Final Report FS PLTU Sumbawa - EN For Web PDF
Final Report FS PLTU Sumbawa - EN For Web PDF
PLN (Persero)
PUSAT ENJINIRING KETENAGALISTRIKAN
Jln. Aipda K.S Tubun I/2 Jakarta
Phone. 021-563842 - 44. Fax. 021-5638661, 5638658
FINAL REPORT
FEASIBILITY STUDY PLTU SUMBAWA
(2X10 MW) NETTO
Revisi:0
PREAMBLE
Feasibility Study Final Report Sumbawa power plant (2x10 MW) Net is a report that
must be submitted in accordance with the Consultant Contract No.
023.PJ/613/PUSENLIS/2013 and 314/GE/DIRUT/VI/2013 between PT. PLN (Persero),
Electricity Engineering Center with PT.Gamma Epsilon.
This final report includes the analysis of requirement electricity, coal supply studies,
design concept generation, environmental aspects, risk assessment, project
implementation schedule, the draft budget, financial analysts and recommendations on
the feasibility study of the project.
Ercham Wahyudi
Director of Operational & Technical
TABEL OF CONTENTS
Preamble .............................................................................................................................. i
Table of Contents ................................................................................................................ ii
List of Tables ..................................................................................................................... viii
List of Figures ...................................................................................................................... x
CHAPTER I INTRODUCTION
Final Report | I - ii
Feasibility Study CFSPP Sumbawa (2 x 10 MW) Netto
PT PLN (Persero)
PUSAT ENJINIRING KETENAGALISTRIKAN
Jl. Aipda KS. Tubun 1 No. 2 Petamburan Jakarta 11420