0% found this document useful (0 votes)
538 views8 pages

Summary Software Test Execution Report Template

This test summary report provides the results of validation testing for the PROJECTNAME system. It summarizes the testing completed between STARTDATE and ENDDATE, any clarifications or deviations from test plans and SOPs, and lists test case results and defects found. The report concludes that based on the validation process, the PROJECTNAME system is approved for use.

Uploaded by

Darius Samah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
538 views8 pages

Summary Software Test Execution Report Template

This test summary report provides the results of validation testing for the PROJECTNAME system. It summarizes the testing completed between STARTDATE and ENDDATE, any clarifications or deviations from test plans and SOPs, and lists test case results and defects found. The report concludes that based on the validation process, the PROJECTNAME system is approved for use.

Uploaded by

Darius Samah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

**PROJECTNAME** Test Summary Report

Version 1.0 DRAFT 1




**PROJECTNAME**
Test Summary Report

**Version 1.0 Draft 1**


Prepared by:

**TESTERNAME**,
Software Quality Engineer

**COMPLETION DATE**

COMPANY Department, Confidential and Proprietary

**PROJECTNAME** Test Summary Report

Version 1.0 DRAFT 1

Document Revision History


Revision Date

Version

Description

Author

**COMPLETION
DATE**

**Version 1.0,
Draft 1**

Initial Version

**TESTERNAME**

COMPANY Department, Confidential and Proprietary

**PROJECTNAME** Test Summary Report

Version 1.0 DRAFT 1

TABLE OF CONTENTS
1. PROJECT OVERVIEW ........................................................................................................................... 4
2. CLARIFICATIONS .................................................................................................................................. 4
3. DEVIATIONS ........................................................................................................................................... 4
4. TESTING SUMMARY .............................................................................................................................. 4
5. TRAINING ............................................................................................................................................... 4
6. RELEASE TO PRODUCTION ................................................................................................................. 4
7. REFERENCES ........................................................................................................................................ 4
8. CONCLUSIONS ...................................................................................................................................... 4
9. TEST CASE RESULTS ........................................................................................................................... 5
10. DEFECT LOG ........................................................................................................................................ 6
11. TRACEABILITY MATRIX ...................................................................................................................... 7
12. TEST SUMMARY REPORT APPROVAL ............................................................................................. 8

COMPANY Department, Confidential and Proprietary

**PROJECTNAME** Test Summary Report

Version 1.0 DRAFT 1

1. Project Overview
This Test Summary Report describes the validation effort utilized by COMPANY Department to
ensure the **PROJECTNAME** system is validated for intended use. This document details the
results of the system testing. System test case execution commenced on **STARTDATE** and
final validation testing was completed on **ENDDATE**.

2. Clarifications
**LIST CLARIFICATIONS FROM SOPS AND TEST PLAN HERE IF APPLICABLE**

3. Deviations
**LIST DEVIATIONS FROM SOPS AND TEST PLAN HERE**
Additional deviations are listed in the **PROJECTNAME** Test Plan.

4. Testing Summary
5. Training
6. Release to Production
7. References

8. Conclusions
Based upon the information gathered during the validation process as outlined in SOP the
**PROJECTNAME** system is validated and approved for use.

COMPANY Department, Confidential and Proprietary

**PROJECTNAME** Test Summary Report

Version 1.0 DRAFT 1

9. Test Case Results


Run #1
Test
Test Case Title
Case #
1
2
3
4
5
Run #2
Test
Test Case Title
Case
#

Run #3
Test
Test Case Title
Case
#

Pass/Fail

Defect #

Pass/Fail

Defect #

Pass/Fail

Defect #

This space intentionally left blank.

COMPANY Department, Confidential and Proprietary

**PROJECTNAME** Test Summary Report

Version 1.0 DRAFT 1

10. Defect Log


Defect
Number

Failed
test
case &
step(s)

Severity

Subject

Description

This space intentionally left blank

COMPANY Department, Confidential and Proprietary

Acceptable
Failure and
explanation

**PROJECTNAME** Test Summary Report

11. Traceability Matrix


Mapping of Requirements to test case numbers.
** INSERT TRACE MATRIX HERE **
This space intentionally left blank

COMPANY Department, Confidential and Proprietary

Version 1.0 DRAFT 1

**PROJECTNAME** Test Summary Report

Version 1.0 DRAFT 1

12. Test Summary Report Approval

Signatures
Printed Name / Title
**PROJECTMANAGER**
COMPANY, Project Manager
**TESTERNAME**
COMPANY, Software Quality
Engineer
**DEVELOPER**
COMPANY, Systems Developer

COMPANY Department, Confidential and Proprietary

Signature

Date

You might also like