0% found this document useful (0 votes)
138 views6 pages

Sap PP Tcode 3

This document contains a list of transaction codes for various SAP modules related to material requirements planning, production planning and control, capacity planning, and master data maintenance. It includes transaction codes for creating and maintaining planning calendars and BOM explosions, total planning runs, evaluations like stock/requirements lists and MRP lists, creating and converting planned orders, order processing, goods movement, and availability checks. It also provides transaction codes for long term planning scenarios and runs, capacity planning evaluations and leveling, and maintaining the factory calendar and number ranges for planned orders.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
138 views6 pages

Sap PP Tcode 3

This document contains a list of transaction codes for various SAP modules related to material requirements planning, production planning and control, capacity planning, and master data maintenance. It includes transaction codes for creating and maintaining planning calendars and BOM explosions, total planning runs, evaluations like stock/requirements lists and MRP lists, creating and converting planned orders, order processing, goods movement, and availability checks. It also provides transaction codes for long term planning scenarios and runs, capacity planning evaluations and leveling, and maintaining the factory calendar and number ranges for planned orders.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
You are on page 1/ 6

Material Requirement Planning

Menu Nodes

TransactionActivity

Master Data

MD25
MD26

Change planning calendar

MD27

Display planning calendar

MDSA

Display BOM explosion number

MDSP

Edit BOM explosion number

MEQ1

Maintain quota file

OPPP

Planning

Create planning calendar

Explode BOM by date

MDUS

Display project assignment

MDUP

Process project assignment

MDL1

Create production lot

MDL2

Change production lot

MDL3

Display production lot

MD20

Create planning file entry

MD21

Display planning file entry

MDAB

Set up planning file entry in background

MDRE

Check planning file entry

MD01

Total planning online

MDBT

Total planning in background

MD03

Single-item, single-level planning

MD02

Single-item, multi-level planning

MD43

Interactive single-item planning

MD50

Multi-level, make-to-order planning

MD51

Multi-level project planning

MF52

Display planning table

MF50

Change planning table

MF57

Planning table by MRP lists

MF51

Planning table by production list

Evaluations

MD04

Stock/requirements list

MD07

Collective access of stock/requirements lis

MD05

MRP list

MD06

Collective access of MRP lists

MDLD

Print MRP list

MD45

Planning result

MD46

Collective access of planning result

MD44

Planning situation for a material

MD47

Planning situation for a product group

MD48

Cross-plant planning situation

MD4C

Order report

MD09

Pegged requirements

CO46

Order progress

Planned Order

MD11

Create planned order

MD12

Change planned order

MD13

Individual access of planned order

MD16

Collective access of planned orders

MD14

Individual conversion of planned order into

MD15

Collective conversion of planned orders int

MDUM

Convert planned order into purchase requisi

CO40

Convert individual planned order into produ

CO41

Collective conversion of planned orders int

CO48

Partial conversion of planned order into pr

COR7

Individual conversion of planned order into

COR7_PC

Collective conversion of planned orders int

COR8

Partial conversion of planned order into pr

MDVP

Collective availability check

MDAC

Execute action for planned order

LONG TERM PLANNING


PALNNING SCENARIO

MS31

CREATE

MS32

CHANGE

MS33

DISPLAY

PLANNING RUN

MS01

ON LINE

MSBT

SA BACKGROUND JOB

MS02

SINGLE ITEM - MULTI LEVEL

MS03

SINGLE ITEM - SINGLE LEVEL

MS50

SINGLE ITEM - SALES ORDER

MS51

SINGLE ITEM PLANNING, PROJECT

MFSO

PLANNING TABLE

EVALUTIONS

MS05

MRP LIST MATERIAL

MS06

MRP LIST COLLECTIVE DISPLAY

MSLD

PRINT MRP LIST

MS04

STOCK/REQUIREMENTS LIST

MS07

STOCK/REQUIREMENT LIST COLLECTIVE DISPLAY

MS44

PLANNING SITUATION MATERIAL

MS47

SITUATION PRODUCT GROUP

MPS-MASTER SCHEDULE ITEMS


TOTAL PLANNING
MDBS

MD40

ON LINE

SA BACKGROUND JOB

MD41

SINGLE ITEM - MULTI LEVEL

MD42

SINGLE ITEM - SINGLE LEVEL

MD43

SINGLE ITEM - INTERACTIVE

MD50

SINGLE ITEM - SALES ORDER

MD51

SINGLE ITEM PLANNING, PROJECT

*** EVALUTION IS SIMILAR TO MRP


PRODUCTION CONTROL
ORDER - CREATE

CONTROL

CO01

WITH MATERIAL

CO07

WITHOUT MATERIAL

CO40

FROM PLANNED ORDER

CO41

COLLECTIVE CONVERTION OF PLANNED ORDER

CO08

FOR SALES ORDER

CO10

FOR PROJECT

CO02

CHANGE

CO03

DISPLAY

MD04
COHV

STOCK/REQUIREMENTS LIST

MASS PROCESSING

COMAC

COLLECTIVE AVAILABILITY CHECK

CO05N

COLLECTIVE RELEASE

CO04N

PRINT

CO09
GOODS MOVEMENT
MATERIAL STAGING

AVAILABILITY OVER VIEW


MF65
MF68

STOCK TRANSFER FOR RESERVATION


LOG

MB1A

GOODS ISSUE

MB31

GOODS RECEIPT

COWBPACK PACK MATERIAL

CONFIRMATION

CO1V

TIME TICKET

FOR OPERATION

CO14

DISPLAY

CO13

CANCEL

CO1L

REQUESTED CONFIRMATIONS

CO1P

PREDEFINED PROCESSES

TOOLS-ARCHIVING

CO78

KOAA

ORDER

SETTELMENT DOCUMENTS

CAPACITY PLANNING
EVALUTION

CM01

WORK CENTER VIEW

LOAD

CM02

ORDERS

CM03

POOL

CM04

BACKLOG

CM05

OVERLOAD

CM07

VARIABLE

EXTENDED EVALUTION CM50

LEVELLING

CM51

INDIVIDUAL CAPACITY VIEW

CM52

ORDER VIEW

CM21

WORK CENTER VIEW

PLANNING TABLE (GRAPHICAL)

CM22

INDIVIDUAL CAPACITY VCM27


CM28
ORDER VIEW

PLANNING TABLE (TABULAR)


PLANNING TABLE (GRAPHICAL)

PLANNING TABLE (TABULAR)


CM31

CM32

PLANNING TABLE (GRAPHICAL)

PLANNING TABLE (TABULAR)

AVAILABLE CAPACITY CR12


CAPACITY

WORK CENTER VIEW

CR13

CHANGE

DISPLAY

OP4A

SHIFT SEQUENCE

OP43

FACTORY CALENDER

Where shall we maintain number range for planned orders?


To maintain number range for planned order. Go to:
MM-->CBP-->NUMBER RANGE-->DEFINE NUMBER RANGE FOR PLANNING
RUN.
Don't allow External Number Assignment.

What is t.code for planning calendar and factory calendar?

Planning Calendar--MD25
Factory Calender--SCAL

Menu Path
SPRO-->Materials Management-->Master Data-->Maintain Planning
SPRO-->Calendar--md25

SPRO-->General Settings-->Currencies-->Expiring Currencies-->Maintain


SPRO-->Calendar-->SCAL

You might also like