C-CS - 20 - 011 - Galvanized Flashing & Sheet Metal Rev - 0
C-CS - 20 - 011 - Galvanized Flashing & Sheet Metal Rev - 0
C-CS - 20 - 011 - Galvanized Flashing & Sheet Metal Rev - 0
Y:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-011 GAL. FLASHING STEEL METAL\C-CS_20_011_GALVANIZED FLASHING & SHEET METAL REV_0.DOC
Client Name:
Project Name:
Project Number:
Specification C-CS-20-011
Page 1 of 11
Rev. 0
FLUOR
Mining & Minerals
Originator
(name/initials)
Hernan Alvarez
Rev
Date
12Jul05
Revision Description
Issued for Construction
; New Issue
ORIGINAL SIGNED BY
APPROVALS
FLUOR
DATE
CLIENT
DATE
Project Manager:
Engineering Manager:
Brad Matthews
12Jul05
Reza Sherkat
12Jul05
Hernan Alvarez
12Jul05
Process Approval:
Y:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-011 GAL. FLASHING STEEL METAL\C-CS_20_011_GALVANIZED FLASHING & SHEET METAL REV_0.DOC
ARCHITECTURAL
Client Name:
Project Name:
Project Number:
Specification C-CS-20-011
Page 2 of 11
Rev. 0
FLUOR
Mining & Minerals
Table of Contents
1.
GENERAL....................................................................................................................................................... 3
1.1
Summary......................................................................................................................................................3
1.2
1.3
Submittals ....................................................................................................................................................3
1.4
1.5
2.
PRODUCTS.................................................................................................................................................... 4
2.1
Materials.......................................................................................................................................................4
2.2
Fabrication ...................................................................................................................................................4
3.
EXECUTION ................................................................................................................................................... 5
3.1
Installation ....................................................................................................................................................5
4.
ATTACHMENTS ............................................................................................................................................ 6
1.
GENERALIDADES......................................................................................................................................... 8
1.1
Resumen......................................................................................................................................................8
1.2
1.3
Remisiones ..................................................................................................................................................8
1.4
Entrega y Almacenamiento..........................................................................................................................9
1.5
Secuencia y Programacin..........................................................................................................................9
2.
PRODUCTOS ................................................................................................................................................. 9
2.1
Materiales.....................................................................................................................................................9
2.2
Fabricacin ..................................................................................................................................................9
3.
EJECUCIN ................................................................................................................................................. 10
3.1
Instalacin ..................................................................................................................................................10
4.
ANEXOS ....................................................................................................................................................... 11
Y:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-011 GAL. FLASHING STEEL METAL\C-CS_20_011_GALVANIZED FLASHING & SHEET METAL REV_0.DOC
ARCHITECTURAL
Client Name:
Project Name:
Project Number:
Specification C-CS-20-011
Page 3 of 11
Rev. 0
FLUOR
Mining & Minerals
GENERAL
1.1
Summary
A.
Scope of Specification
This specification includes but does not necessarily limit materials and labor to furnish, unload,
store, and install galvanized flashing and sheet metal for a complete, operational system.
B.
Related Specifications
The following specifications prescribe items of related Work:
C-CS-20-006
Rough Carpentry
C-CS-20-008
Insulation
C-CS-20-010
Metal Panels
C-CS-20-012
Joint Sealing
C-CS-20-013
Coordinate Work prescribed by this specification with Work prescribed by the above listed
specifications.
1.2
Referenced Publications
Within this specification shall be the latest revision unless otherwise specified; and applicable parts of
the referenced publications shall become a part of this specification as if fully included.
1.3
FM (Factory Mutual)
Submittals
Shop Drawings
1.4
A.
Submit shop showing profiles, interlocking joints, intersections, gages, fabrication and
installation details to Fluor for review. Do not start fabrication until Fluor review comments have
been received.
B.
Submit shop drawings and samples of sheet metal demonstrating profile and interlocking joints
for different types of assemblies.
Handling
Exercise care to prevent damage during transportation and storage.
Y:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-011 GAL. FLASHING STEEL METAL\C-CS_20_011_GALVANIZED FLASHING & SHEET METAL REV_0.DOC
ARCHITECTURAL
Client Name:
Project Name:
Project Number:
Specification C-CS-20-011
Page 4 of 11
Rev. 0
FLUOR
Mining & Minerals
Storage
Store sheet metal above ground and under cover.
1.5
2.
PRODUCTS
2.1
Materials
Conform to FM Loss Prevention Data Sheet 1-49 and Architectural Sheet Metal Manual by SMACNA
for sizes, shapes, and dimensions. The most stringent requirements shall govern.
A.
B.
Solder
ASTM B 32; 60 percent tin and 40 percent lead.
C.
Flux
Muriatic acid neutralized with zinc.
D.
Plastic Cement
Commercial type conforming to ASTM D 4586. No asbestos fibers are permitted.
E.
Fasteners
Annular ring nails, screws, rivets, and bolts of non-corrosive materials.
F.
Lead
Four pound pig lead; ASTM B 29.
G.
Sealant
Two-part polyurethane sealant complying with ASTM C920.
2.2
Fabrication
Form sheet metal on bending brakes. Shape, trim, and hand-seam sheet metal on the bench with
proper tools as far as practicable. Make bends and folds for interlocking metal joints to allow for
expansion and contraction. Fabricate in 2440 mm to 3050 mm lengths. Form true, sharply defined
straight edges and seams.
A.
Gutters
Twenty gage galvanized steel, 1-piece construction complete with outlets, fittings, and
conductors. Joints shall be lapped 25 mm, riveted, and soldered; rivets shall be spaced no
farther than 38 mm apart for the full girth of the section. Ends shall be similarly secured. Outlets
shall be flanged and soldered to inside of gutters, shall be provided with a locked seam, and
Y:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-011 GAL. FLASHING STEEL METAL\C-CS_20_011_GALVANIZED FLASHING & SHEET METAL REV_0.DOC
ARCHITECTURAL
Client Name:
Project Name:
Project Number:
Specification C-CS-20-011
Page 5 of 11
Rev. 0
FLUOR
Mining & Minerals
Cradles
Minimum 3 mm by 25 mm cold rolled galvanized steel bands.
2.
Spacers
Minimum 1.5 mm by 25 mm galvanized flat stock.
3.
EXECUTION
3.1
Installation
A.
B.
General
1.
Anchor work in place with non-corrosive fasteners, adhesives, setting compounds, tapes,
and other materials and devices as recommended by the Manufacturer of each material or
system.
Provide for thermal expansion and building movements.
Comply with
recommendations of Architectural Sheet Metal Manual by SMACNA and FM Loss
Prevention Data Sheet 1-49.
2.
3.
Clean metal surfaces of soldering flux and other substances that could cause corrosion.
4.
Nail flanges to substrates in two staggered rows, each row at a spacing of 150 mm o.c.
5.
Install sections in 3050 mm lengths maximum. Lap joints 100 mm and seal with double
backer beads of specified sealant.
6.
Solder nonmoving seams using flatlock seams, unless otherwise shown. Clean, tin, and
solder in accordance with the metal producer's recommendations. Reinforce soldered lap
joints with 3.2 mm rivets spaced no more than 50 mm apart and soldered water tight.
Gutters / Downspouts
Where shown, install rigid gutters and downspouts.
countersunk flush into the cradles.
C.
Vent Flashing
Flash pipe vents through roof with lead turned 150 mm on roof and turned down 100 mm into
pipe.
D.
Coping
Install continuous cleats to receive both sides of coping. Install coping with 13 mm joints for
expansion and contraction. Cover joints in coping with 150 mm wide cover plates. Under the
cover plate lay strips of 3 mm thick by 25 mm wide sealant tape, 13 mm behind each edge of the
cover and between the cover plate and the metal cover. Fill remaining 13 mm space on each
side of the cover plate with sealant. Handvise coping receivers continuously along cleats.
Y:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-011 GAL. FLASHING STEEL METAL\C-CS_20_011_GALVANIZED FLASHING & SHEET METAL REV_0.DOC
ARCHITECTURAL
Client Name:
Project Name:
Project Number:
Specification C-CS-20-011
Page 6 of 11
Rev. 0
FLUOR
Mining & Minerals
Dissimilar Materials
Where the sheet metal abuts or members into dissimilar materials, the juncture shall be
executed in such a manner as to prevent electrolysis between the 2 materials. Paint the
aluminum surfaces in contact with dissimilar metals with a heavy coat of bitumastic enamel.
F.
Cleaning
After Completion of work of this section remove from jobsite Associated debris, tools and
equipment. Site to be ready for next subtrade.
4.
ATTACHMENTS
Not applicable.
End of Specification
Y:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-011 GAL. FLASHING STEEL METAL\C-CS_20_011_GALVANIZED FLASHING & SHEET METAL REV_0.DOC
ARCHITECTURAL
Client Name:
Project Name:
Project Number:
Specification C-CS-20-011
Page 7 of 11
Rev. 0
FLUOR
Mining & Minerals
Origen
(nombre/iniciales)
Hernan Alvarez
Fecha
Rev.
16May05
Descripcin de la Revisin
Emitida para Construccin
; Nueva Edicin
APROBACIONES
FECHA
CLIENTE
FECHA
Gerente de Proyecto:
Gerente de Ingeniera:
Brad Matthews
12Jul05
Reza Sherkat
12Jul05
Hernan Alvarez
12Jul05
Y:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-011 GAL. FLASHING STEEL METAL\C-CS_20_011_GALVANIZED FLASHING & SHEET METAL REV_0.DOC
ARCHITECTURAL
Client Name:
Project Name:
Project Number:
Specification C-CS-20-011
Page 8 of 11
Rev. 0
FLUOR
Mining & Minerals
GENERALIDADES
1.1
Resumen
A.
Alcance de la Especificacin
Esta especificacin incluye pero no necesariamente se limita a los materiales y mano de obra
para suministrar, descargar, almacenar e instalar la tapajunta galvanizada y la lmina metlica
para un sistema operacional completo.
B.
Especificaciones Relacionadas
Las siguientes especificaciones establecen tems de trabajo relacionado:
C-CS-20-006
Carpintera Gruesa
C-CS-20-008
Aislamiento
C-CS-20-010
Paneles Metlicos
C-CS-20-012
Sellado de Juntas
C-CS-20-013
Coordinar el trabajo prescrito por esta especificacin con el trabajo prescrito por las
especificaciones enlistadas anteriormente.
1.2
Publicaciones Referenciadas
Dentro de esta especificacin deber estar la ltima revisin, a menos que se especifique de otra
manera; y las partes aplicables de las publicaciones referenciadas debern convertirse en parte de
esta especificacin como si estuvieran totalmente incluidas.
1.3
Remisiones
Planos de Fbrica
A.
Remitir los planos de fbrica mostrando los perfiles, juntas de interconexin, intersecciones,
calibres, detalles de fabricacin e instalacin, a Fluor para revisin. No comience la fabricacin
hasta que los comentarios de la revisin de Fluor hayan sido recibidos.
B.
Remitir los planos de fbrica y muestras de la lmina metlica, demostrando el perfil y las juntas
de interconexin para los diferentes tipos de ensambles.
Y:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-011 GAL. FLASHING STEEL METAL\C-CS_20_011_GALVANIZED FLASHING & SHEET METAL REV_0.DOC
ARCHITECTURAL
Client Name:
Project Name:
Project Number:
Specification C-CS-20-011
Page 9 of 11
Rev. 0
FLUOR
Mining & Minerals
Entrega y Almacenamiento
A.
Manipulacin
Mantener cuidado para prevenir dao durante el transporte y almacenamiento.
B.
Almacenamiento
Almacenar la lmina metlica sobre el suelo y bajo cubierta.
1.5
Secuencia y Programacin
Coordinar la instalacin de la lmina metlica con el trabajo relacionado para evitar interferencias.
2.
PRODUCTOS
2.1
Materiales
Sern conforme a la Hoja de Datos para Prevencin de Prdidas 1-49 de FM y al Manual de
Lmina Metlica Arquitectnica de SMACNA para los tamaos, formas y dimensiones. Los
requerimientos ms exigentes debern prevalecer.
A.
B.
Soldadura
ASTM B 32; 60 por ciento estao y 40 por ciento plomo.
C.
Fundente
cido Muritico neutralizado con zinc.
D.
Cemento Plstico
Del tipo comercial conforme a ASTM D 4586. No se permiten fibras de asbesto.
E.
Sujetadores
Clavos anillados, tornillos, remaches, y pernos de materiales no corrosivos.
F.
Plomo
Lingote de Plomo de cuatro libras; ASTM B 29.
G.
Selladores
Sellador de poliuretano de dos partes cumpliendo con ASTM C920.
2.2
Fabricacin
Forme la lmina metlica en plegadora de chapa. Forme, corte y junte a mano la lmina metlica en
un banco, con las herramientas apropiadas tanto como sea factible. Realizar los dobleces y pliegues
para juntas metlicas de interconexin, para permitir la expansin y contraccin. Fabricadas en
Y:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-011 GAL. FLASHING STEEL METAL\C-CS_20_011_GALVANIZED FLASHING & SHEET METAL REV_0.DOC
ARCHITECTURAL
Client Name:
Project Name:
Project Number:
Specification C-CS-20-011
Page 10 of 11
Rev. 0
FLUOR
Mining & Minerals
Canaletas
Acero galvanizado de calibre veinte, construido en 1-pieza completa con salidas, accesorios, y
conductores. Las juntas debern ser traslapadas 25 mm, remachadas y soldadas; los remaches
debern estar espaciados a no ms de 38 mm aparte de la circunferencia completa de la
seccin. Los extremos debern asegurarse similarmente. Las salidas debern ser flanqueadas
y soldadas al interior de las canaletas, debern estar provistos con una costura de cerrado, y
debern extenderse dentro del canaln al menos 76mm. Proveer un colador de fcil remocin
y limpieza para cada caja colectora. Proporcionar juntas de expansin del tipo a tope.
1.
Soportes
Bandas de acero galvanizado, laminado en fro, mnimo de 3 mm por 25 mm.
2.
Espaciadores
Corriente, plano galvanizado, mnimo de 1.5 mm por 25 mm.
3.
EJECUCIN
3.1
Instalacin
A.
B.
Generalidades
1.
2.
3.
4.
Clavar las pestaas a sustratos en dos hileras escalonadas, cada hilera a un espaciado
de 150mm en centros.
5.
6.
Soldar juntas inmviles usando costuras de conexin planas, a menos que se muestre de
otro modo. Limpiar, estaar y soldar de acuerdo con las recomendaciones del productor
del metal. Reforzar las juntas a traslape soldadas con remaches de 3.2mm espaciados a
no ms de 50mm aparte, y soldadas aprueba de agua.
Canaletas / Bajantes
Donde se muestre, instale canaletas y bajantes rgidos. Fijar a las claveras con 2 tornillos para
madera avellanados al ras en los soportes.
Y:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-011 GAL. FLASHING STEEL METAL\C-CS_20_011_GALVANIZED FLASHING & SHEET METAL REV_0.DOC
ARCHITECTURAL
Client Name:
Project Name:
Project Number:
Specification C-CS-20-011
Page 11 of 11
Rev. 0
FLUOR
Mining & Minerals
Tapajuntas de Ventilacin
Tapar las juntas de los tubos de ventilacin que pasan a travs del techo con plomo doblado
150mm en el techo y doblado hacia abajo 100mm dentro del tubo.
Nota al Especificador!!!! Use tapajuntas de drenaje del techo solo con sistemas de techado
construidos.
D.
Coronamiento
Instalar listones continuos para recibir ambos lados del coronamiento. Instalar el coronamiento
con juntas para expansin y contraccin de 13mm. Cubrir las juntas en el coronado con placas
de cubierta de 150mm de ancho. Bajo las placas de cubierta coloque listones de cinta selladora
de 3mm de espesor por 25mm anchos, 13mm atrs de cada extremo de la cubierta y entre la
placa de cubierta y la placa metlica. Rellenar los 13mm de espacio remanente en cada lado de
la placa de cubierta con sellador. Atornillar a mano los receptores de coronamiento
continuamente a lo largo de los listones.
E.
Materiales Diversos
Donde la lmina metlica o miembros empaten con materiales diferentes, la junta deber ser
realizada de tal manera que se evite la electrolisis entre los 2 materiales. Pintar las superficies
de aluminio en contacto con metales distintos con un esmalte bitumstico de capa pesada.
F.
Limpieza
Despus de terminar el trabajo de esta seccin, retirar del lugar de trabajo los desechos
relacionados, herramientas y equipo. El lugar quedar listo para el siguiente sub-oficio.
4.
ANEXOS
No se aplica.
Fin de la Especificacin
Y:\103\109 ENGDOC\109.2 CONSPEC_CS\ARCHITECTURAL\C-CS-20-011 GAL. FLASHING STEEL METAL\C-CS_20_011_GALVANIZED FLASHING & SHEET METAL REV_0.DOC
ARCHITECTURAL