Introduction
The light weight of HDPE pipe makes it desirable because of the ease of handling and installation but this same
benefit also makes HDPE pipe prone to flotation. All pipe products, such as concrete and corrugated metal, are
prone to flotation under the right circumstances. In fact, all pipe materials and other buried structures are subject to
flotation. When the uplift on the pipe or structure exceeds the downward force of the weight and load it carries, the
pipe (or structure) will rise or heave. Where flotation is a possibility, proper installation and/or anchoring of the
pipe is critical. This document provides an analysis on minimum cover heights required to prevent pipe flotation for
HDPE pipe sizes 12-60. Buoyant forces due to Controlled low strength material (CLSM) will also be discussed.

Hydrostatic Uplift Due to a High Water Table


Buoyancy becomes an issue in buried pipe when the groundwater encroaches into the pipe zone. For projects
where a high groundwater table or water surrounding the pipe is expected, precautions should be taken to prevent
the floatation of HDPE pipe. Under the right conditions and when increased cover heights are possible, providing a
minimum amount of cover will help prevent flotation.
The vertical hydrostatic uplift force, U, due to the water table can easily be calculated from Equation 1 below:
2
U = D w
(1)
4
where U = lb/linear ft of pipe
D = O.D. of the pipe in question, ft.
w = unit weight of water = 62.4 lb/ft3
This hydrostatic uplift force must be balanced by soil overburden and the weight of the pipe in order to ensure that
the pipe will not float. Soil loads experienced by a pipe at varying water table depths (Wsoil) can be calculated from
Equation 2. Figure 1 illustrates each of the three cases seen in field installations where buoyancy becomes a
concern, and also clarifies all of the parameters contained within Equation 2.
Wsoil = dryHdryD + (sat- w)(Hsub+ 0.1073D)D (2)
where

Wsoil = weight of soil overburden, lb/linear ft of pipe


dry = dry unit weight of the soil, lb/ft3
Hdry = depth of dry soil, ft.
Hsub = depth of submerged soil over top of pipe, ft.
sat = saturated unit weight of the soil, lb/ft3
sat - w = submerged unit weight of the soil, lb/ft3

4640 TRUEMAN BLVD. HILLIARD, OH 43026. (800) 821-6710 www.ads-pipe.com


ATN505

1
ADS 2007

Figure 1
Installation Conditions for Possible Flotation of HDPE Pipe

(a) Water table at pipe crown

(b) Water table exceeds


pipe crown elevation

(c) Water table is at


ground surface

The typical weights (Wpipe) and average outside diameters are shown in Table 1.

Table 1
Approximate Weights of Dual Wall HDPE Pipe
Nominal
Diameter
in. (mm)
4 (100)
6 (150)
8 (200)
10 (250)
12 (300)
15 (375)
18 (450)
24 (600)
30 (750)
36 (900)
42 (1050)
48 (1200)
60 (1500)

Nominal OD
in. (mm)

Weight
lb/ft (kg/m)

4.6 (117)
7.0 (178)
9.5 (241)
12 (305)
14.5 (368)
18 (457)
22 (559)
28 (711)
36 (914)
42 (1067)
48 (1219)
54 (1372)
67 (1702)

0.44 (0.6)
0.85 (1.3)
1.5 (2.2)
2.1 (3.1)
3.2 (4.7)
4.6 (6.8)
6.4 (9.5)
11.0 (16.4)
15.4 (22.9)
19.8 (29.4)
26.4 (39.3)
31.3 (46.6)
45.2 (67.3)

4640 TRUEMAN BLVD. HILLIARD, OH 43026. (800) 821-6710 www.ads-pipe.com

The minimum depth of cover (H) required to resist uplift can be calculated by equating the sum of the downward
forces to the sum of the upward or buoyant forces. While there are varying methods to account for soil load
distribution on the pipe, for conservative minimum cover requirements, the soil load is assumed to be the soil
column directly above the outside diameter of the pipe as illustrated in Figure 2(a). Therefore, minimum cover is
calculated using Equations 3 and 4 below:
U O WSoil + WPipe
where

(3)

Wpipe = weight of the pipe, lb/linear ft of pipe


H = Hdry + Hsub

(4)

Figure 2
Forces Affection Flotation

(a) Soil Column Loading Conditions

(b) Prism Loading Conditions

Table 2, below, provides the calculated minimum cover requirements to prevent flotation of HDPE pipe.

Table 2
Minimum Cover* To Prevent Flotation
of Dual Wall HDPE Pipe
Nominal
Diameter
in. (mm)
4 (100)
6 (150)
8 (200)
10 (250)
12 (300)
15 (375)
18 (450)

Minimum
Cover
in. (mm)
3 (77)
4 (102)
5 (127)
7 (178)
9 (368)
11 (457)
13 (559)

Nominal
Diameter
in. (mm)
24
30
36
42
48
60

Minimum
Cover
in. (mm)
17 (711)
22 (914)
25 (1067)
29 (1219)
33 (1372)
40 (1702)

*For structural purposes, a minimum cover of 12 shall apply for 4-42 pipe, and 24 for 48-60 pipe.

4640 TRUEMAN BLVD. HILLIARD, OH 43026. (800) 821-6710 www.ads-pipe.com

The following assumptions were used to determine minimum cover requirements listed in table 2. For applications
where different installation conditions are present, the possibility of flotation should be reviewed based on the
specific project conditions.
1. The pipe is assumed to be empty. This not only simplifies the calculations but creates a condition that
would encourage flotation. Unless the system is constructed to be watertight, this condition would not likely
be found in an actual installation.
2. The outside diameter of the corrugated pipe was used to determine soil and water displacement.
3. Saturated soil density used was 130 pcf which is typical for many saturated soil mixtures. Soils of greater
densities will reduce the chance of flotation.
4. The water table was assumed to be at the ground surface, as illustrated in Figure 1(c), simulating a fully
saturated soil. This assumption creates a worst case condition to yield more conservative results.

Example 1: Calculate the minimum depth of cover required to prevent 48 N-12 from floating when the water table
is at the top of grade. The dry and saturated unit weights of the soil are 110 lb/ft3 and 130 lb/ft3, respectively.
Solution: U O WSoil + WPipe
Wpipe = 32.0 lb/ft (from Table 1)
U=

(4.5)2 (62.4) = 992.4 lb/ft

The water table is at top of grade, so Figure 1(c) applies. Since Hdry=0, the first term in
Equation 2 is eliminated:
Therefore,

Wsoil = (130 -62.4)[Hsub + (0.1073)(4.5)](4.5) + 32 = 304.2 Hsub + 146.9 + 32

Equation 3 then yields:

992.4 = 304.2 Hsub + 178.9


Hsub = 2.67 = 32.1 (use 33)

Finally, calculate minimum cover from Equation 4:

H = Hsub = 33

The above calculations are conservative. The angle of internal friction of the soil, , and the coefficient of lateral
earth stress, Ko, are not accounted for in the above equations. These parameters are best left to the geotechnical
engineer. If these parameters are added to the above calculations, the depth of cover required would be reduced.
If adequate soil cover cannot be obtained to prevent pipe flotation, an alternate method of stabilizing the pipe can
be chosen. Some examples are shown in Figure 3.

Figure 3
Pipe Stabilizing Alternatives

(a) Geotextile wrap

(b) Concrete collar or


precast swamp weight

(c) Screw anchor

4640 TRUEMAN BLVD. HILLIARD, OH 43026. (800) 821-6710 www.ads-pipe.com

Uplift Due to CLSM Backfill


Controlled low strength material (CLSM) is flowable fill which usually consists of Portland Cement, sand, water,
and fly ash. Uplift due to CLSM backfill can be calculated from Equation 5.
U=

Where,

disp CLSM
144

(5)

Adisp = Area of pipe displaced by CLSM, in2


CLSM = Unit weight of CLSM, lb/ft3
U = Uplift due to CLSM backfill, lb/in

Due to the vast differences in the unit weights between water and CLSM, CLSM uplift can be greater than two
times that of hydrostatic uplift. When backfilling with CLSM, the absence of soil overburden will cause the pipe to
float. Therefore, the pipe must be anchored to remain on its intended alignment and grade. This is commonly
done by anchoring rebar in an X-pattern over the top of the pipe and into the side walls of the trench, by utilizing
dry CLSM material as anchors, or by other types of commercially available anchors.
Spacing of support anchors can vary depending on pipe diameter, height of CLSM lift, and anchor type. The
Engineers design should take these factors into account so to maintain the intended pipe grade. The maximum
spacing between anchor supports should not exceed 10 feet. In this manner, pipe is supported at each joint and at
the midpoint of each length of pipe to ensure adequate stabilization. After determining the spacing between pipe
anchors, an anchor type must be chosen based on the required restraining forces to prevent flotation. Due to the
variations in CLSM mixtures, in-situ soil densities, and the restraining force of the anchors, a geotechnical
engineer should evaluate the project-specific conditions to determine the required anchor type and spacing to
prevent flotation.

Conclusion
Many instances pipe flotation may simply be addressed with adequate cover, in those situations where adequate
cover cannot be achieved, alternate methods for restraining the pipe are available. Even under the significant
uplift conditions of placing CLSM, the pipes embedment grade and alignment can be maintained using anchors.