Standard Materials Cost Per Backpack $16.80 Per Backpack Standard Materials Cost Per Yard $6.00 Per Yard 2.8 Yards Per Backpack

The document provides information to calculate various cost variances for a company that produces backpacks. It includes: 1) Standard costs for materials, direct labor, and overhead for March production totaling $31,500. 1,000 backpacks were produced. 2) The standard cost per backpack is $31.50. The actual cost was $31.35, for a variance of $0.15 per backpack. 3) The standard materials cost is $16.80 per backpack. The actual materials cost was $15,000, for a materials price and quantity variance of $3,000 unfavorable and $1,200 favorable respectively.

Uploaded by

jnplnce
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
110 views3 pages

Standard Materials Cost Per Backpack $16.80 Per Backpack Standard Materials Cost Per Yard $6.00 Per Yard 2.8 Yards Per Backpack

The document provides information to calculate various cost variances for a company that produces backpacks. It includes: 1) Standard costs for materials, direct labor, and overhead for March production totaling $31,500. 1,000 backpacks were produced. 2) The standard cost per backpack is $31.50. The actual cost was $31.35, for a variance of $0.15 per backpack. 3) The standard materials cost is $16.80 per backpack. The actual materials cost was $15,000, for a materials price and quantity variance of $3,000 unfavorable and $1,200 favorable respectively.

Uploaded by

jnplnce
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

Solutions (12/02)

Problem 9-16A
1. Standard cost for March production:
Materials.............................................................................................................
Direct labor..........................................................................................................
Variable manufacturing overhead.........................................................................
Total standard cost (a)..........................................................................................

$16,800
10,500
4,200
$31,500

Number of backpacks produced (b)......................................................................

1,000

Standard cost of a single backpack (a) (b).........................................................

$31.50

Standard cost of a single backpack (above)...........................................................


Deduct difference between standard and actual cost..............................................
Actual cost per backpack.....................................................................................

$31.50
0.15
$31.35

2.

3.

Total standard cost of materials allowed during March (a).................................


Number of backpacks produced during March (b)..............................................
Standard materials
cost per
backpack
(a) (b)...................................................
Standard
materials
cost
per backpack
$16.80 per backpack
=
Standard quantity of materials ($16.8/6)

Standard materials cost per yard

$6.00 per yard

4. Standard cost of material used......................................= 2.8$16,800


yards per
Actual cost of material used..........................................
15,000
Total variance................................................................
$1,800 F

$16,800
1,000
$16.80
2.8 yards

backpack

The price and quantity variances together equal the total variance. If the quantity variance is $1,200
U, then the price variance must be $3,000 F:
Price variance................................................................
Quantity variance..........................................................
Total variance................................................................

$3,000 F
1,200 U
$1,800 F

Alternative Solution:
Actual Quantity
of Input, at
Actual Price
(AQ AP)
3,000 yards
$5.00 per yard
= $15,000*

Actual Quantity
Standard Quantity Allowed
of Input, at
for Output, at Standard Price
Standard Price
(AQ SP)
(SQ SP)
3,000 yards
2,800 yards**
$6.00 per yard*
$6.00 per yard*
= $18,000
= $16,800*

Price Variance,
Quantity Variance,
$3,000 F
$1,200 U*
Total Variance,
$1,800 F

* Given.
** 1,000 units 2.8 yards per unit = 2,800 yards

5. The first step in computing the standard direct labor rate is to determine the standard direct laborhours allowed for the months production. The standard direct labor-hours can be computed by
working with the variable manufacturing overhead costs, because they are based on direct labor-hours
worked:
Standard variable manufacturing overhead cost for March (a).........................................
Standard variable manufacturing overhead rate per direct labor-hour (b)........................
Standard direct labor-hours for March (a) (b)...............................................................
Standard direct labor cost for March
Standard
direct standard
labor per hour
(410,500/1,400)
Total
direct
labor cost for March
$10,500

Total standard direct labor-hours for March

$4,200
$3.00
1,400
$10,500
$7.5

1,400 DLHs

6. Before the labor variances can be computed, it is necessary to compute the actual direct labor cost for
the month:
= $7.50 per DLH
Actual cost per backpack produced (part 2).........................................
Number of backpacks produced...........................................................
Total actual cost of production.............................................................
Less: Actual cost of materials...............................................................
Actual cost of variable manufacturing overhead.....................
Actual cost of direct labor....................................................................

$15,000
3,600

$31.35
1,000
$31,350
18,600
$12,750

With this information, the variances can be computed:


Actual Hours of
Input, at the
Actual Rate
(AH AR)
$12,750

*Given.

Standard Hours
Actual Hours of Input, at the
Allowed for Output, at the
Standard Rate
Standard Rate
(AH SR)
(SH SR)
1,500 hours*
$7.50 per hour
= $11,250
$10,500*

Rate Variance,
Efficiency Variance,
$1,500 U
$750 U
Total Variance,
$2,250 U

7.

Actual Hours of
Input, at the
Actual Rate
(AH AR)
$3,600*

Standard Hours
Actual Hours of Input, at the
Allowed for Output, at the
Standard Rate
Standard Rate
(AH SR)
(SH SR)
1,500 hours*
$3.00 per hour*
= $4,500
$4,200*

Rate Variance,
Efficiency Variance,
$900 F
$300 U
Total Variance,
$600 F

*Given.
8.
Direct materials................................
Direct labor......................................
Variable manufacturing overhead.....
Total standard cost...........................
1

Standard Quantity
or Hours
2.8 yards1
1.4 hours2
1.4 hours

Standard
Price or
Rate
$6 per yard
$7.50 per hour3
$3 per hour

From part 3.
1,400 standard hours (from part 5) 1,000 backpacks = 1.4 hours per backpack.
3
From part 5.
2

Standard
Cost
$16.80
10.50
4.20
$31.50