1.0 INTRODUCTION
The Material Control and Handling Procedure form an integrated part of the Contractor
Quality Management System. The development of this procedure is in line with the Contractor
processes management and the requirement in ISO 9001:2000 Standard.
This procedure is applicable for all materials and equipment that shall be used for the
construction and installation activity that are controlled by the Contractor.
2.0 OBJECTIVES
The objective of this procedure is to provide a guideline and methodology as well as
determine the responsibility of the Contractor personnel including Material Control
Coordinator, Storekeeper and Inspectors in ensuring that all materials or equipment received
are properly stored, monitored, and controlled for easy traceability for both categories of
supplies (Owner and Contractor materials).
3.0 DESCRIPTION
3.1 GENERAL
The material handling process starts with the receiving of the purchase orders and other
supporting documentation from the Procurement for Contractor materials and for Owner
supplied materials, the material handling process starts from the receipt of material at site
including inspection as stipulated on contract document.
3.2 Material Receiving (For Contractor Supplied)
The Material Control Coordinator and/or the Storekeeper are responsible for the receiving of
the materials at the work site. They are also required to make a necessary arrangement for
the receiving, storage, handling and preservation prior to the receiving of the material. Upon
arrival at site / store, the material shall be checked against the supporting documents (P.O,
D.O, Certificates, and Data Sheets, etc.) to ensure that there is no discrepancies in quality
and quantities. The Material Control Coordinator / Storekeeper shall prepare Material
Receiving Report (MRR) and forward to Discipline Inspector for further inspection.
The MRR shall be signed by relevant personnel upon completion of all inspection.
Subsequently if the material is satisfactory, Request for Inspection (RFI) shall be forwarded to
the Owner for their inspection, if required, and if is found acceptable then the same is allowed
for use.
GENERAL PROCEDURE
MATERIAL HANDLING CONTROL
PROCEDURE
Rev. 0
Date: 11/07/2009
In both inspections (internal or with the Owner), if the material was found not in compliance to any
of the requirement, the finding shall be recorded by the Inspector in the Material Discrepancy
Report (MDR) and immediately communicate the issue to the Contractor Project Manager and
Procurement for further action.
The Material Control Coordinator / Store Keeper shall update the Material Status Inventory Report
as
necessary
with
the
accepted
material
information.
The
Material
Control
Coordinator/Storekeeper shall then prepare a Material Delivery Advice and forward it to the
Procurement Department in the Head Office.
3.3.1
3.3.2
The Material Control Coordinator and / or Store Keeper are responsible for
the receiving of the free issue
site. They are also required to make a necessary arrangement for the
receiving, storage and preservation prior to the delivery of materials.
3.3.3
GENERAL PROCEDURE
MATERIAL HANDLING CONTROL
PROCEDURE
3.3.4
Rev. 0
Date: 11/07/2009
Upon completion of all the above, the following activities shall be carried out:
a) The Owner`s Representative and Contractor`s Representative
(discipline inspector together with Material Control Coordinator) shall
jointly inspect all materials, equipment, etc. thoroughly with the use of
necessary tools, equipment, etc. item by item against the data sheet,
drawing, design calculation, etc. to ensure there are no discrepancies
in quality. The Contractor`s Representative shall prepare Material
Inspection Report (MIR) and shall be signed by both parties (Owner /
Contractor Representative).
b) During inspection the following shall be followed:
If the materials are acceptable but with minor discrepancies and not
required any rectification/replacement shall be
recorded in the
That material that is not acceptable and not possible to rectify shall be
rejected. In such case the same shall be brought to the attention of
Owner`s and Contractor`s Project Manager with supporting documents
evidence for their further action to procure or replace the materials.
GENERAL PROCEDURE
MATERIAL HANDLING CONTROL
PROCEDURE
Rev. 0
Date: 11/07/2009
Specific item number. (The item number if not specified by any support
documents shall be the one that is established by the Material Control
Coordinator/Storekeeper. Accept (Green), Reject (Red) or On hold
(Yellow) marking or segregation shall be marked or tagged accordingly
after the inspection as an evidence for inspection status. A color system
as mentioned above has been established and shall be made known to all
related personnel. A copy of the above color code shall be displayed
prominently at all work places.
GENERAL PROCEDURE
MATERIAL HANDLING CONTROL
PROCEDURE
Rev. 0
Date: 11/07/2009
GENERAL PROCEDURE
MATERIAL HANDLING CONTROL
PROCEDURE
Rev. 0
Date: 11/07/2009
At the end of the project all the Material Status Reports will be reviewed and physical
verification will be carried out to determine consumption and / or surplus material status.
Material Status Report will be prepared to record remaining materials at site. The Project
Manager must obtain approval from the General Manager (Commercial) for the disposition of
the saleable surplus material. Disposition of scrap material is under the jurisdiction of Project
Manager.
3.7.1
GENERAL PROCEDURE
MATERIAL HANDLING CONTROL
PROCEDURE
Rev. 0
Date: 11/07/2009