Final Report FS PLTU Sumbawa - EN For Web PDF

This document is the final report of a feasibility study for a proposed 2x10 MW coal-fired power plant in Sumbawa, Indonesia. It was prepared by PT. Gamma Epsilon for PT. PLN (Persero) Electricity Engineering Center. The report includes analyses of electrical requirements, fuel supply options, environmental aspects, project schedule, budget, finances, and risks. It also evaluates the potential advantages of the power plant for economic growth in Indonesia. The power plant is proposed to be located in Sumbawa to help meet the region's increasing electricity demand. Coal was selected as the fuel based on availability from local mines.

Uploaded by

bodongadam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
781 views4 pages

Final Report FS PLTU Sumbawa - EN For Web PDF

This document is the final report of a feasibility study for a proposed 2x10 MW coal-fired power plant in Sumbawa, Indonesia. It was prepared by PT. Gamma Epsilon for PT. PLN (Persero) Electricity Engineering Center. The report includes analyses of electrical requirements, fuel supply options, environmental aspects, project schedule, budget, finances, and risks. It also evaluates the potential advantages of the power plant for economic growth in Indonesia. The power plant is proposed to be located in Sumbawa to help meet the region's increasing electricity demand. Coal was selected as the fuel based on availability from local mines.

Uploaded by

bodongadam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

PT.

PLN (Persero)
PUSAT ENJINIRING KETENAGALISTRIKAN
Jln. Aipda K.S Tubun I/2 Jakarta
Phone. 021-563842 - 44. Fax. 021-5638661, 5638658

FINAL REPORT
FEASIBILITY STUDY PLTU SUMBAWA
(2X10 MW) NETTO

Revisi:0

PT. GAMMA EPSILON


Jln. Terusan Babakan Jeruk 124
Bandung - 40164
Ph. 022-2004899 | Fax. 022-2014978
www.gammaepsilon-77.com | [email protected]
PT PLN (Persero)
PUSAT ENJINIRING KETENAGALISTRIKAN
Jl. Aipda KS. Tubun 1 No. 2 Petamburan Jakarta 11420

PREAMBLE

Feasibility Study Final Report Sumbawa power plant (2x10 MW) Net is a report that
must be submitted in accordance with the Consultant Contract No.
023.PJ/613/PUSENLIS/2013 and 314/GE/DIRUT/VI/2013 between PT. PLN (Persero),
Electricity Engineering Center with PT.Gamma Epsilon.

This final report includes the analysis of requirement electricity, coal supply studies,
design concept generation, environmental aspects, risk assessment, project
implementation schedule, the draft budget, financial analysts and recommendations on
the feasibility study of the project.

Thank you for your attention and cooperation.

Bandung, 24 September 2013


PT. Gamma Epsilon

Ercham Wahyudi
Director of Operational & Technical

Final Report |I-i


Feasibility Study CFSPP Sumbawa (2 x 10 MW) Netto
PT PLN (Persero)
PUSAT ENJINIRING KETENAGALISTRIKAN
Jl. Aipda KS. Tubun 1 No. 2 Petamburan Jakarta 11420

TABEL OF CONTENTS

Preamble .............................................................................................................................. i
Table of Contents ................................................................................................................ ii
List of Tables ..................................................................................................................... viii
List of Figures ...................................................................................................................... x

CHAPTER I INTRODUCTION

1.1 Background ................................................................................................... I-1


1.2 Aim Of Feasibility Study of Sumbawa Coal Fired Power Plant
(2 x 10 MW) I-2...........................................................................................I-1
1.3 Plant Location ............................................................................................... I-2
1.3.1 Sumbawa Coal Fired Power Plant ....................................................... I-2
1.3.2 Region Overview .................................................................................. I-3
1.4 Scope of Work............................................................................................... I-4
1.4.1 Studies ................................................................................................. I-4
1.4.2 Basic Design ........................................................................................ I-5
1.4.3 Cost Estimation .................................................................................... I-7
1.4.4 Project Implementation Schedule ........................................................ I-8
1.4.5 Financial Analysis ................................................................................ I-8
1.4.6 Risk Analysis ........................................................................................ I-9
1.4.7 Discussion of The Advantage of Coal Fired Power Plant
Construction for PLN, Local Government and Economic Growth in
Indonesia .............................................................................................. I-9

CHAPTER II ELECTRICAL STUDY

2.1 Introduction .................................................................................................. II-1


2.2 Electrical Current Conditions........................................................................ II-2
2.2.1 Install Capacity and Power Capable ................................................ II-2
2.2.2 Load System .................................................................................... II-2
2.2.3 Operating Voltage ............................................................................ II-2
2.2.4 Charging Network & Transformer ..................................................... II-3
2.3 Project Plan and Forecast ............................................................................ II-3
2.3.1 Demand Forecast ............................................................................. II-3
2.3.2 Balance of Power ........................................................................... II-10
2.3.3 Development of Substation ............................................................ II-12
2.3.4 Development of Transmission........................................................ II-12

Final Report | I - ii
Feasibility Study CFSPP Sumbawa (2 x 10 MW) Netto
PT PLN (Persero)
PUSAT ENJINIRING KETENAGALISTRIKAN
Jl. Aipda KS. Tubun 1 No. 2 Petamburan Jakarta 11420

2.4 Electrical System Sumbawa....................................................................... II-14


2.4.1 Load Flow Analysis ........................................................................ II-15
2.4.2 Short Circuit Study ......................................................................... II-15
2.4.3 Stability Analysis ............................................................................ II-15

CHAPTER III FIELD INVESTIGATION REVIEW


3.1 Batimetrical and Geological Topography .................................................... III-1
3.1.1 Topography ................................................................................... III-1
3.1.2 Geology ........................................................................................... III-3
3.1.3 Entrance Access ............................................................................. III-4
3.2 Regional Geology........................................................................................ III-5
3.2.1 Amplification Factor ......................................................................... III-5
3.2.2 Predominant Period......................................................................... III-5
3.2.3 Peak Ground (Vibration) Acceleration (PGA) .................................. III-7
3.2.4 Seismic History.............................................................................. III-10
3.2.5 Seismic Activity ............................................................................. III-10
3.2.6 Peak Ground Acceleration (PGA) in Bed Rocks ........................... III-14
3.2.7 Geomorphologi .............................................................................. III-15
3.2.8 Geotechnical and Support Application .......................................... III-16
3.2.9 Recommendation for Foundation .................................................. III-25
3.3 Hidrology dan Hidrometric......................................................................... III-25
3.3.1 Climatologi of Project Site ............................................................. III-25
3.3.1.1 Wind Speed ....................................................................... III-25
3.3.1.2 Temperature ..................................................................... III-27
3.3.1.3 Sunlight Duration ............................................................... III-27
3.3.1.4 Relative Humidity .............................................................. III-28
3.3.1.5 Rain Downpour.................................................................. III-28
3.3.1.6 Sediment Analysis ............................................................. III-32
3.3.2 Taking Seawater Sample .............................................................. III-33

CHAPTER IV THE STUDY OF FUEL SUPPLY


4.1 Types of Fuel ............................................................................................. IV-1
4.2 Selection of Fuel ........................................................................................ IV-4
4.3 The Source of Coal Fuel ............................................................................ IV-8
4.4 The Coal Transportation .......................................................................... VI-16
4.5 The Analyze of Coal Characteristic .......................................................... IV-17

Final Report | I - iii


Feasibility Study CFSPP Sumbawa (2 x 10 MW) Netto