72
Building dynamics 8
If early predictions indicate lateral building accelerations are beyond acceptable limits,
there are a number of options for reducing the accelerations. In most cases, an increase
in the overall lateral stiffness is effective in reducing peak response accelerations. It is not
uncommon for the lateral-force-resisting elements of tall buildings to be proportioned
on the basis of serviceability criteria or stiffness, as opposed to ultimate strength.
An increase in the mass of the structure can also be beneficial in reducing building
accelerations but should be considered in association with overall building stiffness,
which may change as a result of the increased mass and period of vibration.
The cross-sectional shape of the building and characteristics of the exterior surface of
the building can affect the way in which it interacts with the wind. Alteration of the
aerodynamics of the structure or the incorporation of positive aerodynamic features
into the building architecture, including the faade, may prove critical in the design
development of tall and, particularly, super-tall buildings. Any alterations of this type
should be confirmed by wind tunnel testing, and would typically require agreement
with the architect and other designers.
73
9 Wind engineering
9. Wind engineering
Wind engineering is as defined by Dr Jack Cermak
[12]
expensive) floors
Playing a key role in the design of the glazing/building envelope and faade system
Changing both global and local wind flow patterns, potentially increasing the level of
To optimise the design of tall buildings and minimise associated risks, specialised wind
engineering studies with potential to inform the design process from its early stages
include, but are not limited to:
Wind climate
Wind loading
Vortex-shedding mitigation
Auxiliary damping
Cladding pressure
Pedestrian-level wind environment/comfort
Plume dispersion.
This chapter is limited to wind engineering studies directly linked with the strength and
serviceability design of tall buildings.
Some of the parameters designers should consider to establish if the tall building
currently under design is likely to be wind-sensitive include:
Slenderness Ratio: is the tall building slender? h / d > 5, with h being the height of the
tall building and d being the narrower dimension of the its plan cross-section.
Structural frequencies: is the first cantilevering bending mode of the structure sitting at
a frequency lower than 46 / h [m] (h [m] being the height of the tall building in metres).
Mode shapes: do the first modes of vibration of the structure appear to be very threedimensional? (Could the torsional behaviour of the tall building be of any concern?)
74
Wind engineering 9
Nature of the area surrounding the site: is the tall building in relatively close proximity
to a few tall structures of comparable massing and scale? (Could interference effects be
of any concern?)
Limits of applicability of wind design codes (see also Chapter 13) should of course also
be taken into consideration.
A relatively wide range of storm types can generate the extreme wind events driving the
design of lateral-stability systems for tall buildings.
From a structural point of view, the most relevant storm types are:
Synoptic winds (gales, fronts, depressions, extra-tropical cyclones etc.) typical of
from 10 to 30.
Areas affected by tropical storms include regions facing the South China Sea, the south
coast of Japan and the Gulf of Thailand (typhoons); the Coral Sea, north coast of
Australia and Bay of Bengal (cyclones); and the Gulf of Mexico, Caribbean Sea and west
coast of Mexico (hurricanes).
The effect on tall buildings of relatively smaller scale meteorological events such as Shamal
winds (common in the Persian Gulf), thunderstorms (often of short duration) and tornados
(common in the US) still represents an open area of research in wind engineering.
Distinct from other natural hazards such as earthquakes, the energy associated with
turbulent and gusty wind is localised at the low-end of the frequency spectrum
(approximately less than 1 Hz) and shows a decaying trend as the frequency increases.
Wind aerodynamic force is the result of wind interacting with the outer shape/
geometry of tall buildings, while the outcome of interaction between wind aerodynamic
force applied to tall buildings and their structural system is termed wind-induced
response.
Wind-induced response has a mean component (directly linked to site-specific mean
wind speed); a broad-band effectively quasi-static - component (due to excitation by
75
9 Wind engineering
This statistical framework describing how the wind loading mechanism works was
introduced for the first time in the 1960s by Alan Davenport[13,14,15,16].
As a result of interaction between wind and structures, alternating vortexes are shed on
the downstream sides of tall buildings (see Figure 9.1).
9.2.1 Vortex-shedding
Figure 9.1
2D schematic representation of
vortexes generated in the wake of
a cylinder.
This phenomenon, vortex-shedding, generates a net fluctuating force exciting the structure
in the across-wind direction perpendicular to the mean wind flow. These forces are relatively
small but when they occur at frequencies close to that of the structure they may be
significantly amplified, particularly when damping is low.
Vortex-shedding happens at any wind speed and for any plan form, and is typically
enhanced by low levels of wind turbulence (for example sea/desert exposure) and
sometimes by turbulence from upwind structures. The critical vortex-shedding wind
speed, at which the frequency of the shed vortexes coincides with the one of the
structure, can be calculated as follows:
Vc = n . D
St
where n is the structural frequency of interest.
D is a reference dimension of the cross-section of the tall building (typically its width
measured perpendicular to the direction of the mean wind speed).
St is the Strouhal number, a non-dimensional quantity function of the plan form of the
tall building (typically ranging between 0.1, for a square, and 0.2, for a circle).
76
Vortex-shedding forces may have energy over a significant range of frequencies, resulting
Wind engineering 9
in significant responses at wind speeds lower than the critical wind speed indicated by
published Strouhal numbers (see Figure 9.2).
Figure 9.2
Wind speed
Resonant across-wind response typically causes the most critical motions felt by occupants
of buildings and may govern strength design of slender buildings. Such responses are not
well covered in design codes but are routinely studied in the wind tunnel.
9.2.2 Serviceability
Although from a serviceability point of view drift checks under wind loading are important,
wind-induced accelerations checks can in some cases be more stringent. For example, a
150m residential tall building with a first dominant cantilever mode sitting at 0.30 Hz which
is experiencing under 10-year return period winds an overall building drift of 0.25m, would
satisfy the most stringent codes of practice. If 10% of overall building drift is governed by
`dynamics, the resulting wind-induced peak acceleration would be 9 milli-g (10% 0.25 m
(2 x x 0.30 Hz)2 ~ 0.09 m/s2 ~ 9 milli-g); a figure well within widely accepted thresholds for
[17]
77
9 Wind engineering
residential occupancy comfort (typically in the region of 10-15 milli-g). For more flexible and
slender, tall buildings, the percentage of overall building drift governed by `dynamics could
be as large as 50 %; the wind-induced peak acceleration would in this case be 45 milli-g, a
figure exceeding any criteria for occupancy comfort.
introduction of taper, twist, through-building openings and vented top - or local introduction of solid or vented corner fins and slotted or chamfered corners).
A cost-benefit analysis can be run to establish, as part of the preliminary design process,
the most suitable strategy to achieve specific levels of peak dynamic wind loading/
wind-induced accelerations.
While all wind codes provide guidance for assessment of the along-wind response of tall
buildings (see Figure. 9.3), only a few can assist designers in predicting the strength of
across-wind response - the response of the structure to the lateral-wind-turbulence
component and vortex wake. These are: Australian code(2002) , Canadian code(NBCC, 2005) ,
Eurocode(2005) and Japanese code(2004) (the latter is, at present, the only available
wind code offering guidance on assessment of the torsional response of tall buildings to
wind loading excitation). It should be noted that guidance is unfortunately limited to a
few simple geometries and exposures.
[18]
[19]
[20]
Figure 9.3
Schematic representation of the windinduced response of a tall building
Across-wind response
Direction of lateral
component of turbulence
78
Torsional response
Along-wind response
[10]
Wind engineering 9
When it comes to wind engineering and, more specifically, wind loading on tall
buildings, design codes have a relatively limited range of applicability; heights are often
restricted to 200m and cross-sectional shapes are relatively orthodox; for example,
square or rectangular. As a consequence, many tall buildings fall outside the intended
scope of local codified wind loading requirements.
Wind tunnel tests are, therefore, often performed on such buildings to provide a
detailed insight into the design forces and overall response and performance behaviour
of the structure.
Wind tunnel techniques applicable for the evaluation of wind loading on tall structures
are: high-frequency force balance (HFFB), simultaneous pressure integration (SPI) and
aeroelastic. The first two are focused on the measurement of wind aerodynamic forces
acting on tall buildings and evaluation of the wind-induced building response requires
the wind tunnel data to be combined with structural properties provided by structural
engineers. The aeroelastic technique is focused on directly measuring the wind-induced
structural response of tall buildings.
(b)
HFFB wind tunnel models must be designed for stiffness and lightness. To avoid strong
contamination of the measurable signal, their lowest natural frequencies - typically in
the region of 100 Hz - should be at least two times greater than expected lowest natural
frequencies at full scale.
HFFB wind tunnel models are often constructed around a stiff and light central spine
manufactured using materials such as carbon-fibre-reinforced polymer (CFRP) with
light-foam to give the correct outer envelope of the tall building (see Figure 9.4a). There
is no relationship between the inner spine of the wind tunnel model and the structural
core of the real tall building.
HFFB wind tunnel models are generally mounted on stiff balances capable of
simultaneously measuring time-histories of wind-base shears, wind-base overturning
moments and torsion. This technique generally offers quick turnaround and a high
degree of flexibility for re-analysis. As long as the outer shape of the tower does not
vary, the wind tunnel data can be re-processed to reflect the evolution process of the
structural arrangement of tall buildings.
(c)
As measurements at the base are effectively integrated figures, the floor-by-floor wind
loading distribution along the height of the structure is estimated and not directly
measured. Thus the contribution to wind loading from higher modes of vibration, often
important in the design of super-tall buildings higher than 300 m, especially if tapered
(Camelli, 2011)
) - cannot be thoroughly quantified.
[21]
Figure 9.4
Wind tunnel models:
(a) CRFP spine and light-weight foam
component of a HFFB wind tunnel model.
(b) inside of a wind tunnel pressure model.
(c) inside of a wind tunnel pressure model.
79
9 Wind engineering
An alternative way to evaluate the wind loading acting on tall buildings and ultimately
the wind-induced building response to wind loading is to simultaneously measure wind
pressures over the entire building envelope and then derive the overall wind load by
integration through SPI.
Similarly to the HFFB technique, SPI offers a high degree of flexibility for re-analysis at
the cost of slightly longer timescales, mainly driven by the model build phase. As the
measurements are simultaneous over the entire structure, the floor-by-floor wind
loading distribution along the height of the building structure can be accurately assessed
and contribution to wind loading from higher modes of vibration thoroughly calculated.
Wind tunnel pressure models are typically constructed using materials such as plastic,
resins and fibreglass or obtained from rapid prototyping techniques such as selective
laser sintering (SLS) or stereolithography (SLA). The outer envelope of the wind-tunnel
model is instrumented with several hundred pressure sensors (typically 500- 800 but
often exceeding 1,000 in the case of very complex faade arrangements, structurallylinked tall building complexes or super-tall buildings) measuring time-histories of local
fluctuating wind pressures (see Figure 9.4b and 9.4c).
In general, and in the absence of significant proximity effects, the density of the pressure
sensors (often referred to as taps) should be greater around the top third of the structure
and more relaxed in its middle portion. The average density of taps should be of the order
of approximately one sensor over 120 m of building surface: this density will need to be
increased (particularly over the upper portion of the tall building) should the contribution
to wind loading coming from higher modes of vibration be required. Over elements where
both surfaces are directly exposed to the wind such as canopies, architectural fins and high
parapets pressures should be measured simultaneously on each side.
Measurements from wind tunnel pressure models can also be used to assess wind
pressures to assist the design of cladding and heating, ventilation and air-conditioning
systems.
The only way to assess and evaluate wind-structure interaction is to employ the
aeroelastic modelling technique. Aeroelastic wind tunnel models are designed and
constructed to behave in the wind tunnel, vibrating and responding to gust wind loading
excitation, exactly like the real structure.
The design of an aeroelastic wind tunnel model requires both the outer envelope of tall
buildings and the internal structural arrangement to be sufficiently advanced. It needs to
be constructed to accurately match the structural arrangement of the real tall building
and is generally instrumented with accelerometers and/or strain gauges measuring in
real time the structural response of the tall building to wind loading. The inherent
structural damping ratio of the aeroelastic wind-tunnel model should be kept as low as
possible (0.5 % of critical/0.03 logarithmic decrement or less).
80
Wind engineering 9
The aeroelastic technique, like SPI, allows floor-by-floor wind-loading distribution over
the height of the building, as well as the contribution to wind loading coming from
higher modes of vibration, to be established. It should be noted that aeroelastic methods
take longer to undertake due, primarily, to the additional time spent in the modeldesign/build phase and the model-calibration process.
HFFB studies are often conducted at the schematic-design (SD) stage and sometimes as
early as the feasibility/concept stage, to allow detailed, shape-specific wind-induced
response to be directly fed into the structural-design process.
SPI studies often follow during detailed design (DD) to refine the prediction made during
SD. Aeroelastic studies are commonly used in tall building design (at DD stage) when the
structural response is strongly governed by vortex-shedding approaching resonance or
when a direct measurement of the contribution to the total damping coming from the
wind-structure interaction (aerodynamic damping) is required.
The aim of this section is to help designers gather the information required by wind
consultants to conduct wind-engineering studies, and ensure the outcome is sound and
in line with best industry practice.
The term atmospheric boundary layer refers to the lowest portion of the troposphere
(usually 2-3 km above the surface of the Earth) where the effects of surface roughness
as well as local topography control the vertical distribution/profile of both mean wind
speed and turbulence intensity (see Figure 9.5).
Figure 9.5
Schematic representation of the
atmospheric boundary layer.
Vg
Free atmosphere
Gradient height
Zg
81
9 Wind engineering
A direct comparison over the entire height of the tall building between the selected
characteristic wind exposures for the project site (identified using wind models such as
the one proposed by Harris and Deaves(1981) ) and the mean wind speed, intensity of
turbulence and appropriate gust wind speed profiles measured in the wind tunnel should
be exhaustively documented by wind-engineering consultants.
[22]
Ahead of testing, the wind-tunnel laboratory should provide the design team with
documentation showing that the measured mean wind speed/ turbulence intensity and
turbulence length scale in the wind tunnel are respectively within 10 % and a factor of 2
from the prediction of the above theoretical model.
The geometrical scales typically employed for wind-tunnel studies ranges from 1:200 to
1:500 and the obstruction of the wind-tunnel-test section caused by the presence of the
model and its surroundings should be kept to a minimum; ideally in the region of 5 %
and no greater than 10 %.
The area surrounding the project site typically to a radius of 500 m should normally be
modelled (see Figure 9.6). Significant buildings outside this area may need to be included as
part of the surrounds on selected wind angles. Different surrounding scenarios, such as
existing site conditions, proposed/future/consented surrounds and masterplan/project
phasing, should be considered as part of the studies. Should the tall building be part of a
large masterplan of which no sufficient details about the phase of construction are
available investigation of the structure in an isolated condition is recommended.
Figure 9.6
Wind tunnel surround model.
82
Wind engineering 9
To design and construct HFFB, pressure and aeroelastic models - floor plans, elevations
and sections of the proposed building (typically .dwg/.dxf format) or full 3D surface
models (typically 3D CAD/Rhino format) are additionally required. For aeroelastic
models, a sufficiently settled set of structural properties is also necessary (see also
Chapter 13).
In general, in the design of HFFB, pressure and aeroelastic models, great care should be
taken by wind-engineering consultants to minimise and control scale effects related to
the geometry of the building, which could lead to results being sensitive to the windtunnel speed. The wind-tunnel laboratory should demonstrate that quantities such as
mean aerodynamic force coefficients (drag and lift) as well as the Strouhal number are
stable across a wide range of wind-tunnel speeds.
The measured frequency of HFFB, as well as the range of wind speed operated in the
wind tunnel during the tests, should be documented by wind-engineering consultants.
The measurements for wind loading studies (HFFB, SPI or aeroelastic) should be taken
around the clock at a minimum of 10 intervals. Intermediate measurements at finer
intervals should be taken to capture the wind-loading peak response.
83
9 Wind engineering
The directional variation of wind base loads including shears, bending moments and
torsion for foundations design purposes typically calculated for 50-year-return
period design wind speeds or higher should be presented both in terms of mean,
peak static (including the broad-band component) and peak dynamic (including the
narrow-band component).
To assist the design of the super-structure, wind loads should be presented in a floor-byfloor format. The directional variation of wind-induced peak accelerations is typically
calculated for 1- and 10-year-return-period design wind speeds. The results need to be
compared against preferably frequency-dependent criteria such as the ISO 10137-2007
(ISO 2007) (see also Chapter 13).
When HFFB, SPI and aeroelastic studies are performed on tall buildings, direct
comparison between the different techniques should be provided by wind-engineering
consultants.
For additional information on the subject of wind-tunnel testing, please refer to ASCE
Manual of Practice No.67 for Wind Tunnel Studies (ASCE 1998)[23] and the AWESQAM-1-2001 Quality Assurance Manual (AWES, 2001)[24].
Table 9.1 shows indicative budget fees and timescales for wind-engineering studies on a
typical single-tower tall-building project.
Table 9.1
Procurement cost and timescales.
Note
1. Prices refer to the
year of publication
of the present
document.
9.4.4 Computational
fluid dynamics
84
Type of study
Timescales in weeks
Wind microclimate
15-20k
2-3
Wind loading
20-25k
3-4
Cladding pressure
20-30k
3-4
Aeroelastic
50k+
5-6
Wind engineering 9
Although in some cases apparently good results may be achieved, in others it is clear
that they have not. Large eddy-simulation-modelling developments have more potential
than other CFD methods at present but require more computing power than is typically
available on a commercial basis.
Wind-tunnel testing does not suffer from the above-mentioned drawbacks and is a practical
(with time-scale advantages) and well-proven approach for which the methodology has
reached consensus among both the scientific and engineering community.
85
10 Seismic engineering
portions of the lateral drift are due to the axial deformation of the walls and/or
columns as compared to shearing deformation of the frames and walls.
Traditional codes which use an elastic response analysis with force reduction factor R are
not suitable for the seismic design of high-rise buildings. They do not deal with the
non-linear behaviour of tall buildings, whereby several modes of vibration contribute
significantly to the seismic response of the structure.
The aim of this chapter is to provide guidance for designers of tall buildings in seismically
active regions.
Allowance for potential intensity of seismic events used in building design is determined
from a statistical assessment of historical data and accepted levels of risk.
These statistical results are used to produce tables and maps of design ground
accelerations, known as seismic hazard maps, for use in seismic analysis. In the case of
tall buildings, it is usual to carry out specific risk/hazard analysis, including the
characterisation of specific seismic input, such as accelerograms and seismic
displacements which come from different sources.
Eurocode 8 (EC8), as well as the Council on Tall Buildings and Urban Habitat (CTBUH) [1]
in its Recommendations for the Seismic Design of High-rise Buildings, promote such an
approach with their requirement to meet two or more separate performance criteria.
86
Seismic engineering 10
10.1.1 Performance-based
design
In the CTBUH guidance document Recommendations for the Seismic Design of High-rise,
three levels of ground motion are considered, with different expectations:
For frequent earthquakes (a 95-year return earthquake) the building should suffer
little or no damage. Its capacity for resisting gravity loads and future events must
remain intact. The building and its structural members must remain within their
elastic range.
For rare earthquakes (a 475-year return earthquake as used in several standard
seismic design codes), normal buildings may not be repairable but will retain their
capacity to support gravity loads and some capacity for resisting further lateral
loading, while important buildings are still expected to remain principally within the
elastic range.
For very rare earthquakes (a 2475-year return earthquake), an ordinary building will
suffer heavy, unrepairable damage and its capacity to resist further lateral loading will
be spent. It will, however, retain its capacity to resist the real/expected gravity load,
enabling evacuation of the building. More important buildings should retain some
capacity for resisting further lateral loads.
Both the EC8 and CTBUH approaches entail precise definition of the deformation limits
and related level of damages expected for each level of performance.
Limit values are usually establish in advanced codes and, in some cases, are a matter of
agreement between client and designer.
10.1.2 Local effects of ground The stratum encountered at a specific project site has a major impact on the level of
conditions
seismic ground acceleration to which a building is subjected. Typically, a weaker stratum
beneath a building amplifies the intensity of ground acceleration at the surface.
Other issues related to soil conditions at a particular site include landslides, consolidation
of loose soil resulting in total and differential settlements, and liquefaction. Depending
upon the expected peak ground acceleration of a site and the characteristics of the
87
10 Seismic engineering
Liquefaction involves the consolidation of loose soils, in which the settlement occurs in a
very short time, causing a sudden increase in pore-water pressure. As a result, effective
stresses are reduced to zero and the soil effectively turns to liquid, with subsequent loss
of bearing capacity. Poorly-graded soils and reclaimed land are most at risk of
liquefaction and, in such cases, it is common to use deep foundations, which allow for
the transmission of vertical forces to strata without problems of liquefaction.
Seismic design of tall buildings requires characterisation of at least two levels of shaking:
service level earthquakes to check the damage requirements and maximum considered
earthquakes to ensure non-collapse of structures.
In general, seismic hazards are described in codes in terms of a single parameter, namely,
the value of the reference peak ground acceleration related to a specific type of ground
and to the zone in which the structure is located.
Seismic action is represented in basic form by the earthquake motion at a given point in
an elastic ground-acceleration response-spectrum.
Frequently the shape of the elastic response spectrum is taken as being the same for the
two levels of seismic action, the no-collapse and damage limitation requirements.
88
Seismic engineering 10
Figure 10.1
Typical shape of the elastic response
spectrum EC8.
It is important to note that the spectra provided by the code are usually related to a
viscous damping of 5 %. In the case of tall buildings, this value is very high and the
spectrum has to be amplified accordingly. For example, in EC8 the damping correction
factor may be determined by the expression:
n= 10 (5+) 0.55
Where is the viscous damping ratio of the structure expressed as a percentage.
Therefore, for a tall building with an expected value =2.5, the amplification factor of
the spectrum should be 1.15.
The typical shape of the spectrum in codes has two descend parts (see Figure 10.1):
For Tc T TD the acceleration is proportional to 1/T
For
For example in EC8, dependent on soil type, the values of TC (end of the plateau) vary
from 0.4 to 1.0 (limit between the 1/T and 1/T 2 acceleration zone), the value of TD =2.0 s.
As the first mode in tall buildings is normally greater than 2.0 s, the principal mode of
vibration of a tall building is usually in the 1/T 2 acceleration curve zone.
Code spectra are usually calculated from recorded earthquakes with non-long periods.
Therefore, the direct use of standard spectrum has to be carefully calibrated. EC8, for
example, includes specific response spectrum for structures of long vibration periods
such as tall buildings. Figure 10.2 shows the elastic displacement-response spectrum to
be used for analysis of structures in which TE varies from 4.5 to 6.0 s depending on the
type of soil and TF= 10 s. Elastic acceleration spectrum can be derived directly from the
displacement spectrum.
89
10 Seismic engineering
Figure 10.2
Elastic displacement-response spectrum
for long periods (EC8).
It is important to know that when increasing the magnitude over the predominant
period, the spectrum shifts to higher values. The same phenomenon can be seen when
the distance from the epicentre increases and when the ground is softer (Kalkan and
Chopra 2010). Consequently, tall buildings are more sensitive to long-distance highmagnitude earthquakes, particularly when the ground is soft.
For all structures, and tall buildings in particular, architectural decisions have an
enormous impact on security and performance during a seismic attack.
90
Seismic engineering 10
These include:
Large changes in building stiffness
Large changes in building mass
Repositioning of bracing elements from floor to floor
Interaction of two or more towers with a common base
Significant column transfer or offsets
Gravity-induced horizontal shear forces caused by system eccentricities
Limited connectivity of bracing elements to floor diaphragms.
As a design tool for architects and engineers, FEMA 454 chapter 5 covers possible
strategies to combine architectural expression and proper seismic behaviour.
The first step in seismic design should be to identify zones or elements where non-linear
response is anticipated. For frame or braced-frame structures, yielding well distributed
over the height is preferable to yielding concentrated in one of a few storeys. Core wall
structures target yielding at wall opening coupling beams, over the full height of the
building, and yielding of the walls at their base.
Wind load is normally the governing action in tall buildings even in seismic areas. In
zones with moderate earthquakes, a building designed to behave properly in relation to
wind effects requires only small but vital adjustments to have an adequate response to
seismic action.
Even in highly-seismic areas, it is quite possible for wind demands to exceed Service
Level Earthquakes or, for some elements, even Maximum Considered Earthquakes
shaking demands. In addition, wind over-turning moments may exceed seismic overturning moments when defining the lower-bound strength of the structural system.
Therefore, wind performance should be evaluated in parallel with seismic analysis.
91
10 Seismic engineering
One of the specific characteristics of seismic behaviour in tall buildings is the heavy
influence of higher dynamic modes of vibration. Traditional engineering practice for
non-tall buildings has focused strictly on the first translational mode when setting
strength requirements. For tall buildings, the second or even third mode of vibration can
be equally, if not more, important to the overall design.
As illustrated in Figure 10.3, the influence of these higher modes of vibration can result
in significantly higher flexural, as well as shear, demands well above the base of the building.
Figure 10.3
Seismic elastic response of 135m high-tall
building with a central core
Different types of analysis can be used for different design levels and requirements. 3D
models are essential to capture translational as well as torsional effects.
Elastic analysis and linear response-history analysis are appropriate for service
assessment, as component responses are smaller than those causing yielding.
Therefore, the basic tools for designing are elastic response spectra for the service
earthquake, and non-linear response-history analysis for non-collapse (ultimate state)
performance evaluation. Non-linear analyses require knowledge of the reinforcement in
the non-elastic zone; therefore, the seismic analysis for non-collapse situations is
normally conducted in two phases:
Phase 1: Response spectrum analysis takes into account, in a simplified way, the
non-linear behaviour of the structure using a response modification coefficient. With the
results of this analysis, reinforcement of the structure is calculated.
92
Seismic engineering 10
Phase 2: Non-linear analysis uses the reinforcement previously defined. With this
analysis, the performance criteria of the building is checked.
The mathematical model of the structure should represent the spatial distribution of
mass and stiffness. Linear models should always be the first approach to understanding
the dynamic behaviour of buildings under seismic actions.
10.4.1 Modelling
Usually, codes include two set of values: one for the damage limitation stage (service
earthquake) and wind, and the other for the ultimate limit state (or maximum credible
earthquake). LATBSDC, for example, gives the values included in Table 10.1 for expected
material strengths and estimates of component stiffness respectively.
Table 10.1
Reinforced concrete component stiffness
values (2011 LATBSDC)
Element
Serviceability Damage
limitation level
No-Collapse Earthquake
Nonlinear Model
Structural walls
Flexural 0.9 Ig
Shear 1.0 Ag
Flexural *
Shear 1.0 Ag
Basement walls
Flexural 1.0 Ig
Shear 1.0 Ag
Flexural 0.8 Ig
Shear 0.8 Ag
Coupling beams
Flexural 0.5 Ig
Shear 1.0 Ag
Flexural 0.2 Ig
Shear 1.0 Ag
Diaphragm(in-plane-only)
Flexural 0.5 Ig
Shear 0.8 Ag
Flexural 0.25 Ig
Shear 0.25 Ag
Flexural 0.7 Ig
Shear 1.0 Ag
Flexural 0.35 Ig
Shear 1.0 Ag
Flexural 0.9 Ig
Shear 1.0 Ag
Flexural 0.7 Ig
Shear 1.0 Ag
Note
* Nonlinear fibre elements automatically account for cracking of concrete due to the concrete zero-tension stiffness
Where:
Ig represents the gross value of the moment of inertia
Ag the gross value of the concrete area
93
10 Seismic engineering
Floor diaphragms should be included in the model using realistic stiffness. Explicit
modelling of diaphragms at locations where significant force transfer occurs is
necessary. Common assumptions of perfect rigidity will not generally provide accurate
estimates of transfer forces.
Analytical models of the structure should incorporate the entire building, including the
subterranean floors, columns and walls. The model should include the mass and mass
moment of the inertia of those elements.
Tall buildings are complex dynamic systems. An important goal is to identify all regions
of potential inelastic behaviour, whether or not they have been targeted in preliminary
design as zones of desired inelastic behaviour. A typical example of non-target zones of
inelastic behaviour is flexural yielding of walls in middle or upper floors, often caused by
higher mode effects.
Another example is the flexural yielding of columns in middle or upper levels of moment
frames, even though columns are made to be more resistant to flexure than beams. All such
areas involving an expectation of non-linear behaviour should be detailed for ductility.
All structural elements for which significant strength degradation could occur should be
modelled to take potential deterioration into account.
dynamic loading.
In simple terms, the level of damping in a building is its ability to decay the amplitude of
vibration oscillations over time.
Typical damping values quoted for reinforced concrete buildings when subjected to
ultimate seismic events are in the order of 5 % of critical damping; encompassing
energy absorption due to plastic hinging and actual available damping of the structure
in its elastic range. Values to be used in analysis will depend on the type of analysis
performed. For example, for a non-linear time-history analysis, the energy absorption
component is explicitly calculated and an allowance is made separately for the buildings
intrinsic damping, usually around 2.5 %.
94
Seismic engineering 10
10.4.2 Response-spectrum
modal analysis
The complete quadratic combination (CQC) method should be used to combine modal
responses to represent the overall response of the structure considering all significant modes.
The effects of multi-directional loading should be considered according to the applicable code.
In normal buildings and in bridges, it is usual to use a reduction factor R to indirectly take
into account non-linear behaviour for non-collapse situations. As noted previously, this
approach is not appropriate for evaluation of the non-linear response of tall buildings as
the ductility associated with the fundamental mode is typically applied to all modes in the
analysis. In reality, however, the structural response is not the same and, indeed, the same
ductility may not be available in all modes. Nevertheless, it is normal to use modified
response spectra to predesign the reinforcement prior to carrying out non-linear time
history analysis of the structure.
95
10 Seismic engineering
Figure 10.4
Typical generalised force-deformation
relations for concrete elements of
components and concentrated nonlinear zones.
For beams, it can reflect localised plasticity by assigning a moment plastic hinge at each
end. Plastic rotation angles depend on: the reinforcement ratio, transversal
reinforcement amount and disposition, and level of shear force. In the case of columns,
the plastic rotation angles also depend on the level of axial forces. ASCE 41 06 gives
values for the plastic rotations, together with acceptance criteria taking into account
required performance level.
For modelling walls and cores, fibre elements (wall slices as discrete 2D axial members
with uniform non-linearity throughout their length) are commonly used.
Figure 10.5
96
Seismic engineering 10
To take into account the effect of transverse reinforcement in the behaviour of confined
concrete, a Mander model is normally used. The Mander model defines the relationship
stress-strain in the non-confined and confined concrete; in the latter case, the model
includes strength hardening and the increase of the strain limits due to transverse
reinforcement.
Non-linear static procedures (pushover analysis) may be useful as a design aid but should
not be relied upon to quantify response for tall buildings. Nevertheless, there is much
intrinsic value to a non-linear static analysis in the visualisation of the progression of
inelastic behaviour and assist in identifying the primary modes of inelastic behaviour
response. Also, a sufficient number of modes must be included, capturing 90 % of the
total mass in each horizontal direction.
From a seismic point of view, the principal impact of soil-foundation effects are:
10.4.6 Soil-foundation
structure interaction
The soil foundation system will have some mass and flexibility affecting the natural
Due to uncertainties in defining soil parameters, a study of the sensitivity using upper
and lower bond values should be undertaken to investigate seismic behaviour.
Performance objectives and the fulfilment of the acceptance criteria should be assessed in
all critical elements of the structure and in the overall structural system.
ASCE 41-06 is the most widely-used document featuring performance levels and
tabulating acceptance criteria for structural components. In addition, PEER (2010)
provides fundamental information for establishing performance objectives and
modelling approaches.
97
10 Seismic engineering
10.5 Design
As noted previously, due to the relatively rare nature of extreme design seismic events,
an acceptance of significant damage and inelastic design behaviour is expected.
This philosophy has its basis in permitting the controlled formation of plastic hinges in
appropriate structural members to enable the building to continue to drift laterally
through rotation of the hinges, without additional flexure or shear being induced.
Due to the ductile nature of flexural yielding - the preferred plastic hinge mechanism
- great care should be taken to avoid yielding in shear, due to its brittle nature. Once the
preferred ductile mechanisms are selected, designed and detailed accordingly the
remaining structural elements can be designed elastically for the reduced forces.
Systems/elements either specific or pertinent to tall buildings include core and walls;
outriggers; braced frames and diagrids; transfer structures; and podium/basement
structures.
Core and walls are normally the principal horizontal resistance system in many tall
buildings. Some non-linear response of these elements is expected.
A requisite in the design of ductile structural walls and cores is that flexural yielding in
clearly defined plastic zones should control the strength, inelastic deformation, and
energy dissipation in the structure. Brittle failure mechanism or those with limited
ductility should not be permitted. The principal source of energy dissipation in the core
wall must be the yielding of the flexural reinforcement in the plastic hinge regions;
normally, but not exclusively, at the base of the wall. Flexure yielding of coupling beams
also provides energy absorption.
Failure modes to be prevented are those due to diagonal compression caused by shear,
instability of thin-walled sections or of the principal compression reinforcement,
sliding shear along construction joints, and shear or bond failure along lapped splices
or anchorages.
If the shear is the governing effect, the behaviour of such a wall in response to reversed
cyclic loadings is characterised by a steady reduction of strength and ability to dissipate
energy. However, walls designed for flexural ductility and protected against a shear
failure exhibit a greatly improved response. It should be noted that shear forces at the
base of a building calculated by non-linear response history analysis may significantly
exceed those calculated by a linear response spectrum analysis.
For more detail information about core and shear wall dynamic behaviour, see Paulay
and Priestley (1992) and Whyte and Stojadinovic (PEER 2013).
98
Seismic engineering 10
Outrigger systems are often used as part of the lateral force-resisting system of tall
buildings and are typically composed of either deep concrete beams/walls, or concrete
or steel trusses connecting a central core to the perimeter structural system. For
outrigger elements, there is a high shear and/or compression/tension demand which
offers little opportunity for flexural yielding, leading to obvious concerns of brittle failure
of the outriggers. Available ductility is not reliable or consistent and such building types
require detailed, specific analysis to establish the ductile behaviour of such elements.
One issue arising when outriggers are used is variation of the compression-tension transferred
to outer columns when the real performance of the outrigger is far from the elastic behaviour.
Figure 10.6
Uncertainty in the axial forces in the outer
columns in case of non-linear behaviour of
the outrigger.
Diagrid systems, similar to outriggers, act predominantly in axial compression and tension.
Any seismic energy dissipation occurs predominantly through flexure and postbuckling/
tension-yielding behaviour of the diagonal members. When the lateral and gravity load are
taken by the same elements, limited ductility is available without compromising the gravity
support. Unlike outriggers, diagrid systems typically have redundant load paths, making
them more efficient than outrigger systems in withstanding seismic actions. Such systems
require specific analysis to verify their non-linear behaviour.
Figure 10.7
Diagrid systems.
Diagrid systems
99
10 Seismic engineering
Figure 10.8
Concentrically-braced system.
Concentrically-braced frames have limited ductility due to their primarily axial behaviour,
while eccentric braces introduce local bending moments. By that eccentricity, advantage is
taken of short ductile sections between the ends of bracing members. Those ends provide
significant ductility, enabling the bracing elements to remain elastic while significant
inelastic yielding of the ductile fuse occurs.
Figure 10.9
Eccentric-braced system.
Eccentric-braced system
100
Seismic engineering 10
Transfer structures are typically elements subjected to high shear demand under gravity
load; their failure could lead to a disproportionate collapse of the supported structure.
These elements should be designed to ensure that their vertical load-carrying capacity is
maintained under the expected seismic deformation, and should not participate in the
lateral load resistance of the structure. Therefore, its seismic behaviour should basically
be in the elastic range.
Figure 10.10
Transfer structures.
Podium and basement structures are typically characterised by their large inherent stiffness.
This sudden increase in stiffness near the base of the structure can induce very significant
prying forces on the principal lateral load-resisting system of tall buildings, leading to large
shear reversals at the interface which can greatly increase the design forces.
Floor diaphragms may need to be increased in strength to take these additional forces
and shears into account.
Figure 10.11
101
10 Seismic engineering
Joining two tall buildings with a common podium structure may also generate significant
loads in the podium, if the buildings move out of phase.
Podium and basement structures also increase the stiffness of the building, leading to
lower fundamental periods and subsequently higher base shears. Basements are usually
large enough that the forces in the basement walls are in the elastic range. It is usually
unnecessary, and also not desirable, to isolate the tower from the basement unless the
basement is shallow. In such cases consideration may need to be given to isolating the
tower structures through the basement/podium levels.
The primary role of floor plates is to act as horizontal diaphragms to transfer the horizontal
component of seismic force from each floor to the lateral load-resisting structural system.
As they typically have very little ductility, design forces for diaphragms are higher than
those corresponding to the lateral force-resisting system. They must be strong enough to
resist force transmitted by the lateral load-resisting system, if the as-constructed strength
of the system turns out to be greater than the calculated strength. This is typically
accounted for in codes of practice by using an over-strength factor.
Due to its inherently high in-plane strength, the design of the floor itself under these
loads is seldom critical and connection to the lateral force-resisting system becomes the
primary consideration. Care should be taken, however, when large openings are present
in the slab. The use of flat slabs as part of a lateral load-resisting system should be
carefully considered and avoided where possible, due to the shear dominant nature of
flat slabs.
For elements not considered part of the lateral force-resisting system, seismic forces are
not taken into account in their design and their stiffness should not be considered in the
seismic analysis. However, to ensure stability and compatibility, they must be designed
and/or detailed to transfer and withstand gravity forces under expected lateral drifts
known as drift compatibility.
102
Seismic engineering 10
When the device has a functional displacement limit beyond which the element will lose
its properties, it is highly recommended that the structure be checked to ensure it is
acceptable at a value of 50 % of this limit.
10.6 Detailing
10.6.1 Beams
Beams are typically expected to be the source of most rotational hinge mechanisms in
structures and careful detailing is required to ensure that mechanisms develop flexurally
without inducing shear failure.
Where beams have low span-to-depth ratios, as is typical in the coupling beams of core
wall lateral load-resisting systems often used in tall buildings, their behaviour is dictated
primarily by shear rather than flexure.
The shear is transferred through a diagonal strut under high compression and
associated perpendicular tension; with the higher modes of vibration associated with tall
buildings, significant numbers of flexural reversals are possible in a seismic event, placing
even more demand on these members. To prevent brittle failure of these elements,
diagonally-reinforced struts are often detailed to develop the shear strength required
and enable significant ductility.
103
10 Seismic engineering
Figure 10.12
Diagonally-reinforced deep coupling.
10.6.2 Columns
Under large inelastic drifts, significant forces are induced in the columns requiring
effective confinement for two reasons:
To ensure the required strength is developed, following potential spalling of the cover
In the case of using high-strength concrete being used in non-elastic zones, higher levels
of confinement are required to achieve adequate ductility and strength.
Spiral or closed circular hoops are more efficient than square or rectangular closed loops,
as they provide uniform restraint around the perimeter rather than just at the corners by
setting up hoop stresses. For square or rectangular ties, equivalent, effective restraint is
only provided through the introduction of additional cross ties.
10.6.3 Walls
In regions of low to moderate seismicity, plastic hinges are detailed to develop primarily
in beam members, and this mechanism is typically sufficient.
For high seismic zones, energy dissipation due to ductility of beams alone is, usually, not
sufficient and some additional ductility is required from the walls to ensure an efficient
structural solution. Significant load reversals are also expected in high seismic zones and
can lead to major problems if special detailing is not provided. The problem is exacerbated
for shear due to the degradation of the concrete interfaces, particularly where net
104
Seismic engineering 10
For high compression zones at the ends of walls under flexure, high levels of
confinement of the concrete are required for reasons similar to those discussed earlier
for columns. These zones, which typically become thicker and may resist all of the
flexural forces in the wall, are known as boundary elements.
10.6.4 Slab-column
connection details
In buildings supported partially or totally by walls or cores, the integrity of the slab-wall
connections plays a vital role in the behaviour of the structure. As the core sways due to
seismic action, an important rotation is imposed on the connection between slabs and
walls. The rotations are increased by vertical motions associated with elongation and
shortening of the core wall over its height as a result of the flexural action. For more
information on detailing, see Klemencic (2006).
105
11 Time-dependent behaviour
The movement of the building occurs in both the vertical direction (axial shortening) and
the horizontal direction (deviation from verticality) due to cumulative loading, timedependent material properties (such as creep and shrinkage) and the construction
sequence. This movement is very important in the design and construction of tall
buildings as it informs many structural and non-structural considerations.
Movements in tall buildings and related problems, if identified near the end of the
structural design process and prior to construction, can lead to solutions that are both
ineffective and difficult to implement during the construction process. The problems
associated with building movements are best addressed in the design stage, based on
the results of a staged construction analysis.
This chapter provides information on expected building movements and variations in internal
forces resulting from sequential construction and time-dependent material properties. The
information contained within is intended to provide assistance in the design of the structure,
to give details of the interface with follow-on trade construction, and to identify tolerance
and movement data which should be compiled for future reference by users of the building.
Refer also to Chapters 2 and 8 in relation to building drift and dynamic behaviour.
11.1 Definitions
Axial shortening
The axial shortening of a building is the vertical displacement of the building resulting
from the sum of the axial deformations of the vertical members at each floor. In
reinforced concrete vertical members (columns and/or walls), the initial axial
deformation resulting from applied load (elastic deformation) is compounded by
additional deformation due to creep and shrinkage of the concrete, which is usually
greater in magnitude than the elastic deformation.
Differential axial shortening arises because of the differences in the axial stresses
between columns and the core walls. The core walls of tall buildings are generally quite
large, and their size is influenced not only by axial stress requirements but also by
stiffness requirements to resist lateral loads.
106
Time-dependent behaviour 11
The cross sections of columns are usually designed to be as small as possible so columns
are generally more heavily stressed than core walls. As construction progresses, columns
and core walls undergo different amounts and rates of elastic, creep, and shrinkage
shortening. After completion of the building, creep and shrinkage shortening continue to
develop differently in core walls and columns throughout the service life of the building.
In addition, differential shortening between adjacent columns is significant when their
locations and corresponding stress levels are different, eg, among interior, exterior, and
corner columns.
Differential shortening between core walls and columns is generally greatest at between
two-thirds and three-quarters of the height of a tall building, but not at the top of the
building, as the shortening is based on SUBTO movement (see Figure 11.1 and Section 11.1.4).
Figure 11.1
Example of differential shortening between
core walls and columns in a tall building.
Image: Daewoo Engineering and Construction.
The following factors are known to have an effect on axial shortening and should,
therefore, be considered in the calculation of the shortening:
Properties of the concrete (initial and time-dependent properties)
zz Compressive strength
zz Nominal initial modulus of elasticity
zz Creep
zz Shrinkage.
107
11 Time-dependent behaviour
When a tall building has an eccentric or irregular plan or a large variation in shape
vertically, it could be subject to a considerable amount of differential shortening, which
in turn may cause permanent leaning of the building or a deviation from verticality in
the construction stage and after occupancy.
Additionally, tall buildings with symmetric plans may deviate from verticality due to an
asymmetric construction sequence. As a deviation from verticality is the extreme case
of differential axial shortening, it has more significant adverse effects on tall buildings
and, therefore, should be identified before construction so that proper countermeasures
can be taken.
The major factors affecting deviation from verticality are similar to those affecting
axial shortening.
Because the building movement develops with time, it is necessary to define a target
time; the point in time for which the movement is estimated. The movement is the
result of the combined effects of accumulated loading, creep and shrinkage during
construction and the residual effect of creep and shrinkage after occupancy.
Therefore, the ultimate target time is usually some time after completion of
construction. Based on the creep and shrinkage properties of the concrete, the target
time could be at least three years after completion of construction, when more than
90 % of the creep and shrinkage expected to develop during the service life has already
occurred. A different target time could be chosen to identify the building movement at a
specific time, such as at the installation of lifts.
Building movement is the sum of the deformations of all of the building elements after
they have been constructed. As the elements are constructed consecutively, generally
floor-by-floor, the total building movement can be classified as the movement occurring
prior to the completed construction of a certain floor (UPTO) or subsequent to
completion of construction of that floor (SUBTO).
108
Time-dependent behaviour 11
As the central core generally has lower stresses than the perimeter columns and may be
constructed in advance using climbing forms, the shortening of the core and SUBTO
shortening, in particular, is significantly less than that of perimeter columns.
Furthermore, the differential settling of supports can affect the levelness of the
floors and, if not carefully considered or compensated for in the design and
construction, this unevenness may give rise to tolerance problems for floor finishes
and cladding details.
109
11 Time-dependent behaviour
belt
11.2.2 Beams/outriggers/
trusses locked-in forces
These forces can be a significant design problem if certain lateral stability systems such
as outriggers and/or belt trusses engage these vertical members, as the lateral stability
systems are designed to have greater stiffness than other structural members. In
extreme cases, the total member forces, including the locked-in forces, might exceed
the capacity of the member; a problem that can be solved only through design changes
or alternative construction processes (see Section 11.4).
Movement in tall buildings may give rise to construction and serviceability problems as
a result of dimensional incompatibilities between the building structure and nonstructural elements.
11.2.3 Dimensional
incompatibility
With regard to axial shortening, the shortened vertical structure can transfer compressive
forces to neighbouring non-structural elements such as partitions, cladding, piping and lift
guide rails not designed to support vertical loads (see Figure 11.2). A slab that tilts because
of differential shortening or deviation from verticality may cause cracking or bowing of
partitions, unless joints sufficiently allowing for partition movement are provided.
Deviations from verticality mostly influence lifts because verticality is the main concern
during installation and maintenance. The overall deflection of a tall building during
construction will cause the lift shaft to deflect in the same direction and thus reduce the
vertical space available for the installation of lifts.
Occasionally it becomes necessary to remove part of the core wall if a distortion of the
lift shaft occurs during the installation of the lifts. If a deviation from verticality occurs
after installation of the lifts, other problems such as degradation in performance or
durability may arise. In a building with excessive deviation from verticality, the lifts will
come into contact with deflected guide rails, reducing the lifts maximum speed and
causing premature wear in their mechanical components such as clips and rollers.
110
Time-dependent behaviour 11
Figure 11.2
Details for attaching non-structural elements to the structure must be planned so their
displacement or deformation relative to the structure will not cause stresses. All tall
building movements and deformations should be understood and considered in
conjunction with other members of the design team to ensure adequate detailing
provision and to avoid adverse effects on the building services and architecture.
11.3 Prediction and
verification
111
11 Time-dependent behaviour
This analysis method has been widely used for decades, but over recent years there has
been a move towards construction stage analysis and time-history analysis of a 3D
model. As single column analysis is of connected structural members it cannot consider
restraining effects against differential shortening of the beams or slabs connected to the
column or wall. When these restraining effects are significant it becomes necessary to
conduct additional structural analyses based on the tentative results from a one-column
shortening analysis. Construction-stage analysis and time-history analysis of a 3D
model provide a more direct method of accounting for these effects.
Building movements in horizontal and vertical directions can be predicted at any stage
of construction. Post-processing of the analysis results is simpler than one-column
analysis, and results can be directly represented using a graphical user interface (see
Figure 11.3). Locked-in forces due to movement in horizontal members, such as transfer
beams, outriggers, and belt walls/trusses, are calculated and the effects on other
non-structural elements can be assessed by resolving the components of the movement.
Although construction-stage analysis is performed for a designated target time, the analysis
can be used to predict variations in building movements and internal forces as construction
progresses for comparison with the data from field measurements and surveys (Ha et al.
2011)[28]. The results of construction stage analysis are updated based on these comparisons,
as frequently as required. Field monitoring and building-response-model updating can
continue following the end of construction, through comparisons with the results of
time-history analysis to obtain better predictions of the structural response over time.
Construction-stage analysis
112
Time-dependent behaviour 11
Figure 11.3
Example of a graphical representation of the
results of construction stage analysis (Ha et
al. 2011)[28].
To evaluate the structural response of complex and sensitive structures such as high-rise
buildings over time, including creep and shrinkage effects, the most general approach
incorporates the time-dependent constitutive relations for concrete into numerical
methods for continuum mechanics or for structures composed of beams (typically finite
element methods).
With regard to creep, it must be noted that creep-prediction models used in the current
design recommendations and technical guides mentioned in section 11.3.2 are based on
the assumption that the linear viscoelastic behaviour of concrete varies with age,
combining the assumptions of linearity and superposition of the strain responses for
stresses applied sequentially. This model leads to a hereditary, integral formulation for
the creep constitutive law and, consequently, to a system of either linear Volterra
integral compatibility equations or equilibrium equations in which the force method or
the deformation method, respectively, are used for the structural analysis.
A general and effective procedure is to obtain the incremental form of the integral-type
creep constitutive law for a small time-step first. Detailed instructions for this procedure
can be found in section 7.2.4 of the fib (Fdration internationale du bton or International
Federation for Structural Concrete) Model Code for Concrete Structures 2010 (fib 2013)[29],
113
11 Time-dependent behaviour
in the fib textbook Structural Concrete (Chiorino & Sassone 2010)[30], and in a more
extended form in the ACI (American Concrete Institute) guide ACI 209.3R (ACI
Committee 209 2011)[31].
Notwithstanding any action taken to reduce the creep and shrinkage properties of the
specific type of concrete being used, all efforts should be undertaken to reduce the degree of
model uncertainty in the prediction of the time-dependent strains. Reductions can be
achieved using convenient strategies for calibrating the significant parameters in the models
to the specific characteristics of the concrete mixture to be used in the construction.
concrete and the fitting of curves with the least-squares method (Baant & Baweja,
2000 [35]; Baant et al., 2009 [38]) (see Figure 11.4).
114
Although the tests can be conducted on specimens taken from the actual concrete
poured on the site, it is better to establish a systematic testing campaign much earlier in
the process, following completed development of the concrete mix. Updated prediction
models for the time-dependent properties of the concrete can then be used in
movement analysis to increase its accuracy.
Time-dependent behaviour 11
Figure 11.4
Measuring creep strain from concrete
specimens in a climate chamber.
Photo: Daewoo Engineering and Construction.
During the construction phase, a tall building is monitored to record actual movement
for comparison with predicted movement. To measure the long-term effects of concrete
creep and shrinkage, the duration of monitoring can be extended to the target time. In
cases where preset (ie compensation) is applied during construction, the effect of the
preset could be monitored. If the actual movement differs from predictions, the target
and the amount of preset could be adjusted, based on the results of monitoring.
Two types of monitoring can be used for measuring the actual building movement
during construction. Sensor-based measurements of the deformations and
displacements of individual members involve field testing of materials, with full-size
specimens and embedded reinforcing steel under sequential loading in varying
environmental conditions. The other type is surveying the as-built condition of a
building to identify the movement by measuring chronological changes in threedimensional locations of designated points on the building.
However, this approach is generally not feasible, considering the total number of
columns and walls and the long period of measurement. Usually, only certain columns
and walls on a specific floor are selected for monitoring. The preferred floors to be
measured are the lowest ones, where the shortening from all of the subsequent load
applications can be recorded from the beginning to the end of construction. Additional
floors can be chosen when there is an abrupt change in the building plan or the
structural materials, for example, reinforced concrete to steel.
To monitor variations in the actual shortening values, the compressive strains of the
columns and the core walls are measured with vibrating-wire strain gauges. For
reinforced concrete structures, these gauges can be embedded in the member before
115
11 Time-dependent behaviour
casting the concrete (see Figure 11.5) or attached to the surface of the member after the
forms are removed. If strain gauges can be installed in every column from the basement
to the roof, then the total shortening of the building can be obtained by summing the
measurements for each floor.
Figure 11.5
Vibrating-wire strain gauges.
The measured strains are periodically compared with predicted strains from a
movement analysis (see Figure 11.6). The analysis must have updated input data for
material properties and a construction sequence as realistic as possible, to give accurate
predictions of the strains. When a real-time monitoring system is implemented to
compare the actual strain and/or stress levels against the analysis results, back-analysis
and modification of the building design is possible in the event that the actual
measurements deviate from the targets (McCafferty et al. 2011[39]).
The measurements may be taken manually with a portable data logger, or the
gauges and the logger may be part of an automatic measurement system. The initial
measurement of the strain is taken before pouring the concrete, followed by
periodic measurements, for example four times a day, after the concrete is poured
and subsequently reduced to a single measurement each week. When an automatic
measurement system is employed, the data logger can be configured to vary the
periods between measurements. State-of-the-art data loggers can be accessed
through a wireless network module that sends the measured data to the
construction site office or any other location.
116
Time-dependent behaviour 11
Figure 11.6
Measured (steel)
Measured (concrete)
Measured (average)
Predicted
50
0
-50
-100
-150
-200
-250
-300
-350
-400
-450
-500
234
292
350
408
466
524
582
640
698
756
814
While measurements are taken only from selected structural members and the
movements of other members are assumed, the survey is for the entire building as it is
being constructed. The survey is usually performed optically by professional surveyors at
specific intervals of construction, for example, every 10th floor, and changes in selected
locations are recorded until the completion of the building.
Considering allowable tolerances of construction at every floor and latent survey errors,
survey results may not accurately reflect building movement but the results represent
the general tendency of the movement. Therefore, it is not necessary to perform the
survey when the construction of each floor is finished.
Currently cutting-edge technologies such as 3D laser scanning (see Figure 11.7) and
satellite-based measurement systems are being introduced to enhance survey accuracy
and overcome human errors in conventional survey methods.
117
11 Time-dependent behaviour
Figure 11.7
Scanned point-cloud image of the lift shafts
of a tall building generated by a
3-dimensional laser scanner.
Image: Daewoo Engineering and Construction.
Corrective measures for the effects of building movements can be taken at either the
design or construction stage but it is preferable to identify and resolve problems at the
design stage. For corrective measures taken during construction, the focus should be
on how to solve the problem, not just on how to compensate for the movement (Ha et
al. 2011[28]).
Most of the adverse effects stated in section 11.2 can be solved by adjusting the design
or materials to have smaller or equal movements, setting up the joints to respond to
differential movement or making non-structural elements absorb structural movement.
A preset of the structure can be used during the construction process, with due caution.
Considerations at the design and construction stages, and the recommended method for
preset in the construction stage, are dealt with in Section 11.4.1 below.
Consideration should be given to likely movement during the design phase to determine
the suitability of the proposed structural system and member proportions. To minimise
the effects of building movement, individual members must behave or deform (shorten)
with similar magnitudes and rates. This behaviour can be determined in the preliminary
analysis. Appropriate materials can then be selected and procured, and the design of the
structure modified to accommodate movement (Carreira & Poulos 2007[40]).
118
Time-dependent behaviour 11
The effects of creep and shrinkage deformations can be reduced by including additional
steel reinforcement, ensuring adequate initial curing and using concrete mixes with lower
potential for significant drying shrinkage. The preparation of a thorough specification
covering all concrete materials, curing and construction techniques is vital.
Partitions, cladding, curtain walls, lifts and plumbing must be designed to adjust to the
overall building movement and inter-story deformations. Normal serviceability criteria
including cracking, deflection, acoustic performance, fire resistance and vibration
response should be considered during the design process. Careful consideration should
be given to construction tolerances and floor deflections, particularly at the slab
perimeter where cladding systems are attached.
However, it must be observed that this artifice reduces the redundancy of the building
structure, which subsequently reduces the overall rigidity and energy dissipation
capacity of the building structure with respect to dynamic disturbances such as wind
and seismic activity (see Chapters 9 and 10).
Detailing
Structural connections
119
11 Time-dependent behaviour
The effects of advanced core construction are difficult to assess accurately but can be
examined using the construction-stage analysis software mentioned in Section 11.3.1 or,
somewhat laboriously, via spreadsheet calculations in one-column analysis. As a rule of
thumb for reinforced concrete structures, because core walls deform less than columns,
advanced core construction increases differential movement. However, for hybrid
structures with reinforced concrete core walls and steel columns, this construction
method will reduce the differential movement.
Quality assurance and quality control procedures are necessary to verify that design
requirements are met during construction and to avoid problems arising from creep and
shrinkage (Carreira & Poulos 2007[40]).
The horizontal and vertical movements of a tall building can influence the design of joints
between cladding panels, particularly at transfer floors in the structure and potentially at
refuge and mechanical floors incorporating elements such as outriggers and belt trusses.
The movement that must be accommodated in the stack joint at these locations is primarily
due to differential vertical movement between floors and the effects of axial shortening.
For external wall system or cladding fixed to the perimeter of the building at the spandrel
beam or the slab edge, understanding and consideration of the following is required:
Horizontal and vertical cladding joints and cladding panel tolerances
Horizontal slab edge tolerances in plan and vertically
Horizontal insert or cast-in bracket tolerances
Sequencing of cladding attachment in relation to all fit-outs.
Lifts
Lift manufacturers will usually coordinate with architects on the overall plan dimensions
of all lift shafts and pit dimensions, and these dimensions should be considered during
the detailed design phase.
Fit-out
120
Time-dependent behaviour 11
Movement analysis conducted during the detailed design phase should identify problems
associated with movement, and establish appropriate measures including the need for
presets.
121
11 Time-dependent behaviour
Figure 11.8
Example of building movement in threedimensional space (left) and the result of
preset only for UPTO movement (right).
Image: Daewoo Engineering and Construction.
The levels of certain elements on each floor may have to be cast higher than the desired
final level by varying amounts predicted by calculations. Contractors will have to
regularly monitor the levels of all the elements on each floor as construction advances
and report these to the designer. These levels should be compared to the calculated
values; the target levels for subsequent floors may be adjusted based on the actual
movement. If conducted collaboratively using the same approach as in the original
design, an improved result can be achieved.
122
Time-dependent behaviour 11
11.5 Tolerances
However, these tolerances do not explicitly include changes in position resulting from
structural movements due to deflections, settlements and temperature changes. This
omission is not normally a problem, however, since construction tolerances are typically
quite liberal and structural movements for most buildings, even tall buildings, are
relatively small.
Tolerances are typically specified relative to the theoretical building lines and it is
customary to concentrate on those expected to have significance to follow-on trades
and future users. The overall building tolerances or deviations should be summarised or
tabulated for each element type or feature including, but not limited to, the following:
Pile plan position and cut-off
Retaining wall position
Plan position and shapes of walls, columns and openings
Verticality (plumb) of columns and wall elements
Pre-camber position
Floor levelness over a plan area
Vertical cladding tolerance
Abrupt changes in surface level
Cast-in fixing/insert position and level
Straightness and length.
The attachment of follow-on trade construction such as cladding, raised floors and
ceilings should allow for a combination of construction tolerances and movements when
the building is in service.
Local building codes and standards may not always provide relevant guidance on
tolerances for tall building construction (BSI 1990 [41] and ACI Committee 107 2010 [42]).
Construction tolerances are related to the position in which the elements of the
structure are cast and deemed to be pre-strike. Any movement or deflection after the
removal of the formwork/falsework or medium- to long-term settlement, shrinkage,
creep, shortening or thermal effects is not included.
123
12 Materials
12. Materials
Concrete technology has benefited from research and market focus, allowing designers
to fine-tune concrete for specialist applications, including tall building construction.
12.1 Concrete
Throughout this guide the standard European nomenclature for concrete strengths is
used as, for example, C50/60. The prefix C is used for normal and heavyweight
concretes. The prefix LC is used for lightweight concretes. The first number is the
cylinder strength in MPa. The second number is the cube strength, again in MPa.
12.1.1 Foundations
Foundations for tall buildings tend to require large volume pours for rafts or piled rafts.
Consideration should be given to the use of additions such as ground-granulated blastfurnace slag (ggbs) or fly ash to reduce the initial heat of hydration and, thus, early thermal
cracking. The level of additions tends to be around 50-70 % although 80 % ggbs has been
used. Although it is normal to specify the strength of concrete at 28 days, the foundations
are sized for the permanent works and the early stresses applied to the foundations are
significantly lower than the permanent stresses. The concrete can therefore be allowed to
take 56 or 90 days to reach the required strength.
Figure 12.1
160
90 days
140
CEM I
120
Strength ratio, 28 days = 100
28 days
7 days
100
3 days
80
60
40
20
0
1
10
Age, days
124
Cement types
100
Materials
12
12.1.2 Superstructure
Tall buildings tend to use high-strength concrete for vertical structural elements due to
significant savings in the area taken by the vertical structure being available. Highstrength concrete can be considered to be strengths above C50/60. Most concrete tall
buildings above 30 storeys use high-strength concrete, where available.
Concretes for tall buildings are required to be pumpable from ground level up to the level
being served. This requirement affects the design of the concrete mix. If the concrete is
to be pumped more than 30 storeys high, current concrete technology is such that the
concrete will be a high-strength concrete even if a normal-strength concrete is specified.
This can be considered in the initial design to optimise the design of the horizontal
elements as well as the vertical elements.
The benefits of using high strength concrete [43] are particularly noticeable for the
vertical elements and, typically, this is where high-strength concrete is used. The size
of the columns can be reduced by about 40 % by doubling the strength of the
concrete. Walls tend not to be so highly stressed as columns because the loads are
similar to those in the columns but are spread over the greater area of the wall.
High-strength concretes have a higher Youngs Modulus than normal strength
concretes and, therefore, they experience fewer strains. Creep and shrinkage are also
lower in high-strength concretes. To reduce differential shortening between the
columns and the walls the designer should consider using different strengths of
concrete for each, if the stresses are not similar.
Since the Youngs Modulus of concrete is higher in higher strength concretes, slabs (frequently
governed by deflection criteria) can also benefit from the use of high-strength concrete.
High-strength concretes are less ductile than normal-strength concretes and, therefore,
the reinforcement should provide ductility in the form of links for columns and, where
required, walls.
Figure 12.2 gives the stress/ strain curve detailed by the parameters in Eurocode 2 (EN
1992-1-1) showing that, as the strength of concrete increases, the plastic plateau, from
the strain at which the characteristic strength is achieved to the ultimate strain, reduces
from 1.5 to 0 permille ().
This lack of ductility has also been resolved by using steel-fibre reinforcement together
with the normal bar reinforcement[45].
125
12 Materials
Figure 12.2
The stress/ strain curve detailed by the
parameters in Eurocode 2 (EN 1992-1-1)
Research on a series of tunnel fires in the EU has concluded that the use of
polypropylene microfibres in the concrete mix has the most beneficial influence on the
likelihood of spalling, eliminating the risk in high-strength concretes (but not ultra-high
strength) concretes (>150 MPa). EN 1992-1-2 specifies a dosage of more than 2 kg/m3 of
monofilament, polypropylene fibres to reduce the possibility of spalling in high-strength
concrete but this dosage can be reduced if supported by test evidence. The addition of
microfibres has an effect on the pumpability and strength of the concrete and, therefore,
the concrete producer should be consulted to optimise the design of the concrete mix.
12.1.3 Buildability
Buildability was discussed in Chapter 6; the concrete mix will be heavily influenced by
buildability requirements. Early-age strength requirements vary between the different
construction methods and, therefore, the concrete mix will also vary. The concrete
producer should have trialled the different concrete mixes to be used before start on site.
Self-compacting concretes can be useful in the construction of tall buildings where there
might be dense reinforcement with little space for normal compaction. This should be
considered in the design stage if the reinforcement becomes too congested[47].
126
Materials
12
12.2 Reinforcement
Reinforcement production and supply varies greatly around the world. During peaks in
construction activity, reinforcement may also be imported and care should be taken to
ensure it complies with the project specification. Engineers should seek advice on
material supply early in the design process.
The primary material properties of interest to engineers are, typically, strength and
ductility. Ductility is particularly important in seismic zones. However other properties
might also be important, for example, bond and weldability. Engineers will also need to
ensure that reinforcement is compatible with the concrete design standard.
There are numerous proprietary systems available to increase construction efficiency
including:
Continuity systems such as couplers and bent-out bar systems
T-headed reinforcement
Prefabricated punching-shear and movement joint-shear connectors
Prefabricated reinforcement (such as carpet, beam and column cages) including
bent mesh
Prefabricated balcony systems (to prevent a thermal bridge).
It is not possible to provide a global product list here but engineers are encouraged to
research and discuss this early on with the contractor.
12.3 Time-dependent
properties
For the prediction models in the current design recommendations and technical guides
mentioned in Section 11.3.2, fib Model Code 2010 (fib 2013 ) and the ACI 209 guides
(ACI Committee 209 2005, 2008 and 2011 [31, 32, 33, 34]) contain basic definitions and
assumptions for stress-induced strains and shrinkage strains in concrete and detailed
information on their physical mechanisms and influential factors.
[29]
For the purposes and scope of this chapter, the following basic elements should
be noted:
Shrinkage strains and stress-induced strains are considered additive.
Stress-induced strains are normally separated into an initial nominal elastic strain and
a creep strain; however, designers must be aware that this separation is a matter of
convention. Creep strains develop very rapidly during and immediately after the
application of the stress, and consequently the initial nominal elastic strain contains
creep that occurs during the time between the application of the stress and the
measurement of the strain. If this separation is assumed, the initial and creep strains
127
12 Materials
must be defined consistently so that their sum corresponds to the measured stressinduced, time-dependent strain.
Within the range of service stresses, the stress-induced strain is considered an
age-dependent linear viscoelastic behaviour for concrete, combining the assumptions
of linearity and superposition of the strain responses to stresses applied at different
times.
According to these basic definitions and assumptions, when considering only shrinkage
as a stress-independent strain, the total time-dependent strain (t) in hardened
concrete at time t under a constant imposed stress applied at a concrete age t may be
defined by the following equations:
(t) = (t,t) + sh (t)
= J (t,t) + sh (t)
J (t,t) = 1 + C(t,t)
Ec(t)
where (t,t) is the stress-induced strain, sh (t,t) is the shrinkage strain, J (t,t) is the
compliance representing the stress-dependent strain per unit stress, Ec(t) is the nominal
initial modulus of elasticity for the concrete associated with the nominal initial elastic
strain 1/ Ec(t) per unit stress, and C (t,t) is the creep strain per unit stress.
For a variable imposed stress (t), in the frequently assumed case that the law of
variation of the imposed stress is continuous after an initial finite step (to) at age to , the
stress-induced strain at time t is given by the expression:
t
(t) = (t0) J (t,t0 ) + J(t,t) d (t)
128
t0
This equation, a linear Volterra integral equation, represents a constitutive law for the
strain response of concrete to variable imposed stresses. Prediction models for concrete
creep usually provide information for the prediction of the compliance J(t,t)on the basis
of a set of the most significant parameters.
Structural design 13
This chapter is set out as a series of notes. The intention is that they will form a quick
reference for the experienced engineer needing guidance on aspects of design and
analysis that are particular to tall buildings.
The notes are brief, for quick reference. Where further detail is required on the
application of the various methods, the reader should refer to specialist literature.
References are listed at the end of the guide.
These notes bring together the best of international good practice. In addition, of course,
designers should refer to, and comply with, the building codes or regulations that exist in
the jurisdiction where the building is to be constructed.
The notes are arranged to coincide with three broad stages of design:
Concept design. At this stage, a minimum level of analysis and a series of structural
the suitability of design. Many of the methods listed in scheme design will replace the
quick and approximate methods recommended in the concept design stage. See
Section 13.2.
Detailed design. A full set of detailed documents is required, proving the
acceptability of the design and calculations to demonstrate the design meets them.
The methods follow on closely from those used in scheme design.See Section 13.3.
The fundamental aims and requirements for the structural design of a building do not
change with its height. There are, however, some areas that become more important as
the building becomes taller. These are listed below:
Dynamic component of wind load. Gusty, time-varied wind loading may induce a
ground shaking are complex. A tall building will need a more subtle form of analysis
taking account of the nonlinearity and multi-modal nature of the building response.
Differential vertical movement. Vertical shortening of the structure is greater; the
129
13.1.1 Objectives
damping etc.
Key structural dimensions
zz Column and wall positions and slab and beam depths.
Structural form of floor slabs and framing
zz Column forces are large, and restraint is required.
13.1.2 Essentials
Assess seismic hazard at the site. If doubt exists, seek the advice of a competent
specialist. EC8 part 1 section 3.2.1 (2011) has a useful definition of very low and low
seismicity. If seismicity is very low, it is not generally necessary to carry out
additional analysis and checking for seismic ground shaking effects.
Consider shear flexibility of the core. The core will consist of a number of shear wall
elements linked by lintel beams. The stiffness of these beams will have a very
significant effect on the degree to which the core acts as a single structural element.
Consider effect of doorways and other openings in outriggers. The stiffness of an
outrigger element has a significant effect on the overall stiffness of the stability system.
Consider lateral restraint of walls. Some walls may not be laterally restrained by
floor slabs; for example, where a wall separates a lift shaft from a stairwell. Keep a
careful eye on their slenderness.
Design-in sufficient torsion stiffness. A twisting response to wind or seismic ground
shaking will generate high lateral accelerations at some points in the floor plate. This
could lead to discomfort among building users and/or high seismic deformations.
Arrange structural system to dissipate sufficient energy during seismic events.
additional vertical forces on transfer structures and long or heavy spans or cantilevers.
Regular plan form and elevation. Abrupt changes in stiffness and mass distribution
130
Centre of lateral stiffness at centre of mass. Eccentric floor plates twist under
Minimise weight of floor slab and framing. This will reduce column loads, increase
the natural frequency, and reduce seismic demands. It should also reduce the
embodied carbon and resource demand. Be aware of the economics of relevant
industry; the viability of your project may depend on it.
Maximise proportion of the building dead load carried by the stability system.
The stability system must resist overturning, generating moments or uplift forces.
Columns, walls and foundations are all simpler, stiffer and cheaper if they remain in
compression at all times. Will also reduce the need for foundations resisting tension.
Size the stability system to achieve no tension in service. In vertical elements of
the stability system, cracking has a very significant effect on the stiffness of a
reinforced concrete element. If walls and columns do not see tensile stress in service,
assume un-cracked section properties in the analysis. This reduces the need for
tension capacity in foundations.
Overall deflection under wind load less than, for example, H/500. The aim here is
to arrive at a design achieving the occupant comfort criterion, to limit p-delta effects
and allow practical detailing of the cladding. H/500 will be superseded in later design
stages by more specific checks for comfort and cladding movement.
Prefer no horizontal movement under vertical loading. Effects can be offset by
construction process simpler and safer and will reduce the build cost.
131
Build an analysis model. Use your favourite analysis software. Some people work by
hand at this stage. The model should be simple to build and amend, so that alternatives
can be looked at quickly. It does, however, need to be detailed enough to pick up the
significant structural effects.
Model core using linked stick elements or using 2D elements. The 1D element
carefully refined at lintel beams, lintel beam connections and around builders work
holes. 2D meshes that are too coarse can cause significant errors.
In 2D analysis be careful that linked freedoms do not limit the structural action of
the lintel beam elements. Linking freedoms at floor levels will cause errors if lintel
beams are modeled using 2D elements.
Model rotational flexibility of lintel beam connection to shear wall. Lintel span
A rigid link in the xy plane at each floor level is a convenient way to simplify the
model. Care is required, however, to ensure this does not mask important structural
actions. Only use if in-plane effects are not significant. Be careful of using it with
outriggers or mega bracing.
In stick element modelling, consider neglecting minor axis and element torsion
effects. If minor axis and torsion effects are not required for the functioning of the
stability system, consider setting I and J values for the core wall to zero so that they
are not considered in the analysis.
Use appropriate E values for duration of loading. Short-term E can be used for wind
load may well be amplified by the combined influence of the gravity loads and the
deflection of the system. Evaluate this effect and use P-delta analysis if it is significant.
132
linear response-spectrum analysis. The model will need to represent all the building
mass, its distribution in plan over each floor plate and the columns supporting it.
Carry out a linear response-spectrum analysis to EC8 or IBC. This will offer a first
z directions. Analysis package should enable scaling of the modal dynamic results to
the appropriate response spectrum for the site.
Use CQC method. Combine the effects of individual modes into the total response
method is recommended.
Choose q or R appropriately. Take expert advice if doubt exists about the value of q
or R to use. This will have a very significant effect on the design because of the direct
effect on section strength demands.
Add accidental torsion. In accordance with code.
Confirm all sections can be designed with sufficient ductility. Use rules from the
133
13.2.1 Objectives
Finalise dimensions and setting-out of structural system. Position and size of all
vertical structure, elements of the stability system, and slab edges should be agreed
with the design team and fixed.
Detailed coordination with other disciplines. Finalise the interface between
following trades and the stability system.
Produce scheme-stage drawings. A report describing the system and how interfaces
with the building design is often useful at this stage as well.
Produce estimates of concrete and rebar quantities. Usually required for cost-checking.
13.2.2 Essentials
useful guide:
zz H < 200m
zz H/d < 5; where d is the minimum horizontal dimension perpendicular to the wind.
zz Plan form is rectangular
zz Building is prismatic.
If your building lies outside these limits, wind tunnel testing will probably be required.
Seek the advice of a competent specialist.
Determine whether Non-Linear Time History Analysis is required.
CTBUH 2008 Recommendations for the Seismic Design of High-rise Buildings, sets
out the consensus view of the worlds most experienced designers of high-rise structures
in seismic zones. It recommends non-linear time history analysis (NLTHA) is required when:
zz H > 50m
zz Seismic hazard is moderate or high.
average return period of 50 years. Elastic response spectrum analysis can be used.
See appendix B of CTBUH recommendations (2008).
No structural collapse during a seismic event with an average return period of
2,500 years. Non-linear time history response analysis will probably be required.
Refer to CTBUH recommendations (2008). Consult a competent specialist if lacking
the capability for this type of analysis.
134
value for that detail in ASCE 7-10 (2010). For every structural element. If this
condition is met, the collapse prevention requirement has been met.
13.2.3 Structural
engineering targets
Ensure all sections can be reinforced economically. Check all elements, particularly
outriggers framing into core walls, shear in lintel beams, anchorage where beams
span perpendicular to a thin wall, areas of tensile stress in core walls, and clashes
where several beams frame into the same piece of concrete.
Storey drift under wind load coordinated with the cladding design. The relative
movement of one storey relative to the next will be very important in the design of
the cladding system. Limit used in design should be agreed with the cladding supplier.
Values in the range of h/500 to h/200 have all been used successfully in the past and
h/300 probably strikes a good balance, while h/400 is easier for cladding suppliers to
deal with.
Lateral acceleration under wind load is acceptable to occupants. A dynamic
consideration calculated in the wind-tunnel laboratory: it is influenced by the wind
climate, building geometry, building mass distribution and stiffness, the geometry of
the surroundings and the available damping.
The scheme-stage analysis model should include sufficient detail to allow the design
level of precision and more thorough coordination with the design team.
It is likely that lateral accelerations will not cause significant discomfort or negative
135
of the building.
The analysis axes. To coincide with directions of movement in first two modes, if possible.
Things to remember:
Model rotational moment of inertia of floor plates. In order to model torsional effects.
Ensure first two modes are translational. Rather than torsional.
Probably wont need pdelta analysis. Lambda crit for the service state should be
Then, use a modal dynamic analysis to prepare this data to send to the wind-tunnel
laboratory:
Modal frequencies. For first three modes.
Mode shapes. For first three modes.
Floor-by-floor masses and positions. Of centre of each floor mass, in 3D.
For the testing stage, the wind-tunnel laboratory needs 3D external geometry of the building
and the surroundings and the analysis origin and axes defined relative to the 3D geometry data.
136
q, or R, =2.
Ductile detailing required when demand to capacity >1. Structural components
with strength demand to capacity ratios >1.0 should be detailed as components of an
intermediate framing system to ASCE 7-10. When strength demand is less than
capacity, specific seismic detailing is not required.
Foundations designed for elastic demand. Or the maximum base moment and
shear that the structure can deliver to the foundation, accounting for all possible
sources of reserve strength.
building importance.
Response-spectrum based on 2% damping. See CTBUH 2008 appendix A.
Accidental torsion need not be included.
All structure to remain elastic.
137
2008, appendix A. Energy absorption after the onset of yielding will be explicitly
modelled in the NLTHR analysis.
Post-yield force-displacement relationships based on ASCE 41-06 (2007). Or
other industry standard relationships, where they exist, and where they are
appropriate.
Floor diaphragms. Modelling must allow for calculation of diaphragm and collector
forces and in-plane forces from transfer structures and outriggers.
Second order and p-delta effects will be required. This analysis needs to account
for the effects of significant deflections.
Accidental torsion need not be included.
Number of analyses. Required. Will depend on the choice of ground motion histories.
Output peak racking deformations and floor accelerations. These are used for
assessment of non-structural components. Racking deformations are often more
meaningful than storey drifts.
138
13.3.2 Essentials
Adequate strength of all elements at ultimate limit state. In non seismic design.
Adequate inter-storey drifts. Relative to the limits agreed with the cladding supplier
rely on cast-in steel fittings, ensure that the failure mode for the fitting is ductile. This
means that beams connecting to the plates can be designed without assessing the
effect of beam end rotations.
(2008), as appropriate.
139
Construction joints in core. Will need to coordinate with the formwork design and
(probably) no need for ps-delta analysis. Gives inter-storey drifts to pass on to the
cladding designer and designer of the internal partitions
Dead-load deflection analysis. May be required to provide data to calculate presets:
vertical, horizontal or floor slope. This should take creep and shrinkage into account in
a multi-stage analysis.
140
References
References
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
141
References
22. Harris, R.I., Deaves, D.M. The Structure of Strong Winds, Paper No. 4, Proceedings
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
142
of the CIRIA Conference on Wind Engineering in the Eighties, London, 12-13 November,
Construction Industry Research and Information Association, London, 1981
American Society of Civil Engineers (ASCE), ASCE Manual of Practice No.67 for Wind
Tunnel Studies, American Society of Civil Engineers, 1998
Australasian Wind Engineering Society, Quality Assurance Manual - Wind
Engineering Studies of Buildings, AWES-QAM-1-2001, 2001
Bast, W. D., McDonnell, T. R., Parker, L., and Shanks, S. P., Measured shortening and its
effects in a Chicago high-rise building, Proceedings of the Third Forensic Engineering
Congress, San Diego, CA, pp. 564-576, 2003
Fintel, M., Ghosh, S. K., and Iyengar, H., Column shortening in tall structures
prediction and compensation (EB108.01D), Portland Cement Association, 1986.
Fintel, M., and Khan, F. R., Effect of column creep and shrinkage in tall structures
Prediction of inelastic column shortening, ACI Journal, Dec., Vol. 66, No. 2, pp.
957-967, 1969.
Ha, T., Lee, S. and Oh, B., Prediction and control of movement of high-rise buildings
during construction, fib Symposium PRAGE 2011, Session 2B-4: Construction
Technology, pp. 482-486, 2011.
fib, fib Model Code 2010, Wilhelm Ernst & Sohn, Berlin, 2013.
Chiorino, M. A. and Sassone, M., Further considerations and updates on time
dependent analysis of concrete structures, Structural Concrete - Textbook on
behaviour, design and performance, 2nd edition, Vol. 2, Sec. 4.16, fib Bulletin 52,
Lausanne, pp. 43-69, 2010.
ACI Committee 209, Analysis of creep and shrinkage effects in concrete structures
(ACI 209.3R-XX), American Concrete Institute, Farmington Hills, MI, 2011, 229 pp.
ACI Committee 209, Guide for modelling and calculating shrinkage and creep in
hardened concrete (ACI 209.2R-08), American Concrete Institute, Farmington Hills,
MI, 2008, 48 pp.
ACI Committee 209, Prediction of creep, shrinkage, and temperature effects in
concrete structures (ACI 209R-92, Reapproved 2008), American Concrete Institute,
Farmington Hills, MI, 2008, 47 pp.
ACI Committee 209, Report on factors affecting shrinkage and creep of hardened
concrete (ACI 209.1R-05), American Concrete Institute, Farmington Hills, MI, 2005, 12 pp.
Baant, Z. P., and Baweja, S., Creep and shrinkage prediction model for analysis and
design of concrete structures - Model B3, in: A. Al-Manaseer ed., The A. Neville
Symposium: Creep and Shrinkage - Structural Design Effects, ACI SP-194, American
Concrete Institute, Farmington Hills, MI, pp. 1-83, 2000.
Baant, Z.P., Hubler, M.H., and Yu, Q., Excessive creep deflections: An awakening,
ACI Concrete International, August, pp. 44-46, 2011.
Baant, Z. P., Li, G.-H., and Yu, Q., Prediction of creep and shrinkage and their
effects in concrete structures: Critical appraisal, Proceeding of 8th International
Conference on Creep, Shrinkage and Durability of Concrete and Concrete Structures CONCREEP 8, Vol. 2, T. Tanabe, et al. eds., CRC Press, Boca Raton, FL, 2009, pp.
12751289, 2009.
Gardner, N. J., Comparison of prediction provisions for drying shrinkage and creep
of normal-strength concretes, Canadian Journal of Civil Engineering, Vol. 31, pp.
767-775, 2004.
References
39. McCafferty, P., Brodkin, D., Farnsworth, D., and Scott, D., Engineering an icon The
40.
41.
42.
43.
44.
45.
46.
47.
Further Reading
Marina Bay Sands Integrated Resort, STRUCTURE magazine, June, pp. 29-33, 2011.
Carreira, D. J., and Poulos, T. D., Designing for effects of creep and shrinkage in
high-rise concrete buildings, ACI SP 246-07, pp. 107-132, 2007.
BSI, Guide to accuracy in building (BS 5606:1990), British Standards Institution, 1990,
60 pp.
ACI Committee 107, Specification for tolerances for concrete construction and materials
(ACI 117-10), American Concrete Institute, Farmington Hills, MI, 2010, 80 pp.
fib bulletin 42 Constitutive modelling of high strength / high performance concrete:
fib 2008
The Concrete Society, Technical Report 49 Design guidance for high strength
concrete. 2010
The Concrete Society, Technical Report 63 Guidance for the Design of Steel-FibreReinforced Concrete. 2007
The Concrete Centre, CCIP-031 Performance of Concrete Structures in Fire. 2011
The Concrete Society, Technical Report 62 Self-compacting Concrete: A review. 2005
Yu, Q., Baant, Z.P., and Wendner, R., Improved algorithm for efficient and realistic
creep analysis of large creep-sensitive concrete structures, ACI Structural Journal, Vol.
109, No. 5, Sep-Oct. pp. 665-675, 2012.
Sassone, M. and Casalegno, C., Evaluation of the structural response to the time-
design of supertall buildings. A case study: The Burj Dubai Tower, ACI SP 246-07, pp.
135-150, 2007.
Sinn, R. C. and Abdelrazaq, A. K. Robustness and Redundancy Design for Tall Buildings, ASCE
ENV 1994-1-1: 1994 Eurocode 4: Design of Composite Steel and Concrete Structures: Part 1.1:
General Rules and Rules for Buildings with Reference to the UK National Application
Document, Steel Construction Institute. 1994
143
References
Composite Steel and Concrete Structures. General rules and rules for buildings, Thomas
Telford, 2004.
International Standardization Organization (ISO), , Basis for design of structures -
McGraw-Hill, 1998
Council on Tall Buildings and Urban Habitat (CTBUH), Recommendations for the Seismic
Virginia, 2007
Council of Tall Buildings and Urban Habitat. Recommendations for Seismic Design of
Seismic Design of Tall Buildings, Version 1.0, TBI Guidelines Working Group. PEER Report
2010/05, Berkeley, California, , University of California, available at http://peer.berkeley.
edu/tbi/publications-reports/, November 2010
Los Angeles Tall Buildings Structural Design Council, An Alternative Procedure for Seismic
Analysis and Design of Tall Buildings Located in the Los Angeles Region, available at www.
tallbuildings.org, 2008.
Smith, R. Merello, R. and Willford, M. Intrinsic and Supplementary Damping in Tall
Buildings, Proceedings of the institution of the ICE Structures and Buildings, Vol.163, (2), pp.
111 118, London, 2010.
International Code Council (ICC), 2009 International Building Code, Cengage Learning,
144
Case Studies
Case Studies
This chapter provides just some examples of tall buildings using concrete. The case studies
have been selected to show a range of building use, storey heights and construction
methods. There are also projects from across the world from cities such as London,
Chicago, Mumbai and Shangai.
146
147
148
149
5. Strata, London, UK
150
151
152
8. Millharbour, London, UK
153
154
155
157
158
145
Case Study 1
The shear walls are 450 mm thick at the base of the tower, reducing to 300 mm thick at
the top. The structure is founded on rock, with variations across the site. This required
the use of bored caissons or spread bases in close proximity to one another.
The basement structure is formed of 3 levels. The floor-framing system for the parking
structure typically consists of 225 mm two-way flat slabs with drop panels at the columns.
Columns are at a maximum of 9.0 metres in both directions within the parking areas.
The floor-framing system consists of a concrete one-way slab system with 800 mm
wide by 750 mm deep post-tensioned concrete beams spanning 21 metres to reinforced
concrete columns at 4.5 m centres in the open office area. Standard reinforced concrete
beam and slabs are used for shorter spans around the core walls.
The column sizes vary as follows: 1,200 mm x 1,000 mm at the base, reducing to 1,200 mm
x 750 mm for the most of the levels and 800 mm columns near the top of the building.
PROJECT TEAM
CLIENT: Bank Boston
ARCHITECT: SOM
STRUCTURAL ENGINEER: SOM
M&E: SOM
MAIN CONTRACTOR: Hochtief
FRAME CONTRACTOR: Hochtief
Floor plate.
146
Case Study 2
The foundation is a mixture of piled raft and pile caps. The thickness of the piled raft
varies from 2.25 m to 2.75 m. The building has three basement levels.
The stability system uses a building frame with a central core. The floors are post-tensioned
slabs on reinforced and post-tensioned beams in the twisting tower and normal reinforced
concrete slabs on beams in the other tower. The slab thicknesses vary to accommodate
bending and shear forces on varying spans. The concrete for the horizontal elements is
C40/50 and C50/60. The walls are 300 mm to 500 mm thick and the columns are 500 mm
to 1,200 mm diameter. The concrete for the vertical structure is C40/50 to C65/80.
PROJECT TEAM
CLIENT: Foresight Investments
ARCHITECT: Aedas, H+H
STRUCTURAL ENGINEER: Ramboll Middle East
M&E: Ramboll Middle East
MAIN CONTRACTOR: Target
FRAME CONTRACTOR: Target
Floor plate.
147
Case Study 3
PROJECT TEAM
CLIENT: Cajasol
ARCHITECT: Pelli Clarke Pelli Architects
STRUCURAL ENGINEER: Ayesa and Fhecor Ingenieros
M&E ENGINEER: Ayesa
MAIN CONTRACTOR: UTE FCC-INABENSA
Project Manager: Aynova
Floor plate.
148
Case Study 4
The Majunga tower is an office building with integrated parking at La Dfense, Paris. It is
42 storeys and 180 m high above ground and includes 3 basement levels. The building
design includes outdoor areas on every floor and 2,000 m of accessible green spaces.
The project has achieved a BREEAM Excellent rating.
2
The tower is asymmetric in plan in relation to its core and this produced the shape of
the tower, which is formed by three vertical strips.
The stability system is formed by the reinforced concrete core, plus reinforced concrete
facade columns. The core walls are formed in C60/75 concrete and are 650mm and
300 mm thick. The columns are C80/95 concrete and 700 mm to 1,350 mm in diameter.
The foundation is a C45/55 concrete raft 2.2m thick, founded on limestone. The thickness of
the raft was based on the need to limit deflection of the tower and the surrounding structures.
Columns are inclined on the east facade is of the tower. This imposes significant forces in
the floors, which are taken by the core. The floors are reinforced concrete slabs of 180
320 mm thick and supported on 500 x 700 mm deep faade beams.
PROJECT TEAM
Client: Unibail Rodamco
Architect: Jean-Paul Viguier
Structural Engineer: SETEC TPI
M&E: INEX
Main Contractor & Frame Contractor: Eiffage Construction
Floor plate.
Image: Setec tpi
149
Case Study 5
Strata, London, UK
PROJECT DESCRIPTION
Structural System: RC Core and RC wing walls
Type/ occupancy: Residential: 408 apartments
Storeys/height: 43 storeys 147.9 m
Floor area: 34,000 m2
Frame Cost: 70M
Completion date: 2011
The 43-storey, 147.9 m high, Strata tower is located in the Elephant and Castle district,
London and provides 408 apartments for residential accommodation.
The building is recognisable by the three 9 m diameter wind turbines integrated into the
top of the building.
This tall building has one basement level founded on bored piles, up to 1.5 m in diameter. The
stability is provided by the reinforced concrete central core supplemented by reinforced
concrete wing walls over the bottom 10 storeys. The walls are 225 mm to 500 mm thick and
of C50/60 concrete. The C50/60 columns are typically 300 mm thick, varying in length from
300 mm to 2,400 mm. Walking columns are used to shrink the footprint of the building at the
top and bottom of the tower. The 200 mm-thick post-tensioned floor slabs span 8 m along
the faade and 10 m internally and are C32/40 concrete.
PROJECT TEAM
CLIENT: Brookfield Europe
ARCHITECT: BFLS
STRUCURAL ENGINEER: WSP
M&E: WSP
MAIN CONTRACTOR: Brookfield Multiplex
FRAME CONTRACTOR: Buildstone
POST TENSIONING DESIGNER: CCL
POST TENSIONING CONTRACTOR: CCL
Floor plate.
150
Case Study 6
Post-tensioned beams on parking and office floors typically span 13.8 m and are
generally 600 mm wide and 450 mm deep. Exterior multi-storey column transfer walls
are used at offset column locations at the top of the building. Spandrel beams typically
used in the frame are 600 mm wide and 810 mm deep with columns typically
measuring 600 mm by 900 mm.
Columns are mostly 1,000 mm square at the base of the tower, reducing to 600 mm
square near the top of the tower in many cases. Concrete strengths ranged from
100 MPa to 35 MPa.
Load balanced perimeter PT beam / column frames form the overall frame system that
serves as part of the buildings lateral stability system and serve to transfer column loads
before column framing enters into parking areas.
PROJECT TEAM
CLIENT: Tishman Speyer Properties
ARCHITECT: SOM
STRUCTURAL ENGINEER: SOM
M&E: SOM
MAIN CONTRACTOR: MORSE DIESEL INTERNATIONAL
FRAME CONTRACTOR: MORSE DIESEL INTERNATIONAL
Floor plate.
151
Case Study 7
The stability system uses a reinforced concrete core and a perimeter frame. The
columns are 1,200 mm x 1,200m square and the core walls are 350 mm to 680 mm
thick. Inclined columns are used at the curved elevation. The floor slabs are 110 mm
125 mm-thick slabs on beams.
Project Team
Developer: China State Shipping Corporation; CITIC Pacific Group
Design Architect: Arquitectonica
Associate Architect: ECADI
Structural Engineer: Arup
MEP Engineer: J. Roger Preston Group
Main Contractor: Shanghai Construction
Floor plate.
152
Case Study 8
Millharbour, London, UK
PROJECT DESCRIPTION
Structural System: RC core and outriggers
Type/ occupancy: Residential
Storeys/height: 51/43 storeys
Frame Cost: 27 M
Completion date: 2008
Part of the Millharbour Quarter development, this project is located in the heart of the
Isle of Dogs, London.
The substructure of the building comprises a reinforced concrete raft foundation and a
single-level basement. The basement was constructed using top-down construction, a
technique latterly used at The Shard.
The super-structure has a reinforced concrete core plus outriggers. The outriggers were
designed to engage perimeter columns to limit lateral accelerations. The floor slab is 200 mm
thick with 7.6 m spans. Columns are 300/350 mm thick and 240/300 mm deep and
used C70/80 concrete. Double-height in-situ concrete columns were used to accelerate the
construction cycle. The walls are also RC concrete and are 300-450 mm thick.
PROJECT TEAM
CLIENT: Ballymore
ARCHITECT: SOM
STRUCTURAL ENGINEER: WSP
M&E: Hoare Lee
MAIN CONTRACTOR: Canary Wharf Contractors
FRAME CONTRACTOR: Laing ORourke
Floor plate.
153
Case Study 9
This residential and office building has 58 storeys above ground and a rectangular plan
with insets on each long face. There is a single basement level providing parking and
plant space. The basement-perimeter retaining walls consist of 500 mm thick reinforced
concrete retaining walls. The basement slab is formed as a 150 mm on grade slab.
The foundations for the tower are formed of belled caissons, with the smallest pile having a
shaft dimension of 760 mm and the largest a shaft dimension of 1,680 mm. The details
required the installation of a temporary steel liner above the level of the belled base of the
piles and the founding material at the base of the belled caissons is noted as approximately
1,450 kPa. All column loads are founded directly on individual piles with locally thickened caps.
The stability system used is a braced tube formed from reinforced concrete columns at close
centres (1.7 m) and similar-width spandrel beams. Reinforced concrete infill panels in a diagonal
pattern on each face form cross-bracing lines to provide additional strength and stiffness. They
also create a distinctive architectural style. The column sizes range from 760 mm x 1,150 mm
at the bottom of the tower to 600 mm x 700 mm at the top of the tower.
The building plan starts much wider at ground floor. The shape of the lower part of the tower
is sloped inwards to the typical floor plan width at level 11. The lower floors are all flat slabs,
with or without drop panels at the column positions, and of thicknesses varying from
180 mm to 215 mm. These levels comprise a mixture of retail, parking and commercial use.
Downstand beams are used in some locations to support slightly longer spans or isolated
locations of heavier load. The concrete for the slabs and beams is C35/45.
Project Team
ARCHITECT: SOM
STRUCTURAL and M&E ENGINEER: SOM
Floor plate.
154
Case Study 10
This development of three towers of 64, 75 and 77 storeys high will include offices, a
hotel and apartments. There is a three storey basement and 15 storey podium across the
project site on which the towers are constructed.
The stability system for the two taller towers is formed from the core walls with gravity
columns on the periphery. The shortest tower uses the core walls with outriggers at the
plant-room floors and gravity columns on the periphery. Core-wall thicknesses are 1,000
mm for the flange walls and 300 mm for the walls acting as webs.
The basement slabs are reinforced concrete flat slabs with drop panels and the
superstructure slabs are post-tensioned flat slabs.
The total quantity of concrete consumed in the foundation is 30,250 m , with close to
225,000 m of concrete in the superstructure. Embedded thermocouples were used
during construction to control the temperature in the raft and core walls.
3
The core walls and columns were constructed using jump-form. The building
movements were monitored during construction.
155
Project Team
CLIENT: Omkar
ARCHITECT: Foster and Partners
Consulting Architect: UHA
STRUCTURAL ENGINEER: Buro Happold
M&E: Buro Happold
LANDSCAPE ARCHITECT: LDA Design
WIND ENGINEER: RWDI Consulting Engineers & Scientists
Main Contractor: Larson & Toubro
156
Case Study 11
The foundations are a piled raft and 3.5 m thick. There are 5 basement levels that total
18 m in depth. The stability for this tall building comes from a central core with fan
walls, and the fan walls are transferred at the podium level. The podium level,
basements and ground floor use reinforced concrete slabs and mainly flat slabs.
In the tower the residential floors use post-tensioned concrete construction and on the
remaining floors, RC slabs and beams are used. The walls vary from 250 mm to 850 mm
thick, the columns vary from 1,800x800 mm to 1,200x400 mm and the circular
columns from 600 mm to 1,300 mm in diameter. The concrete was C60 to C50 for
horizontal elements and C80 to C50 for vertical elements.
PROJECT TEAM
CLIENT: Damac Gulf Properties LLC
ARCHITECT: Aedas, U+A Architects
STRUCTURAL ENGINEER: Ramboll Middle East
M&E: Ramboll Middle East
MAIN CONTRACTOR: Arabtec
FRAME CONTRACTOR: Arabtec
Floor plate.
157
Case Study 12
The stability system is a reinforced concrete core with a high level hat truss to engage the
external columns so as to control acceleration. The columns are a mixture of concrete and
steel with high-strength C65/80 concrete used at the bottom. The walls are 250 mm
800 mm thick and also use high-strength C65/80 concrete at the bottom.
There are three basement levels and the foundations consist of a secant piled perimeter wall
and piled raft. Top down construction was used to construct the core and the foundations.
The floors are composite floor on steel beams up to level 40 and then 200 -250 mm
thick post-tensioned slabs from levels 41 to 69. The top spire levels are formed by a steel
frame. The concrete for the horizontal elements is C32/40.
At the time of publishing it is the tallest building in the UK, and when completed it was
the tallest building in Western Europe.
PROJECT TEAM
Client: Sellar Property Group in partnership with the State of Qatar
Architect: Renzo Piano Building Workshop with Adamsons Associates
Structural Engineer: WSP
M&E: Arup
Main Contractor: Mace
Concrete Frame Contractor: Byrne Bros.
Hat truss.
158
Working Group
Convenor:
Authors:
Tall Buildings
This guide was authored by fib task group 1.6 and published by a
working group from The Concrete Centre and the fib. Both groups
were chaired by Andy Truby, formerly of Ramboll and presently of
TrubyStevenson.
This guide has been published jointly by the fib and The Concrete
Centre and is also available as fib Bulletin 73. Readers can access
more information at:
www.concretecentre.com
www.fib-international.org
www.fibuk.org
CCIP-058
Published September 2014
ISBN 978-1-908257-14-7
Price Group R
MPA The Concrete Centre and Fdration internationale du bton (fib)
Gillingham House,
38-44 Gillingham Street, London, SW1V 1HU
Tel: +44 (0)207 963 8000
www.concretecentre.com