Resource Management in
Primavera P6 Rel 6.2
Student Guide
D57541GC10
Edition 1.0
April 2009
D59293
Copyright 2009, Oracle. All rights reserved.
Disclaimer
This document contains proprietary information and is protected by copyright and other intellectual property laws. You may
copy and print this document solely for your own use in an Oracle training course. The document may not be modified or
altered in any way. Except where your use constitutes "fair use" under copyright law, you may not use, share, download,
upload, copy, print, display, perform, reproduce, publish, license, post, transmit, or distribute this document in whole or in part
without the express authorization of Oracle.
The information contained in this document is subject to change without notice. If you find any problems in the document,
please report them in writing to: Oracle University, 500 Oracle Parkway, Redwood Shores, California 94065 USA. This
document is not warranted to be error-free.
Restricted Rights Notice
If this documentation is delivered to the United States Government or anyone using the documentation on behalf of the
United States Government, the following notice is applicable:
U.S. GOVERNMENT RIGHTS
The U.S. Governments rights to use, modify, reproduce, release, perform, display, or disclose these training materials are
restricted by the terms of the applicable Oracle license agreement and/or the applicable U.S. Government contract.
Trademark Notice
Oracle is a registered trademark of Oracle Corporation and/or its affiliates. Other names may be trademarks of their
respective owners.
This training manual may include references to materials, offerings, services, or products that were previously offered by
Primavera Systems, Inc. Certain materials, offerings, services, or products may no longer be offered or provided. Oracle
Corporation and its affiliates cannot be held responsible for any such references should they appear in the text provided.
Course Contents
Lesson 1:
Creating Resources and Roles
Roles and Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Resources Window . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Resource Security . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Defining Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Creating a Resource via Wizard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Resource Details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
General Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Codes Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Details Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
Units & Prices Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Roles Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Notes Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Timesheets Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Creating a Material Resource . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
Defining Roles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
Creating a Role . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
General Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
Resources Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
Prices Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
Limits Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
Resource Management in Primavera P6 Rel. 6.2
Course Contents
Lesson 2:
Assigning Cost Accounts
29
Cost Accounts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
Assigning a Cost Account . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
Expenses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
Cost Account Columns . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
Lesson 3:
Resource and Role Analysis
35
Resource Usage Profile . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
Displaying the Profile . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
Viewing Allocation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
Stacked Resource Histogram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
Resource Usage Spreadsheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
Analyzing Resources via Spreadsheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
Left Pane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45
Middle Pane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
Right Pane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
Editing the Resource Usage Spreadsheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48
Viewing Role Allocation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50
Case Study 1: Assigning and Analyzing
55
Lesson 4:
61
Resource Assignments Window
The Resource Assignments Window . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
Assignment Details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
General Tab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
Adjusting Assignments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66
Viewing Nonlinear Allocation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68
ii
Resource Management in Primavera P6 Rel. 6.2
Course Contents
Lesson 5:
Manual Resource Allocation
71
Resource Lag and Resource Duration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72
Adding Lag, Duration to Resource Assignment . . . . . . . . . . . . . . . . . . . . 72
Resource Curves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75
Viewing Resource Curves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75
Assign a Curve to a Resource Assignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76
Lesson 6:
Bucket Planning
79
Future Period Bucket Planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
Bucket Planning and Baselines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
Specifying the Activity Duration Type . . . . . . . . . . . . . . . . . . . . . . . . . . . 81
Editing Future Period Buckets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82
Editing Period Buckets for Multiple Assignments . . . . . . . . . . . . . . . . . . . 84
Tracking Manual Curves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86
Lesson 7:
Leveling Resources
89
Leveling Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 90
Handling Resource Conflicts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91
Leveling Rules . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 92
Leveling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 93
Selecting Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 95
Adding Leveling Priorities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 96
Analyzing the Leveled Project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 98
Viewing the Leveling Log . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 99
Leveling Based on Activity Priority . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100
Leveling Based on Project Priority . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 103
Resource Management in Primavera P6 Rel. 6.2
iii
Course Contents
Lesson 8:
Storing Period Performance
109
Past Period Actuals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 110
Viewing Financial Periods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 111
Selecting Financial Periods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 112
Displaying Financial Periods in Columns . . . . . . . . . . . . . . . . . . . . . . . . 113
Storing Past Period Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 114
Editing Past Period Actual Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 116
Lesson 9:
Resource Reporting
119
Methods for Reporting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 120
Reports Window . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 121
Running an Existing Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 122
Run Report Dialog Box . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 123
Print Preview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 124
Report Wizard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 126
Create or Modify Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 127
Select Subject Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 127
Select Additional Subject Areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 128
Configure Columns . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 129
Changing Colors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 130
Adding a Report Title . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 131
Generating the Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 132
Print Preview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 133
Saving a Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 134
Assigning a Report to a Report Group . . . . . . . . . . . . . . . . . . . . . . . . . 135
Creating a Report Using the Current Layout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 136
Case Study 2: Resolving Overallocation
iv
141
Resource Management in Primavera P6 Rel. 6.2
Course Contents
Appendix A:
Settings for Computing Activity and Resource Data
143
Unlinking Budgeted, At Completion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 144
Driving vs. Non-Driving Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 147
Driving Resource Assignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 148
Non-Driving Resource Assignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . 149
Appendix B:
Creating Calendars
153
Calendars . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 154
Calendar Types . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 154
Worktime Types . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 155
Calendar Coding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 155
Global Calendars . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 156
Viewing a Global Calendar . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 157
Adding a Project Calendar . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 158
Linking Holidays Calendar, Setting Workweek . . . . . . . . . . . . . . . . . . . . 159
Setting Nonworktime . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 160
Setting Exceptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 161
Appendix C:
Assigning Resources and Costs
163
Assigning by Role . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 164
Assigning By Role to Multiple Activities . . . . . . . . . . . . . . . . . . . . . . . . . 166
Assigning Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 167
Assigning Resource to Level of Effort Activity . . . . . . . . . . . . . . . . . . . . 167
Assigning a Nonlabor Resource . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 168
Adjusting Resources Budgeted Units/Time . . . . . . . . . . . . . . . . . . . . . . 169
Designating a Primary Resource . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 170
Assigning a Material Resource . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 171
Resource Management in Primavera P6 Rel. 6.2
Course Contents
vi
Resource Management in Primavera P6 Rel. 6.2
Course Objectives
Resource Management in Primavera P6 Rel. 6.2 will cover the following topics:
Creating Resources and Roles
Describe resources and roles
Describe resource security
View the Resources window
Create a resource via New Resource wizard
View Resource Details
Assign resource codes
Define resource rates
Create a role
Add information in Roles dialog box
View the Resources window
Assigning Cost Accounts
Assign cost accounts to resource assignments
Assign cost accounts to expenses
Resource and Role Analysis
Analyze resource usage using Resource Usage Profile
Analyze resource usage using Resource Usage Spreadsheet
Compare staffed vs. unstaffed role allocation
Case Study 1: Assigning and Analyzing
Resource Assignments Window
Identify sections in the Resource Assignments window
Use the Resource Assignments window to view and edit resource allocation
Select data to display in the Resource Usage Spreadsheet
Manual Resource Allocation
Assign resource lag and duration to resource assignments
View and assign resource curves to manually spread allocation
Bucket Planning
View future period bucket planning
Edit future period buckets for a resource assignment
Track manual curves in the project
2009 All rights reserved. No part of this publication may be reproduced without prior written permission of Primavera Systems Inc.
Course Objectives (continued)
Leveling Resources
Define resource leveling
Set resource leveling options
Level a project to resolve resource conflicts
Analyze the effects of resource leveling
Level based on activity and project priorities
Storing Period Performance
Display financial periods as columns
Store past period performance
Resource Reporting
Describe reporting methods
Run a resource report
Create a resource report with the Report wizard
Create a report using the current layout
Case Study 2: Resolving Overallocation
2009 All rights reserved. No part of this publication may be reproduced without prior written permission of Primavera Systems Inc.