Procedure Pipeline

This document discusses various techniques for installing underwater pipelines, including: - The S-lay installation method for flexible risers at PLEM (Pipeline End Manifold) using heavy chains, suction caisson, and winches. - Components of PLEM such as the suction caisson, mooring joint, heavy chain, flexible riser, and riser buoy. - Procedures for pipeline shore approach which involves pulling layout, pulling head, and winch capacity. - Factors considered in design such as material grade, water depth, tensioner capacity, overbend radius, sea state, and response amplitude operator (RAO). Criteria include DNV simplified laying criteria.

Uploaded by

Darma Hermawan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
363 views61 pages

Procedure Pipeline

This document discusses various techniques for installing underwater pipelines, including: - The S-lay installation method for flexible risers at PLEM (Pipeline End Manifold) using heavy chains, suction caisson, and winches. - Components of PLEM such as the suction caisson, mooring joint, heavy chain, flexible riser, and riser buoy. - Procedures for pipeline shore approach which involves pulling layout, pulling head, and winch capacity. - Factors considered in design such as material grade, water depth, tensioner capacity, overbend radius, sea state, and response amplitude operator (RAO). Criteria include DNV simplified laying criteria.

Uploaded by

Darma Hermawan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 61

Pipeline Installation

Dr. Amnart Rittirong


Dr
[email protected]

I t ll ti Techniques
Installation
T h i

S-lay installation technique


Installation of flexible riser at PLEM
Spool installation
Shore Approach

Derrick Lay Barge

S-Lay
L Configurations
C fi
ti

Installation Procedures

General approach
Start
Start--up operation
Start
Start--up positioning
Drop dead man anchor
Pretensioning check
Rigging with pullpull-up head
Pipelay operation
Laydown operation
Target box positioning
Flange
Flange--up laydown head and connect with A&R
winch
Release tensioner

Start--up Operation
Start

Pipelay
p y Operation
p

St ti 0: Ready
Station
R d Rack
R k

St ti 1a: Fit
Station
Fit--up

St ti 1b:
Station
b Root
R t & hot
h t pass

Station 2: Fill pass

St ti 3: Fill pass
Station

Station 5a: NDT

Station 5b: Repair

Station 7: Field joint

Heat Shrink
Sleeve

Infill
Foam
Mastic resin

Station 8: To Seabed

L d
Laydown
H d
Head

Pipelay Operation: Anchor Handling

Pipelay Operation: Anchor Handling

Pipelay
p y Operation
p

Analysis
A l i off SS-Lay
L Stress
St

I t ll ti Analysis
Installation
A l i off Pipelay
Pi l
Standard software
Offpipe
OrcaFlex
ABAQUS

Design Scenario

Static Analysis
Dynamic analysis
Start--up analysis
Start

D i Parameters
Design
P
t

Pipeline material grade


Water depth
Tensioner capacity
p
y
Stinger overbend radius
Stinger buoyancy requirements
Sea state (Dynamic analysis only)
Response Amplitude Operator: RAO
(Dynamic analysis only)

Design
g Criteria

DNV Criteria Simplified (Sect.


(Sect.13
13 H300)
300)
Thi simplified
This
i
lifi d llaying
i
criteria
i i may be
b used
d as a preliminary
li i
simplified criterion of the local buckling check during early
design stages.

Static Analysis

Pipelay configuration
Determine pipe submerged unit weight
Determine the radius of curvature
Determine the required
q
tension
(Centenary's equation)
FEA analysis
Static analysis
D
Dynamic
i analysis
l i
Start up analysis

Radius of curvature
Govern by the overbend stress
As
as possible
A minimum
i i
ibl to
t minimize
i i i the
th requiring
i i
tension
Estimated from the following equation
Radial stress

ED
=
2R

Minimum overbend radius

ED
R =
2 SYMS

PLEM and Flexible Riser


Installation

Flexible Riser

Why do we need the heavy chain ?

PLEM Components

Suction
Suct
o Ca
Caisson
sso

Mooring
M i Joint
J i t

Heavyy Chain

Flexible Riser

Ri
Riser
Buoy
B

Buoy Attachment

Riser Lift

Riser String Pulled Down to PLEM

Hose Assemblyy

Riser and Mooring System Configuration on Seabed

Abandon Arrangement
g

Fl
Flange
P
Protector
t t

Sho e App
Shore
Approach
oach

Pulling
g Layout
y

Pulling
P lli Head
H d

Pulling Facilities

Pi li Fittings
Pipeline
Fitti

Flanges
Gasket
Ball valves

Flange
Fl
and
d Gasket
G k t

W ld Neck
Weld
N k Flange
Fl

S i l Flange
Swivel
Fl

K
Kamos
G k t
Gasket

Subsea Ball Valve

Hydratight Bolt Tensioning

Anode

Bracelet Anode, Galvalum III

Replacement Anode

Assignment
A i
t

Explain how to control stress and strain in


the pipeline during installation
What factors control the winch capacity
for pipeline shore approach?
E l i how
h
i
ll suction
i caisson
i
Explain
to install