3 - Levelling PDF
3 - Levelling PDF
3 - Levelling PDF
Qassim University
Unaizah College of Engineering
Civil Engineering Department
Definitions
Leveling is the process used to determine a
difference in elevation between two points.
A Level is an instrument with a telescope that
can be leveled with a spirit bubble.
An Elevation is a vertical distance above or
below a reference datum.
Datum is an assumed or a fixed reference plane.
Mean Sea Level (M.S.L.) is a reference datum
for levelling.
Dr. Waleed Tahawy
Definitions
A vertical Line is a line from the surface of the
earth to the earths center. Plumb line, line of
gravity.
A level Line is a line in a level surface.
A Level Surface is a curved surface parallel to
the mean surface of the earth.
A Horizontal Line is a straight line
perpendicular to a vertical line.
Dr. Waleed Tahawy
Definitions
Benchmarks (B .M) Are fixed points information
site and attributed placed in different places until
you start racing
them when conducting
settlement.
Back sight (B.S.) Is the first reading taken after
placing the device in any position so that we see
the greatest possible number of points required
to find the elevation.
Fore sight (F.S) Is the last reading taken before
transfer the device.
Dr. Waleed Tahawy
Definitions
Benchmark (B .M )
Definitions
Intermediate sight (I.S.) Is reading taken
between the back sight and fore sight reading.
Elevation of line of sight (H.I) Is the imaginary
vertical level determined by the line of sight to
the amount of increase or decrease for sea
level.
Equipment
Level
Instrument
Equipment
A level is an instrument giving horizontal line
of sight and magnifying the reading at a far
away distance.
It consists of the following parts:
(i) A telescope to provide a line of sight
(ii) A level tube to make the line of sight
horizontal and
(iii) A leveling head to level the instrument
Dr. Waleed Tahawy
Equipment
Equipment
Automated Levels
- Easy to use (not power!)
- Needs experience
- Robust even in hostile environment
Digital Levels
- Push-button technique
- No reading errors, special staff
- Readings are stored and analyzed digitally
Dr. Waleed Tahawy
Equipment
Tripod is a portable three-legged frame, used as
a platform for supporting the weight and
maintaining the stability of some other object
Tripod
plumb bob
Equipment
Staff Is a wooden or metal ruler one side
runway to meters and centimeters. And is a
ruler of solid wood 2 , 3 , 4 , 5 meters in length
and usually 4 meters.
INVAR type for high
precision leveling
Equipment
Staff
Barcode
for Digital Levels
Conventional (E-type)
Equipment
Pole staff bubble (bull eye)
Keep the pole upright
Any tilt will disturb your readings
Equipment
Survey Markers
Gives you a fixed point
Should be of good quality
Should be long-term
Preferable in bedrock, settled buildings, or bridges
Do not use fences or walls
Equipment
Survey Markers
why?
Why do we perform leveling surveys?
To determine the topography of sites for
design projects
Set grades and elevations for construction
projects
Compute volumes of earthwork
Method of measuring
A Level is an instrument with a telescope that
can be leveled with a spirit bubble. The optical
line of sight forms a horizontal plane, which is at
the same elevation as the telescope crosshair.
By reading a graduated rod held vertically on a
point of known elevation (Bench Mark) a
difference in elevation can be measured and a
height of instrument (H.I.) calculated by adding
the rod reading to the elevation of the bench
mark.
Dr. Waleed Tahawy
Method of measuring
Once the height of instrument is established,
rod readings can be taken on subsequent
points and their elevations calculated by
simply subtracting the readings from the
height of instrument.
leveling
Leveling of the instrument is done to make the
vertical axis of the instrument truly vertical. It is
achieved by carrying out the following steps:
Step 1: The level tube is brought parallel to any
two of the foot screws, by rotating the upper part
of the instrument.
Step 2: The bubble is brought to the center of the
level tube by rotating both the foot screws either
inward or outward. (The bubble moves in the
same direction as the left thumb.)
Dr. Waleed Tahawy
leveling
Step 3: The level tube is then brought over the third
foot screw again by rotating the upper part of the
instrument.
Step 4: The bubble is then again brought to the
center of the level tube by rotating the third foot
screw either inward or outward.
Step 5: By rotating the upper part of the instrument
through 180, the level tube is brought parallel to
first two foot screws in reverse order. The bubble will
remain in the center if the instrument is in
permanent adjustment.
Dr. Waleed Tahawy
leveling
Leveling Principle
Basic Principle of Leveling
Fore sight
fs
bs
Dh = bs - fs
Gravity Gradient
Taking readings
Method of taking readings on a ruler settlement
direct leveling a back sight is taken on the rod held at the
bench mark ( A ) .
H..I = E.L.V of B.M. ( A ) + B.S.
Turning the telescope to bring
1422
into view the rod held on point B
afore sight is taken .
elev. Point B = H .I F .S
check the work by the following equation:
B.S. - F.S. = Last R.L. First R.L.
Dr. Waleed Tahawy
Level
Line of Sight
r
Level
Vertical
d
R
A
B
c+r
AB = r
AE = c
Dr. Waleed Tahawy
BE = c + r
KA 2
KA 2
c
2R c 2R
R 6370 km
KA 2
c
0.0000785 KA 2 km 0.0785 KA 2 m
2 6370
Distance (m)
(c + r)m
30
60
100
120
150
300
1000
0.001
0.002
0.006
0.068
First - Order
3 K
Second - Order
5 K
Third - Order
12 K
Fourth - Order
25 K
P3
P5
5 km
P4
Com.
Adjusted Elev.
Elev. (m) Correction (m)
(m)
643.44
643.44
657.34
- 0.14
657.20
645.68
- 0.26
645.42
630.06
- 0.33
629.73
641.11
- 0.43
640.68
643.93
- 0.49
643.44