Fire Protection System
Fire Protection System
Design Basics.
The Basics Of Design will be on the clients (TNB) specified required for the fire
protection of the Hydroelectric Project, Hulu Terengganu. In addition the
system design will be in accordance and compliance to Jabatan Bomba
Malaysia requirent and standards as follows :a)
b)
c)
d)
4) Eelctrical Room
a. Kiddle Argonite Fire Extinguishing System with Kiddle Senator
Aspirating Smoke Detection addition Optical / Heat Detectors.
9) Battery Room.
a. Kiddle Argonite Fire Extinguishing System with Kiddle Senator
Aspirating Smoke Detection addition Optical / Heat Detectors.
b. Control Panel, Schedule 40 pipelines and nozzles, Discharge and
nozzles.
c. Portable Fire Extinguisher- Co2 Fire Extinguisher.
10)
GSUT Transformer.
Water Spray High Velocity Nozzles System with Deluge Alarm Control
Valve, fittings and Nozzles are High Velocity Nozzles. System Fire
Detection and actuation are by :
11)
SCHEDULE OF PRICES
Protected Area
Amount (RM)
6,480,000.00
4,280,000.00
135,000.00
11 KV Room
135,000.00
33 KV Room
135,000.00
Control Room
140,000.00
DC Room
100,000.00
Battery Room
Transformer
Testing and Commissing
68,000.00
280,000.00
50,000.00