Arup Global Dams and Reservoirs Brochure

Download as pdf or txt
Download as pdf or txt
You are on page 1of 16
At a glance
Powered by AI
Arup is a multidisciplinary firm of designers, engineers, and business consultants. They provide professional services to clients and work on innovative and sustainable infrastructure projects globally.

Arup provides a diverse range of professional services including design, engineering, and business consulting. They work on planning, building, and infrastructure projects.

Arup takes a holistic approach to dam and reservoir projects considering social, technical, economic, and environmental issues for sustainable solutions. They deliver projects on time and on budget.

Dams and Reservoirs

Local knowledge, global expertise

About Arup

Front cover image: Ulley Reservoir, UK

Arup is a firm of designers, engineers and business consultants


providing a diverse range of professional services to clients. The firm
is the creative and inspirational force behind many of the worlds
most innovative and sustainable planning, building and infrastructure
projects.
We believe that talented people and collaborative working
relationships form the basis of successful project delivery. By sharing
knowledge and expertise with colleagues across the globe, our local
teams can draw upon a wide range of specialist skills. Through
bringing together an unrivalled range of technical, design, creative
and management expertise we create real value for our clients.
We are a wholly independent organisation owned in trust, giving us
the freedom to work on some of the most challenging projects in the
world. We have more than 10,000 staff working in 90 offices in more
than 30 countries. Arups multi-disciplinary approach means that
any given project may involve people from any or all of the sectors
or regions in which we operate. Our fundamental aim is to bring
together the best professionals to meet our clients needs.

Copenhagen
Dublin, Cork,
Galway and Limerick
Seattle

San Francisco
Los Angeles

London and 14
other UK offices

Toronto
Chicago
Washington DC

Amsterdam

Berlin
Dsseldorf

Milan

Boston
New York and
New Jersey

Moscow
Warsaw
Kiev

Krakow
Frankfurt Wroclaw

Madrid

Belgrade

Bucharest

Rome Istanbul

Beijing

Ankara

Tianjin
Chongqing

Houston
Doha

Dubai

Seoul

Tokyo

Shanghai

Shenzhen
Taipei
Guangzhou
Macau
Hong Kong

Abu Dhabi
Mumbai
Hyderabad

Bangkok

Abuja
Penang
Kuala Lumpur

Lagos

Phnom Penh

Manila

Ho Chi Minh City


Kota Kinabalu
Brunei

Singapore

Bulawayo
Rio de Janeiro
So Paulo

Wuhan

Cairns
Townsville

Harare
Port Louis

Gaborone
Johannesburg
Cape Town

Brisbane
Durban

Perth
Adelaide
Melbourne

Sydney
Auckland

Introduction

Dams and Reservoirs

La Ferme Dam, Mauritius

Dams and reservoirs are crucial for the storage of water, whether
it is for potable water supply, flood alleviation, hydro-electricity,
or irrigation. The development of a new dam or reservoir, the final
choice of site and design of the structure will depend not only
on the topography but also on the geology, seismic activity and
environmental impact.
Arups holistic approach delivers dam and reservoir projects, on
time and to budget. Seeking excellence in every aspect of our work
and organisation provides the very best service to our clients. Our
approach considers the social, technical, economic and environmental
issues for a sustainable solution within the local, regional and
national political context.
Our constantly evolving skills base reflects the diversity of both our
clients and our staff. However complex the challenge, we have the
expertise and the resources to resolve it.
Our objective is to help our clients meet their business needs by
adding value through technical excellence, efficient management and
personal service. To this end we are professionally committed to
providing optimal solutions to all our clients in the water engineering
sector.

Our services include the following:


-- Planning and promotion of proposed
developments
-- Expert advice
-- Feasibility and design
-- Hydrolology and water resources planning
-- Remedial works and rehabilitation
-- Construction supervision and project
management
-- Supervision and inspection of existing
dams and reservoirs
-- Hazard indexing and risk assessment
-- Geotechnical appraisal
-- Sustainability appraisal and environmental
assessment
-- Reservoir safety studies, seismic and dam
break analysis
-- Decommissioning of existing assets
-- Hydropower assessment and
implementation
-- Technical research
-- Computational fluid dynamics

Dams and Reservoirs

Feasibility and Design


Arup has over 60 years experience of modern dam design. We have
worked with clients at all stages of the design process. Our input into
recent schemes has included:
-----------

Desk studies and site selection


Site investigation
Optioneering and value engineering
Hydrological analysis and water resources planning
Feasibility and planning stage design
Hydraulic analysis of control structures
Geotechnical, structural and seismic analysis
Consideration of environmental impact and sustainability
Technical review and expert advice
Contract management and site supervision

Vistula Dam Study, Poland


Arup is undertaking a feasibility study for a possible
second dam on Vistula River, located in the protected
area of Natura 2000. Our scope of work includes concept
design, multi-criteria analysis of several locations and
solutions, Environmental Impact Assessment, a cost benefit
analysis and dam breach analysis.

We have been involved with the design and construction of earth


embankment dams; concrete gravity dams; concrete buttress dams;
rockfill dams and a concrete arch dam. Design work has also been
carried out on Roller Compacted Concrete (RCC) dams. Our input
has ranged from small local schemes to large international projects
and at all stages of the design process.
Arup has a strong capability in hydrological analysis of proposed
and existing reservoirs and can provide specialist input on all aspects
of the water cycle, including yield analysis and water resources
planning. We carry out flood risk assessments of existing dams,
working closely with our inspecting engineers to support their
assessments of the structures. Such analyses have been carried out for
individual reservoirs, cascades of multiple reservoirs, and portfolios
of reservoir assets.
Our hydrologists have been involved in the selection and
development of new reservoir sites; optimisation of both proposed
and existing dams and detailing of control structures, including
detailed hydraulic analysis, leading to scour protection and stilling
basin design. Dam spillway hydraulics can often be highly complex,
therefore we adopt a tiered approach to hydraulic analysis to ensure
the level of assessment carried out is proportionate to the design
implications. Where necessary, we can go into the highest level of
detail, using physical modelling and computational fluid dynamics
to drive the design.

Cheddar Reservoir Number 2, UK


Arup is providing advice on feasibility, planning and
delivery of a new 6,000 Ml raw water storage reservoir
at Cheddar, in Somerset, England. The new reservoir will
be fed from Mendip spring sources close to the famous
Cheddar Gorge show caves, and gravitate from there to the
existing reservoir, located nearby.

Upper Thames Reservoir, UK


Arup provided project management skills and advice on the
broad range of planning and consultation issues involved
in Thames Waters proposal for a new reservoir. It would
be the largest of its kind in Europe, with a base area of
approximately 10 km.

Dams and Reservoirs

Pickering Flood Alleviation Scheme, UK

Lotsane Dam, Botswana

Arup is undertaking detailed design of a large raised


reservoir to operate as flood storage, attenuating the 25
year event at Pickering. The scheme is highly sensitive
and public perception is paramount. The site borders an
important SSSI and is bounded by a privately owned steam
railway.

Arup has been engaged for the feasibility study, tender and
construction supervision services for Lotsane Dam. Upon
completion it will have a 30m high, 1,5km long earth/
rockfill dam with an ungated 180m long spillway crest and
an active storage of 42 million m.

Foxwood Dam, South Africa

Murowa Dam, Zimbabwe

Arup is undertaking a detailed feasibility study for


Foxwood Dam on the Koonap River in Adelaide. Our
scope of work includes water resource assessments,
environmental scoping, geotechnical investigations, dam
design and agricultural assessments.

Arup provided full design and construction supervision


of the mine water supply. The scheme comprised of water
resource assessments to meet a high level of assurance of
supply, an off river storage dam, a pumping station with
an off take weir on the Runde River and steel and GRP
pipelines.

Letsibogo Dam, Botswana

Lower Notwane Dam, Botswana

Arup was appointed in a Joint Venture for the detailed


design and construction supervision of this 27m high
rockfill dam and outlet works. This involved a detailed
review of the hydrology, project optimisation and
geotechnical assessment.

Arup undertook a pre-feasibility study to identify dam


and off river storage sites on the Lower Notwane River
and its tributaries. The river is one of the last non
utilised major surface water resources in Botswana. Its
catchment includes the capital Gaborone and other large
connurbations as well as Gaborone dam and Bokaa dam.

Dams and Reservoirs

Dam Safety Inspections


Regular inspection and supervision of existing dams is imperative in
minimising risk and highlighting potential issues in a timely manner.
This enables further studies or remedial works to be programmed
before becoming critical to the safety of the structure. Arup has
particular experience in:
--------

assessing the safety of existing dams


undertaking risk assessments
design and implementation of remedial measures
dam break and inundation maps
emergency planning
expert witness
construction supervision

We have undertaken a number of dam safety studies for portfolios of


dams, which includes the Nurek Dam, the tallest dam in the world.
Arup also provide expert advice for emergency planning; risk
reduction and have been called out to assist during incidents. A
number of Arup staff and sub-consultants are licensed under the
relevant statutes, for example to act as an All Reservoir Panel or
Supervising Engineers under the United Kingdom (UK) Reservoirs
Act 1975; or internationally, as Large Dams Panel Engineers. Arup
staff have also acted as World Bank Dam Panel Experts on several
international dam projects including the Rogun Dam project, which
on completion will be 335m high.

Rogun Dam, Tajikistan


Arup is providing expert advice to the World Bank on dam
engineering, dam safety and seismic engineering for the
Rogun hydropower plant in Tajikistan, Central Asia. When
completed, the 335m high Rogun Dam will be the tallest
dam in the world. The Rogun hydropower plant will have a
power generating capacity of 3,600MW.

Large Dam Safety Inspections, Zimbabwe


Arup was appointed by the World Bank to provide
technical assistance to the Zimbabwe National Water
Authority (ZINWA). Our scope includes the inspection of
25 large dams, a review of the legislative and institutional
framework with respect to dam safety and the provision of
recommendations for dam modernisation.

Expert Advice and Emergency Planning, UK


Arup has provided reservoir experts to undertake training
and advice to Local Resilience Forums. The training
included legislation; types of dam; and appurtenant works
and incident management.

Dams and Reservoirs

La Ferme Dam, Mauritius

Confidential Chile Project

Arup carried out a performance and condition assessment


on an existing dam, and developed a dam safety training
programme which was delivered to the local client.

Arup was commissioned by an insurance client to


undertake damage assessment and reporting on causes
of damage to a hydroelectric dam, appurtenant works
and power station, following the Chilean earthquake in
February 2010.

Gorpley Dam Monitoring, UK

La Mesa Dam, Phillipines

Arup designed a tailored survey methodology to ensure


that any significant movement would be detected at
Gorpley Dam. A combination of Terrestrial Laser
Scanning (TLS) and contact theodolite survey was used
to develop an accurate baseline and in detecting any
movement between surveys.

Arup carried out a peer review including: safety evaluation


and hazard categorisation; condition and performance
assessment; hydraulic studies; structural and geotechnical
assessment; seismic hazard assessment; sedimentation
study and recommendations for rehabilitation works.

Statutory Inspections, UK

Nutclough Reservoir, UK

Arup provide Panel Engineers for Section 10 and Section


12 Statutory Inspections under the UK Reservoirs Act
1975. Our clients include the Environment Agency; Water
Utilities; Councils; as well as numerous private individuals.
We also have staff who are qualified internationally as
Large Dams Panel Engineers.

In July 2012, Arup actioned an emergency call out of an


All Reservoirs Panel Engineer following heavy rain and
flooding in the Hebden Bridge area. Arup undertook an
immediate site visit to assess the state of dam, reporting
back to the client on remedial measures to be taken, both
in the short and medium term.

Dams and Reservoirs

Rehabilitation
Inspection of existing dams world-wide frequently reveals the need
for remedial works. Most of the works are required because of the
gradual deterioration of the dams and their associated structures/
equipment, combined with the imposition of stricter requirements
for flood, seismic and dam break analyses.
Rehabilitation works include:
-----------

raising of earth embankments and concrete dams


upgrading of draw-off towers and tunnels
provision of new, enlarged spillways and intakes
provision of emergency drawdown facilities
strengthening works
leakage reduction measures
installation of instrumentation
performance monitoring
water quality monitoring / water treatment
spillway modification

Lake Mead Intake, Hoover Dam, USA


Arup is leading the engineering design of a vital new
intake tunnel at the lake, to safeguard future water quality
and supply amid declining lake levels caused by drought.
Arups scope includes tunnel and shaft design, geotechnical
engineering, hydraulics design and intake structure design.

Arup make extensive use of advanced hydrological techniques,


including both numerical and physical hydraulic modelling. This
enables us to accurately route floods through the reservoirs and
existing spillway structures. Increasingly these investigations are
now supplemented by seismic and dam break analyses, which often
did not form part of the original design for the existing dams.
We have been responsible for the design and specification of
remedial, improvement, abandonment and discontinuance works at
many existing dams and service reservoirs.

Windleden Reservoir, UK
Arup provided a Qualified Civil Engineer under the
Reservoirs Act 1975, to supervise the design and
construction of a new spillway. The study included a
hydraulic model test of the original masonry spillway and
the design of a new reinforced concrete spillway.

La Ferme Dam, Mauritius


Arup is undertaking the detailed design for the
rehabilitation and raising of a composite concrete/masonry
gravity dam and earthfill embankment dam. We are also
involved in the preparation of tender documentation and
construction supervision.

Dams and Reservoirs

Mill Beck Reservoir, UK

Threipmuir and Harlow Reservoirs, UK

A disused railway embankment in Market Weighton,


was deemed to act as a large raised reservoir under the
Reservoirs Act 1975. Arup provided reservoir safety
advice, feasibility of options to pass the Probable
Maximum Flood (PMF), outline design, consultation,
environmental impact & detailed design.

Arup was commissioned to support modification works


to two reservoirs in a sensitive natural environment. This
provided increased flood attenuation and storage capacity
as part of the Water of Leith Flood Prevention Scheme.

Ulley Reservoir, UK

Trebeddrod Reservoir, UK

In June 2007, one of the spillways at Ulley reservoir failed.


Arup managed the emergency works to stabilise the dam
and carried out investigations to determine the extent of
rehabilitation works. We undertook detailed design and
construction supervision of a new spillway, rehabilitation
of dam core, rip rap and draw-off pipework.

Arup provided detailed design to increase the spillway


capacity at this Category A reservoir. We developed the
preferred engineering option, undertaking all necessary
investigations and environmental surveys for the works.
Flood reduction benefits were conserved through use of
multi-stage overflow weirs.

Bransholme Surface Water Lagoon, UK

Washburn Valley, UK

Arup undertook a review of surface water flooding and


developed options for increasing capacity of an existing
surface water reservoir; addressing recommendations made
in the interests of safety under the UK Reservoirs Act
1975. We prepared outline designs, tender documentation
and undertook construction supervision.

Arup undertook detailed design, hydrology, risk and value


management, management of the planning application,
tender process and construction supervision for three
major reservoir safety schemes in the Washburn Valley.
Works included raising of the crest levels, reconstruction of
spillway bridges and increasing spillway capacity.

Dams and Reservoirs

Hydropower
A robust and thorough assessment of technical, environmental, and economic issues is
essential to the successful delivery of hydropower projects. Arup provides clients with an
integrated package of skills that address often complex and detailed design issues, including:
-- strategic site evaluation and site selection, engineering and environmental feasibility
assessment, project management, hydropower resource assessment, economic analysis and
access feasibility
-- design & assessment planning, project management, environmental impact assessment
(including all specialist skills e.g. sustainability, ecology, fisheries, archaeology, landscape,
noise, etc), turbine selection, control system design, grid connection, consents and
licensing, flood risk assessment, access design and geotechnics
-- project implementation including project management, procurement, ecological
management planning and monitoring, habitat creation and technical advice to financial
institutions

Tsitsa Falls hydropower, South Africa

Zengamina mini Hydropower, Zambia

Arup reviewed a potential scheme for generating upto


100MW of hydropower. The scheme included large
Roller Compacted Concrete (RCC) dams and hard rock
tunnels. Our scope included water resource assessments,
engineering concept development, energy generation,
capital cost estimating and economic modelling.

Arup provided site engineering and management for the


700kW hydro electric scheme. The project acts as an
independent self sustaining community minigrid/utility
for an impoverished area with significant pressure of
population increase, relying mostly on subsistence farming.

Mini Hydropower, Armenia

Botterkloof and Kruisvallei Mini Hydro, South Africa

Arup is reviewing five mini hydropower projects, which


are currently at different stages of development in Armenia.
We are assessing whether the projects have been executed
in compliance with technical and engineering international
best practice. The five schemes selected for this project will
have installed capacities in the range 1.4MW to 3MW.

Arup was appointed by Rand Merchant Bank and the


Development Bank of Southern Africa to undertake
due diligence reviews of two separate 4MW mini hydro
schemes on the As river in South Africa. The schemes are
promoted by two separate developers.

Dams and Reservoirs

Computational Fluid Dynamics


Computational Fluid Dynamics (CFD) software packages provide a means of mathematically
modelling complex flows within and around physical objects and scenes. These packages can
be used where traditional hydraulic engineering cannot represent the complexity of the flows.
Arup has tested CFD approaches against physical modelling on a number of schemes and can
confidently represent the complex geometries, optimising the design more readily.
We make extensive use of physical hydraulic modelling for complex 3D flow problems
such as: reservoir spillway design; assessment of potential structural failure mechanisms;
water quality modelling and flow circulation. This aids the development of detailed design
solutions.
Arup is leading the research and use of Terrestrial Laser Scanning (TLS), which augments
our in-house capability. TLS data acquisition techniques have the potential to provide CFD
models with data that is of sufficient high quality to not be a significant source of error in flow
prediction; thereby ensuring channels and structures are no longer under-represented in CFD
models.

Carno Reservoir, UK

Ulley Reservoir, UK

Arup carried out a CFD study to assess the hydraulic


capacity of the spillway and the impact of a proposed road
crossing under various flood event scenarios. The
modelling provided the flow properties of the spillway,
the stilling basin, the culvert channel and part of the
downstream natural channel under 100 year event and PMF.

Arup used Terrestrial Laser Scanning (TLS) and the site


monitor software to capture any movement during the
emergency situation that resulted in the 2007 floods. The
TLS survey was used to construct a wireframe model of
the spillway, which was transferred into CFD software and
allowed 3D analysis of flows down the spillway.

Reservoir Circulation, UK

Boltby Reservoir, UK

CFD modelling techniques were used to predict and


modify water circulation patterns within a reservoir, in
order to react to water quality issues in the river channel.

CFD study of the spillway at Boltby, following an extreme


flood event in June 2005, which resulted in severe damage
of the spillway channel and stilling basin.

Dams and Reservoirs

Hazard Indexing and Risk Assessment


The reliance on ageing dam structures and their associated apertunance works results in
increased maintenance; remedial works; major civils works and possible damage and failure
during extreme events. The assessment of the risk a dam structure poses to the downstream
population and the likelihood of failure of that structure is imperative in the management
of our dams. Within the UK in recent years, there have been incidents with ageing masonry
spillways; undersized spillways due to changing hydrological conditions and issues with the
fabric of historic embankment dams.
Arup has been involved in developing systems of hazard indexing and risk assessment
for dams to assist in the programming of maintenance works, surveillance schemes and
emergency plans. Our analysis incorporates not only details of the dam, but also information
on the operational reliability of gates and hoists, for example, and reviews of instrumentation
data. We have capability in undertaking risk assessments on dam structures worldwide,
including specialist seismic assessments.

QRA of Embankment Dams

Wocawek Dam Breach Modelling, Poland

The study assessed and categorised risk across nearly 100


dams owned by the client. This provided an overview of
risk across the portfolio and identified the highest risk
dams, ranked using alternative criteria such as level of
risk, consequences, annual probability of failure and
management of the risk.

Arup is undertaking a dam break analysis on the proposed


new dam across the Vistula river as well as the existing
Wocawek dam. The analysis will consider breach
scenarios, following Modes of Dam Failure research and
define the inundation envelope of the downstream flood
wave.

Emergency Drawdown Study, UK

Resilient Cities, UK

Arup undertook a regional drawdown study on our


clients portfolio of reservoirs, in accordance with the
UK Department for Environment, Food and Rural Affairs
(DEFRA) Draft Engineering Guide to Emergency Planning
for UK reservoirs.

In order to assess Sheffields resilience to the effects of


climate change, Arup developed a toolkit which helped
identify systems that would be affected and what the
key interdependencies are. We are now working with the
Council, stakeholders and communities to implement the
action plan.

Dams and Reservoirs

Technical Research
Arup has extensive knowledge and experience in the design, construction and performance
of dams of various types and the associated fields. This enabled the firm to carry out research
contracts for various bodies in the United Kingdom. Our clients have included: CIRIA; BRE;
Scottish and Southern Energy Plc; DEFRA and private water companies.
Our research has covered a wide range of dam and reservoir specific issues, including:
Small Embankment Reservoirs (CIRIA); Field Testing Techniques for Embankment Dams
(BRE); Reinforced Grass Spillways (CIRIA); Stepped Block Spillways (CIRIA); Concrete
and Masonry Dams (CIRIA); Valves and Pipework (CIRIA); Performance of blockwork
and slabbing protection (with HR Wallingford); Modelling techniques using CFD (private);
Application of CFD to hydraulic structures (private).

e and monitoring
Modes of dam failur iques
and measuring techn
48/R1

Project: SC0800

Terrestrial Lidar for CFD Modelling of Reservoir


Spillways

Scoping Study on Modes of Dam Failure and


Measuring and Monitoring Techniques, UK

Arup developed a methodology by which scenes, objects


and structures could be measured using TLS, represented
in a spatial model for stable CFD modelling. A series of
repeatable stages are then created which allows future
projects to be conducted in an efficient and consistent way.

Arup carried out a study on the modes of dam failure for


earth embankments in the United Kingdom. The scoping
study focused on two areas: modes of failure of dams
and failure of monitoring techniques; and monitoring and
measuring methods for embankment dams.

International Hydropower Association


Sustainability Protocol

Application of CFD Modelling to Hydraulic Structures

Arup facilitated two phases of consultation and


development on the International Hydropower
Associations Sustainability Protocol, for the IHAs
Hydropower Sustainability Assessment Forum.

Arup analysed two spillways, highlighting the objectives


and reasoning behind the application of CFD to aid
the design. The case studies showed CFD can increase
confidence in the design decisions made and aid
understanding of the physics of the structure at full scale.

Dams and Reservoirs

Sustainability Appraisal and Environmental Assessment


Hydropower, dams and reservoirs, developed and managed sustainably can provide national,
regional, and local benefits, and have the potential to play an important role in enabling
communities to meet sustainable development objectives. Sustainability impacts may arise
at any stage of a project lifecycle, including the construction, commissioning and operation
of a dam as well as the decommissioning stage. Planning and funding decisions need to be
informed by sustainability criteria which achieve a balance between economic, social and
environmental values.
Sustainability is a key component of our dams and reservoirs project work. In 2009, Arup
facilitated two phases of consultation and development on the International Hydropower
Associations Sustainability Protocol for the IHAs Hydropower Sustainability Assessment
Forum. The protocol sets out a process to assess, and improve, the contribution to sustainable
development that a hydropower project could offer.

Vistula Dam, Poland

Havant Thickett, UK

Arup is undertaking an environmental impact assessment


(EIA) for the proposed Vistula Dam. The upstream dam
was constructed in 1970 and is located in the protected
area of Natura 2000. This is an extremely environmentally
sensitive project, as the existing reservoir contains large
amounts of potentially harmful sediments.

Arup managed ecological issues during planning for a


new 19million m3 reservoir, particularly the loss of over
15 hectares of semi-natural woodland habitat and rare
species. The mitigation strategy was devised to improve
forestry biodiversity as a result of habitat creation and the
protection of the existing forest edge.

Mill Beck Balancing Reservoir, UK

Cheddar Reservoir Number 2, UK

Arup delivered the detailed design of a new spillway.


The site is in the heart of the local town and required a
socially inclusive and flexible design approach, along
with consideration of environmental constraints to deliver
optimum hydraulic performance, whilst enhancing the
aesthetics of the downstream space and local environment.

Arup are producing a high level master plan setting out


how the scheme will be delivered. This will map out the
recommended strategy and will cover all aspects of the
scheme including consultation, environmental surveys and
studies, planning, land purchase, design, construction and
operational issues.

Dams and Reservoirs

Geotechnical Appraisal and Seismic Analysis


Arups geotechnical engineers and engineering geologists provide specialist design, advisory
and management services and also provide the UK representative to the ICOLD seismic
technical committee.
Arup has expertise in a wide portfolio of specialist skill areas, such as geology, seismology,
and risk analysis and we have used these skills successfully on an extensive portfolio of
projects. We can provide a wide range of detailed analytical skills, access to resources and
to the full spectrum of geo-hazard, seismic hazard, seismic risk and earthquake engineering
skills.
We have been involved with a number of projects in the United Kingdom, the United States,
Greece, New Zealand, Southern Africa, Turkey, the Philippines and Indonesia, to assess the
safety of dams and reservoirs under seismic loading. This has involved investigations into
the behaviour of both embankment dams and concrete gravity dams using pseudostatic,
deformation and dynamic analyses.

Evinos Dam, Greece

Haldon Dam, New Zealand

The 124m high earthfill dam was perceived to have


certain deficiencies in the design by the EU. Arup made
recommendations for changes to the hydrology and flood
assessment, the spillway tunnel, the seismic aspects,
risk assessment and natural slope stability and the slope
protection.

Arup is acting as expert witness for Haldon Dam. Our


scope covers dam safety, geotechnical and seismic
appraisal of the existing dam. The dam structure is 20m
high and retains 250,000m3 of water.

La Mesa, Philippines

Confidential Project, Chile

The La Mesa Dam is a 30m high earth fill embankment


which was constructed over 80 years ago to form a
reservoir. It is part of the strategic water distribution
network for a large portion of Metro Manila. Arup carried
out a peer review of a seismic and structural assessment of
La Mesa Dam, intake structures and reservoir.

Arup was appointed to carry out investigations on a HEP


dam project in Chile, following the 2010 earthquake. We
reviewed the project design documentation, undertook
site inspection of the principal areas of damage, and
conducted an analysis to determine whether the damage
was earthquake related.

Contacts

Peter Kelham
Rose Wharf, 78 East Street
Leeds
LS9 8EE
United Kingdom
t: +44 (0) 113 2428498
[email protected]

Ljiljana Spasic-Gril
13 Fitzroy Street
London
W1T 4BQ
United Kingdom
t: +44 (0) 20 7636 1531
[email protected]

James Hampton
10 High Street
Melrose Arch
Johannesburg
2076
South Africa
t: +27 11 218 7600
[email protected]

Sergei Terzaghi
Level 10
201 Kent Street
PO Box 76
Millers Point
Sydney
Australia
t: +61 2 9320 9235
[email protected]

www.arup.com