Fi MM Integration
Fi MM Integration
Purchase Org
2000
Plant
ABCD - 1100
0001
0002
1200
1300
0002
Purchase Org
2000
Plant
ABCD - 1100
0001
0002
1200
1300
0002
2000
Plant
ABCD - 1100
0001
0002
1200
0002
-1-
1300
MM-FI INTEGRATION
MM
MM
Purchase
Requisition
PR
Quotation
Purchase Order
PR
PurchQuotation
Agreement
Purch
Enquiry
Starts with
Receipts
Procurement
Cycle
Goods Receipts
Invoice
GR / IR
MM
GL, AP
Update
FI
Outgoing Payment
Invoice Verification
MM
FI
FI
MM Flows
Raw-material Purchase enquiry Purchase quotation Purchase Order GR - Goods
Receipt (Raw-material) IR - Invoice receipt Goods (Raw-material) issue for Consumption
to Production department Goods (Finished) received from production department
MM journal entries
-2-
MM-FI INTEGRATION
-3-
MM-FI INTEGRATION
262 Reversal of 261
521 Material received without production order
522 Reversal of 521
561 When posting opening stock
562 Reversal of 561
601 When goods delivered
602 Reversal of 601
Transaction keys
These transaction keys are used to determine accounts or posting key for line items which are
created automatically by the screen. These transaction keys are defined in this system and cannot
be changed by the user.
BSX Inventory postings (every inventory accounts we assign BSX key)
WRX For GR / IR Accounts
PRD Price difference accounts / production order differences
GBB Offsetting entries for inventory posting
Offsetting entries for inventory posting
VBR Raw-material Consumption account
VNG Scraping
BSA Opening stock taken
AUF Production receive against production order
ZOF Production receive without production order
VAY Delivery where sales accounts is a reverse accounts
AVA Production order difference
VAX Delivery where sales accounts not a revenue accounts
Valuation Classes
Valuation classes is nothing but sub-classify of the material
1- Raw-material
Local material
Imported material
Inter unit material
2- Stocks
Imported, Local
3- Finished Goods
Own goods
-4-
MM-FI INTEGRATION
Other goods (Imported goods)
Valuation Area
Valuation area is nothing but Plant
Valuation grouping / Valuation modify / Valuation modification tools
It is nothing but combination of Company code + Plant + Chart of Accounts
Movements type
Similar to Accounts group is material type
ROH Raw-Material
FERT Finished goods
FRSA Storage and spares
VERP Packing material
HAWA Trade groups
DIEN Services
MM Integration Steps
Define Plant (OX10)
Path: Spro Img Enterprise structure Definition Logistics general Define, Copy,
Check plant
Double click on Define plant
Check on new entries
Plant TAPL (Any code)
Name Plant in Hyderabad
Factory calendar 01
Click on address field
Country IN (Give complete address)
Click on Save
Define, Copy, Delete, Check the Division (OVXB)
Path: Same
Double click on define division
Click on new entries
Division
Name
ST
Steel
Press enter key and Save
-5-
MM-FI INTEGRATION
Come back
Note: You can create any division like Marketing, Purchasing etc
Maintain Storage location (OX09)
Path: Spro Img Enterprise structure Definition Material managements Maintain
storage location
Plant TAPL
(Tick mark)
Click on new entries
Storage location
Description
HYD
Hydrabad
Press enter key and Save
Comeback wise
Maintain Purchase Organization (OX08)
Path: Same
Click on new entries
Purchase Organization
TAPO
Press enter key and Save
Come back wise
-6-
MM-FI INTEGRATION
Plant
TAPL
-7-
MM-FI INTEGRATION
Click on position
Company code TAST
Year
Period
ABP (Allow back date period)
2009
1
Tick mark
Press enter key and Save
Note: Here we can open two period at a time
Define Attributes of Material types (OMS2)
Path: Same as up to basic settings Material types Define attributes of material type
Click on position
Material type ROH
(Tick mark)
Now select ROH Material type
Double click on Qualities/ values updating folder
Click on position
Valuation area TAPL (Plant Code) (Tick mark)
Quantity updating
Value updating
Tick mark
Tick mark
Press enter key and Save
Double click on material types folder
Click on position
Material type FERT
(Tick mark)
Select your material type FERT
Double click on Quantities/ Value updating folder
Click on position
Valuation area TAPL
(Plant code) (Tick mark)
Quantity updating
Value updating
Tick mark
Tick mark
Press enter key and Save
Come back wise
Note: Just like you can give attribution for whatever material type you are using in the company
Set tolerance limit for Purchase order (OMEU)
Path: Spro Img Material managements Purchasing Purchase order Set tolerance
limit for price variance
Select PE, SE tolerance key from 0001 Company code
Click on copy as field (F9)
Change the company code in to TAST
Press enter key
Again change the company code in to TAST
Press enter key and Save.
Come back wise.
Set tolerance limit for Goods receipts (OMC0)
-8-
MM-FI INTEGRATION
Path: Spro Img Material managements Inventory managements and physical inventory
Goods receipts Set tolerance limit
Select B1, B2, VP tolerance key from 0005 Company code
Click on copy as field (F9)
Change the company code in to TAST
Press enter key
Again change the company code in to TAST
Press enter key
Again change the company code in to TAST
Press enter key and Save.
Come back wise.
Plant Parameters
Path: Same as up to Inventory managements and Physical inventory Plant parameters
Select 1000 plant
Click on copy as field
Change the plant in to TAPL (Plant in Hyderabad)
Press enter key and Save
Comeback wise
Set tolerance limit for Invoice verification (OMR6)
Path: Spro Img Material Managements Logistics invoice verification Invoice block
Set tolerance limit
Select BD and ST Tolerance key from 0005 Company code
Click on copy as
Change the company code in to TAST
Press enter key
Again change the company code to TAST
Press enter key and Save
Come back wise
Define automatic status change (OMRV)
Path: Same as up to Logistics invoice verification Invoice verification in background
Define automatic status change
Click on new entries
Company code - TAST
Press enter key and Save
Comeback wise
-9-
MM-FI INTEGRATION
- 10 -
MM-FI INTEGRATION
Select line item display
Sort key 001
Click on create/ bank / interest tab
Field status group G006 (Material Accounting)
Select post automatically
Press enter key and Save.
2- Just like Create the Inventory of finished goods accounts
3- GL Accounts GR / IR Accounts
Company code TAST
Click on create field
Account group Liabilities
Select balance sheet accounts
Short text GR / IR Account
Long text GR / IR Account
Click on control data tab
Select only balance in local currency
Select open item managements
Select line item display
Tax category - *
Select posting without tax allowed
Sort key 001
Click on create/ bank / interest tab
Field status group G045 (Goods / Invoice receive clearing)
Press enter key and Save.
4- GL Accounts Increase / decrease of stock Accounts
Company code TAST
Click on create field
Account group Incomes
Select profit and loss accounts
Short text Increase or decrease of stock Account
Long text Increase or decrease of stock Account
Click on control data tab
Select line item display
Sort key 001
Click on create/ bank / interest tab
Field status group G030 (Chang in stock Account)
Press enter key and Save.
5- GL Accounts Raw-material consumption Accounts
Company code TAST
Click on create field
Account group Expenses
Select profit and loss item
- 11 -
MM-FI INTEGRATION
Short text Raw-material consumption Accounts
Long text Raw-material consumption Accounts
Click on control data tab
Select line item display
Sort key 001
Click on create/ bank / interest tab
Field status group G003 (Material consumption account)
Press enter key and Save
Update this account to CO
Group together valuation area (OMWD)
Path: Spro Img Material managements Valuation and account assignments Account
determination Account determination without wizard Group together valuation area
Click on position
Valuation area TAPL (Plant code) (Tick mark)
Valuation grouping code X (Any code)
Press enter key and Save
Comeback wise.
Define valuation class (OMSK)
Path: Same
Click on valuation class tab
3000 Raw-material
7920 Finished Goods
Come back wise.
Configure automatic Postings (OMWB)
Path: Same
Click on cancel tab
Click on account assignments tab
1- Double click on BSX Transaction key (Inventory posting)
Chart of account CHAC
(Tick mark)
Select valuation modify
Select valuation class
Click on save
Valuation modify
Valuation class
Accounts
X
3000
Inventory of Raw-material Accounts
X
7920
Inventory of Finished goods accounts
Press enter key and save.
- 12 -
MM-FI INTEGRATION
Comeback wise
2- Double click on WRX transaction key (GR/IR Accounts)
Select valuation modify
Select valuation class
Click on save
Valuation modify
Valuation class
Accounts
X
3000
GR / IR Accounts
Press enter key and Save
3- Double click on GBB transaction key (Offsetting entries for inventory post)
Select General modification
Select Valuation modify
Select Valuation class
Click on save
Valuation modify
General modify
Valuation class
Accounts
X
VBR
3000
Raw-material consumption a/c
X
AUF
7920
Increase / Decrease stock a/c
X
ZOF
7920
Increase / Decrease stock a/c
X
VAY
7920
Increase / Decrease stock a/c
X
VAX
7920
Increase / Decrease stock a/c
Press enter key and Save
Comeback three times
Documents types number ranges settings (OBA7)
1- WA - Goods issued
2- WE - Goods receive
3- RE - Invoice posting (Purchase)
Go to OBA7 for documents
1- Click on position
Documents type WA
(Tick mark)
Double click on WA Documents type
Click on number range info tab
Company code TAST
Click on change intervals tab
Click on insert intervals tab
No
Year
From number
49
2009
500001
Press enter key and Save
To number
600000
- 13 -
MM-FI INTEGRATION
Path: Sap easy access Accounting Financial accounting Accounts payable Master
records Maintain centrally Create
Company code TAST
Purchase organization TAPO
Press enter key
Fill address and Name fields
Press three times enter key
Reconciliation accounts Sundry Creditors
Sort key 012
Cash management A1
Press enter key
Payment term - 0001
Tolerance - TAMV
Press three times enter key
Order currency INR
Terms of Payments 0001
Select GR Based invoice verification
Press enter key and Save
Open Material periods (MMPV)
Path: Sap easy access Logistics Material managements Material masters Other
Close period
From Company code TAST
Period 1 (Give current period)
Fiscal year 2009
Press F8 for execute
Comeback wise
Note
Before Creating a material Go to MMPV check which is the current open period activated in the
system. If it is showing the previous period (suppose period 01 is activated) you cannot post any
transaction in current period (Suppose current period is 05). In order to change this Go to MMPV
Give the next Period 02 in the Period column and Select the Check and close period radio botton
and press F8 for execute. Come back again
Give the next Period 03 in the Period column and Select the Check and close period radio botton
and press F8 for execute. Come back again
Give the next Period 04 in the Period column and Select the Check and close period radio botton
and press F8 for execute. Come back again
Give the next Period 05 in the Period column and Select the Check and close period radio botton
and press F8 for execute. Come back again
Material Creation (MM01)
- 14 -
MM-FI INTEGRATION
Path: Sap easy access Logistics Material managements Material masters Material
Create (General) Immediate
Material MAT01 (Give your material name)
Industry specter M
Material type ROH - Raw-material
Click on select view(s) tab
Select Basic data1, Accounting, Purchasing
Click on organizational level tab
Plant TAPL
Storage location HYD
Press enter key
Material Raw-material
Base unit of measures KG
Material group ST
Gross weight 1000
Weight unit G
(Grams)
Net weight 1000
Click on Purchase tab
Purchase group RAM
Click on Accounting tab
Valuation class 3000
Price control V
Moving price 100
Press enter key and Save
Postings
Creation of purchase order (ME21N)
Path: Sap easy access Logistics Material managements Purchasing Purchase order
Create Vendor / supplying plant known (ME21N)
Vendor Vendor Account
Documents date 01-05-2009
Click on header tab
Click on Organizational tab
Purchase organization TAPO
Purchase Group - RAM
Company code TAST
Item
Material
Po quantity Net price
01 (any)
MAT01
100
100
Press enter key and Save
Click on Save
Note the purchase order number 4500017134
Currency
INR
- 15 -
Plant
TAPL
MM-FI INTEGRATION
- 16 -
MM-FI INTEGRATION
Invoice date 01-05-2009
Posing date 01-05-2009
Amount 10000
Activate Tax
Select Tax key A1
Text Invoice posting
Purchasing order / scheduling agreem 4500017134
Press enter key
Click on Payments tab
Base line date Give current date
Press enter key and Save
Go to FBL3N check the concerned GL
GR / IR Clearing account
Vendors
Input tax
Surcharge
Edu-cess
- 1000
- 10441.2
- 400
- 40
- 1.2
- 17 -
MM-FI INTEGRATION
- 18 -