4 Study of Small Scale LNG Carrier
4 Study of Small Scale LNG Carrier
4 Study of Small Scale LNG Carrier
July 2014
Principal Design Project of Small Scale LNG Carrier/bunkering
ship with DF Engine, CAJS
Presented by
Mr. Kei Tanaka, CEng. CMarEng. FIMarEST
Project Manager
( General Manager, Daihatsu Diesel Mfg. Co., Ltd. )
1. Member of Study
Principal Design Project of Small Scale LNG
Carrier / Bunkering Ship with DF Engine
Project Member
The Cooperative Association of Japan Shipbuilders
Association
Shipping
Shipbuilding
Shipbuilding
Tank Plant
Engine
Class
Background
Target
Economical Issue
Natural
Gas
Transport
Oil
Price
Increase
of the
natural
gas use
NOx
SOx
GHG
Environmental Issue
Coastal
LNG Carrier
LNG
Bunkering
Ship
GAS
Fuelled
Ship
Gas Fuelled
Ship
LNG User
LNG Bunkering
Ship
Only 1
Gas Fuelled
Ships
About 50
Gas fuelled
Electrical Propulsion
Requirement of LNG
Bunkering
Base Plan
Type of Ship : LNG Carrier /Bunkering Ship
Operation Route : Tokyo Bay Hokkaido for LNG Transport
Speed
: 13.0kt
Main Engine for Alternator : Natural Gas Use
Cargo Tank : IMO Type C Independent Tank
Capacity
: 3,500m3
Gas only
Maneuverability
No. of Propeller : 2
Given by Propulsion Efficiency
& Redundant propulsion
FPP
Fixed Pitched Propeller
with Inverter
High Cost
Reduction Gear
CPP
Controllable Pitched Propeller
MSB
Starter
CPP
M
Electrical Motor
Alternator
Engine
3.3 Performance
Hull Form
Twin-Skeg
Normal Rating
at 13.0kt
BHP : 1,695kWe
Maximum Continuous Rating
BHP : 1,995kWe
Performance Curve
NOR
Condition
Departure
& Arrival
Condition
1,781
1,514
534
1,995
1,695
599
235
235
735
160
315
514
2,230
1,930
1,334
160
315
514
74%
85%
59%
21%
42%
68%
Port
Cargo
Cargo
Condition Loading Unloading
Alternator Output
>757kW
Case 2
Case 3
Natural Gas is
supplied by
No
Yes
Yes
No
No
Yes
(For BOG of LNG
Cargo Tank)
Gas
Compressor
Yes
No
Vaporizer
Main
Re-liquefaction
Plant
Result
System is Complicated
& Expensive.
LNG Fuel is supplied From LNG Cargo Tank to LNG Fuel Tank
No re-liquefaction plant
Boil off gas of LNG Cargo Tank is used as Fuel
gas
Tank Connection
Space
Vaporizer
Hoseguide
Drip Tray
ERC
Water Curtain
Drip Tray
LNG Transfer
Hose
Bunkering
Ship
Fender
Gas-fuelled
Ship
LNG Carrier /
Bunkering Ship
Gross
Tonnage
Ab 5,200ton
Loa
107.80 m
Lpp
101.40 m
17.20 m
7.80 m
Ab 4.60m
DW
Ab 2,650 ton
Speed
13.0 knots
(85%NOR)
Cargo
Tank
Volume
3,500 m3
General Arrangement
CPP
Propulsion System
Main Generator
Engine
Alternator
Propulsion Motor
Reduction Gear
2 sets
Propeller
Main
Switch
Board
LNG
Alternator
Propulsion Motor
& Reduction Gear
Capacity
38 m3
No.
1 set
10 bar g
-163
Materials
Ab 500Nm3/h MCR
5 40
50kg/h
LNG Vaporizer
500kg/h
Capacity
Ab 3,500m3
No.
2 sets1,750m3 x 2 sets
7.0 bar g
Minimum Design
Temperature
-163
Materials
Nickel Steel
Ab 3 Hours (1,200m3/h)
Ab 3 Hours (1,200m3/h)
Other Equipment
Hose Handling
Crane
Hose Guide
Cargo Handling
Manifold
Dual Fuel
Engine
LNG
Cargo Tank
LNG
Fuel Tank
LNG Fuel
Compressor Room
LNG Fuel
Tank Space
Tank Connection
Space
MDO Tank (P/S)
To LNG Fuel
Compressor Room
Tank Connection
Space
Gas Heater/Cooler
LNG Vaporizer
CPP
Propeller
Electrical Switch
Board for Cargo
Reduction
Gear
MSB
Propulsion
Motor
Gas Supply
Unit
Dual Fuel
Engines
Conclusion