UNIVERSITY OF PUNE
[4364]-414
B. E. (Civil) Examination - 2013
QUANTITY SURVEYING CONTRACTS & TENDERS
(41009) (2008 Course)
[Time: 4 Hours]
Instructio
ns:
1 Answers to the two sections should be written in separate
answer-books.
2 Black figures to the right indicate full marks.
3 Your answer will be valued as a whole
4 Neat diagrams must be drawn wherever necessary.
5 Use of logarithmic tables, slide rule, Mollier charts, electronic
pocket calculator and steam tables is allowed.
6 Assume suitable data, if necessary.
7 Answer any three questions from Section I and any three
questions from Section II
SECTION -I
Q.1
[4]
[6]
i)
ii)
external)
Brick masonry in superstructure for main walls
and partition walls
[6]
[4]
[3]
ii)
R.C.C. in tooting
[3]
[3]
[3]
Page 2 of 7
V) R.C.C. in beam
[3]
[3]
Figure 1(a)
Figure 1(b)
OR
Q. 4
[2]
ii)
[3]
Page 3 of 7
Q. 5
[3]
[3]
v)
[3]
[4]
A) Determine the rate per unit for the item of U.C.R. masonry
in C.M.C(1:6) in superstructure. use following rates for
materials and labour, also assume any other data if
necessary stating it clearly
[6]
[6]
ii)
Q. 6
[6]
[4]
SECTION II
Q. 7
A) A construction equipment is purchased for Rs 160,000/Knowing that the salvage value is Rs 20,000/- at the end of
5 years calculate book value of the equipment at the end of
each year using constant percentages method of
depreciation.
[8]
[6]
i)
ii)
iii)
Sinking Fund
Depreciation and
Leasehold property
[4]
OR
Q. 8
[10]
[4]
Figure 2(a)
Figure 2(b)
Q. 9
[6]
[6]
[4]
Page 6 of 7
OR
Q. 10
[6]
B) Write note on
[6]
i)
ii)
Q.11
pre-bid conference
method of inviting tenders
[4]
[4]
[6]
[6]
OR
Q. 12
Page 7 of 7
[4]