Classification of Items
General Notes
Building Works
Page No.
I
VI
Bd-A
Excavation
Bd-B
Pile Foundation
--
Bd-C
Bd-E
12
Bd-F
13
27
Bd-G
Brick Work
28
31
Bd-H
Stone Masonary
32
--
Bd-I
33
--
BD-J
Water Proofing
34
41
10
BD-J-1
42
43
11
Bd-K
Expansion Joints
44
--
12
Bd-L
45
52
13
Bd-M
53
64
14
Bd-N
Wood Finish
65
66
15
Bd-O
Oil Painting
67
75
16
Bd-P
76
78
17
Bd-Q
Wood Work
79
83
18
Bd-R
84
99
19
Bd-T
100 130
20
Bd-U
Iron Work
131 134
21
Bd-V
135 160
22
Bd-W
Miscellaneous
a)
161 164
b)
Guniting
165 166
c)
Fencing Work
167 169
d)
Dismentaling
170 178
Chapter
Classification of Items
Page No.
BR
Bridge Works
179 206
CD
207 209
RD
Road Works
5(A)
210 217
5(B)
218 224
5(C)
Asphaltic Construction
225 243
5(D)
Concrete Pavement
244 265
5(E)
Protection Work
266 267
5(F)
Road Furniture
268 285
Survey Work
Material Rates
286 305
306 317
Labour Rates
318
9
10
Transportation Rates
Rates for Loading &
Unloading , Stacking &
Transportation, Materials
319 321
11
12
324 325
326 -
13
Consumption Of Cement
for different grades of
concrete
322 323
327
GENERAL NOTE
1)
The schedule of rates for the year 2014 - 2015 is applicable for Public Works Region,
Nagpur as per circular No. TS /SENAG ./ CSR / 1119 / 2014 dated 13.08.2014 with
For the rates in notified Tribal areas, Hilly and inaccessible areas, corporation area, Municipal
Council area, Sugar producing area, Jail premises and naxalite affected area an increase of
percentage over schedule of rates prescribed as follows.
a)
10%
b)
Corporation areas
5%
c)
4%
d)
5%
e)
Jail premises
15%
f)
20%
( i ) The Superintending Engineers should specify the sugarcane producing & tribal areas
under their circle.
( ii ) If Jail premises is situated in Corporation or Municiple area, an increase of 5% or 4%
respectively shall not be added.
( iii ) For Gadchiroli District Notified Trible area, Hilly or inaccessible area, an increase shall
be (10% + 20%) = 30%
A)
If the material is supplied by the Department the above percentage shall be applied on the
cost of item after deducting the cost of material including VAT as applicable as per note No.
3 below.
B) If the material is to be brought by the Contractor the above percentage shall be applied to the
cost of item directly.
C) Items which are not included in this schedule of rates shall be adopted from schedule of
rates for National Highway works Nagpur Region for the corrosponding year.
(I)
3)
Schedule of rates are based on the following rates of materials inclusive of VAT at the rate
of 12.5% for Cement, Bitumen & Emulsion and 5% for Steel.
Material
Rates Proposed for 2014-15
Cement
Rs.44300/-Per M.T.
Structural steel
Bitumen
Bulk VG-10
Bitumen
Packed VG-10
Bitumen
Bulk VG-30
7
8
10
11
(Ex-Refinery Mumbai)
Rs. 56885/-Per M.T.
(Ex-Refinery Mumbai)
Rs. 53925/-Per M.T.
(Ex-Refinery Mumbai)
Rs. 57915/-Per M.T.
Bitumen
Packed VG-30
(Ex-Refinery Mumbai)
Rs. 57580/-Per M.T.
Bitumen
Bulk VG-40
(Ex-Refinery Mumbai)
Bitumen
Packed VG-40
a)
The rates of bulk / packed Bitumen adopted for the items of bituminous works are based
on the prevailing rates on 01.06.2014 Exrefinery Mumbai .The rates of Medium setting
Hincol Bitumen Emulsion for packed drums are based on the prevailing Rates on
01.06.2014.
b)
The rates of cement and steel are applicable at District & Taluka headquarters.
(II)
4)
5)
(a) For specific tests like taking bores, span load tests, plate load test etc. which are not
included in the rate analysis of the items. Estimates for these test shall be prepared on the
basis of rates approved by Superintending, Engineer, Vigilance & Quality Control Circle,
Nagpur or D.S.R. approved by MERI Nashik.
6)
(b) For angle boring & drilling in standing water the rate will be 1.5 times the usual drilling
charges.
Royalty charges are included in the basic rates of material .
7)
The charges towards quality control tests is considered in the scheduled rates.
8)
M.VAT as applicable is already considered for the different item of works in Schedule of
Rates.
9)
BUILDING WORKS
a) For Building works, basic lead upto 5 Kms. is considered for all completed items.
b) The floor is designated by the space contained within the top of the virgin slab / roof
covering below to the top of the virgin slab / roof covering above.
c(i) for every additonal floor percentage increase in the rates shall be considered for the
items in the following section as given in table without deducting the cost of cement and steel.
Sr. No
Section
Item
Percentage Increase
For Every For Every
Floor up to Floor above
4th Floor
4th Floor
BDF, BDG
R.C.C. B.B.Masonry
ii
BDF
M.S./HYSD/TMT Reinforcement
0.25
iii
BDJ
iv
BDL
Plastering,Poiinting
BDM
vi
BDM
0.25
(III)
Sr. No
Section
Item
vii
Percentage Increase
For Every For Every
Floor up to Floor above
4th Floor
4th Floor
4
a) External Painting
b) Internal Painting
BDO
viii
BDR
ix
BDT
0.25
0.25
0.25
0.25
xi
BDV
xii
c (ii) The precentage increase in rates as above should be on the rate of Current Schedule of
Rate for that item.
c (iii) Items to be carried out above terrace such as water proofing treatment on terrace,
water storage tank, parapet wall with coping , staircase, lift room with slab, plastering painting
etc required for the completion of building are assumed to be the items of it's lower floor.
d) In Nagpur Corporation area and Chandrapur Municipal area the use of clay bricks is
prohibited on original works. For such works only fly-ash bricks shall be used , except for
foundation of load bearing structures.The Clay Bricks can be used for Maintenance Work
only.
(IV)
e) The use of wooden centering & formwork including wooden props is prohibited. Only
plywood or steel formwork is to be used with steel props.
f) With a view to conserve the natural resources, the use of country teak wood for doors and
windows shall be avoided as for as possible, except for doors located on the external face of
the building.
g) For the items of oil painting, distempering under Bd - 0 & Bd - P, the sample shall be got
approved by Executive Engineer & a note regarding make / Company of approved sample
shall be taken by concerned Junior Engineer in measurement book. Unless that is done, the
measurement should not be treated as completes.
h) False celling shall be of Gypsum Board only, for using any other suitable material for false
celling S E's permission shall be sought.
i) The pattern of fixing flooring tiles / stones shall be got approved from Dy. Chief Architect/S
E.
j) Prior permission of Chief Engineer in writing is necessary before execution of item of paving
block as per Govt. Resolution No. CAT-10/11/ case no. 360/Building, Mantralaya Mumbai,
Dated 09/12/2011.
Items of doors and windows with Iron Oxidised fixtures and fastenings are considered. For
other types of fixtures and fastenings add percentage as given below per square metre rate.
Chromium Plated
2%
5%
6%
Brass
20%
Brass Oxidised
23%
FOR WINDOWS
Chromium Plated
1%
3%
4%
Brass
15%
Brass Oxidised
17%
(V)
For bridge work and C.D. work basic lead of 5 Km. is considered.
For working out rates for items with leads more than 5 km. the estimate should be prepared
for actual leads deducting initial lead charges of 5 km. for all completed items except items
of road work.
12 ) Additional lift for bridge items :For additional lift for various bridge items as per list given below , rate shall be increased in
percentage given below. Lift is to be measured with respect to common datum level for raft
foundation the datum level shall be raft top. For other type of foundation, average bed level
shall be treated as datum.
a) Pier ,Abutment,Returns, Wing
wall, Pier cap,Box Returns.Upto
4.00m
b) For every additional 2.00 m
beyond 4.00 m from datum
Nil
3.50%
c) For transportation of Hot Mix Material from plant to work site , the loose quantity of Hot Mix
Material shall be considered while preparing the estimate.
d) Quantity of bitumen has been taken from MORTH specification of Roads & Bridges 2013.
The actual quantity will depends upon the job mix formula wherever applicable.
(VI)
BD - A :
EXCAVATION
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
1
BDA
1
2
BDA
2
UNIT
Labour
Cu.m
Cu.m
Cu.m
132.00
143.00
155.00
132.00
143.00
155.00
Cu.m
Cu.m
Cu.m
137.00
148.00
159.00
137.00
148.00
159.00
Cu.m
Cu.m
Cu.m
148.00
160.00
174.00
148.00
160.00
174.00
Cu.m
Cu.m
Cu.m
155.00
166.00
179.00
155.00
166.00
179.00
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
3
BDA
3
4
BDA
4
UNIT
Labour
Cu.m
Cu.m
Cu.m
160.00
173.00
184.00
160.00
173.00
184.00
Cu.m
Cu.m
Cu.m
168.00
179.00
192.00
168.00
179.00
192.00
Cu.m
360.00
360.00
Cu.m
372.00
372.00
Cu.m
364.00
364.00
Cu.m
376.00
376.00
B) Including Dewatering
i. Lift upto 1.5 m.
ii. Lift above 1.5 m to 3.00 m.Depth
Spec. No. : Bd.A. 4/Page No. 259
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
UNIT
5
BDA
5
Labour
Cu.m
Cu.m
456.00
481.00
376.00
394.00
Cu.m
461.00
377.00
Cu.m
498.00
398.00
Cu.m
Cu.m
565.00
584.00
528.00
551.00
Cu.m
Cu.m
568.00
589.00
530.00
557.00
66.00
66.00
7
BDA
10
SR.NO.
&
CODE
NO.
8
BDA
11
DESCRIPTION OF ITEMS
UNIT
Labour
300.00
71.00
349.00
71.00
10
BDA
14
493.00
122.00
BD - B : PILE FOUNDATION
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
Completed
Labour
Rmt.
Rmt.
390.00
402.00
0.00
196.00
196.00
0.00
Rmt.
Rmt.
573.00
585.00
206.00
210.00
iii) 30 cm diameter
M-20 grade
M-25 grade
Rmt.
Rmt.
713.00
731.00
216.00
216.00
Rmt.
979.00
1005.00
231.00
231.00
750.00
770.00
226.00
226.00
1155.00
1194.00
242.00
242.00
M-25 grade
Spec. No. : I.S. 2911 Part I 1964 Clause
No. 6.1.5.
2
Rmt.
Rmt.
BD - C :
SR.NO.
& CODE
NO.
1
BDC
2
DESCRIPTION OF ITEMS
Completed
Labour
M.T.
64975.00
8150.00
M.T.
58751.00
3996.00
M.T.
64201.00
4947.00
3
BDC
6
SR.NO.
& CODE
NO.
4
BDC
8
UNIT
DESCRIPTION OF ITEMS
Completed
Labour
M.T.
72267.00
12865.00
M.T.
67471.00
12139.00
M.T.
74422.00
6212.00
6
BDC
11
SR.NO.
& CODE
NO.
UNIT
DESCRIPTION OF ITEMS
Completed
Labour
M.T.
76594.00
9681.00
8
BDC
12A
Cm.
3.50
1.50
DESCRIPTION OF ITEMS
Completed
1
BDE
1D
Labour
Cu.m 2638.00
519.00
Cu.m 2907.00
519.00
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
Completed
3
BDE
1A
Labour
526.00
4
BDE
1
10
542.00
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
Completed
5
BDE
2
Labour
573.00
Cu.m. 4580.00
596.00
630.00
11
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
Completed
7
BDE
4
8
BDE
5
Labour
573.00
595.00
620.00
Cu.m. 4692.00
635.00
12
1
BDF
1A
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
a) For C.C.M-20
Cu.m.
4851.00
696.00
b) For C.C.M-25
Cu.m.
5016.00
726.00
13
SR.NO.
&
CODE
NO.
2
BDF
3
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
4916.00
5060.00
696.00
726.00
a) For C.C.M-20
b) For C.C.M-25
Cu.m.
Cu.m.
14
SR.NO.
&
CODE
NO.
3
BDF
5
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cu.m.
6176.00
1084.00
b) For C.C.M-25
Cu.m.
6320.00
1114.00
Sq.m.
142.00
45.00
4
BDF
27
15
SR.NO.
&
CODE
NO.
5
BDF
6A
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cu.m.
6299.00
1316.00
Cu.m.
6448.00
1341.00
16
SR.NO.
&
CODE
NO.
6
BDF
9A
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cu.m.
6600.00
1392.00
Cu.m.
6737.00
1424.00
a) For C.C.M-20
b) For C.C.M-25
Spec.No.: Bd.F.9/Page No.303/I.S. 456 (2000)
17
SR.NO.
&
CODE
NO.
7
BDF
10A
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
a) For C.C.M-20
Cu.m.
7064.00
1398.00
b) For C.C.M-25
Spec.No.: Bd.F.10/ Page No.304/I.S. 456
(2000)
Cu.m.
7201.00
1429.00
18
SR.NO.
&
CODE
NO.
8
BDF
16
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
8273.00
8418.00
1455.00
1487.00
a) For C.C.M-20
b) For C.C.M-25
Spec.No.: Bd.F.16/Page
(2000)
Cu.m.
Cu.m.
No.306/I.S.
19
456
SR.NO.
&
CODE
NO.
9
BDF
7A
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
7501.00
7645.00
1348.00
1379.00
a) For C.C.M-20
b) For C.C.M-25
Spec.No.: Bd.F.7/Page No.301/I.S. 456 (2000)
20
Cu.m.
Cu.m.
SR.NO.
&
CODE
NO.
10
BDF
15A
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
a) For C.C.M-20
Cu.m.
7334.00
1429.00
b) For C.C.M-25
Spec.No.: Bd.F.15/Page No.306/I.S. 456
(2000)
Cu.m.
7478.00
1462.00
21
SR.NO.
&
CODE
NO.
11
BDF
8A
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
a) For C.C.M-20
Cu.m.
6898.00
1429.00
b) For C.C.M-25
Cu.m.
7054.00
1462.00
22
SR.NO.
&
CODE
NO.
12
BDF
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
a) For C.C.M-20
Cu.m.
6893.00
1442.00
b) For C.C.M-25
Cu.m.
7026.00
1474.00
a) For C.C.M-20
Cu.m.
6830.00
1025.00
b) For C.C.M-25
Cu.m.
6797.00
1025.00
23
SR.NO.
&
CODE
NO.
13
BDF
13A
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cu.m.
6954.00
1442.00
Cu.m.
7098.00
1474.00
a) For C.C.M-20
Cu.m.
7521.00
1164.00
b) For C.C.M-25
Spec No.: As directed by Engineer-in-charge.
Cu.m.
7687.00
1196.00
a) For C.C.M-20
b) For C.C.M-25
Spec.No.:
(2000)
14
BDF
23, 24
Bd.F.13/Page
No.305/I.S.
456
24
SR.NO.
&
CODE
NO.
15
BDF
14A
DESCRIPTION OF ITEMS
Completed
Labour
6559.00
6704.00
1164.00
1196.00
71.00
10.00
a) For C.C.M-20
b) For C.C.M-25
Spec.No.: Bd.F.14/Page
(2000)
16
UNIT
Cu.m.
Cu.m.
No.305/I.S.
456
25
No.
SR.NO.
&
CODE
NO.
17
BDF
8B
18
BDF
11A
19
BDF
11
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cu.m.
Cu.m.
164.00
210.00
4.00
4.00
a) For C.C.M-20
b) For C.C.M-25
Spec.No.: Bd.F.11/Page No.304/I.S. 456
(2000)
Providing and laying in situ M-20 Cement
concrete or trap / granite / quartzite / gneiss
metal for RCC work of walls including
scaffolding,
compaction,
finishing,
plywood/steel formwork, steel centering. The
C.M. 1:3 plaster is considered for rendering
uneven and honey combed surface only.
(Excluding reinforcement) Newly laid concrete
shall be covered by gunny bag, plastic,
tarpaulin etc. (Wooden centering / formwork
will not be allowed).
Cu.m.
8916.00
1708.00
Cu.m.
9061.00
1740.00
Cu.m.
8024.00
2128.00
Spec.No.:
(2000)
Bd.F.11/Page
No.304/I.S.
26
456
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
20
BDF
17
Labour
Providing
and
fixing
in
position
reinforcement of various diameters for
R.C.C. pile caps, footings, foundations, slabs,
beams and columns, canopies, staircases,
newels, chajjas, lintels, pardies, coping, fins,
arches etc. as per detailed design and
drawings and schedules including cutting,
bending, hooking the bars, binding with wires
or tack welding and supporting as required
completed.
a) Mild steel
M.T. 58097.00
4594.00
M.T. 59601.00
4594.00
Sq.m.
429.00
93.00
Sq.m.
598.00
112.00
27
BD - G :
BRICK MASONARY
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
1
BDG
1
2
BDG
1
UNIT
Labour
Cu.m.
3549.00
545.00
Cu.m.
3413.00
545.00
Cu.m.
3604.00
589.00
Cu.m.
3467.00
589.00
4
BDG
5
28
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
5
BDG
7
UNIT
Labour
Sq.m.
579.00
107.00
Sq.m.
557.00
107.00
Sq.m.
507.00
110.00
Cu.m.
3488.00
702.00
7
BDG
8
8
BDG
10A
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
9
BDG
10B
UNIT
Labour
Cu.m.
3777.00
732.00
Cu.m.
3005.00
567.00
Cu.m.
7832.00
553.00
11
BDG
20
12
BDG
Cu.m.
1315.00
84.00
13
BDG
Cu.m.
1642.00
84.00
30
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
14
BDG
31
UNIT
Cu.m.
Labour
1770.00
84.00
BD - H :
SR.NO.
&
CODE
NO.
1
BDH
1
STONE MASONARY
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cu.m.
1393.00
342.00
Cu.m.
1561.00
386.00
3
BHS
14
Cu.m.
1717.00
589.00
4
BDH
12
Cu.m.
1651.00
567.00
Cu.m.
2044.00
723.00
BD - I : BLOCK MASONARY
SR.NO.
& CODE
NO.
1
BDI
1
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
392.00
173.00
804.00
261.00
2
BDI
2
33
BD - J : WATER PROOFING
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed Labour
1
BDJ
2
273.00
60.00
477.00
107.00
3305.00
1220.00
3
BDJ
9
34
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed Labour
213.00
79.00
504.00
116.00
35
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed Labour
625.00
167.00
243.00
107.00
36
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed Labour
37
1029.00
207.00
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed Labour
38
1103.00
244.00
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed Labour
10
39
965.00
167.00
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed Labour
11
40
1002.00
202.00
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed Labour
12
41
1103.00
328.00
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
654.00
134.00
294.00
79.00
Kg.
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
UNIT
43
Completed
Labour
959.00
98.00
BD - K : EXPANSION JOINTS
SR.NO.
&
CODE
NO.
1
BDK
1A
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Sq.m.
1554.00
143.00
Sq.m.
2099.00
178.00
Sq.m.
2567.00
268.00
Sq.m.
3875.00
455.00
3
BDK
1C
4
BDK
1D
44
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
1
BDL
1A
101.00
34.00
2
BDL
2
124.00
63.00
3
BDL
2A
129.00
62.00
140.00
59.00
5
BDL
3
203.00
76.00
45
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
6
BDL
4
204.00
77.00
7
BDL
4A
214.00
76.00
8
BDL
4B
221.00
78.00
9
BDL
5
254.00
81.00
10
BDL
7
305.00
104.00
46
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
11
312.00
105.00
12
BDL
9
324.00
109.00
451.00
176.00
497.00
459.00
218.00
218.00
14
SR.NO.
&
CODE
NO.
15
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
653.00
322.00
938.00
432.00
16
48
Sqm
SR.NO.
&
CODE
NO.
17
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Sqm
810.00
262.00
201.00
56.00
7.00
7.00
18
19
49
Rmt.
SR.NO.
&
CODE
NO.
20
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Rmt.
a) 50 mm wide
Rmt.
b) 100 mm wide
Rmt.
c) 150 mm wide
Spec.No. : As directed by Engineer- in-charge.
28.00
18.00
36.00
24.00
43.00
29.00
21
Rmt.
52.00
13.00
22
Rmt
14.00
10.00
23
Rmt.
55.00
50
``
Specifications for Stone Grit Wash Plaster
1)
2)
The base plaster should be cured for 3 to 4 days before applying the
Grit Wash Plaster.
3)
4)
5)
After the initial setting of about 1 to 2 hours the surface of stone Grit
plaster surface be scrubbed and washed out gently with a nylon brush
and water. The cement on the surface of stone chips be washed away
exposing the aggregates.
6)
2)
3)
4)
5)
6)
1 part of marble chips (zero no. - passing through 2.36 mm & retained
on 600 mic. I.S. Sieve) or quartz sand be added to 1 part of above mix
and be mixed homogeneously.
51
7)
``
The above mix be prepared in dry condition and potable water be added
to the dry mix in such a quantity as to get a mortar having stiff
consistancy and this mortar be applied on the prepared base surface.
White cement slurry be applied @ 2 kg/sqm. On base coat before
applying a stonecrete plaster.
8)
After initial setting of 1 to 2 hours the grooves can be cut as per the
required size and design of the panel with a sharp steel strip.
9)
10)
11)
12)
The surface be cleaned by wire brush and wash out all dust, dirt etc. for
good texture.
13)
After complete drying, apply Silicone coating or water repellent with the
help of a brush or a spray.
52
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Sq.m.
764.00
112.00
2
BDM
3B
Sq.m.
814.00
124.00
3
BDM
5B
Sq.m.
845.00
133.00
Sq.m.
219.00
90.00
53
SR.NO.
& CODE
NO.
5
BDM
6A
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Sq.m.
268.00
90.00
Sq.m.
278.00
99.00
Sq.m.
328.00
82.00
7
BDM
9
Sq.m.
363.00
94.00
Sq.m.
338.00
82.00
54
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Sq.m.
373.00
94.00
10
BDM
12A
745.00
120.00
11
BDM
13A
Sq.m.
781.00
145.00
Sq.m.
926.00
254.00
9
BDM
11
55
SR.NO.
& CODE
NO.
13
BDM
44
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Sq.m.
813.00
254.00
Sq.m.
910.00
254.00
Sq.m.
963.00
288.00
Sq.m.
856.00
288.00
Sq.m.
952.00
288.00
14
BDM
45A
15
BDM
45A
56
SR.NO.
& CODE
NO.
16
BDM
16
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Sq.m.
2521.00
327.00
Sq.m.
1927.00
327.00
Sq.m.
2558.00
345.00
Sq.m.
1965.00
345.00
a) For flooring
Sq.m.
3189.00
327.00
Sq.m.
3226.00
345.00
17
BDM
17
makrana
18
makrana
57
SR.NO.
& CODE
NO.
19
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Sq.m.
626.00
205.00
Sq.m.
2044.00
205.00
Sq.m.
3055.00
220.00
Sq.m.
781.00
306.00
Sq.m.
2199.00
301.00
Sq.m.
3209.00
316.00
Sq.m.
455.00
129.00
871.00
194.00
20
21
BDM
22B
58
SR.NO.
& CODE
NO.
22
BDM
23
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Sq.m.
400.00
120.00
Sq.m.
416.00
120.00
Sq.m.
2069.00
405.00
Sq.m.
785.00
128.00
24
BDM
26
25
BDM
29B
59
SR.NO.
& CODE
NO.
26
BDM
29C
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Sq.m.
598.00
126.00
Sq.m.
1989.00
356.00
Sq.m.
3273.00
368.00
Sq.M.
383.00
118.00
Sq.M.
360.00
120.00
makrana
28
BDM
33A
60
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
29
Sq.m
3379.00
189.00
30
BDM
33B
Sq.m.
351.00
118.00
Sq.m.
370.00
120.00
Sq.m.
48.00
17.00
32
BDM
36
61
SR.NO.
& CODE
NO.
33
BDM
43
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Sq.m
625.00
121.00
Sq.m.
412.00
118.00
Sq.m.
380.00
118.00
Sq.m.
139.00
96.00
Sq.m.
1284.00
304.00
Sq.m.
1626.00
304.00
34
BDM
49
35
62
SR.NO.
& CODE
NO.
37
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Sq.m.
Sq.m.
1330.00
1677.00
293.00
329.00
Sq.m.
626.00
207.00
Sq.m.
2044.00
207.00
sqm.
3071.00
207.00
a) Half moulding
Rmt.
64.00
45.00
b) Fullmoulding
Rmt.
96.00
68.00
38
39
63
SR.NO.
& CODE
NO.
40
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Sq.m.
883.00
179.00
Sq.m.
910.00
192.00
c) For steps
Sq.m.
926.00
192.00
Sq.m.
963.00
398.00
41
64
BD - N :
SR.NO.
& CODE
NO.
WOOD FINISH
DESCRIPTION OF ITEMS
UNIT
Completed
1
BDN
11A
Labour
Sq.M.
15.00
9.00
Sq.M.
22.00
11.00
3
BDN
12 B
Sq.M.
20.00
12.00
4
BDN
13A
Sq.M.
44.00
21.00
5
BDN
14A
Sq.M.
19.00
11.00
Sq.M.
13.00
6.00
65
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
7
BDN
16B
Labour
Sq.M.
21.00
10.00
Sq.M.
47.00
18.00
Sq.M.
20.00
15.00
Sq.M.
229.00
99.00
Sq.M.
102.00
39.00
8
BDR
20
9
BDR
21
10
66
BD - O : OIL PAINTING
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
1
BDO
1
47.00
18.00
2
BDO
1A
58.00
22.00
26.00
11.00
67
SR.NO.
& CODE
NO.
4
BDO
2A
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
38.00
18.00
48.00
26.00
45.00
18.00
55.00
26.00
6
BDO
3
7
BDO
3A
68
SR.NO.
& CODE
NO.
8
BDO
4
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
52.00
11.00
66.00
18.00
77.00
24.00
10
BDO
4B
69
SR.NO.
& CODE
NO.
11
BDO
5
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
59.00
18.00
50.00
21.00
74.00
24.00
40.00
12.00
13
BDO
5A
14
BDO
6
70
SR.NO.
& CODE
NO.
15
BDO
6A
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
56.00
18.00
77.00
22.00
38.00
11.00
17
BDO
7
71
SR.NO.
& CODE
NO.
18
BDO
7A
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
58.00
15.00
53.00
18.00
74.00
22.00
20
BDO
7B
72
SR.NO.
& CODE
NO.
21
BDO
8
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
39.00
17.00
38.00
16.00
50.00
21.00
23
BDO
8A
73
SR.NO.
& CODE
NO.
24
BDO
8A
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
49.00
21.00
23.00
9.00
17.00
9.00
26
BDO
8D
74
SR.NO.
& CODE
NO.
27
BDO
8E
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
23.00
10.00
14.00
10.00
88.00
38.00
29
75
Sqm
1
BDP
7D
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
12.00
5.00
2
BDP
1
7.00
5.00
3
BDP
1A
10.00
6.00
10.00
5.00
12.00
6.00
5
BDP
2A
76
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
6
BDP
2B
14.00
7.00
7
BDP
3
10.00
6.00
11.00
6.00
9
BDP
3A
12.00
7.00
10
BDP
5
7.00
7.00
Sq.m.
Sq.m.
77
SR.NO.
& CODE
NO.
11
BDP
5A
12
BDP
6
DESCRIPTION OF ITEMS
Labour
28.00
41.00
10.00
11.00
Sq.m.
Sq.m.
56.00
80.00
17.00
17.00
Sq.m.
Sq.m.
70.00
88.00
18.00
18.00
2.00
2.00
66.00
40.00
14
BDP
7B
Completed
UNIT
15
78
Sqm
BD - Q : WOOD WORK
SR.NO.
& CODE
NO.
1
BDQ
24A
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Rmt.
315.00
49.00
Sq.m.
1254.00
472.00
Sq.m.
887.00
325.00
79
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Sq.m.
694.00
336.00
Cu.m.
88327.00
9850.00
6
BDQ
5A
Cu.m.
39249.00
7482.00
80
SR.NO.
& CODE
NO.
7
BDQ
22
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Rmt.
97.00
17.00
Rmt.
144.00
21.00
9
BDQ
8
Rmt.
704.00
177.00
Rmt.
205.00
45.00
Sq.m.
1209.00
394.00
Sq.m.
1642.00
749.00
11
BDQ
13
12
BDQ
11
81
SR.NO.
& CODE
NO.
13
BDQ
11A
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Sq.m.
2067.00
749.00
Sq.m.
1731.00
245.00
82
SR.NO.
& CODE
NO.
15
DESCRIPTION OF ITEMS
83
UNIT
Sq.m
Completed
Labour
2714.00
573.00
1
BDR
5(a)
DESCRIPTION OF ITEMS
Completed
Labour
Sq.m
Sq.m
785.00
877.00
71.00
71.00
Rmt.
Rmt.
692.00
774.00
62.00
63.00
Sq.m.
405.00
65.00
Sq.m.
405.00
65.00
3
BDR
7
2
BDR
6
UNIT
4
BDR
8
84
SR.NO.
& CODE
NO.
5
BDR
9
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Rmt.
292.00
57.00
Rmt.
Rmt.
2115.00
2262.00
135.00
135.00
Rmt.
Rmt.
1657.00
1711.00
99.00
99.00
No.
66.00
15.00
7
BDR
10A
8
BDR
14
85
SR.NO.
& CODE
NO.
9
BDR
16
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Sq.m.
929.00
104.00
Sq.m.
1057.00
116.00
Sq.m.
1026.00
134.00
11
BDR
18
86
SR.NO.
& CODE
NO.
12
BDR
19
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Sq.m.
1404.00
134.00
Sq.m.
1361.00
66.00
Rmt.
254.00
68.00
Rmt.
1559.00
134.00
No.
70.00
27.00
14
BDR
36
16
BDR
38
87
SR.NO.
& CODE
NO.
17
BDR
39
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
82.00
29.00
Sq.m.
1102.00
178.00
Sq.m.
Sq.m.
585.00
616.00
81.00
81.00
No.
88
SR.NO.
& CODE
NO.
20
DESCRIPTION OF ITEMS
89
UNIT
Sq.m.
Completed
Labour
1081.00
439.00
SR.NO.
& CODE
NO.
21
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Sq.m.
1489.00
339.00
Sq.m.
1836.00
224.00
as
directed
by
Engineer-
90
SR.NO.
& CODE
NO.
23
BDR
1
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Sq.m.
360.00
50.00
Sq.m.
371.00
54.00
Rmt.
104.00
33.00
No.
458.00
27.00
Sq.m.
136.00
17.00
No.
76.00
11.00
25
BDR
3
26
BDR
11
27
BDR
31
28
BDR
13
91
SR.NO.
& CODE
NO.
29
BDR
5
DESCRIPTION OF ITEMS
Completed
Labour
Sq.m.
Sq.m.
714.00
785.00
44.00
44.00
Rmt.
82.00
7.00
Rmt.
46.00
5.00
Sqm
1341.00
85.00
Rmt.
1155.00
85.00
30
BDR
29
UNIT
31
BDR
30
32
Providing
and
fixing
G.I.
precoated
metacolour sheet of 0.50 mm thick and 930
profile for roof including roof bolt and
necessary fixing arrangements ( Prior
approval of Sample and brand by Ex.
Engineer is necessary before use)
Spec.No.: As directed by Engineer- in-charge.
33
Providing
and
fixing
G.I.
precoated
metacolour accesories of 0.50 mm thick and
600 mm wide for ridge / valley including roof
bolt and necessary fitting arrangements ( Prior
approval of Sample and brand by Ex.
Engineer is necessary before use)
Spec.No.: As directed by Engineer- in-charge.
92
SR.NO.
& CODE
NO.
34
DESCRIPTION OF ITEMS
93
UNIT
Sqm
Completed
Labour
612.00
173.00
SR.NO.
& CODE
NO.
35
DESCRIPTION OF ITEMS
Providing
and
fixing
colour
coated
Galvalume (A-Z) sheet having high
tensile(min 550 MPa in Yield strength) C.R.
steel base metal with hot dip alloy coating of
Alluminium and Zinc with 0.50 mm overall
sheet thickness for roofing with approved
profile and colour including fixing to purlins
with approved self tapping screws and
EPDM washers etc complete( Prior approval
of Sample and brand by Ex. Engineer is
necessary before use)
UNIT
Completed
Labour
Sqm
1008.00
116.00
Rmt.
567.00
92.00
No.
7500.00
549.00
37
94
SR.NO.
& CODE
NO.
38
DESCRIPTION OF ITEMS
UNIT
Sqm.
a) 10 mm thick
b) 8 mm thick
Spec.No.: As directed by Engineer- in-charge.
Sqm.
Sqm.
95
Completed
Labour
3876.00
153.00
3672.00
153.00
SR.NO.
& CODE
NO.
39a
DESCRIPTION OF ITEMS
96
UNIT
Sqm.
Completed
Labour
2130.00
2.00
SR.NO.
& CODE
NO.
39b
DESCRIPTION OF ITEMS
97
UNIT
Sqm.
Completed
Labour
2175.00
2.00
SR.NO.
& CODE
NO.
39c
DESCRIPTION OF ITEMS
98
UNIT
Sqm.
Completed
Labour
2390.00
2.00
SR.NO.
& CODE
NO.
39d
DESCRIPTION OF ITEMS
99
UNIT
Sqm.
Completed
Labour
2745.00
2.00
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed
Labour
1
BDT
30
a)
Sq.m
3400.00
788.00
b)
Sq.m
3580.00
788.00
a)
Sq.m
2800.00
788.00
b)
Sq.m
3280.00
788.00
Spec.No.:Bd.T.31/Page No.499
100
SR.NO.
& CODE
NO.
3
BDT
34
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed
Labour
Sq.m
2400.00
501.00
b) For 32 mm thick
Sq.m
2171.00
501.00
a) For 35 mm thick
Sq.m
2621.00
540.00
b) For 32 mm thick
Sq.m
2387.00
540.00
101
SR.NO.
& CODE
NO.
5
BDT
55
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed
Labour
Sq.m.
2136.00
196.00
Sq.m.
2485.00
268.00
Sq.m.
2594.00
359.00
Sq.m.
545.00
90.00
7
BDT
57
8
BDT
95
102
SR.NO.
& CODE
NO.
9
BDT
110
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed
Labour
Sq.m
3414.00
692.00
b) For 32 mm thick
Sq.m
3221.00
692.00
Sq.m.
2785.00
716.00
Sq.m.
1475.00
268.00
Sq.m.
1145.00
181.00
11
BDT
122
12
BDT
134
103
SR.NO.
& CODE
NO.
13
BDT
135
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed
Labour
Sq.m.
741.00
161.00
Sq.m.
948.00
206.00
Sq.m.
758.00
153.00
Sq.m.
785.00
170.00
15
BDT
135B
16
BDT
135C
104
SR.NO.
& CODE
NO.
17
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed
Labour
Sq.m.
937.00
205.00
Sq.m.
2680.00
786.00
Sq.m.
3564.00
573.00
Sq.m.
3423.00
573.00
18
105
SR.NO.
& CODE
NO.
20
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed
Labour
Rmt.
289.00
71.00
Sq.m.
1809.00
500.00
Sq.m.
561.00
71.00
Sq.m.
826.00
107.00
22
BDT
22
SR.NO.
& CODE
NO.
24
BDT
24
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed
Labour
Sq.m.
1030.00
134.00
Sq.m.
2468.00
179.00
107
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed
Labour
26
Sq.m.
2137.00
17.00
27
Sq.m.
2713.00
161.00
108
SR.NO.
& CODE
NO.
28
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed
Labour
Sq.m.
4049.00
178.00
Sq.m.
3902.00
178.00
Sq.m.
2098.00
243.00
Sq.m.
2529.00
243.00
109
SR.NO.
& CODE
NO.
30
BDT
53A
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed
Labour
Sq.m
2262.00
251.00
Sq.m
2583.00
251.00
Sq.m
2812.00
360.00
Sq.m
3134.00
360.00
110
SR.NO.
& CODE
NO.
32
BDT
53B
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed
Labour
Sq.m
2981.00
377.00
Sq.m
3297.00
373.00
Sq.m
4066.00
897.00
Sq.m
3913.00
897.00
33
BDT
97
111
SR.NO.
& CODE
NO.
34
BDT
98A
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed
Labour
Sq.m
4513.00
897.00
Sq.m
4316.00
897.00
Sq.m
4115.00
966.00
Sq.m
3995.00
966.00
112
SR.NO.
& CODE
NO.
36
BDT
98C
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed
Labour
Sq.m
4044.00
627.00
Sq.m
4404.00
627.00
Sq.m
4306.00
627.00
113
SR.NO.
& CODE
NO.
38
BDT
98D
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed
Labour
Sq.m
4763.00
627.00
Sq.m
4665.00
627.00
Sq.m
889.00
161.00
Sq.m
981.00
170.00
114
SR.NO.
& CODE
NO.
41
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed
Labour
Sq.m
2453.00
427.00
Sq.m
0.00
2126.00
0.00
356.00
Sq.m
0.00
1461.00
0.00
143.00
43
BDT
133
115
SR.NO.
& CODE
NO.
44
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed
Labour
Sq.m
2496.00
357.00
Sq.m
3989.00
627.00
Sq.m
3870.00
627.00
Sq.m
2780.00
339.00
46
BDT
45
116
SR.NO.
& CODE
NO.
47
BDT
46
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed
Labour
Sq.m
2978.00
356.00
Sq.m
2213.00
268.00
117
SR.NO.
& CODE
NO.
49
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed
Labour
Sq.m
2754.00
404.00
Sq.m
1806.00
295.00
Sq.m
2304.00
316.00
51
BDT
66A
118
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed
Labour
52
BDT
68
Sq.m
2631.00
394.00
53
BDT
68A
Sq.m
2010.00
394.00
Sq.m
1589.00
246.00
Sq.m
1805.00
345.00
119
SR.NO.
& CODE
NO.
56
57
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed
Labour
Sq.m
2551.00
429.00
Sq.m
2409.00
429.00
Sq.m
Sq.m
2834.00
2681.00
356.00
356.00
120
SR.NO.
& CODE
NO.
58
59
BDT
93
60
BDT
94
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed
Labour
Sq.m
2741.00
429.00
Sq.m
2583.00
429.00
Sq.m
Sq.m
556.00
589.00
84.00
85.00
Sq.m
265.00
71.00
121
SR.NO.
& CODE
NO.
61
BDT
113
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed
Labour
Sq.m
Sq.m
600.00
643.00
71.00
71.00
Sq.m
592.00
63.00
Sq.m
1164.00
359.00
Sq.m
Sq.m
3713.00
4080.00
359.00
732.00
62
63
64
a) Alluminium
b) Stainless Steel (Weight @ 15 Kg/Sqm.)
Spec.No.: As directed by Engineer- in-charge.
122
SR.NO.
& CODE
NO.
65
66
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed
Labour
Sq.m
Sq.m
960.00
1250.00
44.00
62.00
Sq.m
1663.00
268.00
123
SR.NO.
& CODE
NO.
68
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed
Labour
Sq.m
2898.00
788.00
Sq.m
5268.00
1379.00
Sq.m
3595.00
1182.00
Sq.m
3099.00
985.00
70
BDT
11
71
BDT
12
124
SR.NO.
& CODE
NO.
72
BDT
23
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed
Labour
Sq.m
3227.00
1083.00
Sq.m
3099.00
985.00
74
BDT
127A
a)
Sq.m
4356.00
887.00
b)
Sq.m
4563.00
887.00
125
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed
Labour
75
BDT
127B
a)
Sq.m
3625.00
754.00
b)
Sq.m
4239.00
788.00
76
BDT
42
Sq.m
3334.00
1064.00
126
SR.NO.
& CODE
NO.
77
BDT
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed
Labour
Sq.m
2652.00
386.00
Sq.m
1122.00
171.00
127
SR.NO.
& CODE
NO.
79
BDT
DESCRIPTION OF ITEMS
RATES FOR
2014-15
(In Rs.)
Completed
Labour
Sq.m
Sq.m
3968.00
3749.00
919.00
919.00
Sq.m
5026.00
1451.00
Sq.m
4898.00
1451.00
80
BDT
UNIT
128
SR.NO.
& CODE
NO.
81
BDT
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed
Labour
Sq.m
2744.00
788.00
Sq.m
683.00
99.00
Sq.m
1036.00
262.00
82
BDT
83
BDT
129
SR.NO.
& CODE
NO.
84
BDT
DESCRIPTION OF ITEMS
UNIT
RATES FOR
2014-15
(In Rs.)
Completed
Labour
3755.00
3504.00
598.00
598.00
a) 35 mm thick
b) 32 mm thick
130
BD - U : IRON WORK
SR.NO.
& CODE
NO.
1
BDU
1A
DESCRIPTION OF ITEMS
UNIT
Labour
Sq.m
1273.00
200.00
Sq.m
1536.00
200.00
Sq.m
2150.00
200.00
Sq.m
2432.00
200.00
Sq.m
2720.00
200.00
Sq.m
3000.00
200.00
131
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Labour
Sq.m
1479.00
200.00
Sq.m
1748.00
200.00
Sq.m
2016.00
200.00
Sq.m
2286.00
200.00
Sq.m
1483.00
200.00
Sq.m
1754.00
200.00
132
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Labour
Sq.m
2135.00
268.00
Sq.m
1406.00
0.00
Sq.m
1722.00
0.00
133
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Labour
16.00
4.00
24.00
6.00
8.00
2.00
12.00
4.00
2) From 30 to 45 cm height
per
cm. of
height
per
cm. of
height
`i Ex, j, =E,
+h x] <in
per
cm. of
height
per
cm. of
height
1) Upto height of 30 cm
2) From 30 to 45 cm height
134
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Ltr.
7.00
2.00
Ltr.
7.00
2.00
3
BDV
5A1
15 mm dia.
Rmt.
250.00
59.00
(ii)
20 mm dia.
Rmt.
288.00
59.00
(iii) 25 mm dia.
Rmt.
337.00
59.00
(iv) 32 mm dia.
Rmt.
368.00
63.00
(v)
40 mm dia.
Rmt.
441.00
63.00
(vi) 50 mm dia.
Rmt.
572.00
63.00
Rmt.
877.00
70.00
Rmt.
1204.00
70.00
SR.NO.
& CODE
NO.
4
BDV
5
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Rmt.
222.00
49.00
(ii) 20 mm dia.
Rmt.
266.00
49.00
(iii) 25 mm dia.
Rmt.
310.00
49.00
(iv) 32 mm dia.
Rmt.
342.00
54.00
(v) 40 mm dia.
Rmt.
413.00
54.00
(vi) 50 mm dia.
Rmt.
544.00
54.00
(vii) 80 mm dia.
Rmt.
822.00
57.00
136
SR.NO.
& CODE
NO.
5
BDV
60A
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Rmt.
83.00
43.00
(ii) 20 mm dia.
Rmt.
104.00
43.00
(iii) 25 mm dia.
Rmt.
113.00
43.00
(iv) 32 mm dia.
Rmt.
143.00
43.00
(v) 40 mm dia.
Rmt.
178.00
45.00
(vi) 50 mm dia.
Rmt.
203.00
45.00
(vii) 63 mm dia.
Rmt.
248.00
45.00
No.
226.00
34.00
6
BDV
8
137
SR.NO.
& CODE
NO.
7
BDV
8
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
No.
190.00
28.00
No.
316.00
29.00
No.
338.00
28.00
No.
335.00
29.00
No.
374.00
39.00
No.
399.00
39.00
No.
302.00
29.00
9
BDV
8B
10
BDV
9
138
SR.NO.
& CODE
NO.
11
BDV
9
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
No.
204.00
29.00
No.
220.00
28.00
No.
278.00
28.00
No.
234.00
28.00
No.
299.00
28.00
No.
No.
No.
No.
No.
No.
No.
392.00
468.00
577.00
662.00
1071.00
1612.00
2457.00
38.00
38.00
38.00
44.00
44.00
52.00
52.00
No.
307.00
31.00
No.
177.00
28.00
13
BDV
12
139
SR.NO.
& CODE
NO.
14
BDV
14
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
No.
194.00
27.00
(a) 15 mm dia.
No.
173.00
31.00
No.
198.00
31.00
(c) 20 mm dia.
Spec.No.: As directed by Engineer- in-charge.
No.
205.00
31.00
No.
273.00
31.00
No.
1804.00
464.00
15
BDV
14
16
BDV
14A
140
SR.NO.
& CODE
NO.
18
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Each
2422.00
460.00
No.
187.00
48.00
No.
525.00
50.00
19
BDV
84
20
BDV
83
141
SR.NO.
& CODE
NO.
21
BDV
74
22
BDV
77
DESCRIPTION OF ITEMS
142
UNIT
Completed
Labour
No.
3825.00
788.00
No.
3241.00
641.00
No.
4004.00
710.00
No.
3493.00
601.00
SR.NO.
& CODE
NO.
23
BDV
57
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
No.
3479.00
565.00
No.
3808.00
593.00
No.
2972.00
501.00
No.
3314.00
540.00
143
SR.NO.
& CODE
NO.
24
BDV
56
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
No
3500.00
590.00
No.
3920.00
622.00
No.
3572.00
498.00
No.
3564.00
542.00
144
SR.NO.
& CODE
NO.
25
BDV
21
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
No.
3699.00
590.00
(b)
------ do ------- with water jet and
fittings
No.
4040.00
622.00
(c)
-------- do ------ Without Flushing
cistern with flush cock and necessary
fittings.
(d)
------ do ------- without flushing
cistern with water jet and fittings
Spec.No.: As directed by Engineer- in-charge.
No.
3398.00
498.00
No.
3728.00
542.00
145
SR.NO.
& CODE
NO.
26
BDV
75
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
No.
3564.00
542.00
No.
3927.00
575.00
No.
3182.00
456.00
No.
3517.00
493.00
No.
4036.00
580.00
No.
3650.00
528.00
27
BDV
76
146
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
28
BDV
23
Providing
and
fixing
white
glazed
earthenware full stall type Urinal without
cistern, stop tap with inlet pipes and 32 mm
dia. UPVC flush pipe, with fitting and flushing
arrangement including UPVC soil pipe, UPVC
trap and soil pipe connection upto the outside
face of the wall, making good to damaged
surface testing etc. complete. (Prior approval
of sample and brand by Ex.Engineer is
necessary before use.)
Spec.No.: Bd.V.23/Page No.562
No.
4893.00
528.00
29
BDV
23A
No.
4948.00
528.00
No.
2246.00
393.00
Providing
and
fixing
white
glazed
earthenware semi stall type urinals without
cistern, with inlet pipes stop tap, UPVC flush
pipe with fittings and flushing arrangement
including UPVC soil pipe, UPVC trap and soil
pipe connection upto outside face of wall,
making good the damaged surface, testing
etc. complete. (Prior approval of sample and
brand by Ex.Engineer is necessary before
use.)
Spec.No.: As directed by Engineer- in-charge.
147
SR.NO.
& CODE
NO.
31
BDV
111
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
No.
1626.00
433.00
No.
2280.00
433.00
No.
2030.00
295.00
32
BDV
24
Providing
and
fixing
white
glazed
earthenware urinal squatting type without
cistern with fitting, inlet pipes, stop tap, 32 mm
dia. UPVC flush pipe with fittings and spreader
arrangement including UPVC soil pipe, UPVC
trap, soil pipe connection upto the outside face
of the wall, making good the damaged
surface, testing etc. complete. (Prior
approval of sample and brand by
Ex.Engineer is necessary before use.)
Spec.No.: Bd.V.24/Page No.563
33
BDV
26
Providing
and
fixing
white
glazed
earthenware lipped flat back corner type
Urinal without flushing cistern, inlet pipe with
stop tap, 32mm diameter UPVC pipe with
fittings, including UPVC soil pipe, trap and soil
pipe connection upto the outside face of wall,
making good the damaged surface, testing
etc. complete. (Prior approval of sample and
brand by Ex.Engineer is necessary before
use.)
Spec.No.: Bd.V.25/Page No.564
148
SR.NO.
& CODE
NO.
34
BDV
28
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
No.
2596.00
433.00
Rmt.
129.00
37.00
No.
2081.00
256.00
No.
2405.00
276.00
35
BDV
29
36
BDV
30B
Providing
and
fixing
white
glazed
earthenware Wash Hand Basin of size 45
cm x 30 cm, brackets, rubber plugs and brass
chain, stop tap, chromium plated bottle trap
and necessary pipe connection including
UPVC waste pipe and trap up to the out side
face of the wall, making good the damaged
surface, testing etc. complete. (Prior
approval of sample and brand by
Ex.Engineer is necessary before use.)
149
SR.NO.
& CODE
NO.
37
BDV
30C
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
No.
2310.00
255.00
No.
2757.00
276.00
Providing
and
fixing
white
glazed
earthenware Wash Hand Basin of 55 cm x
40 cm size, brackets, rubber plugs and brass
chain, stop tap, chromium plated bottle trap
and necessary pipe connections including
UPVC waste pipe and trap upto the out side
face of the wall, making good the damaged
surface, testing etc. complete. (Prior
approval of sample and brand by Ex.
Engineer is necessary before use.)
a) With cold water piller tap
No.
2184.00
266.00
No.
2546.00
284.00
No.
2460.00
276.00
No.
2790.00
284.00
39
BDV
30A
150
SR.NO.
& CODE
NO.
40
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Each
10602.00
1182.00
Per
No.
1018.00
188.00
No.
1890.00
216.00
42
BDV
31A
Providing
and
fixing
white
glazed
earthenware sink 450mm x 300mm x
200mm including all connections of the G.I.
supply and UPVC waste pipe and trap upto
the outside face of the wall, cold water
chromium plated screw down bib tap, rolled
steel or C.I. brackets, rubber plug with chain
and stop tap, making good the damaged
surface, chromium plated bottle trap, testing
etc. complete. (Prior approval of sample and
brand by Ex.Engineer is necessary before
use.)
Spec.No.: Bd.V.31/Page No.566
151
SR.NO.
& CODE
NO.
43
BDV
31
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
No.
2843.00
235.00
No.
2861.00
334.00
No.
711.00
110.00
No.
797.00
148.00
Providing
and
fixing
white
glazed
earthenware sink 600 mm x 450 mm x 200
mm including all connections of the G.I.
supply and UPVC waste pipe and trap upto
the outside face of the wall, cold water
chromium plated screw down bib tap, rolled
steel or C.I. brackets, rubber plug with chain
and stop tap, bottle trap, making good the
damaged surface, testing etc. complete.
(Prior approval of sample and brand by
Ex.Engineer is necessary before use.)
Spec.No.: Bd.V.31/Page No.566
44
BDV
30D
45
BDV
32
46
BDV
32A
152
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
47
No.
246.00
84.00
48
No.
336.00
88.00
No.
788.00
112.00
50
BDV
130
Rmt.
62.00
22.00
153
SR.NO.
& CODE
NO.
51
BDV
36A
DESCRIPTION OF ITEMS
Completed
Labour
Rmt.
Rmt.
Rmt.
201.00
254.00
282.00
59.00
102.00
115.00
Rmt.
Rmt.
Rmt.
265.00
396.00
593.00
39.00
41.00
55.00
52
UNIT
154
SR.NO.
& CODE
NO.
53
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Rmt.
243.00
40.00
Rmt.
Rmt.
443.00
83.00
565.00
102.00
No.
3330.00
532.00
No.
3789.00
611.00
55
BDV
43
155
SR.NO.
& CODE
NO.
56
BDV
43A
57
BDV
44
58
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
No.
4999.00
689.00
No.
5924.00
750.00
No.
5345.00
719.00
No.
5591.00
788.00
No.
43.00
7.00
No.
542.00
89.00
59
BDV
156
SR.NO.
& CODE
NO.
60
BDV
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
No.
706.00
109.00
No.
909.00
316.00
61
BDV
46
62
BDV
126
Rmt.
341.00
135.00
63
BDV
59
No.
465.00
38.00
No.
172.00
40.00
64
BDV
67
157
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
65
BDV
86
No.
116.00
48.00
66
BDV
39
P-573
Rmt.
197.00
84.00
Rmt.
276.00
67.00
Rmt.
316.00
68.00
67
Providing and fixing 150 mm dia. Salt Glazed
BDV-39 Stoneware pipe including fittings such as
P-573 bends, tees, single junctions, double junctions,
laying, jointing (excluding excavation and
refilling
the
trenches)
etc.complete
(Cement: 2.24 kg per m)
Spec.No.: As directed by Engineer- in-charge.
68
Providing and fixing 225 mm dia. Salt Glazed
BD/V-39 Stoneware pipe including fittings such as
P-573 bends, tees, single junctions, double junctions,
laying, jointing (excluding excavation and
refilling the trenches) etc. (Cement: 4.04 kg
per m)
Spec.No.: As directed by Engineer- in-charge.
158
SR.NO.
& CODE
NO.
69
BDV
35
70
BDV
35A
71
BDV
65
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Rmt.
958.00
118.00
Rmt.
799.00
110.00
No.
1396.00
410.00
No.
1472.00
404.00
72
BDV
66
159
SR.NO.
& CODE
NO.
73
BDV
91
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
No.
941.00
74.00
No.
1025.00
74.00
No.
1061.00
985.00
75
BDV
131
76
BDV
132
Cum.
234.00
195.00
77
No.
277.00
117.00
160
BD-W MISCELLANEOUS
(a) ANTITERMITE AND PEST CONTROL
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
Completed Labour
15.75
8.54
No.
68.25
10.98
No.
120.75
8.54
378.00
71.98
161
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
Completed Labour
Sq.m
63.00
113.40
162
113.40
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
Completed Labour
Sq.m.
152.25
31.50
163
No.
21.00
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
Completed Labour
11
No.
8.40
Rmt.
26.25
164
(b) GUNITING
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
1
BDW
2A
Completed
Labour
Sq.m
Sq.m
Sq.m
430.00
600.00
725.00
58.00
77.00
96.00
1040.00
100.00
300.00
35.00
215.00
44.00
165
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
Completed
Labour
140.00
23.00
255.00
32.00
166
DESCRIPTION OF ITEMS
1
BDW
3A
UNIT
Labour
Rmt.
392.00
60.00
Rmt.
382.00
60.00
2
BDW
6A
Sq.m
1660.00
135.00
3
BDW
6
Sq.m.
2001.00
115.00
167
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
168
UNIT
Labour
Rmt.
670.00
71.00
Rmt.
621.00
90.00
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
169
UNIT
Labour
Rmt.
1581.00
187.00
Rmt.
1052.00
142.00
(d) DISMANTALING
SR.NO.
&
CODE
NO.
1
BDW
8 -3E
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Sq.m.
35.00
35.00
Sq.m.
45.00
45.00
3
BDW
8A
Sq.m.
40.00
40.00
Sq.m.
22.00
22.00
Sq.m.
23.00
23.00
170
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Sq.m.
29.00
29.00
M.T.
920.00
920.00
8
BDW
8-3D
Cu.m.
792.00
792.00
9
BDW
8D
Sq.m.
17.00
17.00
No.
168.00
168.00
10
BDW
8E
171
SR.NO.
&
CODE
NO.
11
BDW
8F
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
No.
155.00
155.00
No.
132.00
132.00
12
BDW
8G
13
BDW
8J
Sq.m.
35.00
35.00
14
BDW
8K
Sq.m.
10.00
10.00
15
Sq.m.
31.00
31.00
172
SR.NO.
&
CODE
NO.
16
BDW
8-3F
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Rmt.
4.00
4.00
Sq.m.
2.00
2.00
17
BDW
8 -3G
18
BDW
8-3H
Rmt.
4.00
4.00
19
BDW
8-3I
Rmt.
4.00
4.00
20
BDW
8-4
Sq.m.
2.00
2.00
21
BDW
8-1G
No.
78.00
78.00
173
SR.NO.
&
CODE
NO.
22
BDW
8-1H
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
No.
78.00
78.00
23
BDW
9-1I
Sq.m.
12.00
12.00
24
BDW
8-2
Sq.m.
12.00
12.00
25
BDW
8-2C
Sq.m.
9.00
9.00
Sq.m.
17.00
17.00
Sq.m.
5.00
5.00
26
BDW
8-2D
27
BDW
8-2E
174
SR.NO.
&
CODE
NO.
28
BDW
8-1
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cu.m.
90.00
90.00
Cu.m.
161.00
161.00
Cu.m.
99.00
99.00
30
BDW
8-1B
31
BDW
8-1C
Cu.m.
184.00
184.00
32
BDW
8-2.1
Sq.m.
45.00
45.00
33
BDW
8-2B
Sq.m.
38.00
38.00
175
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
34
BDW
8-1E
Cu.m.
853.00
853.00
35
BDW
8-1F
Cu.m.
117.00
117.00
36
BDW
8-1D
Cu.m.
344.00
344.00
Sq.m.
35.00
35.00
37
BDW
8-2A
38
BDW
8-2F
Rmt.
5.00
5.00
39
BDW
8-2G
Rmt.
7.00
7.00
176
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
40
BDW
8-2H
Rmt.
7.00
7.00
41
BDO
8B
Sq.m.
18.00
18.00
42
BDO
82
Sq.m.
6.00
6.00
43
BDW
15
No.
54.00
54.00
44
BDW
16
No.
118.00
118.00
177
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
45
BDW
16
Sq.m.
2.00
2.00
46
BDW
16
Sq.m.
10.00
10.00
Cu.m.
Cu.m.
234.00
252.00
0.00
0.00
(c ) For 3 Km.
Cu.m.
270.00
0.00
Cu.m.
288.00
0.00
Cu.m.
306.00
0.00
178
BR
SR.NO.
&
CODE
NO.
1
BR
3A1
:-
BRIDGE WORK
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cu.m.
168.00
168.00
Cu.m.
184.00
184.00
Cu.m.
198.00
198.00
Cu.m.
218.00
218.00
Cu.m.
228.00
228.00
Cu.m.
251.00
251.00
Cu.m.
359.00
359.00
Cu.m.
366.00
366.00
179
SR.NO.
&
CODE
NO.
4
BR
3B
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cu.m.
212.00
212.00
Cu.m.
226.00
226.00
Cu.m.
239.00
239.00
Cu.m.
251.00
251.00
Cu.m.
224.00
224.00
Cu.m.
240.00
240.00
Cu.m.
250.00
250.00
Cu.m.
267.00
267.00
Cu.m.
399.00
399.00
Cu.m.
405.00
405.00
Cu.m.
410.00
410.00
Cu.m.
421.00
421.00
6
BR
3D
180
SR.NO.
&
CODE
NO.
7
BR
3E
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cu.m.
457.00
295.00
Cu.m.
468.00
312.00
Cu.m.
482.00
336.00
Cu.m.
494.00
361.00
Cu.m.
634.00
570.00
Cu.m.
652.00
579.00
Cu.m.
682.00
615.00
Cu.m.
699.00
623.00
181
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
9
Labour
Cu.m
72.00 to 125.00
Cu.m
114.00 to 839.00
Cu.m
up to 68.00
Sq.m.
141.00 to 276.00
Sq.m.
112.00 to 196.00
Sq.m.
558.00 to 950.00
Sq.m.
62.00 to 145.00
Sq.m.
164.00 to 204.00
Cu.m.
10
BR
5
182
3344.00
648.00
SR.NO.
&
CODE
NO.
11
BR
5F
12
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cu.m.
4022.00
493.00
Cu.m.
4278.00
542.00
Cu.m.
4479.00
558.00
Cu.m.
3924.00
493.00
183
SR.NO.
&
CODE
NO.
13
BR
5A
14
BR
5E
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cu.m.
5375.00
1577.00
Cu.m.
5618.00
1592.00
Cu.m.
5773.00
1618.00
Cu.m.
5932.00
1634.00
Cu.m.
3368.00
534.00
184
SR.NO.
&
CODE
NO.
15
BR
5C
16
BR
5G
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cu.m.
5009.00
1476.00
Cu.m.
5162.00
1495.00
Cu.m.
5322.00
1518.00
Rmt.
123.00
15.00
Cu.m.
3505.00
612.00
185
SR.NO.
&
CODE
NO.
18
BR
6A
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
445.00
173.00
M.T.
58206.00
8059.00
M.T.
58206.00
8059.00
Cu.m.
5535.00
1379.00
Cu.m.
5689.00
1396.00
Cu.m.
5849.00
1420.00
Cu.m.
20
BR
10
21
BR
12
186
SR.NO.
&
CODE
NO.
22
BR
131
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cu.m.
4801.00
837.00
Cu.m.
5047.00
872.00
Cu.m.
5200.00
887.00
187
SR.NO.
&
CODE
NO.
23
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Rmt
35007.00
17850.00
ii) Depth 5 m. to 10 m.
Rmt.
44176.00
22316.00
iii) Depth 10 m. to 15 m.
Rmt.
48161.00
26790.00
iv) Depth 15 m. to 20 m.
Rmt.
55809.00
27668.00
i) Depth up to 5 m.
Rmt.
34403.00
10986.00
ii) Depth 5 m. to 10 m.
Rmt.
45151.00
14217.00
iii) Depth 10 m. to 15 m.
Rmt.
49086.00
15317.00
iv) Depth 15 m. to 20 m.
Rmt.
56619.00
17604.00
i) Depth up to 5 m.
Rmt.
55073.00
31319.00
ii) Depth 5 m. to 10 m.
Rmt.
72271.00
40827.00
iii) Depth 10 m. to 15 m.
Rmt.
78565.00
43975.00
iv) Depth 15 m. to 20 m.
Rmt.
90634.00
50260.00
i) Depth up to 5 m.
Rmt.
99152.00
67472.00
ii) Depth 5 m. to 10 m.
Rmt. 130126.00
87721.00
iii) Depth 10 m. to 15 m.
Rmt. 141454.00
94474.00
iv) Depth 15 m. to 20 m.
Rmt. 163177.00
107957.00
188
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Rmt. 116629.00
79902.00
ii) Depth 5 m. to 10 m.
Rmt. 153064.00
103881.00
iii) Depth 10 m. to 15 m.
Rmt. 166390.00
111865.00
iv) Depth 15 m. to 20 m.
Rmt. 191938.00
127840.00
a) Depth up to 5 m.
Rmt
73469.00
49828.00
b) Depth from 5 m. to 10 m.
Rmt
96418.00
64776.00
c) Depth from 10 m. to 15 m.
Rmt.
98932.00
65842.00
d) Depth from 15 m. to 20 m.
Rmt. 120906.00
79730.00
189
SR.NO.
&
CODE
NO.
25
BR
16
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
No.
5172.00
575.00
No.
5521.00
627.00
Cu.m.
3964.00
788.00
Cu.m.
244.00
55.00
Cu.m.
3819.00
705.00
27
BR 17
28
BR
18
29
BR
19
190
SR.NO.
&
CODE
NO.
30
BR
24
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cu.m.
4525.00
887.00
Cu.m.
4678.00
903.00
Cu.m.
4839.00
927.00
Rmt.
9091.00
3517.00
Rmt.
10835.00
4488.00
Rmt.
11897.00
4562.00
Rmt.
13456.00
4756.00
191
SR.NO.
&
CODE
NO.
32
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Rmt.
4743.00
633.00
Rmt.
5749.00
720.00
Rmt.
6796.00
814.00
Rmt.
8574.00
1137.00
Rmt.
4861.00
612.00
Rmt.
5871.00
727.00
Rmt.
6923.00
821.00
Rmt.
8708.00
1143.00
Rmt.
5004.00
619.00
Rmt.
6346.00
734.00
Rmt.
7075.00
834.00
Rmt.
8869.00
1157.00
Rmt.
5088.00
633.00
Rmt.
6105.00
739.00
Rmt.
7165.00
841.00
Rmt.
8964.00
1164.00
( B )For M-25
( C )For M-30
( D )For M-35
SR.NO.
&
CODE
NO.
33
BR
27B
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cu.m.
4329.00
896.00
Cu.m.
4573.00
912.00
Cu.m.
4749.00
937.00
Cu.m.
4888.00
959.00
Rmt.
122.00
15.00
M.T.
57934.00
3978.00
M.T.
59438.00
3978.00
35
BR
35
SR.NO.
&
CODE
NO.
36
BR
36A
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
No.
174.00
37.00
b) 28 mm diameter.
No.
196.00
37.00
c) 32 mm diameter.
No.
245.00
44.00
d) 36 mm diameter.
No.
273.00
52.00
e) 40 mm diameter.
No.
311.00
60.00
Cu.m.
4807.00
738.00
Cu.m.
4961.00
754.00
Cu.m.
5120.00
770.00
194
SR.NO.
&
CODE
NO.
38
BR
30
39
BR
39A
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cu.m.
4900.00
738.00
Cu.m.
4950.00
754.00
Cu.m.
5152.00
770.00
Sq.m.
15.00
1.00
Rmt.
1264.00
98.00
Cu.
Cm.
1.00
---
41
195
SR.NO.
&
CODE
NO.
42
BR
48
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
No.
850.00
104.00
Cu.m.
5746.00
1484.00
Cu.m.
5901.00
1500.00
Cu.m.
6060.00
1523.00
Cu.m.
6155.00
1539.00
43
BR
38A1
Note :
Add for height above 3m to 6m. - 5% (Above
average bed level)
Add for height above 6m. - 10% (Above
average bed level)
Spec.No.: BR.38/Page No.135/I.S.456 (2000)
196
SR.NO.
&
CODE
NO.
44
BR
38B
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cu.m.
7165.00
2312.00
Cu.m.
7339.00
2312.00
Note :
Add upto height above 3m to 6m. - 5% (Above
average bed level)
Add for height above 6m. - 10% (Above
average bed level)
Spec.No.: BR.38/Page No.135/I.S.456 (2000)
197
SR.NO.
&
CODE
NO.
45
BR
38A
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cu.m
6164.00
1520.00
Cu.m
6341.00
1538.00
Cu.m
6478.00
1561.00
Cu.m
6573.00
1577.00
No.
616.00
120.00
No.
180.00
31.00
Note :
i) Add upto height above 3m to 6m. - 5%
(Above average bed level)
ii) Add for height above 6m. - 10% (Above
average bed level)
Spec.No.: BR.38/Page No.135
46
BR
55
198
SR.NO.
&
CODE
NO.
47
BR
43B
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Sq.m.
790.00
90.00
Cu.m.
3092.00
492.00
Cu.m.
354.00
82.00
a) For 15 mm Thickness
Sqm.
441.00
77.00
b) For 25 mm Thickness
Sqm.
735.00
128.00
c) For 40 mm Thickness
Sqm.
1174.00
204.00
48
BR
45
49
BR
46
50
199
SR.NO.
&
CODE
NO.
51
BR
47C
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cu.m.
4989.00
1221.00
Cu.m.
5143.00
1237.00
Cu.m.
9502.00
1363.00
Cu.m.
9655.00
1379.00
B) Including steel fibres confirming to I.S. 2801978 and IRC- SP-46-1997 (fibre diameter 0.50
mm to 1.00 mm and length 25mm. to 50mm.)
at the rate of 40 Kg/cum Note :-a) Item to be
used for bridges only b) for item no 51 (B),
separate item of steel reinforcement shall not
be considered.
200
SR.NO.
&
CODE
NO.
52
BR
50A
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cu.m.
5563.00
1381.00
Cu.m.
6433.00
1484.00
Cu.m.
5718.00
1405.00
Cu.m.
6588.00
1500.00
Cu.m.
6926.00
1762.00
201
SR.NO.
&
CODE
NO.
53
BR
51A
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Rmt.
1601.00
575.00
Rmt.
1711.00
217.00
SR.NO.
&
CODE
NO.
55
BR
51D
56
BR
51E
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Rmt.
1804.00
359.00
Rmt.
1234.00
165.00
Rmt.
1675.00
148.00
Rmt.
1607.00
190.00
203
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
59
Providing and fixing Guard Railing of 1000mm
MORTH height as per Type D Drg. No. 15 dt. 20-4-79, and
2703 fixed in 40 x 40 x 6 mm iron, angle embedded in
204
UNIT
Completed
Labour
Rmt.
1563.00
158.00
Rmt.
1543.00
233.00
Rmt.
13276.00
120.00
SR.NO.
&
CODE
NO.
62
BR
56
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Sq.m.
3372.00
992.00
Cu.m.
429.00
98.00
Cu.m.
336.00
49.00
Sq.m.
577.00
127.00
No.
1731.00
275.00
64
BR
57A
65
BR
57B
66
BR
55
205
SR.NO.
&
CODE
NO.
67
DESCRIPTION OF ITEMS
UNIT
tonne
Supplying, fitting and fixing in position true to line
capacity
and level sliding plate bearing with PTFE
surface sliding on stainless steel complete
including all accessories as per drawing and
Technical Specifications and BS: 5400, section
9.1 & 9.2
(for PTFE) and clause 2004 of
MORT&H Specifications etc. complete.
Completed
Labour
233.00
57.00
M.T. 105556.00
16641.00
Cum
7407.00
0.00
Cum
7941.00
0.00
Cum
8469.00
0.00
DESCRIPTION OF ITEMS
1
CD
1
UNIT
Labour
Cu.m.
431.00
111.00
Cu.m.
2984.00
641.00
Cu.m.
4336.00
671.00
3
CD
3A
Providing and laying in situ cement concrete of M15 / 1:2:4 with trap / granite / quartzite / gneiss
metal in face wall/Sidewall of builtup drains
including plywood/ steel formwork and steel
centering, compaction by vibrator, finishing uneven
and honeycombed surface with C.M.1:3 of
sufficient minimum thickness to give smooth and
even surface, filling joints with bitumen, curing etc.
complete. (Excluding cost of reinforcement.)
The C.M. 1:3 plaster is considered for rendering
uneven and honeycombed surface only. Newly
laid concrete shall be covered by gunny bag,
plastic,
tarpaulin
etc.
(Wooden
centering/formwork will not be allowed).
Spec.No.: CD.3/Page No.160 /I.S.456 (2000)
207
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
4
CD
4
UNIT
Labour
Sq.m.
943.00
224.00
Sq.m.
927.00
251.00
Rmt.
970.00
177.00
Rmt.
1482.00
233.00
Rmt.
2354.00
260.00
Rmt.
3008.00
339.00
Rmt.
3548.00
386.00
Rmt.
4921.00
438.00
Rmt.
4851.00
429.00
Rmt.
5673.00
511.00
Rmt.
7794.00
547.00
Rmt.
6922.00
519.00
Rmt.
8829.00
549.00
6
CD
7AA
208
SR.NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
7
CD
8
UNIT
Labour
Cu.m.
4377.00
688.00
Cu.m.
7336.00
876.00
Cu.m.
3116.00
527.00
Cu.m.
245.00
57.00
Cu.m.
4401.00
864.00
No.
286.00
77.00
9
CD
13
10
CD
14
11
CD
15A
12
CD
27
209
5 RD - ROAD WORKS
5(A) EXCAVATION AND EMBANKMENT
SR.NO.&
CODE
No.
1
RD
1A
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
No.
110.00
110.00
No.
217.00
217.00
No.
525.00
525.00
No.
828.00
828.00
No.
1309.00
1309.00
No.
1913.00
1913.00
Cu.M.
64.00
5.00
Cu.M.
84.00
6.00
210
SR.NO.&
CODE
No.
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cu.M.
371.00
89.00
Cu.M.
147.00
4.00
Cu.M.
158.00
4.00
211
SR.NO.&
CODE
No.
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cu.M.
158.00
5.00
Cu.M.
169.00
5.00
Cu.M.
76.00
5.00
212
SR.NO.&
CODE
No.
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
7
RD
2
Cu.m.
99.00
99.00
8
RD
3
Cu.m.
109.00
109.00
Cu.m.
118.00
118.00
Cu.m.
245.00
245.00
Cu.m.
431.00
304.00
10
RD
5
11
RD
6
213
SR.NO.&
CODE
No.
12
RD
7
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cu.m.
528.00
403.00
Cu.m.
118.00
118.00
14
RD
9B
Cu.m.
128.00
128.00
15
RD
9E
Cu.m.
139.00
139.00
16
RD
9C
Cu.m.
262.00
262.00
Cu.m.
511.00
59.00
214
SR.NO.&
CODE
No.
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
18
RD
9F
Cu.m.
101.00
101.00
19
RD
11
Cu.m.
74.00
4.00
Cu.m.
72.00
4.00
Cu.m.
Cu.m.
Cu.m.
26.00
40.00
56.00
26.00
40.00
56.00
Cu.m.
18.00
18.00
21
RD
18A
22
RD
17
215
SR.NO.&
CODE
No.
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
23
RD
10
Cu.m.
43.00
4.00
24
RD
10A
Cu.m.
47.00
4.00
25
RD
12
Cu.m.
165.00
85.00
26
RD
12A
Cu.m.
171.00
88.00
216
SR.NO.&
CODE
No.
27
RD
13
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cu.m.
148.00
78.00
Cu.m.
137.00
76.00
217
29
RD
19
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cu.m.
228.00
122.00
Cu.m.
223.00
172.00
Cu.m.
326.00
354.00
178.00
196.00
Cu.m.
327.00
354.00
276.00
305.00
Cu.m.
280.00
51.00
Cu.m.
250.00
43.00
Spec.No.:Rd.19/Page no.197
30
RD
19A
31
RD
19B
32
RD
23
Cu.m.
Cu.m.
218
SR.NO.
& CODE
No.
34
RD
25
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cu.m.
285.00
56.00
Cu.m.
146.00
57.00
Cu.m.
31.00
31.00
36
RD
27
37
RD
28
Cu.m.
18.00
18.00
38
RD
29A
Spreading
complete.
Cu.m.
31.00
31.00
Cu.m.
27.00
27.00
Sq.m.
13.00
3.00
Sq.m.
15.00
2.00
40
RD
32
Spec.No.:Rd.32/Page No.205
219
SR.NO.
& CODE
No.
41
RD
33A
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Sq.m.
6.00
6.00
Sq.m.
13.00
3.00
Sq.m.
17.00
3.00
Sq.m.
8.00
2.00
Sq.m.
11.00
2.00
Sq.m.
3.00
1.00
Sq.m.
5.00
1.00
Cu.m.
728.00
285.00
42
RD
35
220
SR.NO.
& CODE
No.
46
RD
41B
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cu.m.
747.00
303.00
Cu.m.
779.00
232.00
Cu.m.
501.00
195.00
Cu.m.
501.00
195.00
Cu.m.
475.00
171.00
Cu.m.
210.00
17.00
Sq.m.
1.00
1.00
48
RD
41D
49
RD
41E
50
RD
41F
51
RD
41G
52
RD
82
221
SR.NO.
& CODE
No.
53
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Sq.m.
49.00
32.00
Cum.
768.00
16.00
Cum.
610.00
13.00
54
222
SR.NO.
& CODE
No.
55
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cum.
1079.00
146.00
Cum.
1180.00
146.00
Sq.m.
93.00
18.00
56
Providing and laying Tech fab India CE marked
MORTH Needle Punched and mechanically bonded non
700
woven Geotextile indigenously manufactured from
high quality poly Propylene staple fibers
(continuous filament will not be accepted) on the
prepared subgrade for Seperation. TFI-TECHGO =
PR-15
Spec. No. :MORTH 700
223
SR.NO.
& CODE
No.
57
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cum.
1444.00
275.00
Cum.
1220.00
18.00
58
224
DESCRIPTION OF ITEMS
59
Brooming the W.B.M. surface by wire Brushes, coir
MORTH brushes, dusting, cleaning etc. for receiving the
404
bituminous treatment complete. Brooming the Water
Bound Macadam surface by wire.
UNIT
Completed
Labour
Sqm.
6.00
6.00
Sqm.
130.00
10.00
60
RD
64
61
RD
64
Sqm.
88.00
10.00
62
Sqm.
195.00
11.00
225
SR. NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
,63
UNIT
Completed
Labour
Sqm.
212.00
11.00
Sqm.
158.00
9.00
64
226
SR. NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
65
UNIT
Completed
Labour
Sqm.
158.00
10.00
Sqm.
175.00
7.00
SR. NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
67
68
RD
64
228
UNIT
Completed
Labour
Sqm.
186.00
10.00
Sqm.
138.00
10.00
SR. NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
69
RD
63
UNIT
Completed
Labour
Sqm.
152.00
15.00
Sqm.
169.00
13.00
229
SR. NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
71
RD
66
UNIT
Completed
Labour
Sqm.
66.00
10.00
Sqm.
86.00
9.00
Sqm.
62.00
7.00
73
230
SR. NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
74
UNIT
Completed
Labour
Sqm.
74.00
7.00
a) Type - A
Sqm.
176.00
2.00
b) Type - B
Sqm.
160.00
2.00
231
SR. NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
76
UNIT
Completed
Labour
a) Type - A
Sqm.
191.00
2.00
b) Type - B
Sqm.
175.00
2.00
Sqm.
22.00
2.00
Sqm.
46.00
5.00
77
78
Providing & applying Prime coat with Bitumen VG10 grade on WBM / WMM of granular base ,
spraying bitumen @ 0.75 kg/sqm with the help of
self propelled or towed bitumen pressure sprayer
equiped with suitable nozels to achive uniform dose,
including cleaning of road surface by power
mechanical sweepers etc. complete.
MORTH specification for Raods & Bridge work fifth
revision 2013 section 502 / Page No. 166
232
SR. NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
79
UNIT
Completed
Labour
Sqm.
146.00
3.00
Sqm.
158.00
7.00
233
SR. NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
81
UNIT
Completed
Labour
Cum
5960.00
34.00
Cum.
5990.00
34.00
234
SR. NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
83
UNIT
Completed
Labour
Cum.
6230.00
34.00
Cum.
8970.00
36.00
235
SR. NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
85
86
236
UNIT
Completed
Labour
Cum.
9020.00
36.00
Cum.
9280.00
36.00
SR. NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
87
UNIT
Completed
Labour
Cum.
7180.00
35.00
Cum.
7750.00
35.00
Cum.
7240.00
35.00
Cum.
7800.00
35.00
237
SR. NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
89
UNIT
Completed
Labour
Cum.
7480.00
35.00
Cum.
8050.00
35.00
Sqm.
28.00
28.00
91
Cum.
33.00
33.00
238
SR. NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
92
Design of overlay for existing B.T. surface with
MORTH carrying out testing by Benkelman Beam method as
per guide lines in IRC 81:1997 including design &
testing at site. The charges for transportation of
Benkelman Beam, loaded truck labour for testing
and traffic control are not included..
UNIT
Completed
Labour
Km.
5940.00
0.00
Km.
361.00
35.00
Km.
722.00
62.00
239
SR. NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
95
Carrying out roughness index / road unevenness
MORTH test with car mounted / Jeep towed ARUR machine
(Automatic Road Unevenness Recorder) calibrated
from C.R.R.I. New Delhi (Central Road Research
institute) or any other equivalent authority including
taking observations, feeding data and giving
computerised test results including hire charges of
all machinary and labour etc. complete.
UNIT
Completed
Labour
Km.
361.00
35.00
Km.
13.00
1.00
96
Dead Journey charges for Transporation of
MORTH machine / vehicle for Carrying out roughness index
/ road unevenness test with car mounted / Jeep
towed ARUR machine (Automatic Road Unevenness
Recorder) calibrated from C.R.R.I. New Delhi
(Central Road Research institute) or any other
equivalent authority including taking observations,
feeding data and giving computerised test results
including hire charges of all machinery and labour
etc. complete.
Spec. No. : As directed by Engineer in charge
240
241
4.
Preparing the base :
Any pothole in the existing bituminous road surface and broken edges shall be patched
well and the surface shall be brought to correct level and camber with additional metal
and bitumen as required which will be paid separately. Before starting the work the
bituminous surface shall be swept clean of all the dirt, mud cakes, animal droppings &
other loose foreign material.
If so required by the Engineer, the contractor shall keep the side width & nearby
diversion watered to prevent dust from blowing over the surface to be bituminised.
Existing water bound macadam surface shall be picked for and surface loosened for a
depth of 2.5 cm and the picked surface shall be brought approximately to the correct
camber and section Edge line shall be correctly marked by dog belling the surface to
form a continuous vee notch.
There shall always be sufficient length of prepared surface ahead of the bituminous
surfacing operations as directed by the Engineer to keep these operations continuous.
5.
Tack coat on bitumen surface :
Applying tack coat for existing B.T.surface only at the rate of 50 Kg/100 m2 as per
specification No. RD 47.3.3.
6.
Picking of existing W.B.M. Surface :
Picking of existing W.B.M. surface for receiving bituminous bound macadam as per Rd
33.
7.
Spreading and Compaction :
7.1 : Spreading of 40 mm metal - 40 mm metal shall be spread only at the specified
rate of 9 cubic metric / 6 cubic metre per 100 sqm of area so as to form a layer over the
width of road correct camber / super elevation as required. Any foreign matter, organic
matter, dust, grass etc. shall be removed immediately. The sections shall be checked
with camber board and straight edge batten etc. Any irregularities shall be made good
by adding aggregates in case of depressions and removing aggregates from high spots
checked with camber board and straight edge batten etc. Any irregularities shall be
made good by adding aggregates in case of depressions and removing aggregates
from high spots.
7.2 : Compaction of 40 mm size metal - The surface of 40 mm metal layer after
bringing it to necessary grades and sections shall be rolled with the sue of 8 to 10
tonnes power roller. Rolling shall commence from the edges and progress towards
centre longitudinally except on super elevated portion it shall progress from the lower to
upper edge parallel to the centre line of pavement. When the roller has passed over the
whole area any high spots or depressions, which become apparent shall be corrected
by removing or adding aggregates. The rolling shall then be continued till the entire
surface has been rolled to desired compaction such that there is no crashing of
aggregates and all roller marks have been eliminated. Each pass of roller shall
uniformly overlap not less than one third of the track made in the preceding pass.
8.
Application of Bitumen :
Bitumen of I.S.grade S.35 or S.35 supplied for the work shall be heated to temperature
of 177 Celsius to 191 Celsius (350 F to 375 F) in a bitumen boiler and temperature shall
be maintained at the time of actual application. The hot bitumen shall be applied
through a pressure sprayer on the road surface uniformly at the rate of 200 Kg / 100
Sqmt. or 175 Kg / 100 Sqmt. The road surface shall be divided into suitable rectangles
marked by chalk so as to ensure correct rate of application of the bitumen.
242
9.
Key Aggregates :
On completion of bitumen application, 12 mm size key aggregate shall be spread
immediately at a uniform rate of 1.8 cubic meter / 1.2 cubic meter per 100 square meter
of area when entire surface is in hot condition. Brooms shall be used to ensure even
distribution of key aggregate.
10.
Final Compaction :
Immediately after spraying of bitumen and spreading of key aggregate, the surface
shall be rolled with a power roller to obtain full compaction and to force the blindage of
key aggregate into the interstices of the coarse aggregate. The rolling shall continue till
the asphalt surface hardens and key aggregates stop moving under poser roller.
11.
Surface finish and quality control :
The surface finish shall conform to requirements of clause 902 of specifications for
Road and bridges by Ministry of Surface Transport (copy enclosed) Quality Control Test
and their frequencies shall be as per table below :
Sr.No.
Test
Frequency
1
Quality of binder
Two samples per lot to be subjected to all or some
test as directed by the Engineer.
2
Aggregate Impact Value
One test per 200 cubic meter of aggregate.
3
4
Water absorption of
aggregates
6
7
Aggregate grading
Temperature of binder at
application.
Rate of spreading for
binder
12.
(i)
(ii)
(iii)
(iv)
(v)
(vi)
(vii)
13.
Items to include :
Diversions unless separately provided in the tender.
Preparing the road surface.
Applying tack coat on existing B.T. or picking the existing W.B.M. surface.
Supplying spreading and compaction of 40 mm and 12 mm size aggregate.
Supplying, heating and spraying bitumen.
Supplying, spreading and compaction of 12 mm size chips.
All labour, materials, including bitumen and aggregates used of tools,
plants and equipment for completing the item satisfactorily.
Mode of Measurement and payment: The contract rate shall be for 100 Sqm. The
measurements shall be for the width of the road as executed, limiting it to the width
specified or as ordered by the Engineer and the length measured along the center line.
The measurement dimensions shall be recorded correct upto two places of decimals of
a meter and the area worked out correct upto one place of decimal of a Sqm.
243
97
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cu.m.
5401.00
474.00
b) M-35 Grade
Cu.m.
5505.00
474.00
c) M-40 Grade
Cu.m.
5574.00
474.00
244
SR. NO.
&
CODE
NO.
98
99
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Cu.m.
5668.00
173.00
b) M-35 Grade
Cu.m.
5723.00
173.00
c) M-40 Grade
Cu.m.
5777.00
173.00
No.
234.00
31.00
245
SR. NO.
&
CODE
NO.
100
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
No.
28.00
5.00
Rmt.
68.00
22.00
Rmt.
205.00
10.00
As directed by Engineer-incharge.
101
102
As directed by Engineer-incharge.
246
Scope
1.1
1.2
2.
Materials
2.1
Source of Materials :
The Contractor shall indicate to the Engineer-in-Charge the source of all
materials to be used in the concrete work sufficiently in advance, and the
approval of the Engineer-in-Charge for the same shall be obtained before
the scheduled commencement of the work. If the Contractor later
proposes to obtain materials from a different source, he shall notify the
same to Engineer-in-Charge for his approval before such materials are to
be used.
Cement :
Ordinary Portland Cement for use on the works shall comply in every
respect with the requirements of the IS-8112 amended from time to time.
The cement used in the works shall be manufactured in India and shall be
of a make and quality approved by the Engineer-in-Charge. Only 43 grade
Ordinary Portland Cement shall be used. The Contractor shall provide and
maintain proper and sufficient storage sheds for the cement on the
worksite. The floor of the stores shall be raised at least 23 cm. from the
ground in order to protect the bags from moisture. Cement damaged by
exposure or otherwise will not be allowed to be used in the Work and
same shall be removed from the site at once.
2.2
2.3
Admixtures :
Admixtures conforming to IS : 9103 and IS : 6925 shall be permitted to
improve workability of the concrete or extension of setting time on
satisfactory evidence that it will not have any adverse effect on the
properties of concrete with respect to strength, volume change, durability
and has no deleterious effect on steel bars. The particulars of the
admixture and the quantity to be used, must be furnished to the Engineer in-Charge in advance to obtain his approval before use.
247
2.4
Coarse Aggregate :
(i)
(ii)
(iii)
Fine Aggregate :
The fine aggregate shall consist of clean, natural sand conforming
to IS:383. Fine aggregate shall be free from soft particles, clay,
shale, loam, cemented particles, mica and organic and other foreign
matter.
(iv)
2.5
Water :
Water used for mixing and curing of concrete shall be clean and free from
injurious amount of oil, salt, acid, vegetable matter, or other substances
harmful to the finished concrete. It shall meet the requirements stipulated
in IS : 456-2000.
248
2.6
(i)
The rate proposed in this tender for all concrete and allied works
are inclusive of water cost. The Contractor shall have to make their
own arrangements at their cost for bringing adequate water of
potable quality for mixing concrete, curing purposes and for this no
extra payment will be made.
(ii)
The water brought for concreting and curing etc. shall be got tested
from the laboratory as approved by Engineer-in-Charge to verify
whether it is suitable for above purposes whenever directed. This
testing will be done at Contractors cost.
2.7
2.8
Steel :
The steel shall conform to the requirement of IS : 432, IS : 1139 and IS :
1786 as relevant. The dowel bars shall conform to Grade S 240 and tie
bars to grade S 425 of IS. If steel mesh is used, it shall conform to IS :
1566. The steel shall be coated with epoxy paint for protection against
corrosion.
3.
3.1
Immediately upon the receipt of work order, the Contractor shall inform the
Engineer-in-Charge the exact location of source of the accepted materials.
After approval of all the materials to be used in Pavement Quality
Concrete, the Contractor shall submit the mix design based on proportion
by weight of all ingredients for the approval of Engineer-in-Charge. The
mix design shall be submitted to the Engineer-in-Charge at least one
month in advance of commencing the paving operation.
249
3.2
For design of cement concrete mixes guidance may be had from IRC-44
Tentative guidelines for cement concrete mix design for road pavement
and IS-10262 and IS-SP-23 Hand book on concrete mixes.
The minimum cement content for Dry Lean Concrete and Pavement
Quality Concrete shall be as follows :
Dry Lean Concrete (DLC)
Grade M-10
220 Kg. per Cum.
Pavement Quality Concrete (PQC) Grade M-40
350 Kg. per Cum.
If this minimum cement content is not sufficient to produce in the field,
concrete of the strength specified in the design, it shall be increased as
necessary without additional compensation under the Contract. The
maximum cement content shall, however, not exceed the limits as
specified in relevant IRC Codes.
3.3
3.4
Cement content
b)
W/C ratio
c)
Cement
d)
MSA
technical specifications.
e)
Flexural strength
Concrete Strength :
250
3.4.2 While designing the mix in the laboratory, correlation between flexural and
compressive strength of concrete shall be established on the basis of tests
on samples for any adjustment in design. However, be ensured that in
such case the materials and mix proportions remain unaltered. The water
content shall be the minimum required to provide the specified workability
for full compaction of the concrete to the required density.
3.4.3 At least three cube specimens, one each for 7 days and 28 days strength
testing, shall be cast for every 50 Cum. or part thereof of concrete placed
during construction. On each day's work, not less than nine cubes shall be
cast and the same shall be tested in presence of the Engineer-in-Charge
or his representative in accordance with the testing procedure.
3.4.4 The ratio between the 7 and 28 days strength shall be established for the
mix to be used in the slab in advance, by trial design mix. The average
strength of the 7 days cubes shall be divided by the average strength of
the 28 days for each work and the ratio 'R' shall be determined. The ratio
'R' shall be expressed to three decimal places.
3.4.5 If during the construction the value of 7 days test results fall below the
required 7 days strength as per the design mix then the cement content of
the concrete shall , without extra payment, be increased by 5%. The
increased cement content shall be maintained atleast until the 28 days
strength have been assessed for its conformity with the requirements.
Whenever the cement content is increased, the concrete mix shall be
readjusted to maintain the required workability.
3.4.6 In case the cube test for 28 days period fails, cores shall be taken from the
concrete slab and will be tested at Contractor's cost. The core will be 100
mm dia. If it fails, action as contemplated here under clause no 9.4.12
shall be taken.
3.4.7 The density of the compacted concrete shall be such that the total air
voids are not more than 3%. The air voids shall be derived from the
difference between the theoretical maximum dry density of the concrete
calculated from the specific gravities of the constituents of the concrete
and mix. The average value of three direct density measurements made
on cores of at least of 150 mm diameter. If the average of any two
consecutive measurements of density of core is below the minimum
required, the extent of defective concrete shall be determined by additional
cores as directed by the Engineer-in-Charge and if required the concrete
shall be removed and replaced with new materials in accordance with the
specification.
3.4.8 All cores taken for density measurements shall also be checked for
thickness . In case of doubt, additional cores may be ordered by the
Engineer-in-Charge and taken at locations decided by him to check the
depth or density of concrete slab without any compensation being paid for
the same. Thickness of the slab at any point checked as mentioned above
shall be within a tolerance of 5mm. of the specified thickness as per
251
drawing. The cost of core samples to be taken and their testing shall be
borne by the Contractor. The test samples shall be taken by the agencies
approved by the Superintending Engineer.
3.4.9 In calculating the density, allowance shall be made for any steel in cores.
Cores shall be reinstated with compacted concrete with mix proportions of
1 part of Portland cement, 2 parts of fine aggregate and 2 parts of 10 mm
nominal size single sized coarse aggregate by weight or as directed by the
Engineer-in-Charge at the Contractors cost. In case the cores are taken
from the road already opened to traffic, the mix/material adopted for filling
shall be such as will develop the requisite strength in a minimum of time.
The holes created by cores shall be so filled that these do not shrink, if
necessary non-shrink grout shall be used by the Contractor at his own
cost.
3.4.10 At each site of work, minimum 6 cores shall be taken for testing. Core
density test shall be carried out in accordance with relevant I.S. codes. For
testing of cores for strength, refer para 9.4.11 below.
3.4.11 The results of crushing strength tests on these cores shall not be less than
0.8 times the corresponding cube crushing strength requirement, where
the height to diameter ratio of the core is two. Where height to diameter
ratio is varied, then the necessary corrections would be made in
calculating the crushing strength of cores in the following manner.
The crushing strengths of cylinders with height to diameter ratio between 1
and 2 may be corrected to correspond to the standard cylinder of height to
diameter ratio of 2 by multiplying with the correction factor obtained from
the following equation:f =
0.11 n + 0.78
f =
n =
Where
The corrected test results shall be analysed for conformity with the
specification requirements for cube samples. Where the core tests are
satisfactory, they shall have precedence for assessing concrete quality
over the results of moulded specimens. The diameter of cores shall not be
less than 150 mm.
3.4.12 If the tests on cores of the concrete is not satisfying the strength
requirements, then the payment for the slab shall be withheld for the
period as decided by Engineer-in-Charge. Slab under reference shall be
kept under observation during this period and if defects are noted, then
further course of action as deemed fit including replacement of the slab will
be taken as decided by the Superintending Engineer, whose decision will
be final. In such cases, the decision of the Superintending Engineer,
regarding release of payment, fully or partly, on such slabs, will be binding
on the Contractor.
252
Workability
3.5.1 The workability of the concrete at the point of placing shall be adequate for
the concrete to be full compacted and finished without undue flow. The
optimum workability for the mix to suit the paving plant being used shall be
determined by the Contractor and approved by the Engineer-in-Charge.
3.5.2 The workability shall be determined by the compacting factor test or VeeBee test in accordance with IS 1199 at the minimum rate of one test per
50 cum of concrete or 5 times per day whichever is greater. Tests for
workability shall be carried out at the point of placing in conjunction with
tests for strength. The workability shall be maintained at the optimum
within the range of Compacting factor as Specified in Work specific
technical specifications.
3.5.3 Any alteration to the optimum workability necessitated by change in
conditions shall be rejected only after the same is agreed to by the
Engineer-in-Charge. If any determination of the workability gives a result
outside the tolerance further test shall be made immediately on the next
available load of concrete. The average of two consecutive results and
the difference between them shall be calculated, if the average is not
within 0.03 C of the optimum value or the difference is greater than 0.06
for CF or other value agreed with the Engineer-in-Charge subsequent
samples shall be taken from the delivery vehicle which shall not be
allowed to discharge into the works until compliance with the specification
has been established.
3.6
Design Mix
3.6.1 The Contractor shall carry out laboratory trials of design mixes with the
materials from the approved sources to be used. Trial mixes shall be
made in presence of the Engineer-in-Charge or his representative and
shall be subject to the approval of the Engineer-in-Charge. They shall be
repeated, if necessary until the proportions that will produce a concrete
which complies in all respects with this specification, and conforms to the
requirement of the design/drawings has been determined.
3.6.2 The proportions determined as a result of the laboratory trial mixes may be
adjusted if necessary during start of the construction. Thereafter, neither
the materials nor the mix proportions shall be varied in anyway except with
the written approval of the Engineer-in-Charge.
253
3.6.3 Any change in the source of materials or mix proportions proposed by the
Contractor during the course of work shall be assessed by making
laboratory trial mixes unless approval is given by the Engineer-in-Charge
for minor adjustments like compensation for moisture content in
aggregates or minor fluctuations in the grading of aggregate.
4.
Separation Membrane
5.
A separation membrane shall be used between the concrete slab and the
DLC. Separation membrane shall be impermeable plastic sheeting 125
microns thick laid flat without creases. Before placing the separation
membrane, the DLC shall be swept clean of all the extraneous materials
using air compressor. Where overlap of plastic sheet is necessary, the
same shall be at least 300 mm and any damaged sheeting shall be
replaced. The separation membrane may be stuck to the lower layer wild
patches of adhesives or appropriate tape or concrete nails with washer so
that sheet does not move during placement of concrete.
Forms
5.1
Steel Forms
All side forms shall be of mild steel only. The steel forms shall be mild
steel channel sections of depth equal to the thickness of the pavement or
a few millimeters less than the thickness of the pavement to match with
the plus level tolerances specified for sub-base. In the latter case, the
forms shall be leveled by using metal wedges or shims. The thickness of
flange and web shall not be less than 6 mm. and shall be capable of
resisting all loads applied in the paving process. The length of form shall
not be less than 3m except in the case of installations along curves. The
sections shall have a length of at least 3 m except on curves of less than
45 m radius, where shorter sections may be used. When set to grade and
staked in place, the maximum deviation of the top surface of any section
from a straight line shall not exceed 2 mm in the vertical plane and 5 mm
in the horizontal plane. The method of connection between sections shall
be such that the joint formed shall be free from difference in level, play of
movement in any direction. The use of bent, twisted or worn-out forms will
not be permitted. At least three stake pockets for bracing pins of minimum
25 mm dia or stakes shall be provided for each 3m of form and the bracing
and support must be ample to prevent springing of the forms under the
pressure of concrete or the weight or thrust of machinery operating on the
forms.
5.2
Setting of Forms
The forms shall be jointed neatly and shall be set with exactness to the
required grade and alignment. Both before and after the forms are placed
and set, the subgrade or sub-base under the forms shall be thoroughly
tamped in an approved manner. Sufficient rigidity shall be obtained to
support the forms in such a position till during the entire operation of
compacting and finishing of concrete they shall not at any time deviate
254
Joints
The location and type of joint shall be as shown in the drawing. Joint shall
be constructed depending upon their functional requirement as detailed in
the following paragraphs. The location of the joints should be transferred
accurately at the site and mechanical saw cutting of joints done as per
stipulated dimensions. It should be ensured that the full required depth of
cut is made from edge to edge of the pavement. Sawing of joints shall be
carried out with diamond studded blades soon after the concrete has
hardened to take the load of the sawing machine and personnel without
damaging the texture of the pavement. Sawing operation could start as
early as 6-8 hours depending upon the season.
6.1
Transverse joints
Transverse joints shall be contraction and expansion joints constructed at
the spacing described in the Drawings. Transverse joints shall be straight
within the following tolerances along the intended line of joints which is the
straight line transverse to the longitudinal axis of the carriageway at the
position proposed by the Contractor and agreed to by the Engineer-inCharge except at road junctions or roundabouts where the position shall
be as described in the drawings.
6.1.1 Deviations of the filler board in the case of expansion joints from the
intended line of the joint shall not be greater than 10 mm.
6.1.2 The best fit straight line through the joint grooves as constructed shall be
not more than 25 mm from the intended line of the joint.
6.1.3 Deviations of the joint groove from the best fit straight line of the joint shall
not be greater than 10 mm.
6.1.4 Transverse joints on each side of the longitudinal joint shall be in line with
each other and of the same type and width. Transverse joints shall have a
sealing groove which shall be sealed in compliance with Clause 602.11 of
MORT and H specifications (Fourth Revision)
6.2
Contraction joints
Contraction joints shall consist of a mechanical sawn joint groove, 3 to 5
mm wide and 1/4 to 1/3 depth of the slab 5 mm or as stipulated in the
drawings and dowel bars complying with Clause 602.6.5 of MORT and H
255
Expansion joints
The expansion joints shall consist of a joint filler board complying with
Clause 602.2.7 of MORT and H specifications (Fourth Revision) and dowel
bars complying with Clause 602.6.5 MORT and H of specifications (Fourth
Revision)and as detailed in the drawings. The filler board shall be
positioned vertically with the prefabricated joint assemblies along the line
of the joint within the tolerances given in Clause 602.6.2.1 of MORT and H
specifications (Fourth Revision) and at such depth below the surface as
will not impede the passage of the finishing straight edges or oscillating
beams of the paving machines. The adjacent slabs shall be completely
separated from each other by providing joint filler board. Space around
the dowel bards, between the sub-base and the filler board shall be
packed with a suitable compressible material to block the flow of cement
slurry.
6.4
Longitudinal joint
The longitudinal joints shall be saw cut as per details of the joints shown in
the drawing. The groove may be cut after the final set of the concrete.
Joints should be sawn to at least 1/3 the depth of the slab 5 mm as
indicated in the drawing.
7.
Dowel bars
7.1
Dowel bars shall be mild steel rounds in accordance with MORT and H
specifications (Fourth Revision) Clause 602.2.6 with details / dimensions
as indicated in the drawing and free from oil, dirt, loose rust or scale. They
shall be straight, free of irregularities and burring restricting slippage in the
concrete. The sliding ends shall be sawn or cropped cleanly with no
protrusions outside the normal diameter of the bar. The dowel bar shall be
supported on cradles/dowel chairs in pre-fabricated joint assemblies
positioned prior to the construction of the slabs or mechanically inserted
with vibration into the plastic concrete by a method which ensures correct
placement of the bars besides full recompaction of the Concrete around
the dowel bars. The dowel used in contraction joint shall be provided with
plastic sheath with closed end over 60 per cent of the length. The dowels
also can be coated with polyethylene. The thickness of sheath or
polyethylene coating shall not exceed 0.50 mm.
7.2
about intended lines of the joint within a tolerance of + 25mm. They shall
be aligned parallel to the finished surface of the slab and to the centre line
of the carriageway and to each other within tolerance as given hereunder.
7.2.1 For bars supported on cradles prior to the laying of the slab .
a)
All bars in a joint shall be within 3 mm per 300 mm length of bar.
b)
2/3rd of the bars shall be within 2 mm per 300 mm length of bar
c)
No bar shall differ in alignment from an adjoining bar by more than
3 mm per 300 mm length of bar in either the horizontal or vertical
plane.
d)
Cradles supporting dowel bar shall not extend across the line of
joint i.e. no steel bar of the cradle assembly shall be continuous
across the joint.
7.2.2 For all bars inserted after laying of the slab.
a)
Twice the tolerance for alignment as indicated in (a) above. Dowel
bars supported on cradles in assemblies, when subject to a load of
110 N applied at either end and in either the vertical or horizontal
direction (upwards and downwards and both directions horizontally)
shall conform to be within the following limits.
i)
Two thirds of the number of bars of any assembly tested
shall not deflect more than 2 mm per 300 mm. length of bar.
ii)
The remainder of the bars in that assembly shall not deflect
more than 3 mm per 300 mm length of bar
Dowel bars shall be covered by a thin plastic sheath for at least 60 per
cent of the length from one end, for dowel bars in contraction joints or half
the length plus 50 mm for expansion joints. The sheath shall be tought,
durable and of an average thickness not greater than 0.5 mm and shall
have closed end. The sheathed bar shall comply with the following pull
out test.
7.4
Four bars shall be taken at random from stock and without any special
preparation shall be covered by sheaths as required in above Clause. The
ends of the dowel bars which have been sheathed shall be cast centrally
into concrete specimens 150x150x600 mm. made of the same mix
proponions to be used in the pavement, but with a maximum nominal
aggregate size of 20 mm and cured in accordance with IS 516. At 7 days
a tensile load shall be applied to achieve a movement of the bar of at least
0.25 mm. The average bond stress to achieve this movement shall not be
greater than 0.14 MPa.
7.5
For expansion joints, a closely fitting cap 100 mm long with closed end
consisting of GI pipe 3 mm thickness with closed ends shall be placed
over the sheathed end of each dowel bar. An expansion space at least
equal in length to the thickness of the joint filer boards shall be formed
between the end of the cap and the end of the dowel bar by using
compressible sponge to block the entry of cement slurry between dowel
and cap. It may be taped all round.
257
8.
Tie bars
8.1
The bars in longitudinal joints shall be plain mild steel bars conforming to
IS: 432 or deformed steel bars complying with IS: 1786 and in accordance
with the requirements given below. The bars shall be free from oil, dirt,
loose rust and scale.
Tie bars projecting across the longitudinal joint shall be protected from
corrosion for 75 mm on each side of the joint by a protective coating of
bituminous paint with the approval of the Engineer-in-Charge. The coating
shall be dry when the tie bars are used.
8.2
Tie bars in longitudinal joints shall be made up into rigid assemblies with
adequate supports and fixings to remain firmly in position during the
construction of the slab. Alternatively, tie bars at longitudinal joints may be
mechanically or manually inserted into the plastic concrete from above by
vibration using a method which ensures correct placement of the bars and
recompaction of the concrete around the tie bars. Tie bars are also
inserted mechanically or manually from sides. During side insertion in
fixed form paving they may be bent so that half length remains along the
form. After removal of forms, bars shall be straightened so that they
extend into the concrete placed on the other side of the concrete.
8.3
Tie bars shall be positioned to remain within the middle third of the slab
depth as indicated in the drawings and approximately parallel to the
surface and approximately perpendicular to the line of the joint, with the
centre of each bar on the intended line of the joints within a tolerance of
50 mm, and with a minimum cover of 30 mm below the joint groove .
9.
9.1
9.2
258
9.3
The execution of work shall only be allowed for ambient temperature not
exceeding 35C. The time for execution of C.C. pavement i.e. the laying of
DLC and PQC shall be 6 P.M. to 2 AM next day. The Contractor will have
to ensure, adequate lighting arrangement during the night working.
10.
Joint construction
The placement of concrete at construction joint is particularly critical
Therefore, care must be taken to ensure that only quality concrete is used
in their construction. The concrete used to construct these joints should
be the same as for the remainder of the slab. The practice of modifying
the mix at the joints is not recommended. It should be kept in mind that
load transfer across a doweled joint is greatly affected by the quality of
concrete and compaction around the dowels. The placement of Dowels
should be carefully verified soon after paving begins.
10.1
Sawing
Cleaning joints
Air compressors use for cleaning joints shall be equipped with suitable
traps capable of removing all surplus water and oil in the compressed air.
Immediately after sawing the joint the resulting slurry shall be completely
removed from the joint and immediate area by flushing with a jet of water
under pressure.
10.3
11.
Surface Texture
After the final regulation of the slab and before the application of the curing
membrane, the surface of Concrete slab shall be brush textured in a
direction at right angles to the longitudinal axis of the carriageway. For
details reference shall be made to clause No. 9.9.4 of IRC-15-2002.
259
12.
Surface Tolerances
The levels of the subgrade and different pavement courses as
constructed, shall not vary from those calculated with reference to the
longitudinal and cross profile of the road shown on the drawings or as
directed by the Engineer-in-Charge beyond the tolerances mentioned
below.
12.1
Sub grade
+ 20 mm
-- 25 mm
+ 10 mm
-- 20 mm
+ 10 mm
-- 10 mm
+ 5 mm
-- 6 mm
Provided, however that the negative tolerance for wearing course shall not
be permitted in conjunction with the positive tolerance for base/sub course.
12.2
For checking compliance with the above requirement for subgrade , sub
base courses, measurements, of the surface levels shall be taken on a
grid of point placed at 6.25 m longitudinally and 3.5 m transversely or any
other grid approved by the Engineer-in-Charge. For any 10 consecutive
measurements taken longitudinally or transversely, not more than one
measurement shall be permitted to exceed the tolerance as above. This
one measurement being not in excess of 5 mm greater than the permitted
tolerance.
12.3
12.4
260
Irregularity
Length (m)
National Highways/
Expressways
Roads
of
lower
category
18
12.6
Horizontal alignment
The horizontal alignment shall be checked with respect to the centre line of
the carriageway as shown in the drawings. The edges of the carriageway
as constructed shall be corrected within a tolerance of 10 mm therefrom.
12.7
12.7.1
12.7.2
Drying shrinkage
12.7.3
12.7.4
12.7.5
12.7.6
261
12.8.1 Plastic shrinkage cracks- The discrete crack which is less than 500 mm
length and with its depth of penetration less than half the thickness of the
slab and which does not intersect with a longitudinal edge or formed joint.
The cumulative length of such cracks in each slab shall not be more than
1.0 m length. Cores can be cut to ascertain the depth of cracks where
doubt arises.
12.8.2 Fine hairline crazy cracks
The concrete slabs are to be rejected where the cracks formed are not
complying with the above stipulation . Therefore, the slabs which are to be
rejected are :
i)
Slabs with cracks running transversely or longitudinally penetrating
to full depth and length of the slab.
ii)
Slabs with cracks which are penetrating to more than half the
depth.
iii)
Discrete crack which is more than 500 mm length although its
depth of penetration is less than half of the depth.
iv)
When the total length of all discrete crack is more than 1.0 m whose
depth of penetration is less than half the depth.
13.
Clean Up
The pavement surface shall be swept and/or washed down to remove all
dirt, debris or foreign material prior to opening to traffic.
14.
Opening to traffic
The Contractor shall not permit traffic on the pavement until the concrete
has attained a desired compressive strength.
15.
Other Equipment
Other tools and plants required to carry out pavement concrete work are
as below.
15.1
All equipment necessary for the proper preparation of the subgrade, sub
base and batching, mixing, placing, finishing and curing of the concrete
pavement shall be on the project in good working conditions and shall
have been inspected by the Engineer-in-Charge before the paving
operations are permitted to start. Throughout the construction of the
project, the construction agency shall maintain adequate equipment in first
class working condition to ensure proper execution of the work.
262
15.2
Batching Devices
All batching of materials should be by weight. Weighing equipment shall
be of such design and construction that the materials for each batch can
be quickly and accurately weighed . A weighing accuracy of a 1 percent
may be considered satisfactory. The equipment shall conform to the
requirement laid down in IS 2722-1964 Specifications for portable swing
weight Batchers for concrete (Single and Double bucket type). It shall be
so constructed that the operator can readily shovel out the excess material
in over charged hoppers and the material released all at one time when
the hoppers are discharged.
15.3
Mixer
Concrete mixer of adequate capacity shall be provided and it shall be of
the non tilting type, conforming to the requirements of IS 1791
"Specification for Concrete Mixer (First Revision)" and shall have a rated
capacity of not less than 2 cement bags of mixed concrete. The mixer
shall be equipped with an approved water measuring device capable of
accurate measurement of water required per batch, the mixer shall
preferably be equipped with a mechanically operated pump for filling the
mixer tank.
The mixer if specially specified, shall be equipped with an approved timing
device which will automatically lock the discharge level during the full time
to mixing and release it at the end of mixing period, the device shall also
be equipped with a bell or adjusted to ring each time the lock is released.
If the timing device gets broken or out of order, the mixer will be permitted
to be used while the same is being repaired, provided an approved timepiece equipped with minute and second hand, is provided and that each
batch is mixed for one and half minutes .
15.4
15.5
15.6
Hand Tamper
The tamper shall be shaped to the cross profile of the slab and shall weigh
not less than 10 kg/m. It shall be constructed of 75 mm thick timber or of
263
steel channel cross-section, two feet longer than the proposed width
pavement slab and sufficiently strong and rigid to retain its shape under all
working conditions. If it is of timber it shall be fitted with steel plate at
bottom. The tamper shall be provided with handles which are resilient
and sufficiently long to enable tamping operation to be performed by men
in standing position.
15.7
15.8
Immersion Vibrator
Immersion vibrator shall comprise of a vibrating head with suitable motive
power either of compressed air, electrical or of a Petrol driven engine, rigid
enough to ensure proper control, and manipulation in the mass of
concrete. It shall conform to IS: 2505 Specification for concrete vibrators,
immersed type (First Revision). They shall be employed to ensure
compaction of concrete along the forms and to avoid any tendency in
honey combing at the edges of the slab. In case of road slab exceeding
125 mm thickness, they shall be used at suitable spacing for compacting
the concrete over the entire width of the slabs in addition to screed board
vibrator.
15.9
Longitudinal Float
The longitudinal float shall not be less than 3.75m in length, 150 mm wide
and shall be properly stiffened to prevent flexing and warping.
15.10 Bridges
The bridges shall be so designed that when placed straddling the forms,
no parts shall come in contact with the pavement. They shall be
sufficiently rigid.
15.11 Long Handled wooden float
The blade of the float shall be at least 1500 mm long and 150 mm wide.
Minimum of two floats shall be provided.
15.12 Belts
The belts of canvas shall not be less than 150 mm wide and shall be at
least 600 mm longer than width of the slab. A minimum of two belts shall
be provided.
15.13 Push Brooms
The push brooms shall not be less than 450 mm width and be made from
good quality base fibre. The handle shall be least 300 mm longer than
half the width of the slab. Minimum of four push brooms shall be provided.
264
265
103
RD
73
DESCRIPTION OF ITEMS
Completed
Labour
Sqm.
157.00
85.00
Sqm.
177.00
88.00
105
RD
73
Sqm.
240.00
106.00
106
RD
74
Cum.
414.00
134.00
1948.00
544.00
266
No.
SR. NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
Completed
Labour
No.
3431.00
950.00
No.
5180.00
1566.00
267
110
RD
78
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
No.
750.00
156.00
No.
305.00
110.00
No.
3161.00
781.00
No.
1700.00
470.00
111
RD
78 A
112
RD
78 A
113
RD
80
268
SR. NO.
&
CODE
NO.
114
RD
81
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
No.
1395.00
390.00
No.
1657.00
805.00
115
269
SR. NO.
&
CODE
NO.
116
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Each
3960.00
165.00
Each
iii) 60 cm Circular
Each
2783.00
3564.00
165.00
165.00
iv) 80 cm x 60 cm rectangular
Each
4774.00
165.00
v) 60 cm x 45 cm rectangular
Each
3487.00
165.00
vi) 60 cm x 60 cm square
Each
4037.00
165.00
Each
5951.00
165.00
270
SR. NO.
&
CODE
NO.
117
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
8063.00
153.00
271
Sqm.
SR. NO.
&
CODE
NO.
118
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
9295.00
305.00
272
Sqm.
SR. NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
119
Labour
Overhead Signs
Providing and erecting overhead signs with a
corrosion resistant 2 mm thick aluminum alloy
sheet reflectorised with high intensity retroreflective sheeting vide clause 801.3/ High
intensity Prismatic grade sheeting as per ASTM D
4956, with vertical and lateral clearance given in
clause 802.2 and 802.3 duly painted on back side
with two coats of grey stove enamel paint and
installed as per clause 802.7 over a designed
support system of structural steel work trestles
and trusses of sections and type as per structural
design requirements and approved plans, including
painting with one coat of epoxy primer & two coats
of epoxy finish paint. The nut bolts of board with
angle iron post/supporting structure after fixing at
site has to be electrically welded.Retroreflective
sheeting should be with seven years written
warrenty from the manufacture & authorised
distributer/convertor,for
satisfactory
field
performance,durability & stipulated retroreflectance
of retroreflective sheeting.This certificate in original
should be submitted to the Engineer in charge by
the contractor/supplier.
M.T. 67980.00
Sqm.
b) Aluminium Alloy Plate for Over Head sign
Spec. No. :M.O.R.T & H 2013 Clause No 802
P.No. 335
273
6160.00
2135.00
73.00
SR. NO.
&
CODE
NO.
120
RSC-3
DESCRIPTION OF ITEMS
274
UNIT
Sq.m.
Completed
Labour
7018.00
1830.00
SR. NO.
&
CODE
NO.
121
RSE-1
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Rmt.
693.00
143.00
Rmt.
501.00
128.00
Rmt.
363.00
78.00
123
RSE-3
275
SR. NO.
&
CODE
NO.
124
RSE-4
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Rmt.
308.00
78.00
Rmt.
185.00
78.00
Rmt.
175.00
78.00
126
RSE-6
276
SR. NO.
&
CODE
NO.
127
RSE-7
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Each
385.00
67.00
Each
220.00
18.00
Each
1166.00
598.00
Sq.m.
450.00
13.00
No.
12.00
2.00
129
130
RD 83
277
SR. NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
131
RD 85
No.
19.00
14.00
132
RD
93 A
No.
74.00
33.00
No.
88.00
49.00
No.
12.00
8.00
133
RD
93 B
134
RD
93 C
278
SR. NO.
&
CODE
NO.
135
RD
93 D
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
No.
91.00
56.00
No.
75.00
49.00
No.
30.00
14.00
No.
7.00
4.00
112.00
118.00
34.00
34.00
136
RD
93 E
137
RD
93 F
138
RD
93 G
139
279
Sq.m.
Sq.m.
SR. NO.
&
CODE
NO.
140
RD
94
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
No.
28.00
21.00
Sq.m.
12.00
7.00
1144.00
354.00
143
Cu.m.
Cu.m.
567.00
354.00
567.00
354.00
Cu.m.
140.00
140.00
280
SR. NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
144
No.
229.00
54.00
145
Rmt.
197.00
126.00
Sq.m.
781.00
18.00
281
SR. NO.
&
CODE
NO.
147
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
721.00
18.00
2698.00
207.00
282
Rmt.
SR. NO.
&
CODE
NO.
149
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Rmt
3117.00
100.00
Rmt
4556.00
143.00
283
SR. NO.
&
CODE
NO.
151
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
a)
Rmt
5931.00
214.00
b)
Rmt
6047.00
214.00
c)
Rmt
6186.00
214.00
Rmt.
1793.00
324.00
284
SR. NO.
&
CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
153
Supplying precast conventional reflective delinators
MORTH on four sides for road signs
806
Spec. No. :MORTH 806
No
280.00
57.00
154
Providing and fixing including conveyance charges
MORTH upto a distance of 200 Km. precast concrete post
806
delinators, post of size 130 x 90 x 1300 mm
consisting of 4 B.T. wires with 14,000 Kg/cm2 C.C.
M-20 grade 16mm dia. hold fast, including
excavation & C.C. 1:4:8 foundation block, oil
painting post with 3 coats and Red fluorescent tape
75 x 75mm and white floursent border 20mm wide
around the red tape on all the four sides with
necessary adhesive and laminations etc. complete
No
375.00
92.00
1.00
0.25
6450.00
1056.00
Sq.m.
156
Providing and fixing with apex point upward
MORTH prepared on fibre reinforced plate 3.0 milimeter
801
thick bonded with white retroreflective sheeting on
Engineering grade having pressure sensitive / heat
activated adhesive retrorflective white back ground
and red border and back side gray retoreflective
symbols, letters, numerals, arrows, one M.S. angle
post of 65 x 65 x 6 mm size and 3.65 meter long
inflated bottom and drilled on top and painting
posts with white and black border of 25
centimetres, fitting board to post with 2 numbers of
strong G.I. bolts and nuts including transportation
and fixing in p.c.c. 1:4:8 etc. complete. (The work
to be executed with prior approval of
Superintending Engineer)
No.
285
SURVEY WORK
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
2533.00
Per Km
4356.00
Per No
357.00
Per Km
3220.00
Per Km
708.00
Per Km
293.00
286
2029.00
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Per Km
220.00
/ Km
3264.00
2698.00
/ Km
6439.00
5196.00
Per Km
1415.00
287
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
10
Per No
348.00
164.00
11
Per No
1320.00
799.00
12
Each
24916.00
21163.00
288
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
13
289
Each
Labour
2645.00
Each 31963.00
27436.00
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
15
/ Each
Labour
2990.00
16
A) 0.00 up to 150.oo mtr. [Bed Width]
Each 57244.00
42240.00
Each 62968.00
46530.00
290
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
17
18
4431.00
/ Rmt
2192.00
/ Rmt
2600.00
291
Labour
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
19
/ Rmt
2588.00
2996.00
292
/ Rmt
3857.00
4850.00
Labour
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
21
22
i) BY NX Drill
As directed by Engineer in charge.
/ Rmt
7340.00
/ Rmt
9429.00
/ Rmt
6341.00
1) BY BX Drill
As directed by Engineer in charge.
[As per "Guidelines for preparation of Road
Project" by P.W.D.]
ii) for Trial Bores Drilling In Standing Water
293
7740.00
Labour
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
23
Labour
/ Rmt
5448.00
/ Rmt
6435.00
Per No
2253.00
24
25
294
/Sq.Km. 23138.00
13179.00
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
26
/ Sq.Km 20120.00
295
Per Day
4111.00
Labour
11460.00
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
28
Per Day
6009.00
29
/ Per Day
7809.00
296
Labour
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
30
a)
b)
No.
2420.00
No.
2420.00
c)
No.
1452.00
d)
No.
1452.00
e)
No.
847.00
f)
No.
726.00
g)
No.
424.00
h)
No.
424.00
i)
No.
121.00
j)
No.
121.00
297
Labour
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
31
32
Per Km 22425.00
b) By Auto Level
Per Km 16819.00
Per Km 11247.00
298
Labour
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
33
34
299
sqm
2.00
Per Sqm
1.50
Labour
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
35
Per km
2244.00
36
Preparation of roadway drawing ( profile/ Lsection) using available user data computer in
Auto Cad at required scale spacified in / as per
IRC and submitting on C.D. including template,
necessary project details on each drawing
As directed by Engineer in charge.
by partly using departmental Staff
Per km
1196.00
37
No
3457.00
38
Km
4867.00
300
Labour
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
39
Km
3152.00
40
Km
3991.00
41
Km
398.00
301
Labour
133.00
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
42
302
per Day
10980.00
Labour
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
Labour
Per Sqm
2.00
2.00
Per Km
3042.00
43
44
45
No
3300.00
46
Per Km
2184.00
47
Km
3300.00
303
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
VIDEO PHOTOGRAPHY
1 Preparing and carrying out vido shooting of
One Hour
road, bridges, other structures and programme,
Compact
including preliminarys survey, still shots, moving
Disc
shooting, necessary board for video shooting
hiring of vehicle, equipents for video shooting
tranportation of all equipments, persons,
requried for shooting, lighting arrangement as
may be necessary, editing, mixing, titiling,
lettering, sonding including cost of coloured
casset of approved quality etc. complete.
i) Rate cassette/ hour
Spec. No. :- As directed by Engineer- in charge.
550.00
A) within 50 kms.
I) Work up to 5 Hours
Per day
Per day
2200.00
1100.00
B) beyound 50 Km.
i) Work up to 5 Hours
Per day
Per day
2400.00
1200.00
304
Labour
SR.NO.
& CODE
NO.
DESCRIPTION OF ITEMS
UNIT
Completed
Each set
Each set
Each
Each
305
88.00
143.00
10.00
17.00
Labour
MATERIAL RATES
Sr. Code
No.
Description
Unit
Rate for
2014-15
(Rs.)
No.
33.00
No.
35.00
Cu.m.
210.00
SAND (SCREENED)
Cu.m.
450.00
CEMENT
Bags
290.00
M. T.
44300.00
BINDING WIRES
Kg.
68.00
NAILS
Kg.
68.00
10
M. T.
Deleted
10
M.T.
46000.00
11
15
Cu.m.
240.00
12
18
Cu.m.
130.00
13
19
FIRE WOOD
Quintal
310.00
14
20
M. T.
57580.00
15
M. T.
61570.00
M. T.
53925.00
M. T.
57915.00
M. T.
52895.00
16
17
18
19
22
SOLVANT (LDO)
Ltr.
62.00
20
27
No.
Deleted
21
28
No.
Deleted
22
30
No.
42.00
23
31
Cu.m.
170.00
24
32
No.
Deleted
25
33
No.
Deleted
26
34
Cu.m.
Deleted
27
35
Cu.m.
Deleted
28
36
Cu.m.
295.00
29
37
Cu.m.
320.00
30
38
Cu.m.
305.00
31
39
Cu.m.
320.00
32
40
Cu.m.
650.00
33
41
Cu.m.
700.00
34
42
Cu.m.
750.00
35
43
Cu.m.
460.00
36
44
HARD MURUM
Cu.m.
225.00
306
Sr. Code
No.
Description
Unit
Rate for
2014-15
(Rs.)
37
45
SOFT MURUM
Cu.m.
200.00
38
46
Cu.m.
450.00
39
200.00
40
49
Cu. M.
Cu.m.
41
53
M. T.
47500.00
42
54
STEEL PLATES
M. T.
52000.00
43
Cu.m.
400.00
44
55
Cu.m.
225.00
45
56
Kg.
12.00
46
61
BRICK BATS
Cu.m.
600.00
47
79
BRICKS ( II CLASS)
No.
4.50
48
80
BRICKS ( I CLASS)
No.
Deleted
49
No.
4.00
50
82
FIRE BRICKS
No.
20.00
51
86
KHANDKIES
No.
Deleted
52
92
No.
65.00
53
93
Sq. m.
Deleted
54
95
Sq. m.
180.00
55
97
Kg.
90.00
56
98
Sq. m.
Deleted
57
99
Sq. m.
200.00
58
Sq. m.
Deleted
59
101 NEERU.
Kg.
Deleted
60
Sq. m.
425.00
61
Sq. m.
Deleted
62
Sq. m.
Deleted
63
Sq. m.
Deleted
64
Sq. m.
Deleted
65
Sq. m.
Deleted
66
Sq. m.
180.00
67
Sq. m.
185.00
68
Doz.
Deleted
69
Doz.
Deleted
70
Sq. m.
1600.00
71
Sq. m.
1200.00
72
Kg.
Deleted
73
Kg.
Deleted
307
315.00
Sr. Code
No.
Description
Unit
Rate for
2014-15
(Rs.)
Per 50
Kg.
Bag
Kg.
750.00
74
75
76
Sq. m.
250.00
77
122
Sq. m.
375.00
78
Sq. m.
Deleted
79
Sq. m.
Deleted
80
Sq. m.
475.00
81
Sq. m.
Deleted
82
Sq. m.
170.00
83
Ltr.
100.00
84
139 TURPENTINE
Ltr.
70.00
85
Ltr.
170.00
86
142 VARNISH
Ltr.
150.00
87
Kg.
55.00
88
Ltr.
55.00
89
Kg.
180.00
90
Ltr.
250.00
91
Ltr.
250.00
92
Ltr.
250.00
93
Kg.
140.00
94
Kg.
280.00
95
Kg.
10.00
96
Kg.
85.00
97
Kg.
100.00
98
Kg.
50.00
99
Cu. M.
75000.00
100
Cu. M.
77000.00
101
Cu. M.
77000.00
102
Cu. M.
78000.00
103
Cu. M.
75000.00
104
Cu. M.
56000.00
105
Rmt.
150.00
106
Rmt.
160.00
107
Rmt.
175.00
108
Cu. M.
30000.00
109
No.
3.00
110
No.
6.50
308
100.00
Sr. Code
No.
Description
Unit
Rate for
2014-15
(Rs.)
111
No.
0.75
112
No.
10.00
113
Rmt.
70.00
114
No.
20.00
115
M. T.
66000.00
116
M. T.
68000.00
117
Kg.
90.00
118
Kg.
95.00
119
Kg.
100.00
120
M. T.
66000.00
121
Kg.
100.00
122
Pair.
270.00
123
Kg.
80.00
124
No.
350.00
125
Sq. m.
Deleted
126
Sq. m.
Deleted
127
Sq. m.
Deleted
128
Sq. m.
155.00
129
Sq. m.
400.00
130
Sq. m.
305.00
131
Sq. m.
170.00
132
Sq. m.
385.00
133
Sq. m.
600.00
Sq. m.
430.00
135
Sq. m.
275.00
136
Cum
89000.00
137
No.
45.00
138
No.
55.00
139
No.
60.00
140
No.
65.00
141
No.
50.00
142
No.
60.00
143
No.
70.00
144
No.
50.00
145
No.
30.00
146
Sq. m.
500.00
147
No.
30.00
309
Sr. Code
No.
Description
Unit
Rate for
2014-15
(Rs.)
148
No.
30.00
149
No.
18.00
150
No.
35.00
151
No.
20.00
152
No.
725.00
153
No.
65.00
154
No.
180.00
155
No.
35.00
156
No.
30.00
157
No.
22.00
158
No.
120.00
159
No.
65.00
160
No.
80.00
161
No.
70.00
162
No.
45.00
163
No.
12.00
164
No.
75.00
165
No.
85.00
166
No.
65.00
167
No.
95.00
168
No.
35.00
169
No.
185.00
170
No.
30.00
171
No.
185.00
172
No.
32.00
173
Sq. m.
1350.00
174
No.
170.00
175
Sq. m.
1100.00
176
Sq. m.
130.00
177
No.
40.00
178
No.
35.00
179
Sq. m.
185.00
180
Kg.
80.00
181
No.
140.00
182
No.
130.00
183
No.
135.00
184
No.
65.00
310
Sr. Code
No.
Description
Unit
Rate for
2014-15
(Rs.)
185
No.
8.50
186
No.
Deleted
187
No.
185.00
188
No.
275.00
189
No.
325.00
190
No.
15.00
191
No.
21.00
192
No.
26.00
193
No.
225.00
194
No.
310.00
195
No.
480.00
196
No.
220.00
197
No.
260.00
198
No.
240.00
199
No.
160.00
200
No.
265.00
201
No.
585.00
202
No.
Deleted
203
Pair.
120.00
204
No.
950.00
205
No.
1000.00
206
No.
1750.00
207
No.
550.00
208
Rmt.
45.00
209
No.
700.00
210
No.
1650.00
211
No.
190.00
212
No.
600.00
213
Rmt.
65.00
214
No.
135.00
215
No.
Deleted
216
No.
245.00
217
No.
275.00
218
No.
350.00
219
No.
200.00
220
No.
220.00
221
No.
300.00
311
Sr. Code
No.
Description
Unit
Rate for
2014-15
(Rs.)
222
Rmt.
140.00
223
Rmt.
165.00
224
Rmt.
205.00
225
Rmt.
255.00
226
Rmt.
300.00
227
Rmt.
410.00
228
Rmt.
500.00
229
Rmt.
640.00
230
Rmt.
900.00
231
No.
1250.00
232
No.
45.00
233
No.
50.00
234
Rmt.
60.00
235
No.
50.00
236
No.
120.00
237
Rmt.
90.00
238
Rmt.
50.00
239
Rmt.
60.00
240
Rmt.
70.00
241
Rmt.
90.00
242
Rmt.
110.00
243
Rmt.
125.00
244
Rmt.
155.00
Rmt.
225.00
Rmt.
280.00
247
No.
1300.00
248
No.
850.00
249
No.
175.00
250
No.
490.00
251
No.
520.00
252
No.
1020.00
253
No.
1375.00
254
No.
2400.00
255
No.
385.00
256
No.
510.00
257
No.
630.00
258
No.
3300.00
312
Sr. Code
No.
Description
Unit
Rate for
2014-15
(Rs.)
259
No.
925.00
260
No.
1320.00
261
No.
260.00
262
No.
330.00
263
No.
415.00
264
459 A. C. COLLER
No.
26.00
265
No.
950.00
266
No.
88.00
267
No.
115.00
268
No.
75.00
269
Rmt.
80.00
270
No.
85.00
271
Rmt.
145.00
272
Rmt.
190.00
273
Doz.
165.00
274
Rmt.
50.00
275
Sq. M.
410.00
276
Sq. M.
575.00
277
Rmt.
650.00
278
Rmt.
790.00
279
Rmt.
1200.00
280
No.
180.00
281
No.
60.00
282
No.
55.00
283
630 A. C. BEND 75 MM
No.
50.00
284
No.
53.00
285
No.
300.00
286
No.
160.00
287
No.
55.00
288
No.
70.00
289
No.
55.00
290
No.
160.00
291
No.
55.00
292
No.
30.00
293
No.
82.00
294
No.
385.00
295
No.
90.00
313
Sr. Code
No.
Description
Unit
Rate for
2014-15
(Rs.)
296
No.
220.00
297
No.
165.00
298
No.
60.00
299
No.
75.00
300
No.
30.00
301
Sq. M.
300.00
302
Kg.
70.00
303
Rmt.
30.00
304
Kg.
50.00
305
Rmt.
20.00
306
Kg.
12.00
307
Cu. M.
29000.00
308
Sq. M.
40.00
309
Kg.
50.00
310
Sq. M.
700.00
311
No.
35.00
312
No.
45.00
No.
65.00
314
No.
40.00
315
No.
42.00
316
No.
40.00
317
No.
60.00
318
No.
115.00
319
No.
115.00
320
No.
95.00
321
No.
Deleted
322
No.
125.00
323
No.
185.00
324
No.
220.00
325
851 FLANGE 15 MM
No.
20.00
326
No.
30.00
327
No.
265.00
328
No.
160.00
329
No.
140.00
330
No.
100.00
331
No.
140.00
314
Sr. Code
No.
Description
Unit
Rate for
2014-15
(Rs.)
332
No.
145.00
333
No.
440.00
334
No.
175.00
335
No.
260.00
336
No.
285.00
337
No.
175.00
338
No.
200.00
339
No.
385.00
340
No.
155.00
341
No.
100.00
342
No.
130.00
343
No.
170.00
344
No.
40.00
345
No.
52.00
346
No.
44.00
347
No.
40.00
348
No.
50.00
349
No.
60.00
350
Rmt.
155.00
351
Rmt.
235.00
352
Rmt.
360.00
879 80 mm Dia
Rmt.
715.00
354
Rmt.
900.00
355
Rmt.
1150.00
356
Rmt.
1350.00
357
Rmt.
2200.00
358
Rmt.
2400.00
359
Rmt.
3300.00
360
Sqm
475.00
No.
2000.00
No.
660.00
889 L.D.O
890 Vetrified Tiles 600 mm x 600 mm, 8 mm thick
Litre
75.00
Sqm
890.00
Sqm
1100.00
Sqm
300.00
Sqm
310.00
361
362
363
364
365
366
315
Sr. Code
No.
Description
Unit
Rate for
2014-15
(Rs.)
Sqm
160.00
Litre
Deleted
Litre
100.00
No.
40.00
150
No.
45.00
150
No.
55.00
No.
300.00
374
No.
320.00
375
No.
350.00
376
Sqm.
Deleted
367
368
369
370
371
372
373
150 mm
Deleted
400.00
495.00
740.00
925.00
377
Sqm.
235.00
378
Litre
165.00
379
M. T.
40.00
380
NO.
1450.00
381
NO.
500.00
382
NO.
650.00
383
Sqm
140.00
384
Sqm
380.00
385
KG
135.00
386
Sqm
275.00
Sqm
400.00
387
Cu. M.
540.00
388
Cu. M.
600.00
389
Cu. M.
625.00
Kg.
65.00
No
150.00
Kg
60.00
390
391
50
392
47
Blasting Powder
393
No
2.45
394
Cylinder
3000.00
395
396
Liter
Rmt
318.00
158.00
397
Rmt
127.00
316
Sr. Code
No.
Description
Unit
Rate for
2014-15
(Rs.)
398
Rmt
106.00
399
54
Kg.
70.00
400
Kg
125.00
Sqm
650.00
Gusset plate
401
--
402
--
No
1600.00
403
--
No
200.00
404
--
Liter
112.50
405
--
Sqm
350.00
406
--
Sqm
390.00
407
--
Hallow block
No
70.00
408
--
Kg
365.60
409
Polymer
Kg
355.00
410
--
Sqm
31.50
411
--
Polypropylene fiber
Kg
450.00
412
--
Liter
225.00
413
--
Kg
300.00
414
--
each
30.00
415
--
416
--
Liter
Liter
1500.00
393.75
Sqm
31.50
417
418
--
Kg
100.00
419
--
Synthetic tile
Sqm
400.00
420
--
Bag
650.00
421
--
Kg
75.00
422
Sqm
3000.00
423
Sqm
150.00
424
--
Cow dung
Bag
35.00
425
--
Polishing stone
No
100.00
426
--
Sqm
325.00
427
Gross
50.00
428
Kg
260.00
429
Kg
180.00
Kg
260.00
431
No
66.00
432
No
89.00
433
No
98.00
430
--
317
8. LABOUR
Sr.
No.
Code
RATES
Description
Unit
DAY
283.00
DAY
283.00
DAY
286.00
DAY
283.00
DAY
283.00
DAY
283.00
DAY
283.00
DAY
283.00
DAY
283.00
10
10
DAY
286.00
11
11
DAY
283.00
12
12
DAY
286.00
13
13
MECHANIC.
DAY
286.00
14
14
DAY
286.00
15
16
WELDER/DRILLER, SKILLED.
DAY
286.00
16
17
POLISHMAN, SEMISKILLED
DAY
283.00
17
18
DAY
286.00
18
21
DAY
286.00
19
24
DAY
286.00
20
26
DAY
283.00
21
27
DAY
283.00
22
29
DAY
283.00
23
31
DAY
286.00
24
32
DAY
283.00
25
34
DAY
283.00
26
37
NAVAGHANI
DAY
279.00
27
38
DAY
279.00
28
39
DAY
279.00
29
41
DAY
286.00
30
42
DAY
283.00
31
55
WELDER
DAY
283.00
32
59
ELECTRICIAN
DAY
283.00
33
62
WATCHMAN
DAY
283.00
34
64
SUPERVISOR
DAY
283.00
318
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
5.5
6
6.5
7
7.5
8
8.5
9
9.5
10
10.5
11
11.5
12
12.5
13
13.5
14
14.5
15
15.5
16
16.5
17
17.5
18
18.5
19
19.5
20
78.00
86.00
94.00
103.00
111.00
119.00
127.00
135.00
144.00
151.00
159.00
166.00
175.00
182.00
190.00
198.00
205.00
213.00
219.00
225.00
232.00
238.00
245.00
251.00
258.00
264.00
271.00
277.00
283.00
290.00
295.00
301.00
306.00
311.00
317.00
322.00
327.00
333.00
338.00
344.00
319
LEAD IN K.M.
20.5
21
21.5
22
22.5
23
23.5
24
24.5
25
25.5
26
26.5
27
27.5
28
28.5
29
29.5
30
349.00
354.00
360.00
365.00
370.00
376.00
381.00
386.00
392.00
397.00
402.00
407.00
412.00
417.00
421.00
426.00
431.00
436.00
441.00
446.00
NOTE :-
Note :-Above Rate of transportation of pipe and collers do not include loading and
unloading charges.
320
321
Materials
Unit
Rates for
Loading
carriage of
materials
upto a lead
of 50 Mtrs.
Boulders
Rubbles &
Masonry stones
Metal of all
sizes
Cu.M.
(in Rs.)
21.12
(in Rs.)
17.60
(in Rs.)
10.56
Cu.M.
21.12
17.60
10.56
Moorum Sand
Earth & Loose
material
Lime
Cu,.M.
17.60
16.53
7.04
Cu.M.
24.64
22.29
8.21
Shahabad/
Sikosa
Sq.M.
1.07
1.07
0.96
Fuel Wood
(Babul)
M.T.
19.95
17.60
4.69
Cement
M.T.
30.61
22.29
14.08
M.T.
37.65
30.61
18.77
2
3
Timber
10
Maxphal Pack
Tin
10-A
Carting of bulk
Bitumen
A) From refinery
10-B
Bituminous &
Metal mix (mix
material)
transportation
Transportation of metal
Cu,M.
22.29
16.43
8.21
M.T.
24.64
22.29
10.56
----
----
----
----
----
----
M.T.
322
Sr.No.
Materials
Unit
Rates for
Loading
carriage of
materials
upto a lead
of 50 Mtrs.
(in Rs.)
18.77
(in Rs.)
18.77
(in Rs.)
12.91
11
Bricks
Cu.M.
12
Manglore tiles
including
Ridgeing and
Hipping
1000
Nos
21.12
18.77
15.89
13
Single Allahbad
tiles and country
tiles
1000
Nos
21.12
18.77
15.89
14
Flooring Tiles
size 0.30m x
0.30 m
1000
Nos
21.12
18.77
15.89
15
A.C.sheets
M.T.
23.47
18.77
9.39
16
Bamboos
1000
Nos
42.35
30.61
27.09
17
Ballies of all
Diameters
Rmt.
0.32
0.32
0.32
18
Gravel
Cu.M.
10.56
8.21
5.87
19
Steam Coal
M.T.
23.47
17.60
8.21
20
G.I.Sheets
M.T.
22.29
17.60
8.21
21
R.C.C.Pipes
and Collers
M.T.
47.04
36.48
8.21
323
DESCRIPTION
UNIT
Rate for
2014-15
in Rs.
Hour
643.00
Hour
625.00
Vibrator (Diesel)
Hour
123.00
Hour
117.00
Hour
195.00
Hour
290.00
Hour
13.00
Hour
687.00
Guniting Gun.
Hour
212.00
Day
290.00
10
K.M.
41.00
11
Hour
1004.00
12
Hour
2672.00
13
Hour
2789.00
14
Hour
2455.00
15
Hour
569.00
16
Day
614.00
17
Hour
372.00
18
Day
184.00
19
Day
837.00
20
129.00
21
Running
meter
Hour
22
Hour
210.00
23
Hour
978.00
24
Hour
2035.00
25
Hour
393.00
26
Hour
1027.00
27
Hour
128.00
28
Hour
718.00
324
223.00
Sr.No.
DESCRIPTION
UNIT
Rate for
2014-15
in Rs.
29
Mechanical Sprayer.
M.T.
1088.00
30
Hour
2805.00
31
Hour
1674.00
32
Hour
2342.00
33
M.T.
165.00
34
Hour
1004.00
35
K.M.
68.00
36
K.M.
53.00
37
Hour
960.00
38
Hour
406.00
39
Hour
390.00
40
Hour
1255.00
41
Hour
806.00
42
Hour
1665.00
43
Hour
1417.00
44
Drawn Scraper
Hour
234.00
45
Sismopactor 850-S
Hour
1709.00
46
Hour
460.00
47
Pavement Braker
Hour
285.00
48
Hour
1283.00
49
Hour
1824.00
50
Hour
192.00
51
Mastic Cooker
Hour
67.00
52
Hour
390.00
53
Wagon Drill
Day
4177.00
54
Dozer CAT.D.8.K
Hour
4316.00
55
Dozer CAT.D.4.E
Hour
1542.00
56
Vibratory Roller
Hour
2102.00
325
CEMENT CONSUMPTION
C.C. 1:4:8
3.40 bag/cum
4.40 bag/cum
C.C.M-15/ 1:2:4
6.27 bag/cum
C.C. M-20
7.10 bag/cum
C.C. M-25
7.50 bag/cum
C.C. M-30
8.00 bag/cum
C.C. M-35
8.30 bag/cum
C.C. M-40
8.50 bag/cum